SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
Monthly Knowledge Sharing Meeting-KSM
1-0
Key Discussion points:
1-1
1. Planning, Production & IE KPI:
Monthly Target Vs. achievement status
Monthly Efficiency %
Monthly PCD Hit rate status
Monthly Revenue status
Monthly Profit/Loss status
3. Quality Assurance Department KPI:
 Monthly Final inspection pass status
2. Human Resource Department KPI:
 Monthly worker absenteeism status
4. Set next month performance target
1. Planning, Production & IE KPI:
1-2
Month wise Plan Vs. Achievement status:
1-3
Month wise Floor target Vs. achievement status:
1-4
Month wise Plan Vs. Actual Style Analysis (JUNE-21):
1-5
SMV Type Style Type Style Qty
Produced
Minute
Produced Qty
Avg qty % out
of total
Produce Qty
<4.5 Very Basic 10 62047 14220 1.7%
4.51-7.5 Basic 21 4305274 762465 92.7%
7.51-10.5 Semi Critical 10 344810 41260 5.0%
10.51-15 Heavy Semi Critical 2 44880 4250 0.5%
15.1-20 Critical 0 0 0 0.0%
20.1- >=28 Heavy Critical 0 0 0 0.0%
5.79 Basic 43 4757010 822195 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 0 0 0 0.00%
4.51-7.5 Basic 19 4653023 822507 100.00%
7.51-10.5 Semi Critical 0 0 0 0.00%
10.51-15 Heavy Semi Critical 0 0 0 0.00%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
5.66 Basic 19 4653023 822507 100%
Month wise Plan Vs. Actual Style Analysis (JULY-21):
1-6
SMVType StyleType StyleQty
Produced
Minute
ProducedQty
Avgqty%out
oftotal
ProduceQty
<4.5 VeryBasic 27 10046 660 0.1%
4.51-7.5 Basic 13 2461719 374370 84.6%
7.51-10.5 SemiCritical 1 173537 22985 5.2%
10.51-15 HeavySemiCritical 2 1117080 44610 10.1%
15.1-20 Critical 0 0 0 0.0%
20.1->=28 HeavyCritical 0 0 0 0.0%
8.50 Basic 43 3762381 442625 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 2 38503 9120 1.69%
4.51-7.5 Basic 13 2462516 437260 81.04%
7.51-10.5 Semi Critical 4 321879 40200 7.45%
10.51-15 Heavy Semi Critical 6 686828 53005 9.82%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
6.50 Basic 25 3509725 539585 100%
Month wise Plan Vs. Actual Style Analysis (AUG-21):
1-7
SMVType StyleType StyleQty
Produced
Minute
ProducedQty
Avgqty%out
oftotal
ProduceQty
<4.5 VeryBasic 13 154434 37800 6.4%
4.51-7.5 Basic 19 2585304 437710 74.2%
7.51-10.5 SemiCritical 5 823378 91710 15.5%
10.51-15 HeavySemiCritical 6 265906 22850 3.9%
15.1-20 Critical 0 0 0 0.0%
20.1->=28 HeavyCritical 0 0 0 0.0%
6.49 Basic 43 3829023 590070 100.0%
SMV Type Style Type Style Qty Plan Minute Plan Qty
Avg qty % out of
total Plan Qty
<4.5 Very Basic 0 155321 37964 5.17%
4.51-7.5 Basic 18 3310823 554156 75.50%
7.51-10.5 Semi Critical 5 1207289 127515 17.37%
10.51-15 Heavy Semi Critical 3 160247 14335 1.95%
15.1-20 Critical 0 0 0 0.00%
20.1- >=28 Heavy Critical 0 0 0 0.00%
6.59 Basic 26 4833680 733970 100%
Month wise efficiency %:
1-8
Month wise facts analysis :
1-9
SMV 1st
day 2nd
day 3rd
day 4th
day 5th
day 6th
day 7th
day 8th
day 9th
day 10th
day
<4.5 45% 60% 70% 75% 85% 85% 85% 85% 85% 85%
4.51-7.5 40% 55% 65% 70% 75% 75% 75% 75% 75% 80%
7.51-10.5 35% 45% 55% 60% 65% 65% 65% 70% 70% 70%
10.51-15 35% 45% 50% 55% 60% 60% 60% 65% 65% 65%
15.1-20 25% 35% 45% 50% 55% 55% 55% 55% 55% 60%
20.1-28 25% 35% 40% 45% 50% 50% 50% 55% 55% 55%
>=28.1 10% 20% 30% 35% 40% 45% 45% 45% 45% 50%
Efficiency Requirement
Month Factory
Noof
Working
days
No.Style
Running
No.Styling
No.ofAvg.
Line
Run
days/Styling/
Line
Expected
Efficiency
Achieved
Efficiency%
June-21 KRC(U-3&4) 28 42 9 15 47days 75.0% 55.3%
July-21 KRC(U-3&4) 16 19 13 15 18days 75.0% 54.9%
August-21 KRC(U-3&4) 26 32 12 15 32days 75.0% 52.0%
G.Total H&MTOTAL 23 93 34 45 31days 75.0% 54.1%
PCD Hit & Fail Status :
1-10
Month wise NPT status :
1-11
Non
Productive
Minute
NPT Value
NPT Value in
Tk.
NPT% NPT (Pcs)
NPT (Man-
Hour)
NPT MC/Day
Total Earning
(Including NPT
Value)
Revenue/MC
(Without NPT)
7190 Min. 503.30
$ 41,774৳ 0.08% 1260 Pcs 120 0.4 MC 364,099.91
$ BDT 73621
17460 Min. 1,222.20
$ 101,443৳ 0.34% 2706 Pcs 291 1.8 MC 232,037.53
$ BDT 78925
16800 Min. 1,176.00
$ 97,608৳ 0.23% 2589 Pcs 280 1.1 MC 301,604.55
$ BDT 65856
41450 Min. 2,901.50
$ 240,825৳ 0.20% 6554 Pcs 691 1.1 MC 897,741.99
$ BDT 72019
Month wise Machine utilization % :
1-12
Month wise worker absenteeism status :
1-13
Month wise profit/Loss status (Excluding Abnormal Loss) :
1-14
Month wise per Machine Plan Vs. Achieve Revenue status:
1-15
Month wise On Time Delivery status:
1-17

