Reengineering the Acquisition/Procurement Process:  Requirements Collection Methodology and                  Thomas Vanek     Booz Allen Hamilton NASA PM Challenge 2011     February 9–10, 2011  Randall L. Taylor     Project ManagerAcquisition Reengineering Project     Jet Propulsion Laboratory     California Institute of Technology Copyright © 2010. All rights reserved.
Agenda Project Methodology Requirements Collection Customer Sessions Customer Voting Stakeholder and Process Performer Sessions Preliminary Benchmarking Preliminary Requirements Quick Hits  Where are we Now?
Project Approach Utilize Lean Six Sigma and Reengineering methodologies and techniques Focus on the Customer, and how we can do a better job. In line with the Acquisition Division Mission & Vision The Project is “Exploratory”. Explore solutions that make life better for Subcontract Managers & Contract Technical Managers The Project is conducted like a flight project, using various tools & techniques
Project Methodology Major improvement can come about through a single paradigm change, or by a combination of smaller but important changes. FY09 FY10
Methodology: Project Plan ,[object Object]
Phase A: Concept Studies/Development
Validate Customers, Stakeholders, and Process Performers
Requirements; Concept; Prelim. Concept of Operations; Prelim. Project Plan
Concept Review
Phase B: Preliminary Design
Requirements (baseline); Prelim. Design; Concept of Operations; Project Plan; Integrated Baseline (tech-sched-cost)
Pre-PDR peer reviews; PDR; Confirmation Review
Phase C: Final Design & Build
Phase D: System Assembly, I&T, and Launch
Phase E: Operations & SustainmentPhase B Phase C Phase D Phase E Phase A
Acquisition Reengineering Activity 1:Gather Customer Requirements Activity 1 - Requirements Generation Objective: to capture customer requirements as the basis for proposing a concept (and subsequent design) that meets the requirements in a verifiable manner Requirements are solicited from: Customers – primary customers are Project Managers and Proposal Managers Stakeholders – we have a long list (e.g., Legal, Property, Invoice Management, Engineering and SMA management…) Process Performers – buyers, negotiators, Contract Technical Managers (primary), others Employ a modified version of the JPL Resource Management System technique  Products include preliminary requirements set & recommended “quick hits” (Lean Six Sigma Kaizen events and Just-Do-Its) for implementation Establish JPL acquisition process definition Phase A Phase B Phase C Phase D Phase E
Requirements collection & analysis tools Customer/stakeholder/process performer groups identified Collection sessions technique(s) mapped out Session pre-work conducted prior to each session Customer Requirements Collection Method Illustrative Sampling of requirement fields ,[object Object]
Source Type, e.g., Project Manager
Requirement statement
Requirement rationale
Requirement impact

More Related Content

What's hot

Cole ready aim fire impact!- status impact analysis - nasa
Cole   ready aim fire impact!- status impact analysis - nasaCole   ready aim fire impact!- status impact analysis - nasa
Cole ready aim fire impact!- status impact analysis - nasaNASAPMC
 
Simon.dekker.vance kotrla
Simon.dekker.vance kotrlaSimon.dekker.vance kotrla
Simon.dekker.vance kotrlaNASAPMC
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
Richard.laws
Richard.lawsRichard.laws
Richard.lawsNASAPMC
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidyNASAPMC
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonceNASAPMC
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliottNASAPMC
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahaniNASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinalNASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarieNASAPMC
 
Brian muirhead v1-27-12
Brian muirhead v1-27-12Brian muirhead v1-27-12
Brian muirhead v1-27-12NASAPMC
 
Mc nally
Mc nallyMc nally
Mc nallyNASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Law.richard
Law.richardLaw.richard
Law.richardNASAPMC
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jeanNASAPMC
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationChris Carson
 
Newman.steve
Newman.steveNewman.steve
Newman.steveNASAPMC
 

What's hot (20)

