SlideShare a Scribd company logo
1 of 32
Download to read offline
Skill and Capacity Development Strategy to Support
a Clean Energy Transition
Human Resource Development Centre for
Electricity, New, Renewable Energy and
Energy Conservation (PPSDM KEBTKE)
Laode Sulaeman, Head of PPSDM – KEBTKE, MEMR
Jakarta, 15th Oct 2020
To present at Clean Energy Finance and Investment Mobilization (CEFIM) Program
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
03
01
02
04
05
Introduction
HR Improvement Program
Partnership
Closing
PPSDM – KEBTKE Transformation
TABLEOFCONTENTS
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
01 Introduction
02
03 HR Improvement Program
04 Patnership
05 Closing
PPSDM – KEBTKE Transformation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
NATIONALPRIORTY
PROGRAM
2019-20245 1
5
2
4
3
HUMAN RESOURCES
DEVELOPMENT
INFRASTRUCTURE
BUREAUCRACY
SIMPLIFICATION
ECONOMIC
TRANSFORMATION
REGULATION
SIMPLIFICATION
VISION
Government Priority 2020 - 2024
JOKOWI-MA’RUF VISION :
REALIZATION OF
DEVELOPED INDONESIA
THAT HAS SOVEREIGNTY,
INDEPENDENCE AND
PERSONALITY BASED ON
MUTUAL COOPERATION
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
01 Introduction
02
03 HR Improvement Program
04 Partnership
05 Closing
PPSDM – KEBTKE Transformation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
PPSDM KEBTKE is the only unit that is directly under the Government cq. The Ministry of Energy and
Mineral Resources, which is mandated to carry out capacity building in the field of Electricity and RE/EE
MEMR
DG
Mineral & Coal
DG
Oil & GAS
DG
NREEC
DG
Electricity
HR
Agency
R&D
Agency
Geolical
Agency
Secretariat
General
PPSDM
KEBTKE
SUPPORTING UNIT TECHNICAL UNIT
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
• 2000 - 2015 • Pusdiklat KEBT dan Pusdiklat KEBTKE
• In line with the development of the Regional Autonomy, the
ESDM Education and Training Agency was formed,
including the Centre for Training and Education in
Electricity and Renewable New Energy (KEBT), which was
elaborated in Minister of Energy and Mineral Resources
Decree No. 150 of 2001.
• In 2010 it was restructured into Electricity, New Energy,
Renewable and Energy Conservation (PUSDIKLAT
KEBTKE)
• 2016
PPSDM KEBTKE
• In 2016 with the issuance of
Regulation of the Minister of Energy
and Mineral Resources No. 13 of
2016 concerning the Organization and
Work Procedure of the Ministry of
Energy and Mineral Resources, the
KEBTKE Education and Training
Centre changed its name to the
Human Resource Development
Centre for Electricity, New Renewable
Energy and Energy Conservation
(PPSDM KEBTKE)
• The task of the PBTDM KEBTKE is to
carry out Human Resource
Development in the fields of electricity,
new renewable energy and energy
conservation.
• Issuance of Decree of the Minister of Finance No. 965 /
KMK.05 / 2017 in 2017 PPSDM KEBTKE is changed to
Public Service Agency (BLU PPSDM KEBTKE) added
the function of HR in the electricity, New Renewable
Energy, and Energy Conservation for the Industrial
sector
• Started an effort to implement a large-scale certification.
• Started various other supporting business efforts.
• Remuneration does not burden the state budget (since
2018).
• Change Management Implementation.
• Changes in Institutional Leadership 3 times in 1-year
period.
• 2017
PPSDM KEBTKE as a Public Service Agency
KEBTKE / ENREC : Electricity, New, Renewable Energy, dan Energy Conservation
PPSDM – KEBTKE TRANSFORMATION
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Funding Expectation to Accelerate Clean Energy Project
Equipment & Facilities
Investment
(Needs alternative source of
funding)
Borderline – Remote – Underdeveloped
Communities (Masyarakat 3T)
(limited amount of budget)
APBN / Government
Budget
1. PPSDM KEBTKE welcomes partnership and
collaboration for capacity building and
competency development & deployment
program to cater the demand for qualified
technical personnel working in the energy sector
2. PPSDM KEBTKE is seeking alternatives of funding
for future growth alongside the rapid growth of
electricity demand in Indonesia
3. We are expecting OJK to provide certain
mechanism of funding to increase the technical
competency for all personnel involved on Clean
Energy Projects (from planning to COD and
operation phase)
Free of Charge
Private & Industry
Regulated by Government Tariff
Training and
Certification
Seeking Partnership and
Funding
“Certified and Competent
technical personnel is the key of
success for the continuity and
sustainability of clean energy
power generation projects”
Training and
Certification
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
01 Introduction
02
03 HR Improvement Program
04 Partnership
05 Closing
PPSDM – KEBTKE Transformation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
9.15%
33.58%
20.12%
37.15% 23%
25%22%
30% 31%
20%24%
25%
2019
Target
2025
Target
2050
1. Powerplant : 69,1 GW
2. Energy Consumption: 0,8 TOE/cap
3. Electricity Consumption : 1.084 Kwh/cap
1. Powerplant: 115 GW
2. Energy Consumption : 1,4 TOE/kap
3. Electricity Consumption : 2500 Kwh/kap
1. Powerplant : 430 GW
2. Energy Consumption : 3,2 TOE/kap
3. Electricity Consumption : 7000 Kwh/kap
Sumber : National Energy Council - MEMR
RE
Oil
Gas
Coal
National Energy General Plan (RUEN)
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Facts :
Renewable energy share in the national energy mix is at 9,15%;
Installed capacity of all RE power plants is 10,3 GW (only 12,4% from
the whole total installed power plants capacity 69,1 GW)
Hydro
94,3 GW
Installed
Capacity
5,97GW
Geothermal
23,9 GW
Installed
Capacity
2,13GW
Solar Energy
207,8 GW
Solar PV
Centralized
& Scattered
0,14GW
Wind
60,6 GW
Installed
Capacity
0,15GW
Bioenergy
32,6 GW
Installed
Capacity
1,87GW 11,6
Equal to ~75,2 MBOE
Biodiesel
Million Kilo
Litres
(Installed
Capacity FAME
refinery, 2019)
(includes Palm Oil Mill
Effluent/POME, Empty
Fruit Bunch, Fibers, and
Kernel : 8,7 GW)
Indonesia’s Renewable Energy Resources v.s. Utilization (2019)
Source: Directorate General of NREEC
69,1GW
Coal
Fossil Fuel
+ Bio Fuels
Renewables
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Overview - Electricity Engineering Needs
3.963
6.517
9.231 8.519 9.568
7.346
11.016
1.870
3.241
5.185
3.099
8.875
1.815
1.244
869
672
705
847
892
594
2.563
2.073
865
849
827
824
817
810
814
821
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
(S SUAI RUPT P N 0 9 0 8)
TT Pembangkit (org) TT Transmisi(org) TT Distribusi (org)Powerplant Transmission Distribution
Powerplant: 66.456 Workers
Transmission: 19.612 Workers
Distribution: 11.263 Workers
ELECTRICAL ENGINEER & TECHNICAL OPERATOR
MANPOWER DEMAND
(PT. PLN’s Electricity Supply Business Plan 2019 – 2028)
Source : DG Electricity – MEMR (Processed data)
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
2021 2022 2023 2024 2025 2026 2027 2028
PLTA PS - - - 147 133 6 30 177
PLT lain (EBT) 2,398 6,419 3,946 1,191 3,179 70 97 319
PLTP 271 838 451 764 5,079 108 241 101
PLTA 1,063 - 256 625 2,962 198 288 306
-
2,000
4,000
6,000
8,000
10,000
12,000
Orang
NRE Generating Capacity Building Plan
in 2019 - 2028 (in MW)
Source: RUPTL PLN 2019 - 2028
