Ministry of Land, Infrastructure, Transport and Tourism
Experiences and Strategy of Infrastructure
Development in Japan
February 29, 2016
Toshio OKAZUMI
Director of International Cooperation and Infrastructure Engineering,
Overseas Projects Division, Policy Bureau,
Ministry of Land, Infrastructure, Transport and Tourism- JAPAN
Ministry of Land, Infrastructure, Transport and Tourism
Contents
1
1. Quality Infrastructure – its high quality effect as
a stock of social assets –
2. Japanese Destiny and Present Problems we are
facing
3. Our Challenges and Strategy
Ministry of Land, Infrastructure, Transport and Tourism
2
1. Quality Infrastructure – its high quality effect as
a stock of social assets –
Ministry of Land, Infrastructure, Transport and Tourism
Improvement of Ring Road (Tokyo)
Wednesday, November 27, 2013 Friday, March 13, 2015
After openingBefore opening
Road conditions before and after opening
Inner Ring Expressway
Shinagawa Route
Opened in March 2015
Changes in traffic and time loss from congestion
4.6
2.2
47.9
45.5
0.0
30.0
60.0
0.0
3.0
6.0
開通前 開通後
Traffic Central Ring Road
Time loss from
congestion
Amount of traffic
Time loss from
congestion
Prior to opening:March 10 to April 7, 2015 、 After opening: March 10 to April 7, 2016
Before
opening
After opening
5% reduction
50% Reduction
○9 hour daily traffic congestion around
the Hamasakibashi Junction was almost
resolved.
before after
○Traffic accumulation in Tokyo was
distributed as a result of the Inner Ring
Expressway, then traffic congestion
reduced by half.
Timelossfromcongestion
(Tenthousand/day,time/day
Metropolitan
Inner City
Expressway
Outer Ring
Expressway
Ohashi Junction
Gotanda
EXIT
Gotanda
ENTRANCE
Oi Junction
Inner Ring
Expressway
3
Ministry of Land, Infrastructure, Transport and Tourism
0
10
20
30
H14 H15 H16 H17 H18 H19 H20 H21 H22 H23 H24 H25
産業指定地内の企業立地の件数
件
首都圏外郭放水路
部分通水
首都圏外郭放水路
完全通水
30
20
10
0
件
数
(件
)
H14 H16 H18 H20 H22 H24
企業立地件数※2
2002 2004 2006 2008 2010 2012
NumberofBusinessLocations
○ Reduction of inundated buildings from flood by the
effect of the Metropolitan Outer Underground Channel
→Approximately 7,000 buildings (from 1975 to 1984)
→Approximately 50 buildings (from 2005 to 2014)
○Kasukabe City could be designated as an “Industrial
Designated Area” in 2003, thanks to this Underground
Channel.
○28 businesses (warehouses, shopping centers) were
newly located in this area thanks to the Channel
Metropolitan Outer Underground Channel (Saitama)
首
都
圏
外
郭
放
水
路
春日部市
before
after
Newly located businesses(warehouses, shopping centers)
Industrial Designated Area
Kasukabe City
Route16
Route 16
Channel 18
Outer
Discharge
Channel
Shaft
Channel 18Nakagawa
Nakagawa
Shaft
Kasukabe City
New Business in the Industrial Designated
Partial functioned
Channel Complete
4
Ministry of Land, Infrastructure, Transport and Tourism
Use of Sewage Heat in Makuhari (Chiba Prefecture)
before after
Heat Pump
(Heat Source Equipment)
Air Temperature
0℃ Use as
a heater
When using outside air
as a heat source
Heater
47℃
+47℃ Amount of Energy
Consumption
Release
-5℃
Room Temperature
40℃
High Power
Heat Pump
(Heat Source Equipment)
Use as
a Heater
When using sewage
as a heat source
Sewage
20℃
Heater
47℃
+27℃ Amount of Energy
Consumption
Release
15℃
Room Temperature
40℃
Low Power
(58,000m3/
日)
Kaihinmakuhari
Station
Makuhari
Shintoshin
Makuhari
Shintoshin
Hanamikawa
Terminal
Treatment
Plant
Water intake for
thermal usage
Discharged as is
Hanamikawa
Terminal
Treatment
Plant
Kaihinmakuhari
Station
○In Makuhari Shintoshin Area of Chiba
Prefecture, sewage water discharged from
the treatment plant is introduced to the
area’s cooling and heating. It is used as a
cooler, heater, and hot water supply at 14
buildings.
○Use of sewage heat reduces CO2 as well as
lowers economic costs by approximately 100
million yen annually
Use of Sewage Heat
1
2
8
8
11
14
0
5
1
1
0
20
40
60
80
100
H2 H7 H12 H17 H22 H27
下水熱利用量
下水熱利用箇所数
SewageHeatUse
(Calculatedbyevery
10,000households)
1990 1995 2000 2005 2010 2015
Amount of used sewage
Number of sewage
use locations
5
Ministry of Land, Infrastructure, Transport and Tourism
6
2. Japanese Destiny and Present Problems we are
facing
Ministry of Land, Infrastructure, Transport and Tourism
7
Japanese destiny based on its characteristics
• Although the area of Japan is only 0.25% of the area of the world,
20% of earthquakes over 6.0 on the Richter scale occurred in Japan
and its surrounding area.
Vulnerable to disasters
Japan 220
Number of Earthquakes
(1994~2003)
Total
960
Source: Central Disaster Prevention Council -Japan
