Result 1 Legislation, Policy and Institutional strengthening
Activities streams Project Outcomes
Active National Policy Dialogue
process
National Policy Dialogue revived and it has become an established
platform with strong political ownership
1-2 NPD Steering Committee meetings a year
Implementation of relevant legal
provisions of the EU AA
Status of harmonization of WFD principles in the Ukrainian water
legislation is in accordance with AA commitments
Legislative acts drafted and subject to adoption by respective
Governmental body (in 2017 – ministerial orders on methodology of
classification of surface water and groundwater bodies)
Water Policy Paper
The conceptual vision for the water sector reform developed
Water Policy Paper
National Water Strategy
Water strategy developed along with the conceptual vision of the Policy
Paper for the water sector reform. A strategic water policy framework
fully reflects and supports implementation of the reform and meeting
the commitments taken by Ukraine under the Association Agreement.
National Water Strategy
Revision of the 2011 national targets
to the Protocol on Water and Health
National targets revised and formally adopted together with the
implementation plan. Ukraine is complying with its obligations under
the Protocol
Support to implementation of the
Dniester treaty
Regular bilateral technical meetings organised with Moldovan
counterparts, in coordination with the GEF project.
Ukraine and Moldova have a set of agreed actions on the Dniester.
Result 2 Laboratory and Monitoring programme strengthening
Activities streams Project Outcomes
Assessment
• Needs in terms of equipment, infrastructure, trainings towards WFD
compliant laboratory(ies), QM/accreditation and GW and SW
monitoring identified
• training plan developed
Contract document preparation
• Decision on purchase or upgrade of equipment, infrastructure,
consumables taken
• Technical specifications for procurement agreed
• Tender documentation drafted
Procurement
• Tender published in official journal of European Commission,
Q4/2017
• Procurement process Q1-Q2/2018
Delivery and installation
• Delivery, installation and training on new equipment
• Delivery envisaged end of Q2/2018
Surveys and Training
• Training plan for the laboratories to be decided (2018 onwards)
• Hands-on trainings and training documentation
• Surveys to practice good use carried out (2018 onwards)
Hydrographic districts in Ukraine
Pilot Basins for
RBMP Development
and upscaling based
on EU water
directives
Transboundary harmonisation of RBMP
Sub-basin of Prypiat
Sub-basin of Desna
Sub-basin of Middle Dnieper
Sub-basin of the
Seversky Donets
Sub-basin of Lower Dnieper
River basin district of the
Southern Bug
Sub-basin of
Lower Dniester
Sub-basin of
Prut and Siret
Sub-basin of
Tysa
Sub-basin of Upper Dnieper
Sub-basin of the
Western Bug
River of Azov
River basin district of the Crimea
River basin district of
the Black Sea
Sub-basin of
Lower Danube
1. Sub-basin of San
2. Sub-basin of Lower Don
Result 2 RBMP development
Activities streams Project Outcomes
Dnieper Water Resource Strategy
• Support the development of Dnieper River Basin Management
Scheme in line with the WFD
Delineation and typology
• Reviewed / revised GWB delineation.
• Re-delineation of SWBs due to shift to WFD system B,
• SW Typology reviewed / revised.
• Revised guidelines to support further national implementation.
Pressures and Impact assessment
• Reviewed GW and SW risk assessment as basis for the programme of
measures and the revision of monitoring networks
Environmental objectives and risk
assessment
• Environmental objectives identified.
• Reviewed and revised status assessment procedure towards WFD
compliance.
• Water body status assessed
• Harmonisation of RBM Plans in Prut and Pripyat transboundary
basins improved
Programme of Measures
• Support the development of pilot Pripyat RBMP and Programme of
Measures compliant with the WFD
• Updated and improved national guidelines to be in coherence with
the Ukrainian context.
• Training program established and implemented for up-scaling
Pripyat experience to Dnieper and other Ukrainian Districts.
Result 2 RBMP development
Activities streams Project Outcomes
Data flow management
• Recommendations about strengthening data management at
National and Dnieper basin levels
Public consultation and adoption
• Public consultations on RBMPs and other relevant documentation
linked to participative RBMPlanning conducted
• Training session and coaching on animation technics to conduct
consultation workshops organised
• Guidelines on public participation in the relation with the WFD
elaborated
Result 2 RBMP Implementation
Activities streams Project Outcomes
Surveys and EsCS development
• Sufficient monitoring data available (gap filling) to support the
development of the Prypjat, Upper Dnieper and Middle Dnieper
RBMP.
• Ecological status classification system developed for all relevant
biological quality elements.
Develop key pilot measure
• Support implementation of “soft” selected measures.
• Dashboard (or other tool) for regular monitoring of Programme of
Measures implementation.
Result 3 Stakeholder involvement and communication
Activities streams Project Outcomes
Development of Communication
Strategy
• Communication strategy in place at basin, national and regional scale
to efficiently support IWRM among main interested parties and up to
the wide public
Implementaion of Communication
Strategy
• Communication activities (RBC meetings, Awareness raising events,
Information materials, Websites, Press-releases, Social media, E-
learning, Workshops) at basin, national and regional scale
implemented
• External project communication assured and developed in synergy
with the communication strategy implementation
• Mechanism for sharing information among project partners is
developed (e.g. web based EUWIplusEast information exchange
platform, online collaboration tools, etc)
RBC establishment and support
• Development of practices and progressive institutionalisation of
stakeholder involvement mechanisms for implementation of the EU
water-related acquis, IWRM and MEAs
• Methodological and technical support for stakeholder involvement in
River Basin Management Planning provided