Weitere ähnliche Inhalte

Ähnlich wie Factory Monthly Babylon.ppt

Factory Monthly KPI.ppt
Factory Monthly KPI.pptFactory Monthly KPI.ppt
Factory Monthly KPI.pptNittamallik216
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptNittamallik216
 
Factory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).pptFactory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).pptNittamallik216
 
Factory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptFactory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptNittamallik216
 
Factory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).pptFactory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).pptNittamallik216
 
Factory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).pptFactory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).pptNittamallik216
 
Weekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptWeekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptNittamallik216
 
Factory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).pptFactory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).pptNittamallik216
 
Weekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptWeekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptNittamallik216
 
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptFactory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptNittamallik216
 
Factory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.pptFactory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.pptNittamallik216
 
Weekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptWeekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptNittamallik216
 
Weekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptWeekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptNittamallik216
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptNittamallik216
 
Factory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.pptFactory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.pptNittamallik216
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightTKMG, Inc.
 
Pitch book
Pitch bookPitch book
Pitch bookJun Zhai
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013John Barney
 

Ähnlich wie Factory Monthly Babylon.ppt (20)

Factory Monthly KPI.ppt
Factory Monthly KPI.pptFactory Monthly KPI.ppt
Factory Monthly KPI.ppt
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
Factory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).pptFactory Monthly KPI OF ACCL-1(U-2).ppt
Factory Monthly KPI OF ACCL-1(U-2).ppt
 
Factory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.pptFactory Monthly KPI OF LDC.ppt
Factory Monthly KPI OF LDC.ppt
 
Factory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).pptFactory Monthly ACCL (U-3&4).ppt
Factory Monthly ACCL (U-3&4).ppt
 
Factory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).pptFactory Monthly KRC (U-3&4).ppt
Factory Monthly KRC (U-3&4).ppt
 
Weekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.pptWeekly KPI meeting of FHRO.ppt
Weekly KPI meeting of FHRO.ppt
 
Factory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).pptFactory Monthly KPI OF ARKAY-2(U-1).ppt
Factory Monthly KPI OF ARKAY-2(U-1).ppt
 
Weekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .pptWeekly KPI meeting of Production team .ppt
Weekly KPI meeting of Production team .ppt
 
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).pptFactory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
Factory Monthly KPI meeting of KRC (U-3&4) (From Oct-21 to Dec-2021).ppt
 
Factory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.pptFactory Monthly KPI OF Sewing.ppt
Factory Monthly KPI OF Sewing.ppt
 
Weekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.pptWeekly KPI meeting of IE.ppt
Weekly KPI meeting of IE.ppt
 
Weekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.pptWeekly KPI meeting of PPC team.ppt
Weekly KPI meeting of PPC team.ppt
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
 
Factory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.pptFactory Monthly KSM- AZMERI.ppt
Factory Monthly KSM- AZMERI.ppt
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 
Pitch book
Pitch bookPitch book
Pitch book
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
 
