Nicholas Antonio-01302016

1 of 2
NICHOLAS P. ANTONIO
Cell: 484-716-4780/ nicholaspantonio@comcast.net
SUMMARY
Twenty-five years of experience in refineries, industrial and commercial sites; responsibilities included
a diverse portfolio with scheduling, planning, estimating, cost control, scope development/ design,
field supervision, and project management for a broad variety of mechanical equipment and process
piping. Execution of these assignments has demonstrated strong skills of communication, computer
literacy, work ethic and field applicable experience. Software knowledge, skills and proficiency
include Primavera 6 R8.3 and Immpower (scheduling), SAP, Auto CAD, Microsoft Office (Excel,
Word, Power Point and Project), ISN, Navisworks 2014, PFDs, P&IDs and Construction Documents.
WORK EXPERIENCE
Locations: Braskem, PBF of NJ; Axeon and NuStar Energy of NJ; PES and Sunoco of
Philadelphia and Marcus Hook PA; Delaware City Refining and Valero of DE.
Project Duties Include:
 Schedule and Budget creation/ vendor coordination/ client interaction where daily/ weekly
meeting presentations of progress/ performance/ forecasting and critical path.
 Forecasted manpower/ coordinated equipment requirements and logistic needs for events.
 Review and specify materials for purchasing – including field distribution/ execution.
 Estimating and scheduling of expense and capital scope growths/extra work for event and
into the TA execution plan.
 Follow project thru completion, MOC, PSSR to demobilization of equipment with post TA
and/ or punch list activities. Store/ credit any materials surplus.
 Recognize and remedy many obstacles in project planning/ execution of all magnitudes.
Capital/ TA/ Maintenance Planner/ Scheduler/ Construction Administrator (8/2005 to Present):
 (2/2015 to Present) Braskem TA Planner (Mechanical in SAP/ Sharepoint).
 (9/2014 to 2/2015): Maintenance Planner/ Scheduler/ Field Execution and TA Scheduler/
Quality Control at PBF Energy of NJ.
 (11/2013 to 03/21/14): Capital Planner/ Scheduler for NuStar Energy Rail Rack Expansion.
 (10/2013 to 11/2013): 2013 DCRC Coker and Crude Unit EWR Scheduler and Planner.
 (3/2011 to 10/2013): 865 and 866 Catalyst Change with schedule maintenance. 15-2s Clark
and 15-2s Distillation Event. Simultaneously working the 231 (Expense and Capital) Units
with upcoming 1733/ 431/ 331/ 870 Units.
 (6/2010 to 3/2011): PBF/ FWUSA’s Re-Start Event for NCC at Delaware City, DE. Duties
included forecasting/ tracking and reporting for the North side of the plant’s (FCCU, GAS
PLANT, CRUDE, SULFUR and COKER) units.
2 of 2
 (12/2009 to 06/2010): 15-2, MEA and EC Flare at Sunoco’s 2010 Marcus Hook TA.
 (3/2009 to 11/2009): Exchanger Coordinator/ Planner/ Scheduler for the Valero TA 2009
(Delaware City, DE) FCCU TA. Including the FCCU, Alky, Poly, CHNT, Ether, Butamer
Unit (full scope was 120 exchangers). Designed and cost estimated new bundle washing
facility (temporary vs. capitalized). Steel bolster design for fabrication completed and
coordinated with corresponding Hyster model selection.
 (11/2006 to 03/2009): Sunoco (Philadelphia, PA) TAs: 231 Gulfiner (shot blast of heater
tube inside diameters and catalyst changes on two reactors); 1332 Regeneration, 866
Catalyst Change, 1332 2010 General TA and 1732 2010 General TA. Sunoco
(Philadelphia, PA) for the coordination of all mechanical work on the 210 Atmospheric and
Vacuum Unit turnaround.
 (08/2005 to 11/2006): Sunoco (Philadelphia, PA) for the coordination of all capital work on
the 865 ULSD culminations with the 865 TA expense scope (catalyst change). Capital work
included 347SS Heater re-tube (Barrel and Convection Section) with equipment upgrades.
EWR Planner/ Scheduler for the Sunoco (Philadelphia, PA) 137 2006 TA.
Current and previous projects with Steamfitters LU 420 (08/1989 to Present)
 Many positions including (as mentioned) Scheduler, Estimator, Planner, Field Construction
Administrator and General Foreman, Area Foreman, Foreman, Welder/ UA Certified Pipe
Welder, Journeyman and Apprentice. Jobs listed below are not in total.
 Industrial Projects: NuStar Energy (Rail Rack Expansion), Delaware City Refining, Valero,
PES, Sunoco, Inc. Philadelphia and Marcus Hook at the following Plants (10, 15-2S, 15-2, 17,
MEA, E/C Flare, 210, 231, 865, 866, 869, 1232,1332, 1732, 1733); FPL Energy at Marcus
Hook Energy Center; Exelon Power at Eddystone; Carpenter Technology; Hershey Foods;
Dana Corporation; Tarkett and more.
 Commercial Projects: PSU of Abington, PA(4/2014 to 9/2014) for laboratory and HVAC
renovation, Merck (West Point, PA), GSK Pharmaceutical, Acme Markets,University of Penn
Medical Center, Radisson and Marriott Hotels, Alden Park Manor, Advanta Office Complex,
Penn Medicine and more.
EDUCATION___________________________________________________________________
2014 PA. Clearances for work/ volunteer at Schools/ Universities.
2014 NJMEP: Successful Project Management.
2013 TWIC, PSM (DVSC and Built Rite) and DISA certifications.
2012 Qualifed Rigger (LU 420).
2011 Current UA pipe welding certifications are in procedure 3 and 5.
2001-2011 M.C.C.C. - A.S. in Engineering Science/ Mathematics – completed 85 credit hrs.
1988-1993 Completed 5-year Steamfitters LU 420 Apprentice Training Program
1988 PA Act 120 (Municipal Police Academy/ Patrolman at Limerick Police Department)
1985 Pottsgrove High School (Montgomery County, PA.)