PLTP : Geothermal
PLTA/PS : Hydro & Pump Storage (PS)
PLTM : Minihydro
PLTS : Solar
PLTB : Wind
PLT Bio/Sampah: Biogas & Biomass
PLTAL : Tidal/Ocean
EBT Lain / RE Other
PLTA/Hydro : 5,698
PS /Pump Storage : 493
PLTP /Geothermal : 7,853
EBT lain /RE Other : 17,619
TOTAL Personnel : 31,663
Estimated HR demand for : FS, Build
Design, EPC, Operation, Maintenance
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
HR Capacity Building Program at PPSDM KEBTKE
01
Training
02
Certification
03
Technical
Guidance
04
Energy
Consultancy &
Audit Services
Electricity, New, Renewable Energy and Energy Conservation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Supporting the Directorate General of Electricity and
Directorate General of NREEC to carry out the
development of HR competencies through education and
training in the fields of Electricity, New, Renewable Energy
and Energy Conservation
PPSDM KEBTKE
Human Resources Development Centre for Electricity,
New, Renewable Energy and Energy Conservation
(MEMR Regulation No. 13 /Tahun 2016)
Government Regulation No. 70 year 2009
Law No. 30 year 2009 : Electricity
Law No. 30 year 2007 : Energy
Main Objective :
Legal Framework :
WE ARE HERE TO SERVE :
Central/Local
Government
General Public
Industry
+
DEVELOP REGIONAL COOPERATION
Legal Basis for HR Improvement Activities
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Legal Basis of Electricity Safety, Electricity Certifications
and Standards in Indonesia
Any power installation in
operation must hold a
Commissioning Certificate
Every electricity supporting business
entity must have
Business Entity Certificate
(according to it’s classification and
qualifications)
Technician involved with any
electricity businesses must hold a
certificate of competency
in Electricity
Every equipment and electric power
tools must comply to the
Indonesian National Standards/
SNI requirements
Any electricity business activities
must meet the
electricity safety
requirements
Any electricity business activities
must meet the provisions as
stated in the environmental
laws and regulations.
stipulated on Article 44
paragraph (6)
Indonesia Law
No. 30 of Year 2009
concerning
Electricity
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Certification of Personnel Competency Scheme Related to:
Electricity + Renewable Energy and Energy Conservation
CERTIFICATION
AUTHORITIES:
5
1. Electrical Competency Certification Body
(Lembaga Sertifikasi Kompetensi/ L S K)
PPSDM KEBTKE being appointed by the DG of Electricity as
government Electrical Competency Certification Body by the
Ministry of EMR Decree No: 389K/20/DJL.4/2018
- Exclusive right to certify national electrical assessors
- Certify electrical personels: Technicians, Electrical
Engineers, Managerial level personels working in the
electricity sector
2. Professional Certification Body
(Lembaga Sertifikasi Profesi / L S P)
PPSDM KEBTKE’s License : BNSP-LSP-613-ID 5 October 2016
- Certify personels working in Renewable Energy and Energy
Conservation sector: Geothermal Field Operation
Supervisors, Geothermal Geologist, Geophysicist,
Geochemists, Industrial and Building Energy Managers and
Energy Auditors.
Directorate General of Electricity
Ministry of Energy and Mineral Resources
and
BNSP (National Professional Certification)
Ministry of Manpower
Certification Processes are carried out by :
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Certification Service Scheme
Professional Certification
Institute (LSP) BPSDM ESDM
Competency Certification
Institute (LSK) PPSDM KEBTKE
BNSP dan DG NREEC
• UU 30 th 2007 tentang
Energi
• PP 70 th 2009 tentang
konservasi energi
• UU 21 th 2014 tentang
Panas Bumi
• PP 7 th 2017 tentang
pemanfaatan panas bumi
• SKKNI Auditor Energi
• SKKNI Manager Energi
• SKNNI Panas Bumi
DG Electricity
• UU 30 th 2009 tentang
ketenagalistrikan
• Permen 38 th 2018
tentang Tatacara
Akreditasi dan Sertifikasi
• Permen ESDM No.46 th
2017 tentang SKTTK
• Kepdirjen 217 Tentang
Metodelogi Sertifikasi
• Pedoman SKTTK
Indonesian National Work
Competency Standards (SKKNI)
19 Scope
Certification Scheme
Electricity Engineering
Competency Standards (SKTTK)
19 Scope
Subfields
Implementation of
Regulations
Implementation of
Regulations
DG Electricity-MEMR
Accreditation
BNSP
Accreditation
Participants in
2019: 287 peoples
Participants in 2019:
3200 peoples.
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Certification Services
Input Outcome
In 2018
• 14 scope
ELECTRICITY (LSK PPSDM KEBTKE)
In 2018
• 7 scope
Electric Power Generation
(PLTU/GU/G/P/A/MH/D/EBT)
1. Consultation
2. Construction and Installation
3. Inspection and testing
4. Operation
5. Maintenance
ELECTRIC POWER DISTRIBUTION
(JTM/JTR)
1. Consultation
2. Construction and Installation
3. Inspection and testing
4. Operation
5. Maintenance
UTILIZATION OF ELECTRICITY
(JTM/JTR)
1. Consultation
2. Construction and Installation
3. Inspection and testing
4. Maintenance
ELECTRICITY TRANSMISSION
1. Consultation
2. Construction and Installation
3. Inspection and testing
4. Operation
5. Maintenance
1. Energy Manager in Industry and
buildings
2. Energy Auditor in Industry and
Buildings
3. Geothermal First operations
supervisor (POP)
4. Geothermal Intermediate operations
Supervisor (POM)
5. Geothermal Main Operations
Supervisor (POU)
6. Geothermal Geologist (3 level)
7. Geothermal Geochemist (3 level)
NREEC (LSP BPSDM ESDM)
1. System Design Expert PLTS Off Grid
2. System Design Expert PLTS On Grid
3. System Design Expert PLTMH Off Grid
under 100 kW
4. Energy Auditor in Buildings
5. Electricity Energy System Auditor
6. Thermal and Mechanical Energy Auditor
7. Installation and Development of NRE
Generators (Solar, Hydro, Wind)
8. NRE Power Plant Inspection and Testing
(Solar, Hydro, Wind)
9. Operation of the NRE Generator (Solar,
Hydro, Wind)
10. Maintenance of NRE Generators (Solar,
Hydro, Wind)
11. Geothermal Geophysicist
12. PLC Based Control Installation Expert
2019
Added 5 New scope
2019
Added 12 New scope
1. Energy Manager in Industry and
buildings
2. Energy Auditor in Industry and
Buildings
3. Geothermal First operations
supervisor (POP)
1. Operation of PLTD
2. Maintenance of PLTD
3. Inspection and testing of PLTD
4. Construction and Installation PLTS
5. Maintenance of PLTU
6. Maintenance of JTM Distribution
7. Operation of PLTU
8. Inspection and testing PLTU
9. Construction and Installation PLTU
FAVORITE CERTIFICATION
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
THE ‘NEW NORMAL’ OF
INDONESIA’S ELECTRICAL COMPETENCY CERTIFICATION : ONLINE METHOD
Step-by-steps procedure for applying electrical competency certification at PPSDM KEBTKE’s
Electrical Competency Certification Body - (Lembaga Sertifikasi Kompetensi/ L S K) are as follow:
“Technician involved with any
electricity businesses must hold a
certificate of competency
in Electricity”
stipulated on Article 44
paragraph (6) Indonesia
Law
No. 30 of Year 2009
concerning Electricity
ORAL
ASSESSMENT
VERIFICATION
2. VERIFICATION
Application verification
by Technical Officer In
Charge
4. PRACTICAL ASSESSMENT
Certification Participants submit
their practical videos or self
