SIC Methodology
www.optimumfx.com
What is SIC? A little story…
Aiming for a target
• Sailing with the island as the target
• This journey would normally take 4 days
Checking performance once the 4 day period has
passed
• Captain checks location after 4 days
• Necessary corrections are made
Day-1
Day-2
Day-3
Day-4Day-5&6
(lost)
Checking performance after each day
• Captain checks location after each day
• Necessary corrections are made daily
Partially
day-5
(lost)
Day-1
Day-2
Day-3
Day-4
Checking performance continuously
• Captain checks location every half an hour
• Necessary corrections are made continuously
On
time
Day-1
Day-2
Day-3
Day-4
What are the key goals of SIC?
• Short Interval Control (SIC) is:
 a structured process for identifying and acting on opportunities to improve
the effectiveness and efficiency of production
 a factory-floor process that engages team members to review performance
data on a regular basis to focus their efforts to improve performance
By using SIC problems can be identified and
action taken before they become big problems
• Frequent measurement prevents small problems from becoming
big ones.
Sizeofproblem
Measurement Interval
Day 1 Day 2 Day 3 Day 4 Day 5
As in the case of sail boat (see below x-axis), SIC is a tool of reacting timely to avoid problems
becoming big problems…effectively controlling the process inputs in order to avoid problems all
together (next slide)
SIC is controlling process X´s (inputs) in order to
control Y’s (output)
OutputsInputs
Process
X1
X2
X3
X4
Y1
Y2
Y3
Customer
Yield/scrap
Overtime
Measuring the process metrics (leading) rather than the Ys (lagging) in SIC gives the
opportunity to ACT instead of REACT!!
e.g. number of
customer calls received
e.g. % of calls resolved
on phone
1. Customer
Satisfaction
2. Costs of customer
service
The key principles of SIC
1. Review achieved results
2. Plan next activities
3. Implement planned actions
Last
SIC
Now
Next
SIC
1. Look Back
Review previous losses
Assess previous actions
2. Look Forward
Identify next risks
Decide next actions
3. Implement Actions
Maximise production
The key benefits of implementing SIC
• Increased OEE (by focusing on immediate and relevant losses within the
shift)
• Increased effectiveness (by utilizing high-quality data at its source to drive
decision making)
• High speed of improvement (localized focus increases the speed of
improvements)
• Improved employee engagement (teams gain significant control over how
the line is run)
The key steps to implement SIC on site
Identify target
measurement
unit
Verify data
accuracy &
quality
Create
tracking
process &
define
optimal
control
frequency
Train team
and structure
review
meetings
Sustain
progress
through
audits
Manual vs. Automatic Data Collection
Manual
Low cost required
Quick implementation time
Quick visual results between
data collection and
performance improvement
Automatic
Accuracy of data collection
Small stops and slow cycle
tracking
Less movements and
paperwork
Real-time data and quick
reaction
How does SIC fit into the management routines
process?
SIC
SIC
SIC SIC
24H Review
Weekly Strategic
Meeting
Shift Handover Shift Handover
Shift Handover

More Related Content

What's hot

Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Romains Bos, PMP, MBA
 
Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DiveTKMG, Inc.
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results TKMG, Inc.
 
Rapid Improvement: How to Change Behaviors & Get Stuff Done FAST
Rapid Improvement: How to Change Behaviors & Get Stuff Done FASTRapid Improvement: How to Change Behaviors & Get Stuff Done FAST
Rapid Improvement: How to Change Behaviors & Get Stuff Done FASTTKMG, Inc.
 
Toyota operational leadership structure
Toyota operational leadership structureToyota operational leadership structure
Toyota operational leadership structureLeanLeadership
 
Mastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationMastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationAmanda Gilmore
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 

What's hot (20)

Gemba Walk 02.04.19
Gemba Walk 02.04.19Gemba Walk 02.04.19
Gemba Walk 02.04.19
 
Line Crew Optimisation Methodology
Line Crew Optimisation MethodologyLine Crew Optimisation Methodology
Line Crew Optimisation Methodology
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 
Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep Dive
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Dmaic
DmaicDmaic
Dmaic
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Lean principles
Lean principlesLean principles
Lean principles
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
 
