SlideShare a Scribd company logo
1 of 25
SHAH ABDUL LATIF UNIVERSITY,
GHOTKI CAMPUS
DEPARTMENT OF BUSINESS
ADMINISTRATION
PROJECT EVALUATION
COURSETITLE
Course Instructor: Nadia Memon
Batch: BBA-Part IV 2017
Lecture Topic: Different Investment criteria
Topics of Discussion
 Process of Capital allocation
 Net Present Value
 Payback period
 Discounted Payback period
Capital allocation decisions
 The process of allocating capital is more than just
deciding whether to buy a fixed asset.
 Capital allocation is deciding about nature of firm’s
operation for years to come. The projects and assets
firm select for capital investment usually define
business of that firm.
 Decisions such as these are not easily reversed, once
they are made, that’s why firms make careful strategic
choices that will reap some profit for them.
 Most the firms possess huge possible investments, each
one is option available to firm, some options are
valuable, some are not, firms must learn to identify
which are which? With useful techniques discussed in
this lecture.
1. Net Present Value
 An investment is worth undertaking if it creates value for its owners.
 Investment is said to be valuable if it is worth more in the marketplace than
it costs to acquire.
 “Net present value is the difference between an investments
market value and its cost commonly known as NPV”.
 Suppose you buy a car for Rs. 250,000 and spend another 40,000 on it to get
it fixed up, your total investment is 290,000, now you place the car back in
the market and find that it worth 350,000, the market value exceeds the cost
by 60,000 results in value you have created for the investment.
Net Present Value
 Net present value requires to estimate the future cash flows of investment
opportunity based on realistic assumptions.
 Appropriate discounted rate is identified to discount the future cash flows,
that rate will be based on opportunity cost of capital, means how much rate
we could earn if we invest same amount in any other project/option.
 Net present value will be calculated by subtracting present value of future
cash flows from present value of cash inflows.
 NPV = PV cash inflows – PV cash outflows
 Acceptance Rule
 Accept the project when NPV is positive NPV > 0
 Reject the project when NPV is negative NPV < 0
 May accept the project or indifferent between taking and not taking the
project when NPV is zero NPV = 0
Net Present Value
 NPV = C * (PVAF) – I
 In the above formula,
 C = is the cash inflow expected to be received each period
 PVAF = is the Present value factor
 I= is the initial investment
 can be written as :
Net Present Value Formula when cash flows are constant
𝑁𝑃𝑉 = −𝑰 + 𝑪 𝟏 −
𝟏
𝟏 + 𝑹 𝒏
𝑹
Net Present Value Formula when cash flows are constant
 Example
 Calculate the net present value of a project which requires an initial investment of Rs.
243,000 and it is expected to generate a cash inflow of Rs. 50,000 each month for 12
months. Assume that the salvage value of the project is zero. The target rate of return is
12% per annum.
 We have,
 Initial Investment = Rs: 243,000
 Net Cash Inflow per Period = Rs:50,000
 Number of Periods = 12
 Discount Rate per Period = 12% ÷ 12 = 1%
Add a Slide Title - 3
 Net Present Value =C * PVAF - I
= 50,000 × 11.255 − 243,000
= 562,750 − 243,000
= 319,750
net present value is positive investment should be accepted
Net Present Value Formula when cash flows are constant
 The formula for the net present value can be written as follows:
𝑁𝑃𝑣 =
𝐶1
1+𝑅
+
𝐶2
1+𝑅 2 +
𝐶3
1+𝑅 3
+
𝐶 𝑛
1+𝑅 𝑛
}- I
𝑁𝑃𝑣 =
𝑐 𝑡
1+𝑅 𝑡
− 𝐼
 Where as C1,C2…Cn represents net cash inflow for year 1,2….n
 K is the opportunity cost of capital or return rate
 I is the initial investment n is the expected life of investment
Net Present Value Formula when cash flows are uneven
Example
 Assume that Project X costs Rs 2,500 now and is expected to generate year-
end cash inflows of Rs 900, Rs 800, Rs 700, Rs 600 and Rs 500 in 5 years,
The opportunity cost of the capital may be assumed to be 10 per cent.
 𝑵𝑷𝒗 =
𝟗𝟎𝟎
𝟏+𝟎⋅𝟏𝟎 𝟏 +
𝟖𝟎𝟎
(𝟏+𝟎.𝟏𝟎) 𝟐 +
𝟕𝟎𝟎
𝟏+𝟎.𝟏𝟎 𝟑 +
𝟔𝟎𝟎
(𝟏+𝟎.𝟏𝟎) 𝟒 +
𝟓𝟎𝟎
(𝟏+𝟎.𝟏𝟎) 𝟓 − 𝟐𝟓𝟎𝟎
 Find out the solution .
 Answer = 225
Net present Value Merits and Flaws
 NPV gives important to the time value of money.
2.In the calculation of NPV, both after cash flow and before cash
flow over the life span of the project are considered.
3. Profitability and risk of the projects are given high priority.
4. NPV helps in maximizing the firm's value.
Net present Value Merits and Flaws
 NPV is difficult to use.
2. NPV can not give accurate decision if the amount of investment
of mutually exclusive projects are not equal.
3. It is difficult to calculate the appropriate discount rate.
4. NPV may not give correct decision when the projects are of
unequal life.
2. The Payback Period
 The payback is the length of time it takes to recover our initial investment
 payback period is the amount of time required for an investment to
generate cash flows sufficient to recover its initial cost.
 It is the common practice to talk about that in how much time our
investment pays back and we will get our initial investment fully paid,
usually management as well as common investors interested more in the
projects that payback in shortest possible time that’s why is technique is
widely used to estimate the possible time and desirability of projects.
Based on the payback rule, an investment is acceptable if