Más contenido relacionado

Was ist angesagt?

John_GiblinJohn_Giblin
John_GiblinJOHN GIBLIN
106 views4 Folien
Dereque D.w-refDereque D.w-ref
Dereque D.w-refDereque Jones
184 views3 Folien
Rudy Wick ResumeRudy Wick Resume
Rudy Wick ResumeRudy Wick
177 views1 Folie

Was ist angesagt?(20)

John_GiblinJohn_Giblin
John_Giblin
JOHN GIBLIN106 views
Dereque D.w-refDereque D.w-ref
Dereque D.w-ref
Dereque Jones184 views
Hedegaard Jens - ResumeHedegaard Jens - Resume
Hedegaard Jens - Resume
Jens Hedegaard78 views
Rudy Wick ResumeRudy Wick Resume
Rudy Wick Resume
Rudy Wick177 views
Matthew_Dawson_Resume_2015Matthew_Dawson_Resume_2015
Matthew_Dawson_Resume_2015
Matthew Dawson163 views
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
Jeff Murcer, PMP143 views
selva-cvselva-cv
selva-cv
Selva Kumaran348 views
Brian Means ResumeBrian Means Resume
Brian Means Resume
brian means233 views
David Tyree resume.docxDavid Tyree resume.docx
David Tyree resume.docx
David Tyree392 views
Land surveyorLand surveyor
Land surveyor
Maniyan Suresh110 views
HailmyRizuan_CVHailmyRizuan_CV
HailmyRizuan_CV
Hailmy Rizuan176 views
TNitschResume031715TNitschResume031715
TNitschResume031715
Tamara Nitsch175 views
Wenninger Resume Feb2018Wenninger Resume Feb2018
Wenninger Resume Feb2018
Stan Wenninger118 views
DNorrisRightDNorrisRight
DNorrisRight
David Norris148 views
Current Resume 2016Current Resume 2016
Current Resume 2016
Manuel Padilla76 views
Phillip P. Randel ResumePhillip P. Randel Resume
Phillip P. Randel Resume
Phillip Randel92 views
Perumalsamy_originalPerumalsamy_original
Perumalsamy_original
seenivasagam perumalsamy334 views
L.L. Newell Resume  Outage(2)L.L. Newell Resume  Outage(2)
L.L. Newell Resume Outage(2)
Lonnie Newell85 views
013 5-design-techniques-review013 5-design-techniques-review
013 5-design-techniques-review
Mary Palmer Dargan315 views
Ross, Brian ResumeRoss, Brian Resume
Ross, Brian Resume
Brian Ross89 views