(22.9%)
Epicenter Distribution
※Earthquakes over 6.0 on the Richter scale
Ministry of Land, Infrastructure, Transport and Tourism
8
【Tokyo】
【Paris】
【New York】
【London】
Japanese destiny based on its characteristics
8
Vulnerable to disasters
• The elevation of cities in Japan is lower than the flood water level of rivers.
• There are many steep rivers in Japan compared with rivers in foreign
countries.
River flood water surface elevation
in London, Paris and New York
River flood water surface elevations in Tokyo
River slopes in Japan and foreign countries
Source: MLIT
Rhine
Rivers in Japan
Seine
Loire
Colorado
Mekong
Distance
(km)
Elevation
(m)
出典:「水害の世紀―日本列島で何が起こっているのか」森野美徳 監修
Country
area
(10,000㎢)
Habitable
land area
(10,000㎢)
Ratio
(%)
Japan 37.86 10.35 27.3
U.K. 24.38 20.63 84.6
France 54.79 39.72 72.5
Germany 35.67 23.79 66.7
Japan
U.K.
Germany
France
Habitable land area
Japanese destiny based on its characteristics
9
Limited habitable land
• The ratio of habitable land area to country area in Japan is lower
than in foreign countries.
Legend
Habitable area in white
Japanese destiny based on its characteristics
10
Infrastructure development under severe conditions
• Infrastructure in Japan has been developed against severe natural
disasters under vulnerable condition.
Piers of HANSHIN Expressway in Japan Piers of access road to Charles-de-
Gaulle Airport in France
Inundation disaster caused by the heavy rain on Sep 10 (2015) in
Jyoso city
Jyoso city
Sep 20152006
:KINU river
basin
Recent Disasters
11
石巻市
南三陸町
東松島市
七ヶ浜町
仙台市
多賀城市
名取市
亘理町
山元町
岩沼市
南相馬市
新地町
相馬市
陸前高田市
気仙沼市
釜石市
大槌町
山田町
気仙沼市
陸前高田市
Maximum area
inundated
※1: Aug 4 ,2011 press release by City Bureau
※2: Produced from “Damage Situation and Police
Countermeasures associated with 2011 Tohoku district - off the
Pacific Ocean Earthquake” by National Police Agency (As of
Feb. 14, 2012)
 535km2 of land was inundated
 Approx. 10% (119km2) was urban area
 Approx. 129,000 buildings were destroyed
 15,850 Fatalities, 3,282 missing
Recent Disasters
Great East Japan Earthquake and Tsunami in 2011
Produced from “Inundation Condition Map” by
Geospatial Information Authority
12
Recent Disasters
• Great Hanshin-Awaji Earthquake,
January, 1995
13
There is concern that the safety of various types of infrastructure against large-
scale accidents and disasters will deteriorate as a result of their aging.
Corroded impeller of a draining pump plantAged seabank
破断箇所 補修後
平成19年6月20日破断を発見 平成19年6月29日補修完了
Fractured diagonal member of
a truss bridge
(Great Kiso River Bridge)
Sinking of the apron part of a port facility
Aging of Infrastructure
Fractured part
14
18%
25%
2%
8%
43% 43%
9%
32%
67%
64%
24%
58%
0%
20%
40%
60%
80%
2013 2023 2033 2013 2023 20332013 2023 2033
Road bridges River facilities
(e.g. water gates) Sewerage piping Port quays
Among the facilities developed during and after the high economic growth period,
the proportions of the ones that will become 50-years-old or older will increase at
increasing rates in the next 20 years.
Present Situation of the Aging Infrastructure
2013 2023 2033
* The figures are all as of March.
Proportions of Infrastructure that 50-years-old or older
15
16
3. Our Challenges and Strategy
Challenges for “smart use of infrastructure”
• Under these limited conditions, Japan proactively has been selecting
“smart use of infrastructure” instead of “expanding it”.
出典 オンタリオ州政府
http://www.mto.gov.on.ca/english
/transtek/roadtalk/rt16-4/
17
Limitation of infrastructure development
Challenges for “smart use of infrastructure”
18
<Smart route selection using “ETC 2.0” >
相模湾
Pacific
ocean
Maximum
efficiency
Congested
Not
congested
About 80%
(by 2015)
<Construction of ring expressway>
Three ring roads in
Tokyo Metropolitan Area
64% complete
Chuo Expressway
Inner Ring
Expressway
Congestion!
22
Legend
Sectors that are in service (as
of June 14, 2013)
Provisional 2
lanes*
To be in service by FY 2015* 4 lanes
Under construction (to be
completed in FY 2016 or
thereafter)
6 lanes
○○○ Under study
※
※
* It is not known when non-completed
lanes of provisional 2 lanes will be
constructed.
New challenges for “smart use of infrastructure ”
• “Smart use of roads” utilizing ITS(Intelligent Transport System) or toll control
measures optimizes distribution of traffic volume .
Challenges for “smart use of infrastructure”
19
• Congestion at toll gates on expressways throughout Japan is largely
eliminated
Successful examples of “smart use
of infrastructure ”:
“ETC” (Electronic toll collection system)
2000
(before ETC)