Rapid Improvement: How to Change Behaviors & Get Stuff Done FAST
Rapid Improvement: How to Change Behaviors & Get Stuff Done FASTRapid Improvement: How to Change Behaviors & Get Stuff Done FAST
Rapid Improvement: How to Change Behaviors & Get Stuff Done FAST
 
Toyota operational leadership structure
Toyota operational leadership structureToyota operational leadership structure
Toyota operational leadership structure
 
Dmaic
DmaicDmaic
Dmaic
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Mastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationMastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean Transformation
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 

Similar to SIC (Short Interval Control) Methodology

Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
Practical Application of Agile Techniques in Developing Safety Related Systems
Practical Application of Agile Techniques in Developing Safety Related SystemsPractical Application of Agile Techniques in Developing Safety Related Systems
Practical Application of Agile Techniques in Developing Safety Related SystemsAdaCore
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptxMimmaafrin1
 
The KAIZEN method.pptx
The KAIZEN method.pptxThe KAIZEN method.pptx
The KAIZEN method.pptxJorge Alvarez
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaEnergySec
 
KPI Team Journey
KPI Team JourneyKPI Team Journey
KPI Team JourneyQuEST Forum
 
Develop a Defect Prevention Strategy—or Else!
Develop a Defect Prevention Strategy—or Else!Develop a Defect Prevention Strategy—or Else!
Develop a Defect Prevention Strategy—or Else!TechWell
 
Principles of Lean Maintenance
Principles of Lean Maintenance Principles of Lean Maintenance
Principles of Lean Maintenance PlantEngineering
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato
 
Conducting a Kaizen.pdf
Conducting a Kaizen.pdfConducting a Kaizen.pdf
Conducting a Kaizen.pdfVijay Khonde
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3dVarmahk
 
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionAvoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionSafetyChain Software
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptxminhajulislam90
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringPernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringGlobal Business Events
 
Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Balaji Muniraja
 

Similar to SIC (Short Interval Control) Methodology (20)

Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
Practical Application of Agile Techniques in Developing Safety Related Systems
Practical Application of Agile Techniques in Developing Safety Related SystemsPractical Application of Agile Techniques in Developing Safety Related Systems
Practical Application of Agile Techniques in Developing Safety Related Systems
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx
 
The KAIZEN method.pptx
The KAIZEN method.pptxThe KAIZEN method.pptx
The KAIZEN method.pptx
 
Structured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six SigmaStructured NERC CIP Process Improvement Using Six Sigma
Structured NERC CIP Process Improvement Using Six Sigma
 
KPI Team Journey
KPI Team JourneyKPI Team Journey
KPI Team Journey
 
Itil process framework__rowe(40)
Itil process framework__rowe(40)Itil process framework__rowe(40)
Itil process framework__rowe(40)
 
Develop a Defect Prevention Strategy—or Else!
Develop a Defect Prevention Strategy—or Else!Develop a Defect Prevention Strategy—or Else!
Develop a Defect Prevention Strategy—or Else!
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Principles of Lean Maintenance
Principles of Lean Maintenance Principles of Lean Maintenance
Principles of Lean Maintenance
 
Effective Scrum
Effective ScrumEffective Scrum
Effective Scrum
 
WO presentation
WO presentationWO presentation
WO presentation
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt Reporting
 
Conducting a Kaizen.pdf
Conducting a Kaizen.pdfConducting a Kaizen.pdf
Conducting a Kaizen.pdf
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionAvoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringPernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global Offshoring
 
Visualisation&agile practices ai2014
Visualisation&agile practices ai2014Visualisation&agile practices ai2014
Visualisation&agile practices ai2014
 

More from LineView Academy (was OFX Academy)

More from LineView Academy (was OFX Academy) (20)

Giving and receiving feedback - the methodology
Giving and receiving feedback - the methodologyGiving and receiving feedback - the methodology
Giving and receiving feedback - the methodology
 
RACI Methodology
RACI MethodologyRACI Methodology
RACI Methodology
 
Actionable information 3
Actionable information 3Actionable information 3
Actionable information 3
 
Actionable information 2
Actionable information 2Actionable information 2
Actionable information 2
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
 