its calculated payback period is less than some
prespecified number of years.
For suppose we have 500,000 rupees and we wanted to invest them to secure
our investment as we have different options available, like shares, bank
investment, private partnership, real state and so on, but we want to get our
investment generate inflows in less possible time so we can apply payback
period method and can estimate cash flows of desirable options available and
calculate payback period.
The Payback Rule
Two Content Layout with Table
 The projects initial investment is 500,000
 What is the payback period for this investment when
cash flows are these?
 The initial investment is 500,000. After the first two
years, total cash inflows are 300,000, after third year,
the total cash fl ow is 800,000
 It means the project pays back between the end of
year 2 and in the start of year 3. Because the
accumulated cash flows for the first two years are
300,000 we need to recover 200,000 in the third
year.
 The third-year cash fl ow is $500, so we will have to
wait 200,000/500,000= .4 year to do this. The
payback period is thus 2.4 years, or about two years
and four months.
Year Cash flow
0 -500,000
1 100,00
2 200,000
3 500,000
The Payback period
 Many decisions simply do not warrant detailed analysis because the cost of
the analysis would exceed the possible loss from a mistake.
 Small investment decisions are made by the hundreds every day in large
organizations, so this technique is less time consuming.
 First, because it is biased toward short-term projects, it is biased toward
liquidity.
 The payback period is a kind of “break-even” measure. Because time value is
ignored,
The Payback period Redeeming Qualities
 we calculate the payback period by simply adding up the future cash flows.
There is no discounting involved, so the time value of money is completely
ignored.
 The payback rule also fails to consider any risk differences. The payback
would be calculated the same way for both very risky and very safe projects.
 payback period rule is coming up with the right cutoff period, using a
number that is arbitrarily chosen, there is no guide how to pick a cutoff.
 Biased against long-term projects, such as research and development, and
new projects, as we can not clearly estimate when they payback.
The Payback period Shortcomings of the rule
Year Cash flow
0 -4,800
1 1500
2 2600
3 2900
4 1700
Payback period Example
 Calculating Payback What is the payback period for the following set of cash flows?
 To calculate the payback period, we need to find the time that the project has recovered
its initial investment. After two years, the project has created,
 $1,500 + 2,600 = $4,100
 in cash flows. The project still needs to create another:
 $4,800 – 4,100 = $700
 During the third year, the cash flows from the project will be $2900.
 So, the payback period will be 2 years, plus months
 The payback period is:
 Payback = 2 + ($700 / $2,900) = 2.24 years
 Definition
 The discounted payback period is the length of time until the sum of the
discounted cash flows is equal to the initial investment.
 The major shortcoming of the payback period rule was that it ignored time
value of money, so this improved version fixed this issue.
 Discounted payback is closely associated with NPV because when it pays
back, there must be a positive NPV due to initial investment is retrieved.
 Discounted payback is an improvement on regular payback because it
considers the time value of money.
3. Discounted Payback period
 The discounted payback is calculated the same as is regular payback, with the exception that
each cash flow in the series is first converted to its present value.
 Thus discounted payback provides a measure of financial break-even because of this
discounting, just as regular payback provides a measure of accounting break-even because it
does not discount the cash flows.
 Based on some predetermined cutoff for the discounted payback period, the decision rule is
to accept projects whose discounted cash flows payback before this cutoff period, and to
reject all other projects.
 The primary disadvantage to using the discounted payback method is that it ignores all cash
flows that occur after the cutoff date, thus biasing this criterion towards short-term
projects. As a result, the method may reject projects that in fact have positive NPVs.
Discounted Payback period rule
Example
 Calculating Discounted Payback
 An investment project has annual cash inflows of $6,500, $7,000, $7,500, and $8,000, and a
discount rate of 14 percent. What is the discounted payback period for these cash flows if
the initial cost is $8,000?
 When we use discounted payback, we need to find the value of all cash flows today. The
value today of the project cash flows for the first four years is:
year Discounting PV of cash flow
0 - 8000
1 6500
1 ⋅ 14 1
5,701.75
2 7000
1 ⋅ 14 2
5,386.27
3 7500
1 ⋅ 14 3
5,062.29
 To find the discounted payback, we use these values to find the payback period. The
discounted first year cash flow is $5,701.75, so the discounted payback for an $8,000 initial
cost is:
 We will subtract first year's cash flow from initial investment because payback is highly
likely to occur in second year.
 Discounted payback = ($8,000 – 5,701.75)= 2298.25
 Discounted payback = 1+ 2298.25/$5,386.27 = 1.43 years
Example
HAVE A GREAT DAY !