2008
(after ETC)
3,974 times
(30% of congestion on
expressway)
60 times
< Congestion at toll gates >
Congestion
is eliminated
※ETCは2001年に
本格導入
※渋滞回数: 年間渋滞回数が30回以上又は平均渋滞長が2km以上かつ渋滞回数
が5回以上の主要渋滞ポイントの渋滞回数
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
<Adoption rate for ETC>
(On-board Device)
Roadside antenna
Bidirectional wireless
communications
Challenges for “smart use of infrastructure”
20
• The “SHINKANSEN” realizes high safety, reliability and environmental
friendliness.
Safety
1
Reliability
2
Environmental
Friendliness
3
Passenger
Fatalities
①Operating frequency CO2
emissions
②Average delay time
per trip
15trains/hour
within 1 min.
– ZERO –
50Years
(1964→2014)
1 : 5 : 7.5
g-CO2/person-km
Successful examples of “smart use
of infrastructure ”:
High speed train “SHINKANSEN”
21
Reduction through preventive
maintenance and of new technologies.
○ To prevent further acceleration of the deterioration of infrastructures due to their aging,
MLIT has been intensively conducting inspections, diagnoses, etc.
○ MLIT is aiming at establishing a preventive maintenance-based maintenance cycle to
reduce and level the maintenance cost.
Image of the maintenance cost reduction
and leveling to be achieved
Image of the envisaged maintenance cycle
Diagnosis
Recording
Lifespan Prolongation Plan
Reflection Improvement
MeasuresInspection
Establishing a Maintenance Cycle
Leveling through
planned efforts
Dejima Bridge (Nagasaki City)
[1910 (105 years)]
Establishing a Maintenance Cycle - success examples
No.10 Sluiceway (Kamiita Town,
Tokushima Prefecture) [1922 (93 years)]
Rokugo Water Gate (Ota Ward, Tokyo)
[1930 (85 years)]
22
Improvingtheproductivityandquality
Consensus is
reached faster.
Decisions can
be made faster
Reduce mistakes
in the design
and the extra
time
Workability is
improved
Data sharing
between CIM
and ICT-aided
project on site
Shorteningthetimetocompletion
Comparisons
and evaluations
can be made
easily.
Reinforcement bar layout
simulation
Selection of the optimal route
Confirmation of a complex order
of work steps
Meeting for explaining the project
to local residents
Meeting between the project
owner and contractor
Machine control
Design changes
can be made
easily
ResearchDesign
Work
implementation
Maintenance
work
センサー情報
モデル化素材
議論情報
etc
情報共有ツール
センサーデータ
ヘルスモニタリング
異常値を感知すると、メンバーへの
通知(アラート)が可能
Image of an information-sharing tool for maintenance work
Establishment and operation of
an asset management system
Optimization
of
maintenance
work
Evacuation route
Inclination
of slope
3-dimensional model (simplified)
3-dimensional model
(detailed)
Safety of the
project site
3-dimensional model
3-dimensional model
3-dimensional model
One of the most advanced construction production systems in the world
⇒ Creation of a new industry
Introducing Construction Information Modeling (CIM)
The tool’s settings can be set so that an alarm
message will be sent to the members when an
abnormal value is detected.
Data for modeling
Discussioninformation
Sensor information
Monitor for the
operator
The record of the work
performed and the status of
the work being performed
are displayed.
Sensor data
Health monitoring
Information sharing tool
23
Ministry of Land, Infrastructure, Transport and Tourism
Logistics
High-speed railways
Urban railways /
transport system Toll Roads
Ships / Offshore units Port terminals
Airport terminals
Urban development
 First Project (October 2015):
The Management and Operation of Thi Vai International Port’s Terminal
Business in Vietnam
 Second Project (November 2015):
The Texas High-Speed Railway Project
 Third Project (December 2015):
Urban Passenger Railway Transportation Project in Brazil
JOIN (Japan Overseas Infra. Investment Corp.)
24
Our Challenges and Strategy
1. “Revolution in Construction” to be realized (strategic
management, long-term plan, prioritizing effective stock effect, i-Construction)
2. Introduction and utilization of various funds (national, local,
PPP/PFI, charge, fare, JOIN, etc.)
3. Preventive and Strategic Maintenance (maintenance cycle,
maintenance industry, introducing robot in the fields, etc.)
4. Japanese Contribution for international fields (quality
infrastructure, technology transfer, capacity building, PPP, etc.)
Important strategy for future Infrastructure
A) Economic and Effective use of infrastructure and
Preventive and Strategic Maintenance
B) Investment of Infrastructure Development must be
recognized as basic needs for development
25
Ministry of Land, Infrastructure, Transport and Tourism
Thank you for your attention
26