SERVE model
SERVE modelSERVE model
SERVE model
 
Paradigm thinking
Paradigm thinkingParadigm thinking
Paradigm thinking
 
Neurological levels
Neurological levelsNeurological levels
Neurological levels
 
Living in the present
Living in the presentLiving in the present
Living in the present
 
Helicopter leadership
Helicopter leadershipHelicopter leadership
Helicopter leadership
 
Evolving consciousness
Evolving consciousnessEvolving consciousness
Evolving consciousness
 
AADACM - Changing habits
AADACM - Changing habitsAADACM - Changing habits
AADACM - Changing habits
 
Creating a high five team
Creating a high five teamCreating a high five team
Creating a high five team
 
Situaltional leadership
Situaltional leadershipSitualtional leadership
Situaltional leadership
 
Performance management
Performance managementPerformance management
Performance management
 
Developing a sustainable CI culture
Developing a sustainable CI cultureDeveloping a sustainable CI culture
Developing a sustainable CI culture
 
Meeting auditing skills
Meeting auditing skillsMeeting auditing skills
Meeting auditing skills
 
Auditing meetings
Auditing meetingsAuditing meetings
Auditing meetings
 
Aces in Places
Aces in PlacesAces in Places
Aces in Places
 
SOP example
SOP exampleSOP example
SOP example
 

Recently uploaded

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhiguptaswati8536
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 

Recently uploaded (15)

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 

SIC (Short Interval Control) Methodology

  • 2. What is SIC? A little story… Aiming for a target • Sailing with the island as the target • This journey would normally take 4 days
  • 3. Checking performance once the 4 day period has passed • Captain checks location after 4 days • Necessary corrections are made Day-1 Day-2 Day-3 Day-4Day-5&6 (lost)
  • 4. Checking performance after each day • Captain checks location after each day • Necessary corrections are made daily Partially day-5 (lost) Day-1 Day-2 Day-3 Day-4
  • 5. Checking performance continuously • Captain checks location every half an hour • Necessary corrections are made continuously On time Day-1 Day-2 Day-3 Day-4
  • 6. What are the key goals of SIC? • Short Interval Control (SIC) is:  a structured process for identifying and acting on opportunities to improve the effectiveness and efficiency of production  a factory-floor process that engages team members to review performance data on a regular basis to focus their efforts to improve performance
  • 7. By using SIC problems can be identified and action taken before they become big problems • Frequent measurement prevents small problems from becoming big ones. Sizeofproblem Measurement Interval Day 1 Day 2 Day 3 Day 4 Day 5 As in the case of sail boat (see below x-axis), SIC is a tool of reacting timely to avoid problems becoming big problems…effectively controlling the process inputs in order to avoid problems all together (next slide)
  • 8. SIC is controlling process X´s (inputs) in order to control Y’s (output) OutputsInputs Process X1 X2 X3 X4 Y1 Y2 Y3 Customer Yield/scrap Overtime Measuring the process metrics (leading) rather than the Ys (lagging) in SIC gives the opportunity to ACT instead of REACT!! e.g. number of customer calls received e.g. % of calls resolved on phone 1. Customer Satisfaction 2. Costs of customer service
  • 9. The key principles of SIC 1. Review achieved results 2. Plan next activities 3. Implement planned actions Last SIC Now Next SIC 1. Look Back Review previous losses Assess previous actions 2. Look Forward Identify next risks Decide next actions 3. Implement Actions Maximise production
  • 10. The key benefits of implementing SIC • Increased OEE (by focusing on immediate and relevant losses within the shift) • Increased effectiveness (by utilizing high-quality data at its source to drive decision making) • High speed of improvement (localized focus increases the speed of improvements) • Improved employee engagement (teams gain significant control over how the line is run)
  • 11. The key steps to implement SIC on site Identify target measurement unit Verify data accuracy & quality Create tracking process & define optimal control frequency Train team and structure review meetings Sustain progress through audits
  • 12. Manual vs. Automatic Data Collection Manual Low cost required Quick implementation time Quick visual results between data collection and performance improvement Automatic Accuracy of data collection Small stops and slow cycle tracking Less movements and paperwork Real-time data and quick reaction
  • 13. How does SIC fit into the management routines process? SIC SIC SIC SIC 24H Review Weekly Strategic Meeting Shift Handover Shift Handover Shift Handover