Kpi april
Kpi aprilKpi april
Kpi april
 
Review Framework
Review FrameworkReview Framework
Review Framework
 

Mehr von Nittamallik216

Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptNittamallik216
 
160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptxNittamallik216
 
Factory Monthly KPI of Lida.ppt
Factory Monthly KPI of Lida.pptFactory Monthly KPI of Lida.ppt
Factory Monthly KPI of Lida.pptNittamallik216
 
TP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfTP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfNittamallik216
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptNittamallik216
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptxNittamallik216
 

Mehr von Nittamallik216 (10)

Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx160_16SCCFT4_2020051906270858.pptx
160_16SCCFT4_2020051906270858.pptx
 
Factory Monthly KPI of Lida.ppt
Factory Monthly KPI of Lida.pptFactory Monthly KPI of Lida.ppt
Factory Monthly KPI of Lida.ppt
 
TP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdfTP MAX SWEATPANT SB.pdf
TP MAX SWEATPANT SB.pdf
 
SILAS PJ SET .pdf
SILAS PJ SET .pdfSILAS PJ SET .pdf
SILAS PJ SET .pdf
 
SANDY SS TVP.pdf
SANDY SS TVP.pdfSANDY SS TVP.pdf
SANDY SS TVP.pdf
 
ROMY BODY.pdf
ROMY BODY.pdfROMY BODY.pdf
ROMY BODY.pdf
 
Factory Monthly KSM- New.ppt
Factory Monthly KSM- New.pptFactory Monthly KSM- New.ppt
Factory Monthly KSM- New.ppt
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
 

Kürzlich hochgeladen

FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024Susanna-Assunta Sansone
 
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...boychatmate1
 
Rithik Kumar Singh codealpha pythohn.pdf
Rithik Kumar Singh codealpha pythohn.pdfRithik Kumar Singh codealpha pythohn.pdf
Rithik Kumar Singh codealpha pythohn.pdfrahulyadav957181
 
IBEF report on the Insurance market in India
IBEF report on the Insurance market in IndiaIBEF report on the Insurance market in India
IBEF report on the Insurance market in IndiaManalVerma4
 
Statistics For Management by Richard I. Levin 8ed.pdf
Statistics For Management by Richard I. Levin 8ed.pdfStatistics For Management by Richard I. Levin 8ed.pdf
Statistics For Management by Richard I. Levin 8ed.pdfnikeshsingh56
 
Decoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectDecoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectBoston Institute of Analytics
 
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis model
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis modelDecoding Movie Sentiments: Analyzing Reviews with Data Analysis model
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis modelBoston Institute of Analytics
 
DATA ANALYSIS using various data sets like shoping data set etc
DATA ANALYSIS using various data sets like shoping data set etcDATA ANALYSIS using various data sets like shoping data set etc
DATA ANALYSIS using various data sets like shoping data set etclalithasri22
 
Principles and Practices of Data Visualization
Principles and Practices of Data VisualizationPrinciples and Practices of Data Visualization
Principles and Practices of Data VisualizationKianJazayeri1
 
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdf
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdfWorld Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdf
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdfsimulationsindia
 
Non Text Magic Studio Magic Design for Presentations L&P.pdf
Non Text Magic Studio Magic Design for Presentations L&P.pdfNon Text Magic Studio Magic Design for Presentations L&P.pdf
Non Text Magic Studio Magic Design for Presentations L&P.pdfPratikPatil591646
 
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Boston Institute of Analytics
 
Digital Marketing Plan, how digital marketing works
Digital Marketing Plan, how digital marketing worksDigital Marketing Plan, how digital marketing works
Digital Marketing Plan, how digital marketing worksdeepakthakur548787
 
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...Jack Cole
 
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdf
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdfEnglish-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdf
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdfblazblazml
 
knowledge representation in artificial intelligence
knowledge representation in artificial intelligenceknowledge representation in artificial intelligence
knowledge representation in artificial intelligencePriyadharshiniG41
 
Digital Indonesia Report 2024 by We Are Social .pdf
Digital Indonesia Report 2024 by We Are Social .pdfDigital Indonesia Report 2024 by We Are Social .pdf
Digital Indonesia Report 2024 by We Are Social .pdfNicoChristianSunaryo
 
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Boston Institute of Analytics
 

Kürzlich hochgeladen (20)

FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
 
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...
Introduction to Mongo DB-open-­‐source, high-­‐performance, document-­‐orient...
 
