SlideShare a Scribd company logo
1 of 19
1
Instrument Transformers
• A transformer that is used in conjunction
with a measuring instrument
• It utilizes the current-transformation and
voltage transformation properties to
measure high ac current and voltage
• They also provide isolation
2
Where to use Instrument Transformers
• To measure high currents and high
Voltages
• Why can’t we use voltmeter with very
high series resistance and ammeter with
very low shunt resistance?
3
Disadvantages of Shunts & Multipliers
• Shunts
• Time constant should be same for
meter and shunt
• Power consumed increases
• Insulation problems (for high voltages)
• No Isolation
• Multipliers (Series resistance)
• Power consumption
• Leakage currents, so good insulators
used , hence costly
• No isolation
4
Types of Instrument Transformers
• Current transformer
• Potential (Voltage) transformer
5
Current Transformers
• Secondary is usually 5 A (Standard)
• 5 A is sufficient for a relay to operate and
for a meter to measure
6
Point to note about CT
• Primary current depends on load, but not
on the burden
• Current coil of Wattmeter or Ammeter is
connected across the terminal of the
secondary or Relay
• Secondary operates near short circuit
conditions
• One of the terminal of CT secondary
winding is earthed
7
Types of CT
8
Constructional Details of Window CT
9
Layer 2
Layer 1
Core
Constructional Details of Window CT
10
Primary Winding
Secondary
Winding
Primary
Connections
Constructional Details of wound CT
11
Care, while operating with CT
12
Usually current is measured in terms
of voltage across a standard resistor
13
Connections of CT and PT
14
Potential Transformer
15
16
Points to note about PT
• Secondary is connected voltmeter or
Potential coil of the Wattmeter or Relay
• Design is similar to Power Transformer,
but Potential Transformers are lightly
loaded
• Secondary is usually rated for 110 V
• Should not be shorted
17
Construction of PT
• For the same power rating, Voltage
transformer is costly than Power
transformer (large core & conductor size)
• Output is small (and accurate), but size
is large
• Can carry more load (2 to 3 times)
• Shell type core – Low voltage
• Co-axial windings
18
Construction of PT
• Insulation: Cotton tape and varnished
cambric as insulation for coil
• Oil immersed for more than 7 kV
• Oil filled bushing for oil filled transformer
• If one side of the primary winding is at
neutral, one bushing is sufficient
19

More Related Content

What's hot

Basic types of facts controllers
Basic types of facts controllersBasic types of facts controllers
Basic types of facts controllersAyyarao T S L V
 
measurement of high voltage and high currents
 measurement of high voltage and high currents  measurement of high voltage and high currents
measurement of high voltage and high currents mukund mukund.m
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relayjawaharramaya
 
Comparison of ac and dc transmission
Comparison of ac and dc transmissionComparison of ac and dc transmission
Comparison of ac and dc transmissionjawaharramaya
 
FACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY pptFACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY pptMamta Bagoria
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential TransformerRidwanul Hoque
 
High Frequency High Voltage AC Generation
High Frequency High Voltage AC Generation High Frequency High Voltage AC Generation
High Frequency High Voltage AC Generation Mohammad Mominur Rahman
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch centerddxdharmesh
 

What's hot (20)

Static relay
Static relayStatic relay
Static relay
 
Basic types of facts controllers
Basic types of facts controllersBasic types of facts controllers
Basic types of facts controllers
 
measurement of high voltage and high currents
 measurement of high voltage and high currents  measurement of high voltage and high currents
measurement of high voltage and high currents
 
Ct & pt
Ct & pt Ct & pt
Ct & pt
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relay
 
Comparison of ac and dc transmission
Comparison of ac and dc transmissionComparison of ac and dc transmission
Comparison of ac and dc transmission
 
Two Quadrant chopper
Two Quadrant chopperTwo Quadrant chopper
Two Quadrant chopper
 
Thyristor
Thyristor Thyristor
Thyristor
 
FACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY pptFACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY ppt
 
Facts controller
Facts controllerFacts controller
Facts controller
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Current Transformer and Potential Transformer
Current Transformer and Potential TransformerCurrent Transformer and Potential Transformer
Current Transformer and Potential Transformer
 
High Frequency High Voltage AC Generation
High Frequency High Voltage AC Generation High Frequency High Voltage AC Generation
High Frequency High Voltage AC Generation
 
Z bus building algorithm
Z bus building algorithmZ bus building algorithm
Z bus building algorithm
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Motor drives
Motor drivesMotor drives
Motor drives
 
upfc
upfcupfc
upfc
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 

Similar to Instrument transformer CT & PT

CT and PT Instrument transformer | basic information with some most asked que...
CT and PT Instrument transformer | basic information with some most asked que...CT and PT Instrument transformer | basic information with some most asked que...
CT and PT Instrument transformer | basic information with some most asked que...AkhileshDeshmukh5
 