Weitere ähnliche Inhalte

Andere mochten auch

Mexico City new international airport - Frederico Patino, Mexico
Mexico City new international airport - Frederico Patino, MexicoMexico City new international airport - Frederico Patino, Mexico
Mexico City new international airport - Frederico Patino, MexicoOECD Governance
 
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...OECD Governance
 
Project Initiation Routemap - Denise Bower, United Kingdom
Project Initiation Routemap - Denise Bower, United KingdomProject Initiation Routemap - Denise Bower, United Kingdom
Project Initiation Routemap - Denise Bower, United KingdomOECD Governance
 
What is the problem? Mapping the gaps in infrastrastructure governance today ...
What is the problem? Mapping the gaps in infrastrastructure governance today ...What is the problem? Mapping the gaps in infrastrastructure governance today ...
What is the problem? Mapping the gaps in infrastrastructure governance today ...OECD Governance
 
Crossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomCrossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomOECD Governance
 
Private sector in infrastructure funding/financing models and role of institu...
Private sector in infrastructure funding/financing models and role of institu...Private sector in infrastructure funding/financing models and role of institu...
Private sector in infrastructure funding/financing models and role of institu...OECD Governance
 
Presentation JAPAN FOOD
Presentation JAPAN FOODPresentation JAPAN FOOD
Presentation JAPAN FOODcarmegm
 
Japan Power Point
Japan Power PointJapan Power Point
Japan Power Pointcpaige15
 

Andere mochten auch (9)

Mexico City new international airport - Frederico Patino, Mexico
Mexico City new international airport - Frederico Patino, MexicoMexico City new international airport - Frederico Patino, Mexico
Mexico City new international airport - Frederico Patino, Mexico
 
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...
Planning and preparing Infrastructure plans and projects - Jose Viegas, ITF, ...
 
Project Initiation Routemap - Denise Bower, United Kingdom
Project Initiation Routemap - Denise Bower, United KingdomProject Initiation Routemap - Denise Bower, United Kingdom
Project Initiation Routemap - Denise Bower, United Kingdom
 
What is the problem? Mapping the gaps in infrastrastructure governance today ...
What is the problem? Mapping the gaps in infrastrastructure governance today ...What is the problem? Mapping the gaps in infrastrastructure governance today ...
What is the problem? Mapping the gaps in infrastrastructure governance today ...
 
Crossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United KingdomCrossrail Governance - Simon Adams, United Kingdom
Crossrail Governance - Simon Adams, United Kingdom
 
Private sector in infrastructure funding/financing models and role of institu...
Private sector in infrastructure funding/financing models and role of institu...Private sector in infrastructure funding/financing models and role of institu...
Private sector in infrastructure funding/financing models and role of institu...
 
Presentation JAPAN FOOD
Presentation JAPAN FOODPresentation JAPAN FOOD
Presentation JAPAN FOOD
 
Japanese Ppt
Japanese PptJapanese Ppt
Japanese Ppt
 
Japan Power Point
Japan Power PointJapan Power Point
Japan Power Point
 

Ähnlich wie Experiences and Strategy of Infrastructure Development in Japan - Toshio Okazumi, Japan

Prof. Noboru Koshizuka gfke 2014
Prof. Noboru Koshizuka gfke 2014Prof. Noboru Koshizuka gfke 2014
Prof. Noboru Koshizuka gfke 2014innovationoecd
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...The Business Council of Mongolia
 
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...WRI Ross Center for Sustainable Cities
 