More Related Content

What's hot

Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...
Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...
Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...OECD Environment
 
Session 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoSession 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoIRC
 
Day1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisationDay1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisationgroundwatercop
 
Improving Economic Instruments for Water Resources Management in the Republic...
Improving Economic Instruments for Water Resources Management in the Republic...Improving Economic Instruments for Water Resources Management in the Republic...
Improving Economic Instruments for Water Resources Management in the Republic...OECD Environment
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta projectgroundwatercop
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodologygroundwatercop
 
MLPS Presentation of the Steering Committee Session of 8 May 2015
MLPS Presentation of the Steering Committee Session of 8 May 2015MLPS Presentation of the Steering Committee Session of 8 May 2015
MLPS Presentation of the Steering Committee Session of 8 May 2015GIZ Moldova
 
Day2 1 nijsten_dealing with data
Day2 1 nijsten_dealing with dataDay2 1 nijsten_dealing with data
Day2 1 nijsten_dealing with datagroundwatercop
 
Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017GIZ Moldova
 
8.3.3 Subnational adaptation
8.3.3 Subnational adaptation8.3.3 Subnational adaptation
8.3.3 Subnational adaptationNAP Events
 
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshop
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshopDay 1 9 rupa kumar kolli, wmo, arrcc-carissa workshop
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshopICIMOD
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP ResponseCleanH2O
 
Q1 final quarterly report from tvaqca
Q1 final quarterly report from tvaqcaQ1 final quarterly report from tvaqca
Q1 final quarterly report from tvaqcaKim Christensen
 
Presentation of the Steering Committee Session from 22 October 2014
Presentation of the Steering Committee Session from 22 October 2014Presentation of the Steering Committee Session from 22 October 2014
Presentation of the Steering Committee Session from 22 October 2014GIZ Moldova
 

What's hot (20)

Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...
Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...
Session 3 - SEA and EIA activities overview by Tea Aulavuo and Martin Smutny,...
 
Syr darya 2
Syr darya 2Syr darya 2
Syr darya 2
 
Session 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoSession 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina faso
 
Day1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisationDay1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisation
 
Improving Economic Instruments for Water Resources Management in the Republic...
Improving Economic Instruments for Water Resources Management in the Republic...Improving Economic Instruments for Water Resources Management in the Republic...
Improving Economic Instruments for Water Resources Management in the Republic...
 