Cole ready aim fire impact!- status impact analysis - nasa
Cole   ready aim fire impact!- status impact analysis - nasaCole   ready aim fire impact!- status impact analysis - nasa
Cole ready aim fire impact!- status impact analysis - nasa
 
Simon.dekker.vance kotrla
Simon.dekker.vance kotrlaSimon.dekker.vance kotrla
Simon.dekker.vance kotrla
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
Richard.laws
Richard.lawsRichard.laws
Richard.laws
 
Backup jim cassidy
Backup jim cassidyBackup jim cassidy
Backup jim cassidy
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonce
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Amer.tahani
Amer.tahaniAmer.tahani
Amer.tahani
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 
Brian muirhead v1-27-12
Brian muirhead v1-27-12Brian muirhead v1-27-12
Brian muirhead v1-27-12
 
Mc nally
Mc nallyMc nally
Mc nally
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Law.richard
Law.richardLaw.richard
Law.richard
 
Murphy.dar jean.jean
Murphy.dar jean.jeanMurphy.dar jean.jean
Murphy.dar jean.jean
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan Presentation
 
Newman.steve
Newman.steveNewman.steve
Newman.steve
 

Viewers also liked

An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E systemFIDAfrique-IFADAfrica
 
Zieger.alfred
Zieger.alfredZieger.alfred
Zieger.alfredNASAPMC
 
Alfred mecum
Alfred mecumAlfred mecum
Alfred mecumNASAPMC
 
Leonard.matthew
Leonard.matthewLeonard.matthew
Leonard.matthewNASAPMC
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky finalNASAPMC
 
J marinaro jmay
J marinaro jmayJ marinaro jmay
J marinaro jmayNASAPMC
 
Maturo.a.midgett.j
Maturo.a.midgett.jMaturo.a.midgett.j
Maturo.a.midgett.jNASAPMC
 
Baniszewski.john
Baniszewski.johnBaniszewski.john
Baniszewski.johnNASAPMC
 
Swedish County Council: Sustainable Procurement for Sustainable Development
Swedish County Council: Sustainable Procurement for Sustainable DevelopmentSwedish County Council: Sustainable Procurement for Sustainable Development
Swedish County Council: Sustainable Procurement for Sustainable DevelopmentUN SPHS
 

Viewers also liked (13)

An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E system
 
Un Sustainable Procurement
Un Sustainable ProcurementUn Sustainable Procurement
Un Sustainable Procurement
 
Zieger.alfred
Zieger.alfredZieger.alfred
Zieger.alfred
 
Alfred mecum
Alfred mecumAlfred mecum
Alfred mecum
 
Leonard.matthew
Leonard.matthewLeonard.matthew
Leonard.matthew
 
Rovinsky final
Rovinsky finalRovinsky final
Rovinsky final
 
J marinaro jmay
J marinaro jmayJ marinaro jmay
J marinaro jmay
 
Maturo.a.midgett.j
Maturo.a.midgett.jMaturo.a.midgett.j
Maturo.a.midgett.j
 
Baniszewski.john
Baniszewski.johnBaniszewski.john
Baniszewski.john
 
QIP-SCM
QIP-SCMQIP-SCM
QIP-SCM
 
Accra2009 action plan
Accra2009 action planAccra2009 action plan
Accra2009 action plan
 
Swedish County Council: Sustainable Procurement for Sustainable Development
Swedish County Council: Sustainable Procurement for Sustainable DevelopmentSwedish County Council: Sustainable Procurement for Sustainable Development
Swedish County Council: Sustainable Procurement for Sustainable Development
 
Strategic Management Case Study - Toyota
Strategic Management Case Study - ToyotaStrategic Management Case Study - Toyota
Strategic Management Case Study - Toyota
 

Similar to Taylor.randall

Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0Gavin Berry
 
Supply Chain Strategy Assessment
Supply Chain Strategy AssessmentSupply Chain Strategy Assessment
Supply Chain Strategy AssessmentChief Innovation
 
Optimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and PrioritizationOptimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and PrioritizationInfo-Tech Research Group
 