TOKYO: 5 Year Low Carbon Plan
TOKYO: 5 Year Low Carbon PlanTOKYO: 5 Year Low Carbon Plan
TOKYO: 5 Year Low Carbon PlanJaney Lin Zhao
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_iiVictor Peters
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laningAjay Prasad
 
Guangzhou - case study
Guangzhou - case studyGuangzhou - case study
Guangzhou - case studyParth Sadaria
 
BCCJ | Barclays Disaster Presentation
BCCJ | Barclays Disaster PresentationBCCJ | Barclays Disaster Presentation
BCCJ | Barclays Disaster PresentationSam Maddicott
 
Development Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptxDevelopment Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptxCREBAWebmaster
 
Ali Mahran - the importance of railways for development of reigional communities
Ali Mahran - the importance of railways for development of reigional communitiesAli Mahran - the importance of railways for development of reigional communities
Ali Mahran - the importance of railways for development of reigional communitiesimadhammoud
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaenergiewaechterGmbH
 
News 07 (en)
News 07 (en)News 07 (en)
News 07 (en)otakio
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...BRTCoE
 
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Htike Aung Kyaw
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Crosstown TO
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Crosstown TO
 

Ähnlich wie Experiences and Strategy of Infrastructure Development in Japan - Toshio Okazumi, Japan (20)

Prof. Noboru Koshizuka gfke 2014
Prof. Noboru Koshizuka gfke 2014Prof. Noboru Koshizuka gfke 2014
Prof. Noboru Koshizuka gfke 2014
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
 
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
 
TOKYO: 5 Year Low Carbon Plan
TOKYO: 5 Year Low Carbon PlanTOKYO: 5 Year Low Carbon Plan
TOKYO: 5 Year Low Carbon Plan
 
2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii2818 smart rail_report_the_future_of_asian_rail_ii
2818 smart rail_report_the_future_of_asian_rail_ii
 
Tokyo station city
Tokyo station cityTokyo station city
Tokyo station city
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
 
Guangzhou - case study
Guangzhou - case studyGuangzhou - case study
Guangzhou - case study
 
BCCJ | Barclays Disaster Presentation
BCCJ | Barclays Disaster PresentationBCCJ | Barclays Disaster Presentation
BCCJ | Barclays Disaster Presentation
 
Development Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptxDevelopment Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptx
 
Ali Mahran - the importance of railways for development of reigional communities
Ali Mahran - the importance of railways for development of reigional communitiesAli Mahran - the importance of railways for development of reigional communities
Ali Mahran - the importance of railways for development of reigional communities
 
Sri Lanka - The hub of South Asia
Sri Lanka - The hub of South AsiaSri Lanka - The hub of South Asia
Sri Lanka - The hub of South Asia
 
Paul_Kelly.ppt
Paul_Kelly.pptPaul_Kelly.ppt
Paul_Kelly.ppt
 
Thailand Investment Review, February 2016
Thailand Investment Review, February 2016Thailand Investment Review, February 2016
Thailand Investment Review, February 2016
 
News 07 (en)
News 07 (en)News 07 (en)
News 07 (en)
 
Transiting tokyo
Transiting tokyoTransiting tokyo
Transiting tokyo
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework Development of Osaka Bay Area - Exercise in Global Architecture Coursework
Development of Osaka Bay Area - Exercise in Global Architecture Coursework
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 

Mehr von OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsOECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfOECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxOECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxOECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxOECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxOECD Governance
 

Mehr von OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Kürzlich hochgeladen

ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23JSchaus & Associates
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsBeat Estermann
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportEnergy for One World
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...Amil Baba Dawood bangali
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Christina Parmionova
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfAndrew Griffith
 
Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsSERUDS INDIA
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxPETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxCrisAnnBusilan
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Amil baba
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdfilocosnortegovph
 

Kürzlich hochgeladen (20)

ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
 
2024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 232024: The FAR, Federal Acquisition Regulations - Part 23
2024: The FAR, Federal Acquisition Regulations - Part 23
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical Implications
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 Report
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdf
 
Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor Students
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxPETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf
 

Experiences and Strategy of Infrastructure Development in Japan - Toshio Okazumi, Japan

