Submit Search
Upload
J brennan kmc_laurin_aprince
•
Download as PPT, PDF
•
0 likes
•
14,568 views
N
NASAPMC
Follow
Technology
Education
Report
Share
Report
Share
1 of 16
Download now
Recommended
Antunes.emma
Antunes.emma
NASAPMC
Baldwin.kristen
Baldwin.kristen
NASAPMC
Emma.antunes
Emma.antunes
NASAPMC
J brennan kmc_laurin_aprince
J brennan kmc_laurin_aprince
NASAPMC
SatelliteFinance_SpecialReport_Key Considerations in Hosted Payloads
SatelliteFinance_SpecialReport_Key Considerations in Hosted Payloads
Aaron Shourie
Running head: ACQUISITION STRATEGY: PIEZOELECTRIC EMBEDDED TRANSDUCERS UNDER WALL GEOSTRUCTURE PROGRAM 4 ACQUISITION STRATEGY: PIEZOELECTRIC EMBEDDED TRANSDUCERS UNDER WALL GEOSTRUCTURE PROGRAM Acquisition Strategy: Piezoelectric Embedded Transducers (PET) Under the WALL Geostructure Program XXXXXX ASCM 628 Section 9040 2172 University of Maryland University College March 11, 2017 This strategic plan will specify the details relating to the acquisition of Piezoelectric Embedded Transducers (PET) to be utilized to provide enhanced surveillance capabilities for the new Wide Alignment Limited Loading (WALL) Geostructure Program. As referenced by Kim, Roberts & Brown (2016), United States federal policy and regulatory guidance encourage the use of fixed-price contracts in an effort to secure best value for purchasing groups; therefore, the form of contract that shall be utilized shall be a Fixed Price Economic Price Adjustment (FPEPA) contract to account for the uncertainties of future economic conditions that may cause fluctuations in the future costs of supplies and equipment that the contractor might be required to provide under contract and would not at this time be predictable. Contract Type Pursuant to 41 USC 253 and 10 USC 2305, competition will be full and open and the contract shall be both severable and non-severable. For the procurement of 1,000 Piezoelectric Embedded Transducers, the contract shall be non-severable; however, any elements relating to their maintenance and non-developmental support and data to be reported shall be considered non-severable. Additionally, given the complexity and technical nature of this service, price alone is not sufficient to determine the award and therefore, the contract will be awarded based on a contracting by negotiation bidding process. Furthermore, it is assumed that the U.S. Immigrations and Customs Enforcement (ICE) Acquisitions Division wishes to hold discussions regarding the contract to ensure that its needs are clearly communicated and met to its satisfaction. To allow ICE to have maximum flexibility in awarding the contract, the trade-off process shall also be initiated. Planning Fundamentals The subsequent planning fundamentals shall also be incorporated within this strategic plan as they are essential for the PET sourcing and future negotiations: (1) Contractor Performance Requirements, (2) Deliverables, and (3) Assumptions. Contractor Performance Requirements and Deliverables The contractor shall be responsible for providing substantial value to ICE in the form of required hardware to ensure the enhancement of the surveillance capability for the WALL program, software to certify the technical monitoring and successful operation of the hardware, and the non-developmental support and data which will be utilized to analyze the stabilization and sustainabili ...
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
SUBHI7
IG-14-020
IG-14-020
Michael Palinkas
An older presentation on the differance between UESC and ESPC but still valid
Uescespc Washington
Uescespc Washington
silverwolf_4_u
Recommended
Antunes.emma
Antunes.emma
NASAPMC
Baldwin.kristen
Baldwin.kristen
NASAPMC
Emma.antunes
Emma.antunes
NASAPMC
J brennan kmc_laurin_aprince
J brennan kmc_laurin_aprince
NASAPMC
SatelliteFinance_SpecialReport_Key Considerations in Hosted Payloads
SatelliteFinance_SpecialReport_Key Considerations in Hosted Payloads
Aaron Shourie
Running head: ACQUISITION STRATEGY: PIEZOELECTRIC EMBEDDED TRANSDUCERS UNDER WALL GEOSTRUCTURE PROGRAM 4 ACQUISITION STRATEGY: PIEZOELECTRIC EMBEDDED TRANSDUCERS UNDER WALL GEOSTRUCTURE PROGRAM Acquisition Strategy: Piezoelectric Embedded Transducers (PET) Under the WALL Geostructure Program XXXXXX ASCM 628 Section 9040 2172 University of Maryland University College March 11, 2017 This strategic plan will specify the details relating to the acquisition of Piezoelectric Embedded Transducers (PET) to be utilized to provide enhanced surveillance capabilities for the new Wide Alignment Limited Loading (WALL) Geostructure Program. As referenced by Kim, Roberts & Brown (2016), United States federal policy and regulatory guidance encourage the use of fixed-price contracts in an effort to secure best value for purchasing groups; therefore, the form of contract that shall be utilized shall be a Fixed Price Economic Price Adjustment (FPEPA) contract to account for the uncertainties of future economic conditions that may cause fluctuations in the future costs of supplies and equipment that the contractor might be required to provide under contract and would not at this time be predictable. Contract Type Pursuant to 41 USC 253 and 10 USC 2305, competition will be full and open and the contract shall be both severable and non-severable. For the procurement of 1,000 Piezoelectric Embedded Transducers, the contract shall be non-severable; however, any elements relating to their maintenance and non-developmental support and data to be