Rithik Kumar Singh codealpha pythohn.pdf
Rithik Kumar Singh codealpha pythohn.pdfRithik Kumar Singh codealpha pythohn.pdf
Rithik Kumar Singh codealpha pythohn.pdf
 
IBEF report on the Insurance market in India
IBEF report on the Insurance market in IndiaIBEF report on the Insurance market in India
IBEF report on the Insurance market in India
 
Statistics For Management by Richard I. Levin 8ed.pdf
Statistics For Management by Richard I. Levin 8ed.pdfStatistics For Management by Richard I. Levin 8ed.pdf
Statistics For Management by Richard I. Levin 8ed.pdf
 
Decoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectDecoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis Project
 
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis model
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis modelDecoding Movie Sentiments: Analyzing Reviews with Data Analysis model
Decoding Movie Sentiments: Analyzing Reviews with Data Analysis model
 
DATA ANALYSIS using various data sets like shoping data set etc
DATA ANALYSIS using various data sets like shoping data set etcDATA ANALYSIS using various data sets like shoping data set etc
DATA ANALYSIS using various data sets like shoping data set etc
 
Principles and Practices of Data Visualization
Principles and Practices of Data VisualizationPrinciples and Practices of Data Visualization
Principles and Practices of Data Visualization
 
Insurance Churn Prediction Data Analysis Project
Insurance Churn Prediction Data Analysis ProjectInsurance Churn Prediction Data Analysis Project
Insurance Churn Prediction Data Analysis Project
 
Data Analysis Project: Stroke Prediction
Data Analysis Project: Stroke PredictionData Analysis Project: Stroke Prediction
Data Analysis Project: Stroke Prediction
 
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdf
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdfWorld Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdf
World Economic Forum Metaverse Ecosystem By Utpal Chakraborty.pdf
 
Non Text Magic Studio Magic Design for Presentations L&P.pdf
Non Text Magic Studio Magic Design for Presentations L&P.pdfNon Text Magic Studio Magic Design for Presentations L&P.pdf
Non Text Magic Studio Magic Design for Presentations L&P.pdf
 
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
 
Digital Marketing Plan, how digital marketing works
Digital Marketing Plan, how digital marketing worksDigital Marketing Plan, how digital marketing works
Digital Marketing Plan, how digital marketing works
 
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...
why-transparency-and-traceability-are-essential-for-sustainable-supply-chains...
 
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdf
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdfEnglish-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdf
English-8-Q4-W3-Synthesizing-Essential-Information-From-Various-Sources-1.pdf
 
knowledge representation in artificial intelligence
knowledge representation in artificial intelligenceknowledge representation in artificial intelligence
knowledge representation in artificial intelligence
 
Digital Indonesia Report 2024 by We Are Social .pdf
Digital Indonesia Report 2024 by We Are Social .pdfDigital Indonesia Report 2024 by We Are Social .pdf
Digital Indonesia Report 2024 by We Are Social .pdf
 