  • 1. Ministry of Land, Infrastructure, Transport and Tourism Experiences and Strategy of Infrastructure Development in Japan February 29, 2016 Toshio OKAZUMI Director of International Cooperation and Infrastructure Engineering, Overseas Projects Division, Policy Bureau, Ministry of Land, Infrastructure, Transport and Tourism- JAPAN
  • 2. Ministry of Land, Infrastructure, Transport and Tourism Contents 1 1. Quality Infrastructure – its high quality effect as a stock of social assets – 2. Japanese Destiny and Present Problems we are facing 3. Our Challenges and Strategy
  • 3. Ministry of Land, Infrastructure, Transport and Tourism 2 1. Quality Infrastructure – its high quality effect as a stock of social assets –
  • 4. Ministry of Land, Infrastructure, Transport and Tourism Improvement of Ring Road (Tokyo) Wednesday, November 27, 2013 Friday, March 13, 2015 After openingBefore opening Road conditions before and after opening Inner Ring Expressway Shinagawa Route Opened in March 2015 Changes in traffic and time loss from congestion 4.6 2.2 47.9 45.5 0.0 30.0 60.0 0.0 3.0 6.0 開通前 開通後 Traffic Central Ring Road Time loss from congestion Amount of traffic Time loss from congestion Prior to opening:March 10 to April 7, 2015 、 After opening: March 10 to April 7, 2016 Before opening After opening 5% reduction 50% Reduction ○9 hour daily traffic congestion around the Hamasakibashi Junction was almost resolved. before after ○Traffic accumulation in Tokyo was distributed as a result of the Inner Ring Expressway, then traffic congestion reduced by half. Timelossfromcongestion (Tenthousand/day,time/day Metropolitan Inner City Expressway Outer Ring Expressway Ohashi Junction Gotanda EXIT Gotanda ENTRANCE Oi Junction Inner Ring Expressway 3
  • 5. Ministry of Land, Infrastructure, Transport and Tourism 0 10 20 30 H14 H15 H16 H17 H18 H19 H20 H21 H22 H23 H24 H25 産業指定地内の企業立地の件数 件 首都圏外郭放水路 部分通水 首都圏外郭放水路 完全通水 30 20 10 0 件 数 (件 ) H14 H16 H18 H20 H22 H24 企業立地件数※2 2002 2004 2006 2008 2010 2012 NumberofBusinessLocations ○ Reduction of inundated buildings from flood by the effect of the Metropolitan Outer Underground Channel →Approximately 7,000 buildings (from 1975 to 1984) →Approximately 50 buildings (from 2005 to 2014) ○Kasukabe City could be designated as an “Industrial Designated Area” in 2003, thanks to this Underground Channel. ○28 businesses (warehouses, shopping centers) were newly located in this area thanks to the Channel Metropolitan Outer Underground Channel (Saitama) 首 都 圏 外 郭 放 水 路 春日部市 before after Newly located businesses(warehouses, shopping centers) Industrial Designated Area Kasukabe City Route16 Route 16 Channel 18 Outer Discharge Channel Shaft Channel 18Nakagawa Nakagawa Shaft Kasukabe City New Business in the Industrial Designated Partial functioned Channel Complete 4
  • 6. Ministry of Land, Infrastructure, Transport and Tourism Use of Sewage Heat in Makuhari (Chiba Prefecture) before after Heat Pump (Heat Source Equipment) Air Temperature 0℃ Use as a heater When using outside air as a heat source Heater 47℃ +47℃ Amount of Energy Consumption Release -5℃ Room Temperature 40℃ High Power Heat Pump (Heat Source Equipment) Use as a Heater When using sewage as a heat source Sewage 20℃ Heater 47℃ +27℃ Amount of Energy Consumption Release 15℃ Room Temperature 40℃ Low Power (58,000m3/ 日) Kaihinmakuhari Station Makuhari Shintoshin Makuhari Shintoshin Hanamikawa Terminal Treatment Plant Water intake for thermal usage Discharged as is Hanamikawa Terminal Treatment Plant Kaihinmakuhari Station ○In Makuhari Shintoshin Area of Chiba Prefecture, sewage water discharged from the treatment plant is introduced to the area’s cooling and heating. It is used as a cooler, heater, and hot water supply at 14 buildings. ○Use of sewage heat reduces CO2 as well as lowers economic costs by approximately 100 million yen annually Use of Sewage Heat 1 2 8 8 11 14 0 5 1 1 0 20 40 60 80 100 H2 H7 H12 H17 H22 H27 下水熱利用量 下水熱利用箇所数 SewageHeatUse (Calculatedbyevery 10,000households) 1990 1995 2000 2005 2010 2015 Amount of used sewage Number of sewage use locations 5
  • 7. Ministry of Land, Infrastructure, Transport and Tourism 6 2. Japanese Destiny and Present Problems we are facing
  • 8. Ministry of Land, Infrastructure, Transport and Tourism 7 Japanese destiny based on its characteristics • Although the area of Japan is only 0.25% of the area of the world, 20% of earthquakes over 6.0 on the Richter scale occurred in Japan and its surrounding area. Vulnerable to disasters Japan 220 Number of Earthquakes (1994~2003) Total 960 Source: Central Disaster Prevention Council -Japan (22.9%) Epicenter Distribution ※Earthquakes over 6.0 on the Richter scale