Similar a Nicholas Antonio-01302016

Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016Ron Mailhot
262 views4 Folien
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_DarrDavid Darr
294 views5 Folien
Resume3Resume3
Resume3Joseph Trader II
251 views3 Folien

Similar a Nicholas Antonio-01302016(20)

JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
J E Project Management LLC449 views
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
Ron Mailhot262 views
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_
Eric Zagata261 views
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_Darr
David Darr294 views
Kathleen King Resume_SEP 2016Kathleen King Resume_SEP 2016
Kathleen King Resume_SEP 2016
Kathy King202 views
Resume3Resume3
Resume3
Joseph Trader II251 views
VinothVinoth
Vinoth
vinoth Mathial311 views
Carl D. Guincho  ResumeCarl D. Guincho  Resume
Carl D. Guincho Resume
Carl D Guincho135 views
Andrew David Custer Resume 2016Andrew David Custer Resume 2016
Andrew David Custer Resume 2016
Andy Custer317 views
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
Ben Coleman114 views
Wood Joe Resume_14Jul16Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16
Joe Wood192 views
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
Surendra Narayan Yadav207 views
JJC-CV - April-2016JJC-CV - April-2016
JJC-CV - April-2016
Jeffery Caldwell231 views
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
Ukeje Ev'rest164 views
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
Darrell Darrell174 views
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
Johannes DeLange516 views
Tyler Coughenour ResumeTyler Coughenour Resume
Tyler Coughenour Resume
Tyler Coughenour, CEM, CMVP187 views
RichmondApande PMRichmondApande PM
RichmondApande PM
Richmond Apande89 views
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
Brian Nicholls205 views