Special transformers
Special transformersSpecial transformers
Special transformersPreet_patel
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurementBishal Rimal
 
6. emi instrument transformers (with marking)
6. emi   instrument transformers (with marking)6. emi   instrument transformers (with marking)
6. emi instrument transformers (with marking)Jawad Khan
 
Instrument transformers in the Power System
Instrument transformers in the Power SystemInstrument transformers in the Power System
Instrument transformers in the Power SystemManohar Tatwawadi
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................hiiarindam
 
electrical circuits for igcse physics students
electrical circuits for igcse physics studentselectrical circuits for igcse physics students
electrical circuits for igcse physics studentsJose Paulo
 
Chapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfChapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfmillion22
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CTParth Patel
 
orca_share_media1552831135411.pptx
orca_share_media1552831135411.pptxorca_share_media1552831135411.pptx
orca_share_media1552831135411.pptxJohnwil Sunio
 
Power electronics and applications of semiconductors devices, peripheral effects
Power electronics and applications of semiconductors devices, peripheral effectsPower electronics and applications of semiconductors devices, peripheral effects
Power electronics and applications of semiconductors devices, peripheral effectsSrikanthRaja4
 
instrumental transformer.pptx
instrumental transformer.pptxinstrumental transformer.pptx
instrumental transformer.pptxsameed4
 
Different Types of Transformers
Different Types of TransformersDifferent Types of Transformers
Different Types of TransformersMohibShaikh5
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relaykishore kish
 

Similar to Instrument transformer CT & PT (20)

Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
CT and PT Instrument transformer | basic information with some most asked que...
CT and PT Instrument transformer | basic information with some most asked que...CT and PT Instrument transformer | basic information with some most asked que...
CT and PT Instrument transformer | basic information with some most asked que...
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
Special transformers
Special transformersSpecial transformers
Special transformers
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 
CT & PT.pptx
CT & PT.pptxCT & PT.pptx
CT & PT.pptx
 
6. emi instrument transformers (with marking)
6. emi   instrument transformers (with marking)6. emi   instrument transformers (with marking)
6. emi instrument transformers (with marking)
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
IGBT
IGBTIGBT
IGBT
 
Instrument transformers in the Power System
Instrument transformers in the Power SystemInstrument transformers in the Power System
Instrument transformers in the Power System
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
electrical circuits for igcse physics students
electrical circuits for igcse physics studentselectrical circuits for igcse physics students
electrical circuits for igcse physics students
 
Chapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdfChapter_3-Transformers[1]-1.pdf
Chapter_3-Transformers[1]-1.pdf
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
orca_share_media1552831135411.pptx
orca_share_media1552831135411.pptxorca_share_media1552831135411.pptx
orca_share_media1552831135411.pptx
 
Power electronics and applications of semiconductors devices, peripheral effects
Power electronics and applications of semiconductors devices, peripheral effectsPower electronics and applications of semiconductors devices, peripheral effects
Power electronics and applications of semiconductors devices, peripheral effects
 
instrumental transformer.pptx
instrumental transformer.pptxinstrumental transformer.pptx
instrumental transformer.pptx
 
Different Types of Transformers
Different Types of TransformersDifferent Types of Transformers
Different Types of Transformers
 
Power supply
Power supplyPower supply
Power supply
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 

More from Chandan Singh

Fundamental of Tissue engineering
Fundamental of Tissue engineeringFundamental of Tissue engineering
Fundamental of Tissue engineeringChandan Singh
 
Resistance Measurement instruments
Resistance Measurement instrumentsResistance Measurement instruments
Resistance Measurement instrumentsChandan Singh
 
Resistance Measurement instruments
Resistance Measurement instrumentsResistance Measurement instruments
Resistance Measurement instrumentsChandan Singh
 
Moving iron (MI) instruments
Moving iron (MI) instrumentsMoving iron (MI) instruments
Moving iron (MI) instrumentsChandan Singh
 
Moving iron (MI) instruments
Moving iron (MI) instrumentsMoving iron (MI) instruments
Moving iron (MI) instrumentsChandan Singh
 
Electrical Measurement & Instruments
Electrical Measurement & InstrumentsElectrical Measurement & Instruments
Electrical Measurement & InstrumentsChandan Singh
 
Static characteristics of Instruments
Static characteristics of InstrumentsStatic characteristics of Instruments
Static characteristics of InstrumentsChandan Singh
 
Resistance measurement
Resistance measurementResistance measurement
Resistance measurementChandan Singh
 
Introduction to sensors
Introduction to sensorsIntroduction to sensors
Introduction to sensorsChandan Singh
 
Classification (Analog instruments)
 Classification (Analog instruments) Classification (Analog instruments)
Classification (Analog instruments)Chandan Singh
 
AC Bridges: Balance Condition
AC Bridges: Balance ConditionAC Bridges: Balance Condition
AC Bridges: Balance ConditionChandan Singh
 