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptxIIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptxssuser991a01
 
Case Study: Product Development Redesign for Life Science client
Case Study:  Product Development Redesign for Life Science clientCase Study:  Product Development Redesign for Life Science client
Case Study: Product Development Redesign for Life Science clientChief Innovation
 
Approach for transformation kickoff
Approach for transformation kickoffApproach for transformation kickoff
Approach for transformation kickoffBrian Maguire
 
Poor business analysis The Culprit of IT project Failure
Poor business analysis  The Culprit of IT project FailurePoor business analysis  The Culprit of IT project Failure
Poor business analysis The Culprit of IT project FailureRezaul Karim Majumder
 
Importance of early project requirements definition
Importance of early project requirements definitionImportance of early project requirements definition
Importance of early project requirements definitionMaveric Systems
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsChief Innovation
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinMichele Levasseur
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Walgreens Boots Alliance, Inc.
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003Sidewinder2011
 
Feasibilty .pptx
Feasibilty .pptxFeasibilty .pptx
Feasibilty .pptxMIANMNADEEM
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorialguesta83e9d
 
2.requirements management
2.requirements management2.requirements management
2.requirements managementPanos Fitsilis
 
Chapter16For all types of project and in their different sizes, .docx
Chapter16For all types of project and in their different sizes, .docxChapter16For all types of project and in their different sizes, .docx
Chapter16For all types of project and in their different sizes, .docxchristinemaritza
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 

Similar to Taylor.randall (20)

Project Reviews 20100414 1 0
Project Reviews   20100414 1 0Project Reviews   20100414 1 0
Project Reviews 20100414 1 0
 
Supply Chain Strategy Assessment
Supply Chain Strategy AssessmentSupply Chain Strategy Assessment
Supply Chain Strategy Assessment
 
Chap002
Chap002Chap002
Chap002
 
Optimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and PrioritizationOptimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and Prioritization
 
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptxIIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
 
Case Study: Product Development Redesign for Life Science client
Case Study:  Product Development Redesign for Life Science clientCase Study:  Product Development Redesign for Life Science client
Case Study: Product Development Redesign for Life Science client
 
Approach for transformation kickoff
Approach for transformation kickoffApproach for transformation kickoff
Approach for transformation kickoff
 
Poor business analysis The Culprit of IT project Failure
Poor business analysis  The Culprit of IT project FailurePoor business analysis  The Culprit of IT project Failure
Poor business analysis The Culprit of IT project Failure
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Importance of early project requirements definition
Importance of early project requirements definitionImportance of early project requirements definition
Importance of early project requirements definition
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach Options
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedin
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
 
Feasibilty .pptx
Feasibilty .pptxFeasibilty .pptx
Feasibilty .pptx
 
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change TutorialSanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
Chapter16For all types of project and in their different sizes, .docx
Chapter16For all types of project and in their different sizes, .docxChapter16For all types of project and in their different sizes, .docx
Chapter16For all types of project and in their different sizes, .docx
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Recently uploaded

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 

Recently uploaded (20)