Day1 1 ross_overview
Day1 1 ross_overviewDay1 1 ross_overview
Day1 1 ross_overview
 
DNR Idle Reduction Presentation
DNR Idle Reduction PresentationDNR Idle Reduction Presentation
DNR Idle Reduction Presentation
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Day 1 neno kukuric igrac - methodology
Day 1 neno kukuric   igrac - methodologyDay 1 neno kukuric   igrac - methodology
Day 1 neno kukuric igrac - methodology
 
MLPS Presentation of the Steering Committee Session of 8 May 2015
MLPS Presentation of the Steering Committee Session of 8 May 2015MLPS Presentation of the Steering Committee Session of 8 May 2015
MLPS Presentation of the Steering Committee Session of 8 May 2015
 
Day2 1 nijsten_dealing with data
Day2 1 nijsten_dealing with dataDay2 1 nijsten_dealing with data
Day2 1 nijsten_dealing with data
 
Participative River Basin Management Planning by Yunona Videnina and Pierre H...
Participative River Basin Management Planning by Yunona Videnina and Pierre H...Participative River Basin Management Planning by Yunona Videnina and Pierre H...
Participative River Basin Management Planning by Yunona Videnina and Pierre H...
 
Syr darya 6
Syr darya 6Syr darya 6
Syr darya 6
 
Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017
 
Syr darya 3
Syr darya 3Syr darya 3
Syr darya 3
 
8.3.3 Subnational adaptation
8.3.3 Subnational adaptation8.3.3 Subnational adaptation
8.3.3 Subnational adaptation
 
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshop
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshopDay 1 9 rupa kumar kolli, wmo, arrcc-carissa workshop
Day 1 9 rupa kumar kolli, wmo, arrcc-carissa workshop
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP Response
 
Q1 final quarterly report from tvaqca
Q1 final quarterly report from tvaqcaQ1 final quarterly report from tvaqca
Q1 final quarterly report from tvaqca
 
Presentation of the Steering Committee Session from 22 October 2014
Presentation of the Steering Committee Session from 22 October 2014Presentation of the Steering Committee Session from 22 October 2014
Presentation of the Steering Committee Session from 22 October 2014
 

Similar to Ukraine

Country Progress and Regional Cooperation 2018-2019
Country Progress and Regional Cooperation 2018-2019Country Progress and Regional Cooperation 2018-2019
Country Progress and Regional Cooperation 2018-2019OECD Environment
 
Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021OECD Environment
 
Annex 0.4_Minutes NCC meeting in Az March 15 2016
Annex 0.4_Minutes NCC meeting in Az March  15  2016Annex 0.4_Minutes NCC meeting in Az March  15  2016
Annex 0.4_Minutes NCC meeting in Az March 15 2016Elvin Aliyev, Ph.D.
 
UNDP - GEF Dnipro Basin Enviornment Programme
UNDP - GEF Dnipro Basin Enviornment ProgrammeUNDP - GEF Dnipro Basin Enviornment Programme
UNDP - GEF Dnipro Basin Enviornment ProgrammeIwl Pcu
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch eventOECD Environment
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch eventOECD Environment
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalOECD Environment
 
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalSession 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalOECD Environment
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1OECD Environment
 
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0Vesna Vidmar
 
Future of the Baltic Sea Regional Project
Future of the Baltic Sea Regional ProjectFuture of the Baltic Sea Regional Project
Future of the Baltic Sea Regional ProjectIwl Pcu
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...OECD Environment
 

Similar to Ukraine (20)

Georgia
GeorgiaGeorgia
Georgia
 
“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team“Progress since May 2017” by EUWI+ team
“Progress since May 2017” by EUWI+ team
 
Country Progress and Regional Cooperation 2018-2019
Country Progress and Regional Cooperation 2018-2019Country Progress and Regional Cooperation 2018-2019
Country Progress and Regional Cooperation 2018-2019
 
Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021
 
Annex 0.4_Minutes NCC meeting in Az March 15 2016
Annex 0.4_Minutes NCC meeting in Az March  15  2016Annex 0.4_Minutes NCC meeting in Az March  15  2016
Annex 0.4_Minutes NCC meeting in Az March 15 2016
 
UNDP - GEF Dnipro Basin Enviornment Programme
UNDP - GEF Dnipro Basin Enviornment ProgrammeUNDP - GEF Dnipro Basin Enviornment Programme
UNDP - GEF Dnipro Basin Enviornment Programme
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch event
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch event
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
 
Update on EUWI+ Laboratories’ development and update on surface water, coasta...
Update on EUWI+ Laboratories’ development and update on surface water, coasta...Update on EUWI+ Laboratories’ development and update on surface water, coasta...
Update on EUWI+ Laboratories’ development and update on surface water, coasta...
 
10 eu strategy for the danube region feher
10 eu strategy for the danube region feher10 eu strategy for the danube region feher
10 eu strategy for the danube region feher
 
“Agenda Item 3. Key Milestones 2018” by EUWI+ team
“Agenda Item 3. Key Milestones 2018” by EUWI+ team“Agenda Item 3. Key Milestones 2018” by EUWI+ team
“Agenda Item 3. Key Milestones 2018” by EUWI+ team
 
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_finalSession 1 euwi+ belarus_meeting_2021_03_04_master_final
Session 1 euwi+ belarus_meeting_2021_03_04_master_final
 
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja IstenicSustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
SustSan workshop: GWP CEE Sustainable Sanitation Programme by Darja Istenic
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
 
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0
WP5-Activity_5.1_and_5.2_Trieste.July.2016_Integrated_VVvar3.0
 
Future of the Baltic Sea Regional Project
Future of the Baltic Sea Regional ProjectFuture of the Baltic Sea Regional Project
Future of the Baltic Sea Regional Project
 
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
 

More from OECD Environment

Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet DhakalOECD Environment
 

More from OECD Environment (20)

Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet Dhakal
 

Recently uploaded

Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxNeoV2
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfRajjnish1
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Timedelhimodelshub1
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书zdzoqco
 

Recently uploaded (20)

Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptx
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Unit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdfUnit 1 - introduction to environmental studies.pdf
Unit 1 - introduction to environmental studies.pdf
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Time
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
 