Cathode Ray Osciloscope
Cathode Ray OsciloscopeCathode Ray Osciloscope
Cathode Ray OsciloscopeChandan Singh
 
Permanent Magnet Moving Coil
Permanent Magnet Moving Coil Permanent Magnet Moving Coil
Permanent Magnet Moving Coil Chandan Singh
 
10.m way search tree
10.m way search tree10.m way search tree
10.m way search treeChandan Singh
 
9.bst(contd.) avl tree
9.bst(contd.) avl tree9.bst(contd.) avl tree
9.bst(contd.) avl treeChandan Singh
 

More from Chandan Singh (20)

Fundamental of Tissue engineering
Fundamental of Tissue engineeringFundamental of Tissue engineering
Fundamental of Tissue engineering
 
Resistance Measurement instruments
Resistance Measurement instrumentsResistance Measurement instruments
Resistance Measurement instruments
 
Resistance Measurement instruments
Resistance Measurement instrumentsResistance Measurement instruments
Resistance Measurement instruments
 
Moving iron (MI) instruments
Moving iron (MI) instrumentsMoving iron (MI) instruments
Moving iron (MI) instruments
 
Moving iron (MI) instruments
Moving iron (MI) instrumentsMoving iron (MI) instruments
Moving iron (MI) instruments
 
Electrical Measurement & Instruments
Electrical Measurement & InstrumentsElectrical Measurement & Instruments
Electrical Measurement & Instruments
 
Static characteristics of Instruments
Static characteristics of InstrumentsStatic characteristics of Instruments
Static characteristics of Instruments
 
Resistance measurement
Resistance measurementResistance measurement
Resistance measurement
 
Introduction to sensors
Introduction to sensorsIntroduction to sensors
Introduction to sensors
 
Energy meter
Energy meterEnergy meter
Energy meter
 
Classification (Analog instruments)
 Classification (Analog instruments) Classification (Analog instruments)
Classification (Analog instruments)
 
AC Bridges: Balance Condition
AC Bridges: Balance ConditionAC Bridges: Balance Condition
AC Bridges: Balance Condition
 
Cathode Ray Osciloscope
Cathode Ray OsciloscopeCathode Ray Osciloscope
Cathode Ray Osciloscope
 
Megohmmeter
MegohmmeterMegohmmeter
Megohmmeter
 
Moving Iron
Moving IronMoving Iron
Moving Iron
 
Permanent Magnet Moving Coil
Permanent Magnet Moving Coil Permanent Magnet Moving Coil
Permanent Magnet Moving Coil
 
10.m way search tree
10.m way search tree10.m way search tree
10.m way search tree
 
9.bst(contd.) avl tree
9.bst(contd.) avl tree9.bst(contd.) avl tree
9.bst(contd.) avl tree
 
8.binry search tree
8.binry search tree8.binry search tree
8.binry search tree
 
7.tree
7.tree7.tree
7.tree
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Instrument transformer CT & PT

  • 1. 1 Instrument Transformers • A transformer that is used in conjunction with a measuring instrument • It utilizes the current-transformation and voltage transformation properties to measure high ac current and voltage • They also provide isolation
  • 2. 2 Where to use Instrument Transformers • To measure high currents and high Voltages • Why can’t we use voltmeter with very high series resistance and ammeter with very low shunt resistance?
  • 3. 3 Disadvantages of Shunts & Multipliers • Shunts • Time constant should be same for meter and shunt • Power consumed increases • Insulation problems (for high voltages) • No Isolation • Multipliers (Series resistance) • Power consumption • Leakage currents, so good insulators used , hence costly • No isolation
  • 4. 4 Types of Instrument Transformers • Current transformer • Potential (Voltage) transformer
  • 5. 5 Current Transformers • Secondary is usually 5 A (Standard) • 5 A is sufficient for a relay to operate and for a meter to measure
  • 6. 6 Point to note about CT • Primary current depends on load, but not on the burden • Current coil of Wattmeter or Ammeter is connected across the terminal of the secondary or Relay • Secondary operates near short circuit conditions • One of the terminal of CT secondary winding is earthed
  • 12. 12 Usually current is measured in terms of voltage across a standard resistor
  • 15. 15
  • 16. 16 Points to note about PT • Secondary is connected voltmeter or Potential coil of the Wattmeter or Relay • Design is similar to Power Transformer, but Potential Transformers are lightly loaded • Secondary is usually rated for 110 V • Should not be shorted
  • 17. 17 Construction of PT • For the same power rating, Voltage transformer is costly than Power transformer (large core & conductor size) • Output is small (and accurate), but size is large • Can carry more load (2 to 3 times) • Shell type core – Low voltage • Co-axial windings
  • 18. 18 Construction of PT • Insulation: Cotton tape and varnished cambric as insulation for coil • Oil immersed for more than 7 kV • Oil filled bushing for oil filled transformer • If one side of the primary winding is at neutral, one bushing is sufficient
  • 19. 19