documentation doing certain
Assessment. Furthermore, it will
be observed together using the
Zoom Cloud Meeting media
1. APPLICATION
Applicant submits Assessment
application letter, attached with
form PP-1.1. to PP-1.4. 10 days
before assessment day.
3. WRITTEN ASSESSMENT
Online written test using
PPSDM KEBTKE’s
Learning Management
System (LMS) and Live by
Online Cloud Meeting
(Zoom)
5. ORAL ASSESSMENT
Oral assessment
conducted live using the
Zoom Cloud Meeting
Media
FEEDBACK
6. FEEDBACK
Announcement of the
assessment results by
the assessor team
(Competent / Not yet
Competent)
WRITTEN
ASSESSMENT
APPLICATION
PRACTICAL
ASSESSMENT
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
ONLINE CERTIFICATION DOCUMENTATION
WRITTEN
Assessment
PRACTICAL
Assessment
ORAL
Assessment
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Technical Training (DT) and Technical Guidance (Bimtek)
DT New, Renewable Energy DT Energy ConservationDT Electricity
1. Electricity Assessor
2. Electricity Safety (K2)
3. Electricity Utilization Installation
4. Mechanical and Generating instruments
5. Electric Power System Inspection
6.
Coal Power Plant Planning / Operation / Main
tenance
7. PLTD Planning / Operation / Maintenance
1. POP, POM, POU Geothermal
2. Geothermal Geochemist
3. Geothermal Geophysicist
4. Bioenergy
5.
Preparation of FS / Planning / Development /
Operation / Maintenance of PLTMH
6.
Preparation of FS / Planning / Development / Op
eration / Maintenance PLTB
7.
Preparation of FS / Planning /Development /
Operation / Maintenance of Centralized /
Communal / Rooftop PLTS
1. Fundamentals of Energy Conservation
2. Energy Savings
3. Energy Conservation Tips
4.
Implementation of an Energy Management
System (ISO:50001)
5. Energy Auditor in Industry
6. Energy Auditor in Buildings
7. Energy Manager in Industry
8. Energy Manager in Buildings
Train Participants and Technical Guidance in 2019 : 1250 peoples
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Activities
Electricity Assessor Coal Power Plant OperationPLTD operator Energy Auditor in Buildings
PLTS Operation Electricity Utilization
Installation
Electric Power Distribution
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Our Facilities
ELECTRICITY
ENERGY CONSERVATION
RENEWABLE ENERGY
SUPPORTING FACILITIES
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
01 Introduction
02
03 HR Improvement Program
04 Partnership
05 Closing
PPSDM – KEBTKE Transformation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Partnership to provide a Competency Test Venue (TUK)
40 TUK : Industry and
University throughout
Indonesia
SUMATERA UTARA :
1. UNIVERSITAS SUMATERA UTARA (KERJASAMA)
2. INSTITUT TEKNOLOGI MEDAN (KERJASAMA)
3. PT. SORIK MARAPI GEOTHERMAL POWER (SEWAKTU)
4. PT. INDONESIA ASAHAN ALUMINIUM (KERJASAMA)
5. PLTU BELAWAN
6. PLTU ASAHAN
DKI JAKARTA :
1. PT. INDONESIA POWER (SEWAKTU)
2. PT. PEMBANGKIT JAWA BALI (SEWAKTU)
3. PT. PERTAMINA CORPORATE UNIVERSITY (KERJASAMA)
4. STT PLN (KERJASAMA)
5. PT. PERTAMINA (KERJASAMA)
6. PT. PLN (Persero) UPT PULOGADUNG - GI PULOMAS
JAWA TENGAH :
1. UNIVERSITAS GAJAH MADA (KERJASAMA)
2. UNIVERSITAS NEGERI YOGYAKARTA (KERJASAMA)
3. POLITEKNIK NEGERI SEMARANG (KERJASAMA)
4. CV. SOLARINDO (SEWAKTU)
5. PT. TJB POWER SERVICES
JAWA TIMUR :
1. POLITEKNIK NEGERI MALANG (KERJASAMA)
2. PT. PJB ACADEMY (SEWAKTU)
3. EXXONMOBIL INDONESIA (SEWAKTU)
4. PT.POMI (KERJA SAMA)
KALIMANTAN TIMUR :
1. PT. SLJ GLOBAL (SEWAKTU)
PAPUA :
1. PT. FREEPORT INDONESIA
(SEWAKTU)
KALIMANTAN BARAT :
1. UP3B PLN PONTIANAK (KERJASAMA)
SUMATERA BARAT :
1. PLN UPP TELUK SIRIH (SEWAKTU)
KALIMANTAN SELATAN :
1. PT. TANJUNG POWER INDONESIA (SEWAKTU)
2. PT. MAKMUR SEJAHTERA WISESA (KERJA SAMA)
3. PT.PLN GARDU INDUK CEMPAKA (KERJA SAMA)
BANTEN :
1. PT. INDONESIA POWER – LONTAR (SEWAKTU)
2. PT. INDONESIA POWER – LABUAN (SEWAKTU)
3. PT. KRAKATAU DAYA LISTRIK (SEWAKTU)
4. PT. ASAHIMAS (SEWAKTU)z
SULAWESI SELATAN :
1. POLITEKNIK NEGERI UJUNG PANDANG
(KERJASAMA)
JAWA BARAT :
1. PT. PEMBANGKIT JAWA BALI (SEWAKTU)
2. PT. PLN (SEWAKTU)
3. PT. INDONESIA POWER (SEWAKTU)
4. POLITEKNIK NEGERI JAKARTA (KERJASAMA)
5. POLITEKNIK NEGERI BANDUNG (KERJASAMA)
6. PT. INDOFOOD SUKSES MAKMUR (SEWAKTU)
7. PLTGU MUARA TAWAR
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Partnership to Provide Assessors
93 Assessors from
Industries and
Universities
SUMATERA UTARA :
1 Assessor
DKI JAKARTA
46 Assessor
JAWA TENGAH
2 Assessor
JAWA TIMUR
4 Assessor
KALIMANTAN TIMUR
4 Assessor
SUMATERA BARAT
2 Assessor
KALIMANTAN SELATAN
11 Assessor
BANTEN :
4 Assesor
MALUKU UTARA
1 Assessor
JAWA BARAT
2 Assessor
RIAU:
2 Asessor
JAMBI
1 Assessor
BANGKA BELITUNG
1 Assessor
KEPULAUAN RIAU
4 Assessor
YOGYAKARTA
1 Assessor
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Business Partner
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Local Government Partners
Banten Jawa Barat DKI Jakarta Sumatera Barat Sumatera Utara Jawa Tengah
Kalimantan Selatan Kalimantan Timur Jambi Kepulauan Riau Riau
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
01 Introduction
02
03 HR Improvement
04 Partnership
05 Closing
PPSDM – KEBTKE Transformation
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Closing
Rapid growth of electricity demand in Indonesia and the Government’s RE target on it’s energy mix, has put PPSDM
KEBTKE to a more strategic position, specifically on the duty to providing competent and qualified electrical and
technical personnel working on the energy sector in Indonesia. To strengthen the preparation of human resources in
supporting renewable energy growth and energy transition, PPSDM KEBTKE continues to refine and add various
norms, standards, procedures and criteria (NSPK) which are needed as a legal basis recognized by all stakeholders.
Currently there are around 640 occupational competencies that can be served / implemented. The refinement of this
NSPK continues to be carried out for all types of renewable energy commodities including geothermal.
In order to prepare for the development of technology 4.0 and also face various situations that become obstacles to
modern learning (for example, the Covid19 problem), PPSDM KEBTKE has also perfected distance learning-based
learning methods. This method has been implemented during the Covid19 pandemic period and has received legal
recognition from both the Ministry of Energy and Mineral Resources and the Ministry of Manpower (cq. BNSP). During
the period July - September 2020, this method has been implemented to support workforce competence in various
industries.
Anticipation of technological developments and lessons learned from the experiences of countries that have advanced
in the use of EBT continue to be carried out both institutionally with international institutions, and by involving business
entities that have international reputations. This international cooperation continues to be strengthened through
dialogue and agreements based on G-G with NRE partner countries
1.
2.
3.
ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke
Scan Me !
Website:
Laode Sulaeman
laode.sulaeman@gmail.com
+62-81210949003
laode.sulaeman@esdm.go.id