reported shall be considered non-severable. Additionally, given the complexity and technical nature of this service, price alone is not sufficient to determine the award and therefore, the contract will be awarded based on a contracting by negotiation bidding process. Furthermore, it is assumed that the U.S. Immigrations and Customs Enforcement (ICE) Acquisitions Division wishes to hold discussions regarding the contract to ensure that its needs are clearly communicated and met to its satisfaction. To allow ICE to have maximum flexibility in awarding the contract, the trade-off process shall also be initiated. Planning Fundamentals The subsequent planning fundamentals shall also be incorporated within this strategic plan as they are essential for the PET sourcing and future negotiations: (1) Contractor Performance Requirements, (2) Deliverables, and (3) Assumptions. Contractor Performance Requirements and Deliverables The contractor shall be responsible for providing substantial value to ICE in the form of required hardware to ensure the enhancement of the surveillance capability for the WALL program, software to certify the technical monitoring and successful operation of the hardware, and the non-developmental support and data which will be utilized to analyze the stabilization and sustainabili ...
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
SUBHI7
IG-14-020
IG-14-020
Michael Palinkas
An older presentation on the differance between UESC and ESPC but still valid
Uescespc Washington
Uescespc Washington
silverwolf_4_u
The approval certificate issued by the Federal Energy Regulatory Commission (FERC) on April 7, 2016 for a project to beef up a connection between two pipelines not yet built--PennEast Pipeline and Southern Reliability Project pipeline. Both new pipelines will be located, at least partially, in NJ.
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
Marcellus Drilling News
Article considering why some fleets of young rolling stock are being pushed off-lease and replaced with entirely new fleets, and what the future might hold for financiers and the rolling stock.
Brand new trains being pushed off-lease - implications and options for financ...
Brand new trains being pushed off-lease - implications and options for financ...
Graeme McLellan
Solar PV Rooftop Training Entrepreneurship Development contract structure & agreement
Session 16 contract structure & agreement
Session 16 contract structure & agreement
Chirag Jain
This article explores the potential next steps for Developers if the changes under URD 14D/114 proposed to be made to the ROCs regime for UK solar parks above 5MW in size are passed by the UK Government. There is discussion on what an applicant for a CfD may need, what mechanisms lie in the CfD process to attract debt financiers/equity investors, and what a Developer may do to gear up for the bidding process for CfD-allocation in October this year if legislative changes are implemented to bring forward the CfD for ROCs handover date to 1.4.15.
Potential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passed
Bhalindra Bath - projects & M&A law
Moffett Federal Airfield Lease Overview: Presentation to the Moffett Restoration Advisory Board, February 2015
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
Steve Williams
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
Aditi Tulpule
Caltrain hsrmo uletter
Caltrain hsrmo uletter
Adina Levin
Gensol has summarised the tender issued by SECI for 2.5GW Wind Solar Hybrid ISTS projects. The document covers major commercial & technical guidelines provided in the tender.
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
Applying for contracts for difference when the application window commences on 14 October. Details on Allocation Framework and draft allocation regulations from the UK Government and as published on DECC's website.
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
Bhalindra Bath - projects & M&A law
Good Procedure Process Compliance for Prevention Minimisation of Contractor Contractual Claims Unfounded Frivolous
Beyond Contract Series Article One
Beyond Contract Series Article One
My own
P3S
P3S
artba
05/31: Model P3 Contract Recommendations
05/31: Model P3 Contract Recommendations
artba
The rail rolling stock market is attracting new financiers, who have sometimes struggled to gain traction but are now tasting success.
New entrants tasting success in financing rolling stock - Global Transport Fi...
New entrants tasting success in financing rolling stock - Global Transport Fi...
Graeme McLellan
As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by the State Governments through competitive bidding process for projects costing above a threshold limit which shall be decided by the State Commissions. State has been given option either to use VGF based MTA document of Planning Commission or the Standard Bidding Document of Ministry of Power for procurement of intra-state transmission services. For the VGF based bidding, the unitary charges will require to be approved by the State Commissions prior to bidding. The above said guidelines are for procurement of transmission services to select transmission service provider for a new transmission line. A transmission charges for providing transmission service and O&M required for the various transmission elements shall form the basis for bidding. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of lowest grant sought or highest premium offered.