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 

Taylor.randall

  • 1. Reengineering the Acquisition/Procurement Process: Requirements Collection Methodology and Thomas Vanek Booz Allen Hamilton NASA PM Challenge 2011 February 9–10, 2011 Randall L. Taylor Project ManagerAcquisition Reengineering Project Jet Propulsion Laboratory California Institute of Technology Copyright © 2010. All rights reserved.
  • 2. Agenda Project Methodology Requirements Collection Customer Sessions Customer Voting Stakeholder and Process Performer Sessions Preliminary Benchmarking Preliminary Requirements Quick Hits Where are we Now?
  • 3. Project Approach Utilize Lean Six Sigma and Reengineering methodologies and techniques Focus on the Customer, and how we can do a better job. In line with the Acquisition Division Mission & Vision The Project is “Exploratory”. Explore solutions that make life better for Subcontract Managers & Contract Technical Managers The Project is conducted like a flight project, using various tools & techniques
  • 4. Project Methodology Major improvement can come about through a single paradigm change, or by a combination of smaller but important changes. FY09 FY10
  • 5.
  • 6. Phase A: Concept Studies/Development
  • 7. Validate Customers, Stakeholders, and Process Performers
  • 8. Requirements; Concept; Prelim. Concept of Operations; Prelim. Project Plan
  • 11. Requirements (baseline); Prelim. Design; Concept of Operations; Project Plan; Integrated Baseline (tech-sched-cost)
  • 12. Pre-PDR peer reviews; PDR; Confirmation Review
  • 13. Phase C: Final Design & Build
  • 14. Phase D: System Assembly, I&T, and Launch
  • 15. Phase E: Operations & SustainmentPhase B Phase C Phase D Phase E Phase A
  • 16. Acquisition Reengineering Activity 1:Gather Customer Requirements Activity 1 - Requirements Generation Objective: to capture customer requirements as the basis for proposing a concept (and subsequent design) that meets the requirements in a verifiable manner Requirements are solicited from: Customers – primary customers are Project Managers and Proposal Managers Stakeholders – we have a long list (e.g., Legal, Property, Invoice Management, Engineering and SMA management…) Process Performers – buyers, negotiators, Contract Technical Managers (primary), others Employ a modified version of the JPL Resource Management System technique Products include preliminary requirements set & recommended “quick hits” (Lean Six Sigma Kaizen events and Just-Do-Its) for implementation Establish JPL acquisition process definition Phase A Phase B Phase C Phase D Phase E
  • 17.
  • 18. Source Type, e.g., Project Manager
  • 34.
  • 35. Customer Voting Summary Following the Customer sessions, performed preliminary data analysis, identified the most commonly voiced/most impactful ideas, and prepared an electronic ballot for Customer voting. 51% of customers who attended the Customer Sessions responded. Customers were asked to (1) make choices from a list of 40 items based on importance (Not Important at all, Fairly Important, Very Important) and (2) respond with the Top 5 items from the list by typing the number of his/her selections in an input box. General Email with link to ballot was sent to customers on the morning of Monday, May 17 Eligible voters: 224 How many have voted: 115 Voting complete: May 25 Sample
  • 36. Ballot Analysis Customer voting is one data point — but a very important one. The customer voting process proved to be an excellent communication/feedback mechanism for the customers: they felt they were heard. It also proved to be a useful educational vehicle for the Acquisition Division process performers who attended the sessions. Voting analysis focused on five “cuts” at the data: 1. Those items receiving the largest number of “5” ratings Ten items received 35 or more votes in this range, which means that at least 30% of those who voted rated them the most important (despite some voters finding the item not applicable to them). 2. Those items receiving the largest number of combined “4” and “5” ratings. Thirteen items received 50 or more votes in this range, which means at least 44% of those who voted rated them high (despite some voters finding the item not applicable). 3. Those items receiving the largest number of “Top Five” designations. 4. Those items specific to Commodities receiving high ratings. 5. Those items specific to Subcontracts/Bypass receiving high ratings.
  • 37. Customer Ballot email sent 5/17/10
  • 38. Customer Voting: Part 1(115 responses) The following are the items rated a 5 on the scale ranging from 1: Not important at all to 5: Very important. The following are the items rated either 4 or 5 on the scale ranging from 1: Not important at all to 5: Very important.