More Related Content

What's hot

Comparitive analysis of different tariff policies ntpc
Comparitive analysis of different tariff policies ntpcComparitive analysis of different tariff policies ntpc
Comparitive analysis of different tariff policies ntpcVijaypratapsingh Chauhan
 
Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNLSudhir Negi
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report Study Hub
 
120525 af internship invitation
120525 af internship invitation120525 af internship invitation
120525 af internship invitationDenish Anugra
 
6th Annual Indonesia Power & Electricity
6th Annual Indonesia Power & Electricity 6th Annual Indonesia Power & Electricity
6th Annual Indonesia Power & Electricity helenph513
 
Study of retirement
Study of retirementStudy of retirement
Study of retirementKORBA
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerPeter Cockcroft
 
MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013ZAINI ABDUL WAHAB
 
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...RituSaha3
 
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71zubeditufail
 
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensaHandbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensashrimphead
 
Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Eric Stryson
 
Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Pratap Bhunia
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitmentsfinance29
 

What's hot (16)

Comparitive analysis of different tariff policies ntpc
Comparitive analysis of different tariff policies ntpcComparitive analysis of different tariff policies ntpc
Comparitive analysis of different tariff policies ntpc
 
Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNL
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report
 
120525 af internship invitation
120525 af internship invitation120525 af internship invitation
120525 af internship invitation
 
6th Annual Indonesia Power & Electricity
6th Annual Indonesia Power & Electricity 6th Annual Indonesia Power & Electricity
6th Annual Indonesia Power & Electricity
 
Ntpc
NtpcNtpc
Ntpc
 
Study of retirement
Study of retirementStudy of retirement
Study of retirement
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fuller
 
MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013
 
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
 
Main proj
Main projMain proj
Main proj
 
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
 
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensaHandbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
 
Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013Impact Investment in Mini Hydropower, Indonesia 2013
Impact Investment in Mini Hydropower, Indonesia 2013
 
Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...Summer Internship and Project Report on Power System Operation Corporation Li...
Summer Internship and Project Report on Power System Operation Corporation Li...
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitments
 

Similar to Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a Clean Energy Transition

Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansZAINI ABDUL WAHAB
 
Energy Malaysia Volume 1
Energy Malaysia Volume 1Energy Malaysia Volume 1
Energy Malaysia Volume 1Nieza Noordin
 
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...OECD Environment
 
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaBapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaOECD Environment
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry ZAINI ABDUL WAHAB
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity ConferenceKahren Navarro
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...OECD Environment
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report94600banti
 
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfmza.arifin
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students ZAINI ABDUL WAHAB
 
Energy Malaysia Volume 5 (1)
Energy Malaysia Volume 5 (1)Energy Malaysia Volume 5 (1)
Energy Malaysia Volume 5 (1)Nieza Noordin
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardZAINI ABDUL WAHAB
 
Energy audit conditional grant
Energy audit conditional grantEnergy audit conditional grant
Energy audit conditional grantSteve Lojuntin
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power StationAyush Khare
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Denny Saputra
 
Final Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_ENFinal Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_ENWilliam Sabandar
 

Similar to Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a Clean Energy Transition (20)

Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
 
Energy Malaysia Volume 1
Energy Malaysia Volume 1Energy Malaysia Volume 1
Energy Malaysia Volume 1
 
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
 
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaBapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry
 
Energy Malaysia Volume 2.pdf
Energy Malaysia Volume 2.pdfEnergy Malaysia Volume 2.pdf
Energy Malaysia Volume 2.pdf
 
GEO
GEOGEO
GEO
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity Conference
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
 
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students
 
Energy Malaysia Volume 5 (1)
Energy Malaysia Volume 5 (1)Energy Malaysia Volume 5 (1)
Energy Malaysia Volume 5 (1)
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forward
 
Sustaining energy performance
Sustaining energy performanceSustaining energy performance
Sustaining energy performance
 
Energy audit conditional grant
Energy audit conditional grantEnergy audit conditional grant
Energy audit conditional grant
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011
 
Final Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_ENFinal Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_EN
 

More from OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Recently uploaded

NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfNAP Global Network
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionGLADYSNUEVO1
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.Christina Parmionova
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptxpiyushsinghrajput913
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Menggugurkan Kandungan 087776558899
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...kumargunjan9515
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsMonica Sydney
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.Christina Parmionova
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfSocial Samosa
 

Recently uploaded (20)

NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 

Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a Clean Energy Transition

  • 1. Skill and Capacity Development Strategy to Support a Clean Energy Transition Human Resource Development Centre for Electricity, New, Renewable Energy and Energy Conservation (PPSDM KEBTKE) Laode Sulaeman, Head of PPSDM – KEBTKE, MEMR Jakarta, 15th Oct 2020 To present at Clean Energy Finance and Investment Mobilization (CEFIM) Program
  • 2. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 03 01 02 04 05 Introduction HR Improvement Program Partnership Closing PPSDM – KEBTKE Transformation TABLEOFCONTENTS
  • 3. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 01 Introduction 02 03 HR Improvement Program 04 Patnership 05 Closing PPSDM – KEBTKE Transformation
  • 4. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke NATIONALPRIORTY PROGRAM 2019-20245 1 5 2 4 3 HUMAN RESOURCES DEVELOPMENT INFRASTRUCTURE BUREAUCRACY SIMPLIFICATION ECONOMIC TRANSFORMATION REGULATION SIMPLIFICATION VISION Government Priority 2020 - 2024 JOKOWI-MA’RUF VISION : REALIZATION OF DEVELOPED INDONESIA THAT HAS SOVEREIGNTY, INDEPENDENCE AND PERSONALITY BASED ON MUTUAL COOPERATION
  • 5. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 01 Introduction 02 03 HR Improvement Program 04 Partnership 05 Closing PPSDM – KEBTKE Transformation
  • 6. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke PPSDM KEBTKE is the only unit that is directly under the Government cq. The Ministry of Energy and Mineral Resources, which is mandated to carry out capacity building in the field of Electricity and RE/EE MEMR DG Mineral & Coal DG Oil & GAS DG NREEC DG Electricity HR Agency R&D Agency Geolical Agency Secretariat General PPSDM KEBTKE SUPPORTING UNIT TECHNICAL UNIT
  • 7. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke • 2000 - 2015 • Pusdiklat KEBT dan Pusdiklat KEBTKE • In line with the development of the Regional Autonomy, the ESDM Education and Training Agency was formed, including the Centre for Training and Education in Electricity and Renewable New Energy (KEBT), which was elaborated in Minister of Energy and Mineral Resources Decree No. 150 of 2001. • In 2010 it was restructured into Electricity, New Energy, Renewable and Energy Conservation (PUSDIKLAT KEBTKE) • 2016 PPSDM KEBTKE • In 2016 with the issuance of Regulation of the Minister of Energy and Mineral Resources No. 13 of 2016 concerning the Organization and Work Procedure of the Ministry of Energy and Mineral Resources, the KEBTKE Education and Training Centre changed its name to the Human Resource Development Centre for Electricity, New Renewable Energy and Energy Conservation (PPSDM KEBTKE) • The task of the PBTDM KEBTKE is to carry out Human Resource Development in the fields of electricity, new renewable energy and energy conservation. • Issuance of Decree of the Minister of Finance No. 965 / KMK.05 / 2017 in 2017 PPSDM KEBTKE is changed to Public Service Agency (BLU PPSDM KEBTKE) added the function of HR in the electricity, New Renewable Energy, and Energy Conservation for the Industrial sector • Started an effort to implement a large-scale certification. • Started various other supporting business efforts. • Remuneration does not burden the state budget (since 2018). • Change Management Implementation. • Changes in Institutional Leadership 3 times in 1-year period. • 2017 PPSDM KEBTKE as a Public Service Agency KEBTKE / ENREC : Electricity, New, Renewable Energy, dan Energy Conservation PPSDM – KEBTKE TRANSFORMATION
  • 8. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Funding Expectation to Accelerate Clean Energy Project Equipment & Facilities Investment (Needs alternative source of funding) Borderline – Remote – Underdeveloped Communities (Masyarakat 3T) (limited amount of budget) APBN / Government Budget 1. PPSDM KEBTKE welcomes partnership and collaboration for capacity building and competency development & deployment program to cater the demand for qualified technical personnel working in the energy sector 2. PPSDM KEBTKE is seeking alternatives of funding for future growth alongside the rapid growth of electricity demand in Indonesia 3. We are expecting OJK to provide certain mechanism of funding to increase the technical competency for all personnel involved on Clean Energy Projects (from planning to COD and operation phase) Free of Charge Private & Industry Regulated by Government Tariff Training and Certification Seeking Partnership and Funding “Certified and Competent technical personnel is the key of success for the continuity and sustainability of clean energy power generation projects” Training and Certification
  • 9. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 01 Introduction 02 03 HR Improvement Program 04 Partnership 05 Closing PPSDM – KEBTKE Transformation
  • 10. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 9.15% 33.58% 20.12% 37.15% 23% 25%22% 30% 31% 20%24% 25% 2019 Target 2025 Target 2050 1. Powerplant : 69,1 GW 2. Energy Consumption: 0,8 TOE/cap 3. Electricity Consumption : 1.084 Kwh/cap 1. Powerplant: 115 GW 2. Energy Consumption : 1,4 TOE/kap 3. Electricity Consumption : 2500 Kwh/kap 1. Powerplant : 430 GW 2. Energy Consumption : 3,2 TOE/kap 3. Electricity Consumption : 7000 Kwh/kap Sumber : National Energy Council - MEMR RE Oil Gas Coal National Energy General Plan (RUEN)
  • 11. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Facts : Renewable energy share in the national energy mix is at 9,15%; Installed capacity of all RE power plants is 10,3 GW (only 12,4% from the whole total installed power plants capacity 69,1 GW) Hydro 94,3 GW Installed Capacity 5,97GW Geothermal 23,9 GW Installed Capacity 2,13GW Solar Energy 207,8 GW Solar PV Centralized & Scattered 0,14GW Wind 60,6 GW Installed Capacity 0,15GW Bioenergy 32,6 GW Installed Capacity 1,87GW 11,6 Equal to ~75,2 MBOE Biodiesel Million Kilo Litres (Installed Capacity FAME refinery, 2019) (includes Palm Oil Mill Effluent/POME, Empty Fruit Bunch, Fibers, and Kernel : 8,7 GW) Indonesia’s Renewable Energy Resources v.s. Utilization (2019) Source: Directorate General of NREEC 69,1GW Coal Fossil Fuel + Bio Fuels Renewables
  • 12. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Overview - Electricity Engineering Needs 3.963 6.517 9.231 8.519 9.568 7.346 11.016 1.870 3.241 5.185 3.099 8.875 1.815 1.244 869 672 705 847 892 594 2.563 2.073 865 849 827 824 817 810 814 821 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 (S SUAI RUPT P N 0 9 0 8) TT Pembangkit (org) TT Transmisi(org) TT Distribusi (org)Powerplant Transmission Distribution Powerplant: 66.456 Workers Transmission: 19.612 Workers Distribution: 11.263 Workers ELECTRICAL ENGINEER & TECHNICAL OPERATOR MANPOWER DEMAND (PT. PLN’s Electricity Supply Business Plan 2019 – 2028) Source : DG Electricity – MEMR (Processed data)