More Related Content

What's hot

case study-capital budgeting
case study-capital budgetingcase study-capital budgeting
case study-capital budgeting
infinite_7
 
Capital budget
Capital budgetCapital budget
Capital budget
suns88
 
Capital budgeting Summary 1
Capital budgeting Summary 1Capital budgeting Summary 1
Capital budgeting Summary 1
Ibrahim Ganiyu
 
Capital Budgeting And Investment Decisions In Financial Management 11 Nov.
Capital Budgeting And Investment Decisions  In Financial Management 11 Nov.Capital Budgeting And Investment Decisions  In Financial Management 11 Nov.
Capital Budgeting And Investment Decisions In Financial Management 11 Nov.
Dr. Trilok Kumar Jain
 
Capital budgeting techniques
Capital budgeting techniquesCapital budgeting techniques
Capital budgeting techniques
VJTI Production
 

What's hot (19)

case study-capital budgeting
case study-capital budgetingcase study-capital budgeting
case study-capital budgeting
 
Capital budget
Capital budgetCapital budget
Capital budget
 
Evaluation techniques
Evaluation techniquesEvaluation techniques
Evaluation techniques
 
Capital budgeting
Capital budgeting Capital budgeting
Capital budgeting
 
Net Present Value, IRR and Profitability Index
Net Present Value, IRR and Profitability IndexNet Present Value, IRR and Profitability Index
Net Present Value, IRR and Profitability Index
 
Npv Irr
Npv IrrNpv Irr
Npv Irr
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Net Present Value Vs Profitability Index
Net Present Value Vs Profitability IndexNet Present Value Vs Profitability Index
Net Present Value Vs Profitability Index
 
Npv and IRR, a link to Project Management
Npv and IRR, a link to Project ManagementNpv and IRR, a link to Project Management
Npv and IRR, a link to Project Management
 
Capital budgeting Summary 1
Capital budgeting Summary 1Capital budgeting Summary 1
Capital budgeting Summary 1
 
Discounted payback period
Discounted payback periodDiscounted payback period
Discounted payback period
 
08 chapter 2
08 chapter 208 chapter 2
08 chapter 2
 
Discounted cash flow applications
Discounted cash flow applicationsDiscounted cash flow applications
Discounted cash flow applications
 
Project Management 07
Project Management 07Project Management 07
Project Management 07
 
Chap006
Chap006Chap006
Chap006
 
New Approach to NPV
New Approach to NPVNew Approach to NPV
New Approach to NPV
 
Capital Budgeting And Investment Decisions In Financial Management 11 Nov.
Capital Budgeting And Investment Decisions  In Financial Management 11 Nov.Capital Budgeting And Investment Decisions  In Financial Management 11 Nov.
Capital Budgeting And Investment Decisions In Financial Management 11 Nov.
 