  • 41. Objective: To identify key acquisition/procurement major process improvement areas that might not surface from the requirements collection sessions, but have been previously done by other Acquisition initiatives. Methodology Literature search, by Booz Allen Hamilton and by JPL, plus review of relevant Acquisition Div. activities. Reviewed the following Division activities Division Strategic Plan — BAH compared project Preliminary Requirements to the Strategic Plan Idea Summits — BAH compared project Preliminary Requirements to the collected ideas R2C — JPL reviewed scope of potential Oracle Advanced Purchasing Suite implementation against the Project Plan KPIs — BAH compared project Preliminary Requirements to the proposed Key Performance Indicators Benchmarking resulted in some changes to the Preliminary Requirements (and ideas for Quick Hits and Phase A2/3 study) Preliminary (Coarse) Benchmarking
  • 42. Booz Allen Benchmarking Materials – JPL Analysis – P1 * See Backup slides for references: “Appendix: Booz Allen Benchmarking References”
  • 43. Preliminary Requirements Objective of preliminary requirements: to serve as the basis for conducting Phase A2/3 conceptual design and targeted benchmarking; also provides a resource to identify Quick Hits for management. Methodology Reviewed brainstorming ideas from customers, stakeholders, and process performers Reviewed ballot results Reviewed BAH & JPL benchmarking materials Turned the most popular and/or most promising ideas into preliminary requirements Added a small number of constraints that the new process must comply with BAH tested the draft preliminary requirements set against the Division Strategic Plan (goals and actions) and against the Idea Summits brainstorming ideas Results were very good (not identical) alignment.
  • 44. Acquisition ReengineeringPreliminary Requirements P1 Requirement 1. Programs, Projects, Tasks, and Proposals shall contact Acquisition at the beginning of their life cycle to formulate acquisition strategy and negotiate support commitments. Requirement 2. Acquisition transactions shall be planned to support project/task and one-year-money need dates. Planning shall include end user and supporting discipline rec-dels. Requirement 3. The process shall identify multiple acquisition strategy options for support effort subcontracts. Requirement 4. The process shall identify multiple acquisition strategy options for system contract subcontracts. Requirement 5. The process shall track purchase requisition entry through purchase order award and purchase order award through purchase order closure, while publishing the cycle time metrics for customers. Requirement 6. Purchase Requisition required steps and responsible parties shall be published for end users (requestors) and preparers. Requirement 7. Special Provisioners shall be established to acquire designated products and services for the end users in lieu of a Purchase Requisition transaction. Requirement 8. Procurement Control Points shall be established only where necessary and approved and shall process requests within a goal of 1 work day. Requirement 9. The process shall establish a method for identifying significant repetitive-buy commodities and options for quickly acquiring them. Requirement 10.iProcurement shall be enhanced by expansion of included commodities and improved user search capabilities.
  • 45. Quick Hits “Quick Hits” are process improvement ideas that meet the following criteria: They have clear value to customers (primarily), stakeholders, and process performers They are properly sized to be implemented within 6 months or less (Kaizen-sized or smaller) They do not require any programming by Institutional IT The necessary resources are available and fit within the Acquisition Division budget (or possible small augmentation) Their implementation is not expected to introduce impediments to the broader process reengineering effort An improvement opportunity that requires more study, or otherwise does not meet the above criteria, would be included in the Phase A/B reengineering activity. Quick Hits may be implemented in several ways, e.g.: Just Do It Facilitated focus group Acquisition mini-team Kaizen event The list of recommended Quick Hits is a menu for management to choose from.  They can be implemented in any order.  Apart from Just Do it items, prudence dictates embarking on a maximum of 3 Quick Hits per quarter (to ensure adequate oversight and synergistic coordination with other activities as well as to put less strain on the budget).  
  • 46. Where Are We Now? Completed purchase requisition sub-process reengineering (11 “enablers” all operational) Completed Standard Subcontract Data Requirements (SDRL/DRDs) (official in command media) Received ATP for two Quick Hits Control points sub-process Communication norms Initiated planning for Advanced (Targeted) Benchmarking activity
  • 47. Summary Completed 44 requirements collection sessions with 391 persons, representing customers, stakeholders, and process performers Conducted customer voting with a 51% response rate Performed preliminary benchmarking Generated process Preliminary Requirements to guide new process conceptual design Provided recommended Quick Hits for management consideration Refined the plan for conceptual design phase — Additional information is available in IEEE paper, “Reengineering the Acquisition/Procurement Process: A Methodology for Requirements Collection” (available from the authors)