  • 13. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 2021 2022 2023 2024 2025 2026 2027 2028 PLTA PS - - - 147 133 6 30 177 PLT lain (EBT) 2,398 6,419 3,946 1,191 3,179 70 97 319 PLTP 271 838 451 764 5,079 108 241 101 PLTA 1,063 - 256 625 2,962 198 288 306 - 2,000 4,000 6,000 8,000 10,000 12,000 Orang NRE Generating Capacity Building Plan in 2019 - 2028 (in MW) Source: RUPTL PLN 2019 - 2028 PLTP : Geothermal PLTA/PS : Hydro & Pump Storage (PS) PLTM : Minihydro PLTS : Solar PLTB : Wind PLT Bio/Sampah: Biogas & Biomass PLTAL : Tidal/Ocean EBT Lain / RE Other PLTA/Hydro : 5,698 PS /Pump Storage : 493 PLTP /Geothermal : 7,853 EBT lain /RE Other : 17,619 TOTAL Personnel : 31,663 Estimated HR demand for : FS, Build Design, EPC, Operation, Maintenance
  • 14. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke HR Capacity Building Program at PPSDM KEBTKE 01 Training 02 Certification 03 Technical Guidance 04 Energy Consultancy & Audit Services Electricity, New, Renewable Energy and Energy Conservation
  • 15. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Supporting the Directorate General of Electricity and Directorate General of NREEC to carry out the development of HR competencies through education and training in the fields of Electricity, New, Renewable Energy and Energy Conservation PPSDM KEBTKE Human Resources Development Centre for Electricity, New, Renewable Energy and Energy Conservation (MEMR Regulation No. 13 /Tahun 2016) Government Regulation No. 70 year 2009 Law No. 30 year 2009 : Electricity Law No. 30 year 2007 : Energy Main Objective : Legal Framework : WE ARE HERE TO SERVE : Central/Local Government General Public Industry + DEVELOP REGIONAL COOPERATION Legal Basis for HR Improvement Activities
  • 16. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Legal Basis of Electricity Safety, Electricity Certifications and Standards in Indonesia Any power installation in operation must hold a Commissioning Certificate Every electricity supporting business entity must have Business Entity Certificate (according to it’s classification and qualifications) Technician involved with any electricity businesses must hold a certificate of competency in Electricity Every equipment and electric power tools must comply to the Indonesian National Standards/ SNI requirements Any electricity business activities must meet the electricity safety requirements Any electricity business activities must meet the provisions as stated in the environmental laws and regulations. stipulated on Article 44 paragraph (6) Indonesia Law No. 30 of Year 2009 concerning Electricity
  • 17. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Certification of Personnel Competency Scheme Related to: Electricity + Renewable Energy and Energy Conservation CERTIFICATION AUTHORITIES: 5 1. Electrical Competency Certification Body (Lembaga Sertifikasi Kompetensi/ L S K) PPSDM KEBTKE being appointed by the DG of Electricity as government Electrical Competency Certification Body by the Ministry of EMR Decree No: 389K/20/DJL.4/2018 - Exclusive right to certify national electrical assessors - Certify electrical personels: Technicians, Electrical Engineers, Managerial level personels working in the electricity sector 2. Professional Certification Body (Lembaga Sertifikasi Profesi / L S P) PPSDM KEBTKE’s License : BNSP-LSP-613-ID 5 October 2016 - Certify personels working in Renewable Energy and Energy Conservation sector: Geothermal Field Operation Supervisors, Geothermal Geologist, Geophysicist, Geochemists, Industrial and Building Energy Managers and Energy Auditors. Directorate General of Electricity Ministry of Energy and Mineral Resources and BNSP (National Professional Certification) Ministry of Manpower Certification Processes are carried out by :
  • 18. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Certification Service Scheme Professional Certification Institute (LSP) BPSDM ESDM Competency Certification Institute (LSK) PPSDM KEBTKE BNSP dan DG NREEC • UU 30 th 2007 tentang Energi • PP 70 th 2009 tentang konservasi energi • UU 21 th 2014 tentang Panas Bumi • PP 7 th 2017 tentang pemanfaatan panas bumi • SKKNI Auditor Energi • SKKNI Manager Energi • SKNNI Panas Bumi DG Electricity • UU 30 th 2009 tentang ketenagalistrikan • Permen 38 th 2018 tentang Tatacara Akreditasi dan Sertifikasi • Permen ESDM No.46 th 2017 tentang SKTTK • Kepdirjen 217 Tentang Metodelogi Sertifikasi • Pedoman SKTTK Indonesian National Work Competency Standards (SKKNI) 19 Scope Certification Scheme Electricity Engineering Competency Standards (SKTTK) 19 Scope Subfields Implementation of Regulations Implementation of Regulations DG Electricity-MEMR Accreditation BNSP Accreditation Participants in 2019: 287 peoples Participants in 2019: 3200 peoples.
  • 19. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Certification Services Input Outcome In 2018 • 14 scope ELECTRICITY (LSK PPSDM KEBTKE) In 2018 • 7 scope Electric Power Generation (PLTU/GU/G/P/A/MH/D/EBT) 1. Consultation 2. Construction and Installation 3. Inspection and testing 4. Operation 5. Maintenance ELECTRIC POWER DISTRIBUTION (JTM/JTR) 1. Consultation 2. Construction and Installation 3. Inspection and testing 4. Operation 5. Maintenance UTILIZATION OF ELECTRICITY (JTM/JTR) 1. Consultation 2. Construction and Installation 3. Inspection and testing 4. Maintenance ELECTRICITY TRANSMISSION 1. Consultation 2. Construction and Installation 3. Inspection and testing 4. Operation 5. Maintenance 1. Energy Manager in Industry and buildings 2. Energy Auditor in Industry and Buildings 3. Geothermal First operations supervisor (POP) 4. Geothermal Intermediate operations Supervisor (POM) 5. Geothermal Main Operations Supervisor (POU) 6. Geothermal Geologist (3 level) 7. Geothermal Geochemist (3 level) NREEC (LSP BPSDM ESDM) 1. System Design Expert PLTS Off Grid 2. System Design Expert PLTS On Grid 3. System Design Expert PLTMH Off Grid under 100 kW 4. Energy Auditor in Buildings 5. Electricity Energy System Auditor 6. Thermal and Mechanical Energy Auditor 7. Installation and Development of NRE Generators (Solar, Hydro, Wind) 8. NRE Power Plant Inspection and Testing (Solar, Hydro, Wind) 9. Operation of the NRE Generator (Solar, Hydro, Wind) 10. Maintenance of NRE Generators (Solar, Hydro, Wind) 11. Geothermal Geophysicist 12. PLC Based Control Installation Expert 2019 Added 5 New scope 2019 Added 12 New scope 1. Energy Manager in Industry and buildings 2. Energy Auditor in Industry and Buildings 3. Geothermal First operations supervisor (POP) 1. Operation of PLTD 2. Maintenance of PLTD 3. Inspection and testing of PLTD 4. Construction and Installation PLTS 5. Maintenance of PLTU 6. Maintenance of JTM Distribution 7. Operation of PLTU 8. Inspection and testing PLTU 9. Construction and Installation PLTU FAVORITE CERTIFICATION
  • 20. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke THE ‘NEW NORMAL’ OF INDONESIA’S ELECTRICAL COMPETENCY CERTIFICATION : ONLINE METHOD Step-by-steps procedure for applying electrical competency certification at PPSDM KEBTKE’s Electrical Competency Certification Body - (Lembaga Sertifikasi Kompetensi/ L S K) are as follow: “Technician involved with any electricity businesses must hold a certificate of competency in Electricity” stipulated on Article 44 paragraph (6) Indonesia Law No. 30 of Year 2009 concerning Electricity ORAL ASSESSMENT VERIFICATION 2. VERIFICATION Application verification by Technical Officer In Charge 4. PRACTICAL ASSESSMENT Certification Participants submit their practical videos or self documentation doing certain Assessment. Furthermore, it will be observed together using the Zoom Cloud Meeting media 1. APPLICATION Applicant submits Assessment application letter, attached with form PP-1.1. to PP-1.4. 10 days before assessment day. 3. WRITTEN ASSESSMENT Online written test using PPSDM KEBTKE’s Learning Management System (LMS) and Live by Online Cloud Meeting (Zoom) 5. ORAL ASSESSMENT Oral assessment conducted live using the Zoom Cloud Meeting Media FEEDBACK 6. FEEDBACK Announcement of the assessment results by the assessor team (Competent / Not yet Competent) WRITTEN ASSESSMENT APPLICATION PRACTICAL ASSESSMENT