Capital budgeting techniques
Capital budgeting techniquesCapital budgeting techniques
Capital budgeting techniques
 
Concepts of value and return
Concepts of value and returnConcepts of value and return
Concepts of value and return
 

Similar to Npv and other evaluation techniques

99701101 financial-mgt-notes-section3
99701101 financial-mgt-notes-section399701101 financial-mgt-notes-section3
99701101 financial-mgt-notes-section3
varsha nihanth lade
 
Project management
Project managementProject management
Project management
Anish Jojan
 
Capital Budgeting Decision
Capital Budgeting DecisionCapital Budgeting Decision
Capital Budgeting Decision
Ashish Khera
 
Capital Budgeting Techniques.pptx
Capital Budgeting Techniques.pptxCapital Budgeting Techniques.pptx
Capital Budgeting Techniques.pptx
shailishah38
 

Similar to Npv and other evaluation techniques (20)

INVESTMENT DECISION
INVESTMENT DECISION INVESTMENT DECISION
INVESTMENT DECISION
 
Bsics of Capital Budgeting.pptx
Bsics of Capital Budgeting.pptxBsics of Capital Budgeting.pptx
Bsics of Capital Budgeting.pptx
 
Capital budgeting decisions
Capital budgeting decisionsCapital budgeting decisions
Capital budgeting decisions
 
Financial feasibility of a new business
Financial feasibility of a new businessFinancial feasibility of a new business
Financial feasibility of a new business
 
Cfd ppt
Cfd pptCfd ppt
Cfd ppt
 
Investment decision
Investment decisionInvestment decision
Investment decision
 
99701101 financial-mgt-notes-section3
99701101 financial-mgt-notes-section399701101 financial-mgt-notes-section3
99701101 financial-mgt-notes-section3
 
FM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptxFM Ch6 Capital Budgeting.pptx
FM Ch6 Capital Budgeting.pptx
 
Long term decision making.pptx
Long term decision making.pptxLong term decision making.pptx
Long term decision making.pptx
 
Ch 08
Ch 08Ch 08
Ch 08
 
INVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEMINVESTMENT DECISION AND RELATED PROBLEM
INVESTMENT DECISION AND RELATED PROBLEM
 
Net Present Value - NPV
Net Present Value - NPVNet Present Value - NPV
Net Present Value - NPV
 
Project management
Project managementProject management
Project management
 
Bba 2204 fin mgt week 10 capital budgeting
Bba 2204 fin mgt week 10 capital budgetingBba 2204 fin mgt week 10 capital budgeting
Bba 2204 fin mgt week 10 capital budgeting
 
Chapter 9: Capital Budgeting Techniques
Chapter 9: Capital Budgeting TechniquesChapter 9: Capital Budgeting Techniques
Chapter 9: Capital Budgeting Techniques
 
Chapter 9:Capital Budgeting Techniques
Chapter 9:Capital Budgeting TechniquesChapter 9:Capital Budgeting Techniques
Chapter 9:Capital Budgeting Techniques
 
FM2.pptx
FM2.pptxFM2.pptx
FM2.pptx
 
Capital Budgeting Decision
Capital Budgeting DecisionCapital Budgeting Decision
Capital Budgeting Decision
 
Capital Budgeting Techniques.pptx
Capital Budgeting Techniques.pptxCapital Budgeting Techniques.pptx
Capital Budgeting Techniques.pptx
 
CAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.pptCAPITAL BUDGETING DECISIONS.ppt
CAPITAL BUDGETING DECISIONS.ppt
 

Recently uploaded

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 

Recently uploaded (20)

Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 

Npv and other evaluation techniques

  • 1. SHAH ABDUL LATIF UNIVERSITY, GHOTKI CAMPUS DEPARTMENT OF BUSINESS ADMINISTRATION
  • 2. PROJECT EVALUATION COURSETITLE Course Instructor: Nadia Memon Batch: BBA-Part IV 2017 Lecture Topic: Different Investment criteria
  • 3. Topics of Discussion  Process of Capital allocation  Net Present Value  Payback period  Discounted Payback period
  • 4. Capital allocation decisions  The process of allocating capital is more than just deciding whether to buy a fixed asset.  Capital allocation is deciding about nature of firm’s operation for years to come. The projects and assets firm select for capital investment usually define business of that firm.  Decisions such as these are not easily reversed, once they are made, that’s why firms make careful strategic choices that will reap some profit for them.  Most the firms possess huge possible investments, each one is option available to firm, some options are valuable, some are not, firms must learn to identify which are which? With useful techniques discussed in this lecture.
  • 5. 1. Net Present Value  An investment is worth undertaking if it creates value for its owners.  Investment is said to be valuable if it is worth more in the marketplace than it costs to acquire.  “Net present value is the difference between an investments market value and its cost commonly known as NPV”.  Suppose you buy a car for Rs. 250,000 and spend another 40,000 on it to get it fixed up, your total investment is 290,000, now you place the car back in the market and find that it worth 350,000, the market value exceeds the cost by 60,000 results in value you have created for the investment.
  • 6. Net Present Value  Net present value requires to estimate the future cash flows of investment opportunity based on realistic assumptions.  Appropriate discounted rate is identified to discount the future cash flows, that rate will be based on opportunity cost of capital, means how much rate we could earn if we invest same amount in any other project/option.  Net present value will be calculated by subtracting present value of future cash flows from present value of cash inflows.  NPV = PV cash inflows – PV cash outflows
  • 7.  Acceptance Rule  Accept the project when NPV is positive NPV > 0  Reject the project when NPV is negative NPV < 0  May accept the project or indifferent between taking and not taking the project when NPV is zero NPV = 0 Net Present Value
  • 8.  NPV = C * (PVAF) – I  In the above formula,  C = is the cash inflow expected to be received each period  PVAF = is the Present value factor  I= is the initial investment  can be written as : Net Present Value Formula when cash flows are constant 𝑁𝑃𝑉 = −𝑰 + 𝑪 𝟏 − 𝟏 𝟏 + 𝑹 𝒏 𝑹
  • 9. Net Present Value Formula when cash flows are constant  Example  Calculate the net present value of a project which requires an initial investment of Rs. 243,000 and it is expected to generate a cash inflow of Rs. 50,000 each month for 12 months. Assume that the salvage value of the project is zero. The target rate of return is 12% per annum.  We have,  Initial Investment = Rs: 243,000  Net Cash Inflow per Period = Rs:50,000  Number of Periods = 12  Discount Rate per Period = 12% ÷ 12 = 1%
  • 10. Add a Slide Title - 3  Net Present Value =C * PVAF - I = 50,000 × 11.255 − 243,000 = 562,750 − 243,000 = 319,750 net present value is positive investment should be accepted Net Present Value Formula when cash flows are constant
  • 11.  The formula for the net present value can be written as follows: 𝑁𝑃𝑣 = 𝐶1 1+𝑅 + 𝐶2 1+𝑅 2 + 𝐶3 1+𝑅 3 + 𝐶 𝑛 1+𝑅 𝑛 }- I 𝑁𝑃𝑣 = 𝑐 𝑡 1+𝑅 𝑡 − 𝐼  Where as C1,C2…Cn represents net cash inflow for year 1,2….n  K is the opportunity cost of capital or return rate  I is the initial investment n is the expected life of investment Net Present Value Formula when cash flows are uneven
  • 12. Example  Assume that Project X costs Rs 2,500 now and is expected to generate year- end cash inflows of Rs 900, Rs 800, Rs 700, Rs 600 and Rs 500 in 5 years, The opportunity cost of the capital may be assumed to be 10 per cent.  𝑵𝑷𝒗 = 𝟗𝟎𝟎 𝟏+𝟎⋅𝟏𝟎 𝟏 + 𝟖𝟎𝟎 (𝟏+𝟎.𝟏𝟎) 𝟐 + 𝟕𝟎𝟎 𝟏+𝟎.𝟏𝟎 𝟑 + 𝟔𝟎𝟎 (𝟏+𝟎.𝟏𝟎) 𝟒 + 𝟓𝟎𝟎 (𝟏+𝟎.𝟏𝟎) 𝟓 − 𝟐𝟓𝟎𝟎  Find out the solution .  Answer = 225
  • 13. Net present Value Merits and Flaws  NPV gives important to the time value of money. 2.In the calculation of NPV, both after cash flow and before cash flow over the life span of the project are considered. 3. Profitability and risk of the projects are given high priority. 4. NPV helps in maximizing the firm's value.
  • 14. Net present Value Merits and Flaws  NPV is difficult to use. 2. NPV can not give accurate decision if the amount of investment of mutually exclusive projects are not equal. 3. It is difficult to calculate the appropriate discount rate. 4. NPV may not give correct decision when the projects are of unequal life.
  • 15. 2. The Payback Period  The payback is the length of time it takes to recover our initial investment  payback period is the amount of time required for an investment to generate cash flows sufficient to recover its initial cost.  It is the common practice to talk about that in how much time our investment pays back and we will get our initial investment fully paid, usually management as well as common investors interested more in the projects that payback in shortest possible time that’s why is technique is widely used to estimate the possible time and desirability of projects.
