Ng Eng Beng has 7 years of experience in oil and gas project management. He holds an electrical engineering degree and various safety certifications. Currently employed by Bechtel Malaysia as an electrical and instrumentation field engineer, he has experience managing projects from engineering through commissioning. His responsibilities include verifying installations, resolving issues, ensuring quality, and preparing documentation.
1. Ng Eng Beng
7 years of experience in Oil & Gas / Petrochemical Industry actively performing in
Project Management from Engineering, Procurement, Construction to
Commissioning. Especially skilled in Electrical & Instrumentation.
Current Employment Status:
Location: Lumut
Notice period: 1 month
Skills and Certifications:
Graduate members of Board of Engineers Malaysia. (84804A)
Student members of Institution of Engineers Malaysia. (S 34674)
Qualified in EEHA inspection (Electrical Equipment Hazardous Area) in line with AS/NZS 4761 standards
(20983@135).
Completed theoretical and practical instruction on Swagelok Tube Fitting Installation Training conducted by
Swagelok Malaysia.
Trained by CMP Products to install CMP E1FW & PX2KW-REX cable gland.
Contact Info
Address : No.121, Kampung Baru,
34700 Simpang,
Perak, Malaysia.
Mobile No. : 012-5982885
Email : engbeng85@gmail.com
Personal Particulars
Age : 31 years old Date of Birth : 27 FEB 1985
Nationality : Malaysian Gender : Male
Marital Status : Married
Permanent Residence : Malaysia
2. Educational Background
Highest Education
Level : Bachelor's Degree CGPA : 3.38/4
Field of Study : Electrical Engineering
Name of Institution : Universiti Teknikal Malaysia Melaka
Location : Melaka, Malaysia Graduation 2009
Second Highest Education
Level : STPM CGPA : 2.67/4
Field of Study : Sciences
Name of Institution : SMJK HUA LIAN
Location : Taiping, Perak Graduation : 2004
3. Work Experiences
Company : Intel Technology Sdn Bhd
Period : January 2008 – June 2008 (Internship)
Job title : Assistant in SCAM module
• Worked in assembly of department NTI 7
• Supervised by Mr Toh Beng Wooi and guided by buddy Mr. See Chiou Lai
• Learnt and implemented windows-based statistical analysis software system
• Study of SPC(Statistical Process Control) for identifying and responding to process or equipment
problems
• Design of experiment in identifying process problems
Company : MIE Industrial Sdn Bhd
Period : September 2009 until May 2014
Job title : Project Engineer
Location : Malaysia
a. Project : Petronas Methanol Labuan Phase 2 Rejuvenation &Debottlenecking
• Engineering and construction supervision including calibration, cable laying, impulse tubing,
instrument installation, including flow element installation such as orifice and rotameter, loop
checking of various instruments in debottlenecking and rejuvenation.
• Worked as site engineer for the erection & commissioning of instruments.
• Gained hands-on experience in erection and installation of impulse tubing, junction boxes, cable
trays, cable ducts, conduits, control room panels, laying of cables and installation of various field
instruments.
• Involved in calibration of instruments such as YOKOGAWA transmitters, switches, temperature
elements, pressure elements etc.
• Skillful in reading plant P&ID and Piping Isometric.
• Engineering documents preparation.
• Work permit preparation for daily site work within well understanding of job contents.
b. Project : Asean Bintulu Fertilizer 12th
Turnaround Rejuvenation Project
• Site survey for material purchasing based on BQ (bill of quantity) from contract offer.
• Discussion with clients due to material specification requirements.
• Arrangement for set up of site office.
• Preparation of hook-up drawing for field instrument installation and typical drawing for support
installation.
• Compilation of documents such as loop drawing (from field instrument to control room panel),
plant lay-out drawing, P&ID and etc.
• Meeting with HSE and project department (from ABF) for JMS and JSA review.
• Leading field instruments installation such as Yokogawa and E&H transmitter.
• Involved in instruments loop check and impulse tubing leak test. Troubleshoot for error during
loop check and doing correction for improper tubing installation.
• Stand by for plant commissioning and proper handover to customer with complete documents.
4. c. Project : Malaysino Chemical Industry (Kemaman) instrumentation package
• Attend kick off meeting for project kick start and proper arrangement for mobilization.
• Material purchase based on consultant’s AFC drawings.
• Junction box termination assignment based on total IO points.
• Preparation of proper loop drawings for plant commissioning purpose.
• Preparation of hook-up drawings as instrument installation reference.
• Involved with instrument calibration job such as valve passing test and stroke check, transmitter 5
point check with current injection and etc.
• Weekly meeting with plant owner for progress report and other contractor for site coordination.
• Planning for project cost control based on total man hour loading, material purchased and project
schedule duration.
• Involved with plant commissioning with attendance of consultant’s representative, instrument
supplier technician and etc.
• Worked out of single line diagram for batch controller (filing station) local panel fabrication and
testing for smooth running.
d. Project : Shell Hijau Gasoil Project (Port Dickson)
• Attend kick off meeting for project kick-start such as plant safety requirement, mobilization,
project team introduction and etc.
• Material purchase based on tender BQ and finalised the quantity when AFC document have been
issued.
• Rearrange all tender document and request for those document which not been issued during
tender stage.
• Study all related document with detail in order to finalised materials quantity.
• Clarification for scope of supply for certain material which not stated clearly during tender stage
and proposed material spec for approval.
• Study vendor’s supply document as calibration and installation reference.
• Attend weekly meeting with Fluor representatives for overall progress reporting.
• Planning for site activities based on actual man power loading and submitted weekly look ahead
schedule.
• Lead for field installation activity such as Emerson’s transmitter, local instrument, analyser
house, Foundation Fieldbus junction box with network trunk and etc.