Nicholas Antonio-01302016

  • 1. 1 of 2 NICHOLAS P. ANTONIO Cell: 484-716-4780/ nicholaspantonio@comcast.net SUMMARY Twenty-five years of experience in refineries, industrial and commercial sites; responsibilities included a diverse portfolio with scheduling, planning, estimating, cost control, scope development/ design, field supervision, and project management for a broad variety of mechanical equipment and process piping. Execution of these assignments has demonstrated strong skills of communication, computer literacy, work ethic and field applicable experience. Software knowledge, skills and proficiency include Primavera 6 R8.3 and Immpower (scheduling), SAP, Auto CAD, Microsoft Office (Excel, Word, Power Point and Project), ISN, Navisworks 2014, PFDs, P&IDs and Construction Documents. WORK EXPERIENCE Locations: Braskem, PBF of NJ; Axeon and NuStar Energy of NJ; PES and Sunoco of Philadelphia and Marcus Hook PA; Delaware City Refining and Valero of DE. Project Duties Include:  Schedule and Budget creation/ vendor coordination/ client interaction where daily/ weekly meeting presentations of progress/ performance/ forecasting and critical path.  Forecasted manpower/ coordinated equipment requirements and logistic needs for events.  Review and specify materials for purchasing – including field distribution/ execution.  Estimating and scheduling of expense and capital scope growths/extra work for event and into the TA execution plan.  Follow project thru completion, MOC, PSSR to demobilization of equipment with post TA and/ or punch list activities. Store/ credit any materials surplus.  Recognize and remedy many obstacles in project planning/ execution of all magnitudes. Capital/ TA/ Maintenance Planner/ Scheduler/ Construction Administrator (8/2005 to Present):  (2/2015 to Present) Braskem TA Planner (Mechanical in SAP/ Sharepoint).  (9/2014 to 2/2015): Maintenance Planner/ Scheduler/ Field Execution and TA Scheduler/ Quality Control at PBF Energy of NJ.  (11/2013 to 03/21/14): Capital Planner/ Scheduler for NuStar Energy Rail Rack Expansion.  (10/2013 to 11/2013): 2013 DCRC Coker and Crude Unit EWR Scheduler and Planner.  (3/2011 to 10/2013): 865 and 866 Catalyst Change with schedule maintenance. 15-2s Clark and 15-2s Distillation Event. Simultaneously working the 231 (Expense and Capital) Units with upcoming 1733/ 431/ 331/ 870 Units.  (6/2010 to 3/2011): PBF/ FWUSA’s Re-Start Event for NCC at Delaware City, DE. Duties included forecasting/ tracking and reporting for the North side of the plant’s (FCCU, GAS PLANT, CRUDE, SULFUR and COKER) units.
  • 2. 2 of 2  (12/2009 to 06/2010): 15-2, MEA and EC Flare at Sunoco’s 2010 Marcus Hook TA.  (3/2009 to 11/2009): Exchanger Coordinator/ Planner/ Scheduler for the Valero TA 2009 (Delaware City, DE) FCCU TA. Including the FCCU, Alky, Poly, CHNT, Ether, Butamer Unit (full scope was 120 exchangers). Designed and cost estimated new bundle washing facility (temporary vs. capitalized). Steel bolster design for fabrication completed and coordinated with corresponding Hyster model selection.  (11/2006 to 03/2009): Sunoco (Philadelphia, PA) TAs: 231 Gulfiner (shot blast of heater tube inside diameters and catalyst changes on two reactors); 1332 Regeneration, 866 Catalyst Change, 1332 2010 General TA and 1732 2010 General TA. Sunoco (Philadelphia, PA) for the coordination of all mechanical work on the 210 Atmospheric and Vacuum Unit turnaround.  (08/2005 to 11/2006): Sunoco (Philadelphia, PA) for the coordination of all capital work on the 865 ULSD culminations with the 865 TA expense scope (catalyst change). Capital work included 347SS Heater re-tube (Barrel and Convection Section) with equipment upgrades. EWR Planner/ Scheduler for the Sunoco (Philadelphia, PA) 137 2006 TA. Current and previous projects with Steamfitters LU 420 (08/1989 to Present)  Many positions including (as mentioned) Scheduler, Estimator, Planner, Field Construction Administrator and General Foreman, Area Foreman, Foreman, Welder/ UA Certified Pipe Welder, Journeyman and Apprentice. Jobs listed below are not in total.  Industrial Projects: NuStar Energy (Rail Rack Expansion), Delaware City Refining, Valero, PES, Sunoco, Inc. Philadelphia and Marcus Hook at the following Plants (10, 15-2S, 15-2, 17, MEA, E/C Flare, 210, 231, 865, 866, 869, 1232,1332, 1732, 1733); FPL Energy at Marcus Hook Energy Center; Exelon Power at Eddystone; Carpenter Technology; Hershey Foods; Dana Corporation; Tarkett and more.  Commercial Projects: PSU of Abington, PA(4/2014 to 9/2014) for laboratory and HVAC renovation, Merck (West Point, PA), GSK Pharmaceutical, Acme Markets,University of Penn Medical Center, Radisson and Marriott Hotels, Alden Park Manor, Advanta Office Complex, Penn Medicine and more. EDUCATION___________________________________________________________________ 2014 PA. Clearances for work/ volunteer at Schools/ Universities. 2014 NJMEP: Successful Project Management. 2013 TWIC, PSM (DVSC and Built Rite) and DISA certifications. 2012 Qualifed Rigger (LU 420). 2011 Current UA pipe welding certifications are in procedure 3 and 5. 2001-2011 M.C.C.C. - A.S. in Engineering Science/ Mathematics – completed 85 credit hrs. 1988-1993 Completed 5-year Steamfitters LU 420 Apprentice Training Program 1988 PA Act 120 (Municipal Police Academy/ Patrolman at Limerick Police Department) 1985 Pottsgrove High School (Montgomery County, PA.)