  • 16. Based on the payback rule, an investment is acceptable if its calculated payback period is less than some prespecified number of years. For suppose we have 500,000 rupees and we wanted to invest them to secure our investment as we have different options available, like shares, bank investment, private partnership, real state and so on, but we want to get our investment generate inflows in less possible time so we can apply payback period method and can estimate cash flows of desirable options available and calculate payback period. The Payback Rule
  • 17. Two Content Layout with Table  The projects initial investment is 500,000  What is the payback period for this investment when cash flows are these?  The initial investment is 500,000. After the first two years, total cash inflows are 300,000, after third year, the total cash fl ow is 800,000  It means the project pays back between the end of year 2 and in the start of year 3. Because the accumulated cash flows for the first two years are 300,000 we need to recover 200,000 in the third year.  The third-year cash fl ow is $500, so we will have to wait 200,000/500,000= .4 year to do this. The payback period is thus 2.4 years, or about two years and four months. Year Cash flow 0 -500,000 1 100,00 2 200,000 3 500,000 The Payback period
  • 18.  Many decisions simply do not warrant detailed analysis because the cost of the analysis would exceed the possible loss from a mistake.  Small investment decisions are made by the hundreds every day in large organizations, so this technique is less time consuming.  First, because it is biased toward short-term projects, it is biased toward liquidity.  The payback period is a kind of “break-even” measure. Because time value is ignored, The Payback period Redeeming Qualities
  • 19.  we calculate the payback period by simply adding up the future cash flows. There is no discounting involved, so the time value of money is completely ignored.  The payback rule also fails to consider any risk differences. The payback would be calculated the same way for both very risky and very safe projects.  payback period rule is coming up with the right cutoff period, using a number that is arbitrarily chosen, there is no guide how to pick a cutoff.  Biased against long-term projects, such as research and development, and new projects, as we can not clearly estimate when they payback. The Payback period Shortcomings of the rule
  • 20. Year Cash flow 0 -4,800 1 1500 2 2600 3 2900 4 1700 Payback period Example  Calculating Payback What is the payback period for the following set of cash flows?  To calculate the payback period, we need to find the time that the project has recovered its initial investment. After two years, the project has created,  $1,500 + 2,600 = $4,100  in cash flows. The project still needs to create another:  $4,800 – 4,100 = $700  During the third year, the cash flows from the project will be $2900.  So, the payback period will be 2 years, plus months  The payback period is:  Payback = 2 + ($700 / $2,900) = 2.24 years
  • 21.  Definition  The discounted payback period is the length of time until the sum of the discounted cash flows is equal to the initial investment.  The major shortcoming of the payback period rule was that it ignored time value of money, so this improved version fixed this issue.  Discounted payback is closely associated with NPV because when it pays back, there must be a positive NPV due to initial investment is retrieved.  Discounted payback is an improvement on regular payback because it considers the time value of money. 3. Discounted Payback period
  • 22.  The discounted payback is calculated the same as is regular payback, with the exception that each cash flow in the series is first converted to its present value.  Thus discounted payback provides a measure of financial break-even because of this discounting, just as regular payback provides a measure of accounting break-even because it does not discount the cash flows.  Based on some predetermined cutoff for the discounted payback period, the decision rule is to accept projects whose discounted cash flows payback before this cutoff period, and to reject all other projects.  The primary disadvantage to using the discounted payback method is that it ignores all cash flows that occur after the cutoff date, thus biasing this criterion towards short-term projects. As a result, the method may reject projects that in fact have positive NPVs. Discounted Payback period rule
  • 23. Example  Calculating Discounted Payback  An investment project has annual cash inflows of $6,500, $7,000, $7,500, and $8,000, and a discount rate of 14 percent. What is the discounted payback period for these cash flows if the initial cost is $8,000?  When we use discounted payback, we need to find the value of all cash flows today. The value today of the project cash flows for the first four years is: year Discounting PV of cash flow 0 - 8000 1 6500 1 ⋅ 14 1 5,701.75 2 7000 1 ⋅ 14 2 5,386.27 3 7500 1 ⋅ 14 3 5,062.29
  • 24.  To find the discounted payback, we use these values to find the payback period. The discounted first year cash flow is $5,701.75, so the discounted payback for an $8,000 initial cost is:  We will subtract first year's cash flow from initial investment because payback is highly likely to occur in second year.  Discounted payback = ($8,000 – 5,701.75)= 2298.25  Discounted payback = 1+ 2298.25/$5,386.27 = 1.43 years Example
  • 25. HAVE A GREAT DAY !

Editor's Notes

  1. NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image.