  • 9. Ministry of Land, Infrastructure, Transport and Tourism 8 【Tokyo】 【Paris】 【New York】 【London】 Japanese destiny based on its characteristics 8 Vulnerable to disasters • The elevation of cities in Japan is lower than the flood water level of rivers. • There are many steep rivers in Japan compared with rivers in foreign countries. River flood water surface elevation in London, Paris and New York River flood water surface elevations in Tokyo River slopes in Japan and foreign countries Source: MLIT Rhine Rivers in Japan Seine Loire Colorado Mekong Distance (km) Elevation (m) 出典:「水害の世紀―日本列島で何が起こっているのか」森野美徳 監修
  • 10. Country area (10,000㎢) Habitable land area (10,000㎢) Ratio (%) Japan 37.86 10.35 27.3 U.K. 24.38 20.63 84.6 France 54.79 39.72 72.5 Germany 35.67 23.79 66.7 Japan U.K. Germany France Habitable land area Japanese destiny based on its characteristics 9 Limited habitable land • The ratio of habitable land area to country area in Japan is lower than in foreign countries. Legend Habitable area in white
  • 11. Japanese destiny based on its characteristics 10 Infrastructure development under severe conditions • Infrastructure in Japan has been developed against severe natural disasters under vulnerable condition. Piers of HANSHIN Expressway in Japan Piers of access road to Charles-de- Gaulle Airport in France
  • 12. Inundation disaster caused by the heavy rain on Sep 10 (2015) in Jyoso city Jyoso city Sep 20152006 :KINU river basin Recent Disasters 11
  • 13. 石巻市 南三陸町 東松島市 七ヶ浜町 仙台市 多賀城市 名取市 亘理町 山元町 岩沼市 南相馬市 新地町 相馬市 陸前高田市 気仙沼市 釜石市 大槌町 山田町 気仙沼市 陸前高田市 Maximum area inundated ※1: Aug 4 ,2011 press release by City Bureau ※2: Produced from “Damage Situation and Police Countermeasures associated with 2011 Tohoku district - off the Pacific Ocean Earthquake” by National Police Agency (As of Feb. 14, 2012)  535km2 of land was inundated  Approx. 10% (119km2) was urban area  Approx. 129,000 buildings were destroyed  15,850 Fatalities, 3,282 missing Recent Disasters Great East Japan Earthquake and Tsunami in 2011 Produced from “Inundation Condition Map” by Geospatial Information Authority 12
  • 14. Recent Disasters • Great Hanshin-Awaji Earthquake, January, 1995 13
  • 15. There is concern that the safety of various types of infrastructure against large- scale accidents and disasters will deteriorate as a result of their aging. Corroded impeller of a draining pump plantAged seabank 破断箇所 補修後 平成19年6月20日破断を発見 平成19年6月29日補修完了 Fractured diagonal member of a truss bridge (Great Kiso River Bridge) Sinking of the apron part of a port facility Aging of Infrastructure Fractured part 14
  • 16. 18% 25% 2% 8% 43% 43% 9% 32% 67% 64% 24% 58% 0% 20% 40% 60% 80% 2013 2023 2033 2013 2023 20332013 2023 2033 Road bridges River facilities (e.g. water gates) Sewerage piping Port quays Among the facilities developed during and after the high economic growth period, the proportions of the ones that will become 50-years-old or older will increase at increasing rates in the next 20 years. Present Situation of the Aging Infrastructure 2013 2023 2033 * The figures are all as of March. Proportions of Infrastructure that 50-years-old or older 15
  • 17. 16 3. Our Challenges and Strategy
  • 18. Challenges for “smart use of infrastructure” • Under these limited conditions, Japan proactively has been selecting “smart use of infrastructure” instead of “expanding it”. 出典 オンタリオ州政府 http://www.mto.gov.on.ca/english /transtek/roadtalk/rt16-4/ 17 Limitation of infrastructure development
  • 19. Challenges for “smart use of infrastructure” 18 <Smart route selection using “ETC 2.0” > 相模湾 Pacific ocean Maximum efficiency Congested Not congested About 80% (by 2015) <Construction of ring expressway> Three ring roads in Tokyo Metropolitan Area 64% complete Chuo Expressway Inner Ring Expressway Congestion! 22 Legend Sectors that are in service (as of June 14, 2013) Provisional 2 lanes* To be in service by FY 2015* 4 lanes Under construction (to be completed in FY 2016 or thereafter) 6 lanes ○○○ Under study ※ ※ * It is not known when non-completed lanes of provisional 2 lanes will be constructed. New challenges for “smart use of infrastructure ” • “Smart use of roads” utilizing ITS(Intelligent Transport System) or toll control measures optimizes distribution of traffic volume .