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Amitava Nag
This document will help you Technical Functional Requirements contractors must adhere to before going for ITES-4H Contract
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
Shane Emerson
The Mountaineer XPress project is approximately 150 miles of new pipeline with approximately 2.7Bcf per day of transportation capacity from existing and future points of receipt along or near CPG’s system, most of it located in West Virginia.
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
Marcellus Drilling News
Electrical Products Group Conference
Electrical Products Group Conference
Electrical Products Group Conference
TextronCorp
ARC_SBIR_TechInvestments_Handbook_2012
ARC_SBIR_TechInvestments_Handbook_2012
Matthew F. Reyes
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Harry Clark
On February 25, 2016, the FASB issued the new standard, Leases (ASC 842). There are elements of the new standard that could impact almost all entities to some extent, although lessees will likely see the most significant changes. Lessees will need to recognize virtually all of their leases on the balance sheet, by recording a right-of-use asset and lease liability. The IASB issued its new standard, IFRS 16, Leases, earlier this year. There are significant areas of divergence between guidance applicable under US GAAP and that required by IFRS.
In depth: The leasing standard
In depth: The leasing standard
PwC
Bejmuk bo
Bejmuk bo
NASAPMC
Baniszewski john
Baniszewski john
NASAPMC
More Related Content
Similar to J brennan kmc_laurin_aprince
The approval certificate issued by the Federal Energy Regulatory Commission (FERC) on April 7, 2016 for a project to beef up a connection between two pipelines not yet built--PennEast Pipeline and Southern Reliability Project pipeline. Both new pipelines will be located, at least partially, in NJ.
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
Marcellus Drilling News
Article considering why some fleets of young rolling stock are being pushed off-lease and replaced with entirely new fleets, and what the future might hold for financiers and the rolling stock.
Brand new trains being pushed off-lease - implications and options for financ...
Brand new trains being pushed off-lease - implications and options for financ...
Graeme McLellan
Solar PV Rooftop Training Entrepreneurship Development contract structure & agreement
Session 16 contract structure & agreement
Session 16 contract structure & agreement
Chirag Jain
This article explores the potential next steps for Developers if the changes under URD 14D/114 proposed to be made to the ROCs regime for UK solar parks above 5MW in size are passed by the UK Government. There is discussion on what an applicant for a CfD may need, what mechanisms lie in the CfD process to attract debt financiers/equity investors, and what a Developer may do to gear up for the bidding process for CfD-allocation in October this year if legislative changes are implemented to bring forward the CfD for ROCs handover date to 1.4.15.
Potential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passed
Bhalindra Bath - projects & M&A law
Moffett Federal Airfield Lease Overview: Presentation to the Moffett Restoration Advisory Board, February 2015
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
Steve Williams
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
Aditi Tulpule
Caltrain hsrmo uletter
Caltrain hsrmo uletter
Adina Levin
Gensol has summarised the tender issued by SECI for 2.5GW Wind Solar Hybrid ISTS projects. The document covers major commercial & technical guidelines provided in the tender.
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Gensol Engineering Limited
Applying for contracts for difference when the application window commences on 14 October. Details on Allocation Framework and draft allocation regulations from the UK Government and as published on DECC's website.
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
Bhalindra Bath - projects & M&A law
Good Procedure Process Compliance for Prevention Minimisation of Contractor Contractual Claims Unfounded Frivolous
Beyond Contract Series Article One
Beyond Contract Series Article One
My own
P3S
P3S
artba
05/31: Model P3 Contract Recommendations
05/31: Model P3 Contract Recommendations
artba
The rail rolling stock market is attracting new financiers, who have sometimes struggled to gain traction but are now tasting success.
New entrants tasting success in financing rolling stock - Global Transport Fi...
New entrants tasting success in financing rolling stock - Global Transport Fi...
Graeme McLellan
As per Para 5.3 of Tariff Policy 2016, intra-state transmission projects shall be developed by the State Governments through competitive bidding process for projects costing above a threshold limit which shall be decided by the State Commissions. State has been given option either to use VGF based MTA document of Planning Commission or the Standard Bidding Document of Ministry of Power for procurement of intra-state transmission services. For the VGF based bidding, the unitary charges will require to be approved by the State Commissions prior to bidding. The above said guidelines are for procurement of transmission services to select transmission service provider for a new transmission line. A transmission charges for providing transmission service and O&M required for the various transmission elements shall form the basis for bidding. Under the MTA, it has been decided that the prospective bidders would be awarded projects on the basis of lowest grant sought or highest premium offered.