• Discussions with reactor vendor representative for procedures of reactor’s thermocouples
installation.
• Propose certain typical drawing such as panel support and proximity switch support bracket for
approval.
• Finalise instrument location on site with supervisor and Fluor’s site engineer.
• Compilation of termination diagram and loop drawing for plant commissioning.
e. Project : Flare Gas Recovery Unit project at Petronas Gas Processing Plant (Kerteh)
• Material purchasing based on latest AFC drawing and submission of specification to be approved
by main contractor.
• Revise junction box GA drawings from supplier in order to meet client’s requirement.
• Arrangement for calibration activity such as equipment with valid certificate, set up of test bench
for PSV pop test by third party and proper storage for instrument after calibrated.
• Power up and visual inspection for wireless transmitter. Proper calibrations only carry out after
installed and configured of wireless gateway with DCS.
5. • Assign manpower in group for site activities such as cable tray installation, cable pulling,
stanchion installation, panel installation and junction box installation.
• Work as site engineer for erection activities such as instrument installation, impulse tubing
installation, air pipe installation and cable termination.
• Monitoring for QA/QC inspection activities such as cable megger, material incoming inspection,
impulse tubing leak test and etc.
• Site survey with main contractor’s engineer for additional instrument installation work.
• Attend weekly progress meeting for site’s progress reporting as well as coordination with other
contractor.
• Skilful in reading vendors supplied drawings for compressor instruments installation.
• Organise internal weekly walkabout for field installation progress catch up.
f. Project : Compressor installation at KR2 IETS project for Petronas Penapisan (Terengganu)
Snd Bhd
• Material purchasing based on latest AFC drawing and submission of specification to approve by
clients.
• Material specification submissions for approval.
• Material purchase include vortex flow transmitter, pressure transmitter, control valve and MCC
module for compressor power supply.
• Site survey with vendor representative and clients for MCC modification work in substation.
• Further discussions with piping engineer for vortex flow transmitter upstream/downstream piping
requirement in order to maintain good accuracy of reading.
• Clarification for control valve characteristic based on advice from vendor for a better valve
opening.
• Skilful in reading P&ID and piping GA drawing in tracking the actual location of transmitter and
other info.
• Monitor closely for material delivery in order to assure construction progress ahead of overall
tight schedule.
• Proper manpower arrangement with leading of experienced supervisor in order to maintain the
quality of site installation work.
• Attend FAT for control valve testing such seat leak test and hydro test.
• Monitor closely for MCC module installation and invite clients to witness for testing such cable
meggerig, continuity check and module switch on for voltage measurement.
• Invite third party for MCC module relay setting.
Company : Bechtel Malaysia Inc
Period : May 2014 until current
Job title : Electrical & Instrumentation Field Engineer
Location : Malaysia
a Project : Wheatstone LNG ISBL Module Fabrication
• Review IFC drawings issued by engineering.
• Familiar with Bechtel Procurement System such as materials purchase and materials withdrawal
for field installation.
• Issuance of Field Material Request to purchase materials (with long lead time) locally in order to
meet the module load out date. Locally ordered materials must meet the project specification or
equal.
6. • Initiate technical query such as Field Changed Document or Request For Information through
Project Technical System due to design changed based on site actual condition.
• Initiate Non-Conformance Report for field installation deviate from IFC drawings and material
damaged due to construction activity.
• Attend weekly conference meeting with engineering team to update and resolve on site current
issues.
• Perform material incoming inspection to assured material arrived are as per datasheet and project
specification.
• Daily update for field installed quantity in TeamWorks and Setroute system (Bechtel quantity
report system). Whilst verify on site for quantity installed.
• Conduct quality training for craft worker such as cable tray and cable ladder installation, cable
bending radius measurement, earthing requirment as per project specification and etc.
• Joined EEHA (electrical equipment hazardous area) inspection. Details of inspection such as
confirmation of certification number, equipment protection level, temperature class, gas group
and etc.
• Verify field installation work such as cable bending radius, tubing installed with slope as
required, cable termination and etc.
• Organize inspection walkdown with client when completed installation of raceway, lightings,
instrument, F&G devices, cable termination and etc.
• Preparation of punchlist after walkdown with client and submit to construction team for
rectification.
• Organize walkdown with client for punch items verification before handover to turnover group.
• Preparation of work packages for submissions after field inspection accepted by client.
• Preparation of As-builts drawings to reflect actual field installation in new issuance drawings.
7. • Initiate technical query such as Field Changed Document or Request For Information through
Project Technical System due to design changed based on site actual condition.
• Initiate Non-Conformance Report for field installation deviate from IFC drawings and material
damaged due to construction activity.
• Attend weekly conference meeting with engineering team to update and resolve on site current
issues.
• Perform material incoming inspection to assured material arrived are as per datasheet and project
specification.
• Daily update for field installed quantity in TeamWorks and Setroute system (Bechtel quantity
report system). Whilst verify on site for quantity installed.
• Conduct quality training for craft worker such as cable tray and cable ladder installation, cable
bending radius measurement, earthing requirment as per project specification and etc.
• Joined EEHA (electrical equipment hazardous area) inspection. Details of inspection such as
confirmation of certification number, equipment protection level, temperature class, gas group
and etc.
• Verify field installation work such as cable bending radius, tubing installed with slope as
required, cable termination and etc.
• Organize inspection walkdown with client when completed installation of raceway, lightings,
instrument, F&G devices, cable termination and etc.
• Preparation of punchlist after walkdown with client and submit to construction team for
rectification.
• Organize walkdown with client for punch items verification before handover to turnover group.
• Preparation of work packages for submissions after field inspection accepted by client.
• Preparation of As-builts drawings to reflect actual field installation in new issuance drawings.