  • 20. Challenges for “smart use of infrastructure” 19 • Congestion at toll gates on expressways throughout Japan is largely eliminated Successful examples of “smart use of infrastructure ”: “ETC” (Electronic toll collection system) 2000 (before ETC) 2008 (after ETC) 3,974 times (30% of congestion on expressway) 60 times < Congestion at toll gates > Congestion is eliminated ※ETCは2001年に 本格導入 ※渋滞回数: 年間渋滞回数が30回以上又は平均渋滞長が2km以上かつ渋滞回数 が5回以上の主要渋滞ポイントの渋滞回数 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 <Adoption rate for ETC> (On-board Device) Roadside antenna Bidirectional wireless communications
  • 21. Challenges for “smart use of infrastructure” 20 • The “SHINKANSEN” realizes high safety, reliability and environmental friendliness. Safety 1 Reliability 2 Environmental Friendliness 3 Passenger Fatalities ①Operating frequency CO2 emissions ②Average delay time per trip 15trains/hour within 1 min. – ZERO – 50Years (1964→2014) 1 : 5 : 7.5 g-CO2/person-km Successful examples of “smart use of infrastructure ”: High speed train “SHINKANSEN”
  • 22. 21 Reduction through preventive maintenance and of new technologies. ○ To prevent further acceleration of the deterioration of infrastructures due to their aging, MLIT has been intensively conducting inspections, diagnoses, etc. ○ MLIT is aiming at establishing a preventive maintenance-based maintenance cycle to reduce and level the maintenance cost. Image of the maintenance cost reduction and leveling to be achieved Image of the envisaged maintenance cycle Diagnosis Recording Lifespan Prolongation Plan Reflection Improvement MeasuresInspection Establishing a Maintenance Cycle Leveling through planned efforts
  • 23. Dejima Bridge (Nagasaki City) [1910 (105 years)] Establishing a Maintenance Cycle - success examples No.10 Sluiceway (Kamiita Town, Tokushima Prefecture) [1922 (93 years)] Rokugo Water Gate (Ota Ward, Tokyo) [1930 (85 years)] 22
  • 24. Improvingtheproductivityandquality Consensus is reached faster. Decisions can be made faster Reduce mistakes in the design and the extra time Workability is improved Data sharing between CIM and ICT-aided project on site Shorteningthetimetocompletion Comparisons and evaluations can be made easily. Reinforcement bar layout simulation Selection of the optimal route Confirmation of a complex order of work steps Meeting for explaining the project to local residents Meeting between the project owner and contractor Machine control Design changes can be made easily ResearchDesign Work implementation Maintenance work センサー情報 モデル化素材 議論情報 etc 情報共有ツール センサーデータ ヘルスモニタリング 異常値を感知すると、メンバーへの 通知(アラート)が可能 Image of an information-sharing tool for maintenance work Establishment and operation of an asset management system Optimization of maintenance work Evacuation route Inclination of slope 3-dimensional model (simplified) 3-dimensional model (detailed) Safety of the project site 3-dimensional model 3-dimensional model 3-dimensional model One of the most advanced construction production systems in the world ⇒ Creation of a new industry Introducing Construction Information Modeling (CIM) The tool’s settings can be set so that an alarm message will be sent to the members when an abnormal value is detected. Data for modeling Discussioninformation Sensor information Monitor for the operator The record of the work performed and the status of the work being performed are displayed. Sensor data Health monitoring Information sharing tool 23
  • 25. Ministry of Land, Infrastructure, Transport and Tourism Logistics High-speed railways Urban railways / transport system Toll Roads Ships / Offshore units Port terminals Airport terminals Urban development  First Project (October 2015): The Management and Operation of Thi Vai International Port’s Terminal Business in Vietnam  Second Project (November 2015): The Texas High-Speed Railway Project  Third Project (December 2015): Urban Passenger Railway Transportation Project in Brazil JOIN (Japan Overseas Infra. Investment Corp.) 24
  • 26. Our Challenges and Strategy 1. “Revolution in Construction” to be realized (strategic management, long-term plan, prioritizing effective stock effect, i-Construction) 2. Introduction and utilization of various funds (national, local, PPP/PFI, charge, fare, JOIN, etc.) 3. Preventive and Strategic Maintenance (maintenance cycle, maintenance industry, introducing robot in the fields, etc.) 4. Japanese Contribution for international fields (quality infrastructure, technology transfer, capacity building, PPP, etc.) Important strategy for future Infrastructure A) Economic and Effective use of infrastructure and Preventive and Strategic Maintenance B) Investment of Infrastructure Development must be recognized as basic needs for development 25
  • 27. Ministry of Land, Infrastructure, Transport and Tourism Thank you for your attention 26