  • 21. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke ONLINE CERTIFICATION DOCUMENTATION WRITTEN Assessment PRACTICAL Assessment ORAL Assessment
  • 22. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Technical Training (DT) and Technical Guidance (Bimtek) DT New, Renewable Energy DT Energy ConservationDT Electricity 1. Electricity Assessor 2. Electricity Safety (K2) 3. Electricity Utilization Installation 4. Mechanical and Generating instruments 5. Electric Power System Inspection 6. Coal Power Plant Planning / Operation / Main tenance 7. PLTD Planning / Operation / Maintenance 1. POP, POM, POU Geothermal 2. Geothermal Geochemist 3. Geothermal Geophysicist 4. Bioenergy 5. Preparation of FS / Planning / Development / Operation / Maintenance of PLTMH 6. Preparation of FS / Planning / Development / Op eration / Maintenance PLTB 7. Preparation of FS / Planning /Development / Operation / Maintenance of Centralized / Communal / Rooftop PLTS 1. Fundamentals of Energy Conservation 2. Energy Savings 3. Energy Conservation Tips 4. Implementation of an Energy Management System (ISO:50001) 5. Energy Auditor in Industry 6. Energy Auditor in Buildings 7. Energy Manager in Industry 8. Energy Manager in Buildings Train Participants and Technical Guidance in 2019 : 1250 peoples
  • 23. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Activities Electricity Assessor Coal Power Plant OperationPLTD operator Energy Auditor in Buildings PLTS Operation Electricity Utilization Installation Electric Power Distribution
  • 24. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Our Facilities ELECTRICITY ENERGY CONSERVATION RENEWABLE ENERGY SUPPORTING FACILITIES
  • 25. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 01 Introduction 02 03 HR Improvement Program 04 Partnership 05 Closing PPSDM – KEBTKE Transformation
  • 26. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Partnership to provide a Competency Test Venue (TUK) 40 TUK : Industry and University throughout Indonesia SUMATERA UTARA : 1. UNIVERSITAS SUMATERA UTARA (KERJASAMA) 2. INSTITUT TEKNOLOGI MEDAN (KERJASAMA) 3. PT. SORIK MARAPI GEOTHERMAL POWER (SEWAKTU) 4. PT. INDONESIA ASAHAN ALUMINIUM (KERJASAMA) 5. PLTU BELAWAN 6. PLTU ASAHAN DKI JAKARTA : 1. PT. INDONESIA POWER (SEWAKTU) 2. PT. PEMBANGKIT JAWA BALI (SEWAKTU) 3. PT. PERTAMINA CORPORATE UNIVERSITY (KERJASAMA) 4. STT PLN (KERJASAMA) 5. PT. PERTAMINA (KERJASAMA) 6. PT. PLN (Persero) UPT PULOGADUNG - GI PULOMAS JAWA TENGAH : 1. UNIVERSITAS GAJAH MADA (KERJASAMA) 2. UNIVERSITAS NEGERI YOGYAKARTA (KERJASAMA) 3. POLITEKNIK NEGERI SEMARANG (KERJASAMA) 4. CV. SOLARINDO (SEWAKTU) 5. PT. TJB POWER SERVICES JAWA TIMUR : 1. POLITEKNIK NEGERI MALANG (KERJASAMA) 2. PT. PJB ACADEMY (SEWAKTU) 3. EXXONMOBIL INDONESIA (SEWAKTU) 4. PT.POMI (KERJA SAMA) KALIMANTAN TIMUR : 1. PT. SLJ GLOBAL (SEWAKTU) PAPUA : 1. PT. FREEPORT INDONESIA (SEWAKTU) KALIMANTAN BARAT : 1. UP3B PLN PONTIANAK (KERJASAMA) SUMATERA BARAT : 1. PLN UPP TELUK SIRIH (SEWAKTU) KALIMANTAN SELATAN : 1. PT. TANJUNG POWER INDONESIA (SEWAKTU) 2. PT. MAKMUR SEJAHTERA WISESA (KERJA SAMA) 3. PT.PLN GARDU INDUK CEMPAKA (KERJA SAMA) BANTEN : 1. PT. INDONESIA POWER – LONTAR (SEWAKTU) 2. PT. INDONESIA POWER – LABUAN (SEWAKTU) 3. PT. KRAKATAU DAYA LISTRIK (SEWAKTU) 4. PT. ASAHIMAS (SEWAKTU)z SULAWESI SELATAN : 1. POLITEKNIK NEGERI UJUNG PANDANG (KERJASAMA) JAWA BARAT : 1. PT. PEMBANGKIT JAWA BALI (SEWAKTU) 2. PT. PLN (SEWAKTU) 3. PT. INDONESIA POWER (SEWAKTU) 4. POLITEKNIK NEGERI JAKARTA (KERJASAMA) 5. POLITEKNIK NEGERI BANDUNG (KERJASAMA) 6. PT. INDOFOOD SUKSES MAKMUR (SEWAKTU) 7. PLTGU MUARA TAWAR
  • 27. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Partnership to Provide Assessors 93 Assessors from Industries and Universities SUMATERA UTARA : 1 Assessor DKI JAKARTA 46 Assessor JAWA TENGAH 2 Assessor JAWA TIMUR 4 Assessor KALIMANTAN TIMUR 4 Assessor SUMATERA BARAT 2 Assessor KALIMANTAN SELATAN 11 Assessor BANTEN : 4 Assesor MALUKU UTARA 1 Assessor JAWA BARAT 2 Assessor RIAU: 2 Asessor JAMBI 1 Assessor BANGKA BELITUNG 1 Assessor KEPULAUAN RIAU 4 Assessor YOGYAKARTA 1 Assessor
  • 28. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Business Partner
  • 29. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Local Government Partners Banten Jawa Barat DKI Jakarta Sumatera Barat Sumatera Utara Jawa Tengah Kalimantan Selatan Kalimantan Timur Jambi Kepulauan Riau Riau
  • 30. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke 01 Introduction 02 03 HR Improvement 04 Partnership 05 Closing PPSDM – KEBTKE Transformation
  • 31. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Closing Rapid growth of electricity demand in Indonesia and the Government’s RE target on it’s energy mix, has put PPSDM KEBTKE to a more strategic position, specifically on the duty to providing competent and qualified electrical and technical personnel working on the energy sector in Indonesia. To strengthen the preparation of human resources in supporting renewable energy growth and energy transition, PPSDM KEBTKE continues to refine and add various norms, standards, procedures and criteria (NSPK) which are needed as a legal basis recognized by all stakeholders. Currently there are around 640 occupational competencies that can be served / implemented. The refinement of this NSPK continues to be carried out for all types of renewable energy commodities including geothermal. In order to prepare for the development of technology 4.0 and also face various situations that become obstacles to modern learning (for example, the Covid19 problem), PPSDM KEBTKE has also perfected distance learning-based learning methods. This method has been implemented during the Covid19 pandemic period and has received legal recognition from both the Ministry of Energy and Mineral Resources and the Ministry of Manpower (cq. BNSP). During the period July - September 2020, this method has been implemented to support workforce competence in various industries. Anticipation of technological developments and lessons learned from the experiences of countries that have advanced in the use of EBT continue to be carried out both institutionally with international institutions, and by involving business entities that have international reputations. This international cooperation continues to be strengthened through dialogue and agreements based on G-G with NRE partner countries 1. 2. 3.
  • 32. ppsdm kebtke kesdm ppsdm kebtke kesdm www.ppsdmkebtke.esdm.go.id ppsdm kebtke @ppsdmkebtke Scan Me ! Website: Laode Sulaeman laode.sulaeman@gmail.com +62-81210949003 laode.sulaeman@esdm.go.id