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
 

Factory Monthly Babylon.ppt

  • 1. Monthly Knowledge Sharing Meeting-KSM 1-0
  • 2. Key Discussion points: 1-1 1. Planning, Production & IE KPI: Monthly Target Vs. achievement status Monthly Efficiency % Monthly PCD Hit rate status Monthly Revenue status Monthly Profit/Loss status 3. Quality Assurance Department KPI:  Monthly Final inspection pass status 2. Human Resource Department KPI:  Monthly worker absenteeism status 4. Set next month performance target
  • 3. 1. Planning, Production & IE KPI: 1-2
  • 4. Month wise Plan Vs. Achievement status: 1-3
  • 5. Month wise Floor target Vs. achievement status: 1-4
  • 6. Month wise Plan Vs. Actual Style Analysis (JUNE-21): 1-5 SMV Type Style Type Style Qty Produced Minute Produced Qty Avg qty % out of total Produce Qty <4.5 Very Basic 10 62047 14220 1.7% 4.51-7.5 Basic 21 4305274 762465 92.7% 7.51-10.5 Semi Critical 10 344810 41260 5.0% 10.51-15 Heavy Semi Critical 2 44880 4250 0.5% 15.1-20 Critical 0 0 0 0.0% 20.1- >=28 Heavy Critical 0 0 0 0.0% 5.79 Basic 43 4757010 822195 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 0 0 0 0.00% 4.51-7.5 Basic 19 4653023 822507 100.00% 7.51-10.5 Semi Critical 0 0 0 0.00% 10.51-15 Heavy Semi Critical 0 0 0 0.00% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 5.66 Basic 19 4653023 822507 100%
  • 7. Month wise Plan Vs. Actual Style Analysis (JULY-21): 1-6 SMVType StyleType StyleQty Produced Minute ProducedQty Avgqty%out oftotal ProduceQty <4.5 VeryBasic 27 10046 660 0.1% 4.51-7.5 Basic 13 2461719 374370 84.6% 7.51-10.5 SemiCritical 1 173537 22985 5.2% 10.51-15 HeavySemiCritical 2 1117080 44610 10.1% 15.1-20 Critical 0 0 0 0.0% 20.1->=28 HeavyCritical 0 0 0 0.0% 8.50 Basic 43 3762381 442625 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 2 38503 9120 1.69% 4.51-7.5 Basic 13 2462516 437260 81.04% 7.51-10.5 Semi Critical 4 321879 40200 7.45% 10.51-15 Heavy Semi Critical 6 686828 53005 9.82% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 6.50 Basic 25 3509725 539585 100%
  • 8. Month wise Plan Vs. Actual Style Analysis (AUG-21): 1-7 SMVType StyleType StyleQty Produced Minute ProducedQty Avgqty%out oftotal ProduceQty <4.5 VeryBasic 13 154434 37800 6.4% 4.51-7.5 Basic 19 2585304 437710 74.2% 7.51-10.5 SemiCritical 5 823378 91710 15.5% 10.51-15 HeavySemiCritical 6 265906 22850 3.9% 15.1-20 Critical 0 0 0 0.0% 20.1->=28 HeavyCritical 0 0 0 0.0% 6.49 Basic 43 3829023 590070 100.0% SMV Type Style Type Style Qty Plan Minute Plan Qty Avg qty % out of total Plan Qty <4.5 Very Basic 0 155321 37964 5.17% 4.51-7.5 Basic 18 3310823 554156 75.50% 7.51-10.5 Semi Critical 5 1207289 127515 17.37% 10.51-15 Heavy Semi Critical 3 160247 14335 1.95% 15.1-20 Critical 0 0 0 0.00% 20.1- >=28 Heavy Critical 0 0 0 0.00% 6.59 Basic 26 4833680 733970 100%
  • 10. Month wise facts analysis : 1-9 SMV 1st day 2nd day 3rd day 4th day 5th day 6th day 7th day 8th day 9th day 10th day <4.5 45% 60% 70% 75% 85% 85% 85% 85% 85% 85% 4.51-7.5 40% 55% 65% 70% 75% 75% 75% 75% 75% 80% 7.51-10.5 35% 45% 55% 60% 65% 65% 65% 70% 70% 70% 10.51-15 35% 45% 50% 55% 60% 60% 60% 65% 65% 65% 15.1-20 25% 35% 45% 50% 55% 55% 55% 55% 55% 60% 20.1-28 25% 35% 40% 45% 50% 50% 50% 55% 55% 55% >=28.1 10% 20% 30% 35% 40% 45% 45% 45% 45% 50% Efficiency Requirement Month Factory Noof Working days No.Style Running No.Styling No.ofAvg. Line Run days/Styling/ Line Expected Efficiency Achieved Efficiency% June-21 KRC(U-3&4) 28 42 9 15 47days 75.0% 55.3% July-21 KRC(U-3&4) 16 19 13 15 18days 75.0% 54.9% August-21 KRC(U-3&4) 26 32 12 15 32days 75.0% 52.0% G.Total H&MTOTAL 23 93 34 45 31days 75.0% 54.1%
  • 11. PCD Hit & Fail Status : 1-10
  • 12. Month wise NPT status : 1-11 Non Productive Minute NPT Value NPT Value in Tk. NPT% NPT (Pcs) NPT (Man- Hour) NPT MC/Day Total Earning (Including NPT Value) Revenue/MC (Without NPT) 7190 Min. 503.30 $ 41,774৳ 0.08% 1260 Pcs 120 0.4 MC 364,099.91 $ BDT 73621 17460 Min. 1,222.20 $ 101,443৳ 0.34% 2706 Pcs 291 1.8 MC 232,037.53 $ BDT 78925 16800 Min. 1,176.00 $ 97,608৳ 0.23% 2589 Pcs 280 1.1 MC 301,604.55 $ BDT 65856 41450 Min. 2,901.50 $ 240,825৳ 0.20% 6554 Pcs 691 1.1 MC 897,741.99 $ BDT 72019
  • 13. Month wise Machine utilization % : 1-12
  • 14. Month wise worker absenteeism status : 1-13
  • 15. Month wise profit/Loss status (Excluding Abnormal Loss) : 1-14
  • 16. Month wise per Machine Plan Vs. Achieve Revenue status: 1-15
  • 17. Month wise On Time Delivery status: 1-17