Ukraine

  • 1. EUROPEAN UNION WATER INITIATIVE PLUSEUROPEAN UNION WATER INITIATIVE PLUS FOR THE EASTERN PARTNERSHIPFOR THE EASTERN PARTNERSHIP FIRST STEERING COMMITTEE MEETINGFIRST STEERING COMMITTEE MEETING 1616THTH MAY 2017, BRUSSELSMAY 2017, BRUSSELS UKRAINEUKRAINE
  • 2. Result 1 Legislation, Policy and Institutional strengthening Activities streams Project Outcomes Active National Policy Dialogue process National Policy Dialogue revived and it has become an established platform with strong political ownership 1-2 NPD Steering Committee meetings a year Implementation of relevant legal provisions of the EU AA Status of harmonization of WFD principles in the Ukrainian water legislation is in accordance with AA commitments Legislative acts drafted and subject to adoption by respective Governmental body (in 2017 – ministerial orders on methodology of classification of surface water and groundwater bodies) Water Policy Paper The conceptual vision for the water sector reform developed Water Policy Paper National Water Strategy Water strategy developed along with the conceptual vision of the Policy Paper for the water sector reform. A strategic water policy framework fully reflects and supports implementation of the reform and meeting the commitments taken by Ukraine under the Association Agreement. National Water Strategy Revision of the 2011 national targets to the Protocol on Water and Health National targets revised and formally adopted together with the implementation plan. Ukraine is complying with its obligations under the Protocol Support to implementation of the Dniester treaty Regular bilateral technical meetings organised with Moldovan counterparts, in coordination with the GEF project. Ukraine and Moldova have a set of agreed actions on the Dniester.
  • 3. Result 2 Laboratory and Monitoring programme strengthening Activities streams Project Outcomes Assessment • Needs in terms of equipment, infrastructure, trainings towards WFD compliant laboratory(ies), QM/accreditation and GW and SW monitoring identified • training plan developed Contract document preparation • Decision on purchase or upgrade of equipment, infrastructure, consumables taken • Technical specifications for procurement agreed • Tender documentation drafted Procurement • Tender published in official journal of European Commission, Q4/2017 • Procurement process Q1-Q2/2018 Delivery and installation • Delivery, installation and training on new equipment • Delivery envisaged end of Q2/2018 Surveys and Training • Training plan for the laboratories to be decided (2018 onwards) • Hands-on trainings and training documentation • Surveys to practice good use carried out (2018 onwards)
  • 4. Hydrographic districts in Ukraine Pilot Basins for RBMP Development and upscaling based on EU water directives Transboundary harmonisation of RBMP Sub-basin of Prypiat Sub-basin of Desna Sub-basin of Middle Dnieper Sub-basin of the Seversky Donets Sub-basin of Lower Dnieper River basin district of the Southern Bug Sub-basin of Lower Dniester Sub-basin of Prut and Siret Sub-basin of Tysa Sub-basin of Upper Dnieper Sub-basin of the Western Bug River of Azov River basin district of the Crimea River basin district of the Black Sea Sub-basin of Lower Danube 1. Sub-basin of San 2. Sub-basin of Lower Don
  • 5. Result 2 RBMP development Activities streams Project Outcomes Dnieper Water Resource Strategy • Support the development of Dnieper River Basin Management Scheme in line with the WFD Delineation and typology • Reviewed / revised GWB delineation. • Re-delineation of SWBs due to shift to WFD system B, • SW Typology reviewed / revised. • Revised guidelines to support further national implementation. Pressures and Impact assessment • Reviewed GW and SW risk assessment as basis for the programme of measures and the revision of monitoring networks Environmental objectives and risk assessment • Environmental objectives identified. • Reviewed and revised status assessment procedure towards WFD compliance. • Water body status assessed • Harmonisation of RBM Plans in Prut and Pripyat transboundary basins improved Programme of Measures • Support the development of pilot Pripyat RBMP and Programme of Measures compliant with the WFD • Updated and improved national guidelines to be in coherence with the Ukrainian context. • Training program established and implemented for up-scaling Pripyat experience to Dnieper and other Ukrainian Districts.
  • 6. Result 2 RBMP development Activities streams Project Outcomes Data flow management • Recommendations about strengthening data management at National and Dnieper basin levels Public consultation and adoption • Public consultations on RBMPs and other relevant documentation linked to participative RBMPlanning conducted • Training session and coaching on animation technics to conduct consultation workshops organised • Guidelines on public participation in the relation with the WFD elaborated
  • 7. Result 2 RBMP Implementation Activities streams Project Outcomes Surveys and EsCS development • Sufficient monitoring data available (gap filling) to support the development of the Prypjat, Upper Dnieper and Middle Dnieper RBMP. • Ecological status classification system developed for all relevant biological quality elements. Develop key pilot measure • Support implementation of “soft” selected measures. • Dashboard (or other tool) for regular monitoring of Programme of Measures implementation.
  • 8. Result 3 Stakeholder involvement and communication Activities streams Project Outcomes Development of Communication Strategy • Communication strategy in place at basin, national and regional scale to efficiently support IWRM among main interested parties and up to the wide public Implementaion of Communication Strategy • Communication activities (RBC meetings, Awareness raising events, Information materials, Websites, Press-releases, Social media, E- learning, Workshops) at basin, national and regional scale implemented • External project communication assured and developed in synergy with the communication strategy implementation • Mechanism for sharing information among project partners is developed (e.g. web based EUWIplusEast information exchange platform, online collaboration tools, etc) RBC establishment and support • Development of practices and progressive institutionalisation of stakeholder involvement mechanisms for implementation of the EU water-related acquis, IWRM and MEAs • Methodological and technical support for stakeholder involvement in River Basin Management Planning provided