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Amitava Nag
This document will help you Technical Functional Requirements contractors must adhere to before going for ITES-4H Contract
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
Shane Emerson
The Mountaineer XPress project is approximately 150 miles of new pipeline with approximately 2.7Bcf per day of transportation capacity from existing and future points of receipt along or near CPG’s system, most of it located in West Virginia.
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
Marcellus Drilling News
Electrical Products Group Conference
Electrical Products Group Conference
Electrical Products Group Conference
TextronCorp
ARC_SBIR_TechInvestments_Handbook_2012
ARC_SBIR_TechInvestments_Handbook_2012
Matthew F. Reyes
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Harry Clark
On February 25, 2016, the FASB issued the new standard, Leases (ASC 842). There are elements of the new standard that could impact almost all entities to some extent, although lessees will likely see the most significant changes. Lessees will need to recognize virtually all of their leases on the balance sheet, by recording a right-of-use asset and lease liability. The IASB issued its new standard, IFRS 16, Leases, earlier this year. There are significant areas of divergence between guidance applicable under US GAAP and that required by IFRS.
In depth: The leasing standard
In depth: The leasing standard
PwC
Similar to J brennan kmc_laurin_aprince
(20)
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
FERC Docket No. CP15-89-000 - Approving Garden State Expansion Project
Brand new trains being pushed off-lease - implications and options for financ...
Brand new trains being pushed off-lease - implications and options for financ...
Session 16 contract structure & agreement
Session 16 contract structure & agreement
Potential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passed
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
CATOs-Opportunities-for-Onshore-Tranmission-final[1]
Caltrain hsrmo uletter
Caltrain hsrmo uletter
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
Beyond Contract Series Article One
Beyond Contract Series Article One
P3S
P3S
05/31: Model P3 Contract Recommendations
05/31: Model P3 Contract Recommendations
New entrants tasting success in financing rolling stock - Global Transport Fi...
New entrants tasting success in financing rolling stock - Global Transport Fi...
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
Mountaineer XPress Project - Open Season & Project Information
Mountaineer XPress Project - Open Season & Project Information
Electrical Products Group Conference
Electrical Products Group Conference
ARC_SBIR_TechInvestments_Handbook_2012
ARC_SBIR_TechInvestments_Handbook_2012
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
In depth: The leasing standard
In depth: The leasing standard
More from NASAPMC
Bejmuk bo
Bejmuk bo
NASAPMC
Baniszewski john
Baniszewski john
NASAPMC
Yew manson
Yew manson
NASAPMC
Wood frank
Wood frank
NASAPMC
Wood frank
Wood frank
NASAPMC
Wessen randi (cd)
Wessen randi (cd)
NASAPMC
Vellinga joe
Vellinga joe
NASAPMC
Trahan stuart
Trahan stuart
NASAPMC
Stock gahm
Stock gahm
NASAPMC
Snow lee
Snow lee
NASAPMC
Smalley sandra
Smalley sandra
NASAPMC
Seftas krage
Seftas krage
NASAPMC
Sampietro marco
Sampietro marco
NASAPMC
Rudolphi mike
Rudolphi mike
NASAPMC
Roberts karlene
Roberts karlene
NASAPMC
Rackley mike
Rackley mike
NASAPMC
Paradis william
Paradis william
NASAPMC
Osterkamp jeff
Osterkamp jeff
NASAPMC
O'keefe william
O'keefe william
NASAPMC
Muller ralf
Muller ralf
NASAPMC
More from NASAPMC
(20)
Bejmuk bo
Bejmuk bo
Baniszewski john
Baniszewski john
Yew manson
Yew manson
Wood frank
Wood frank
Wood frank
Wood frank
Wessen randi (cd)
Wessen randi (cd)
Vellinga joe
Vellinga joe
Trahan stuart
Trahan stuart
Stock gahm
Stock gahm
Snow lee
Snow lee
Smalley sandra
Smalley sandra
Seftas krage
Seftas krage
Sampietro marco
Sampietro marco
Rudolphi mike
Rudolphi mike
Roberts karlene
Roberts karlene
Rackley mike
Rackley mike
Paradis william
Paradis william
Osterkamp jeff
Osterkamp jeff
O'keefe william
O'keefe william
Muller ralf
Muller ralf
Recently uploaded
In this session, we will delve into strategic approaches for optimizing knowledge management within Microsoft 365, amidst the evolving landscape of Copilot. From leveraging automatic metadata classification and permission governance with SharePoint Premium, to unlocking Viva Engage for the cultivation of knowledge and communities, you will gain actionable insights to bolster your organization's knowledge-sharing initiatives. In this session, we will also explore how to facilitate solutions to enable your employees to find answers and expertise within Microsoft 365. You will leave equipped with practical techniques and a deeper understanding of how there is more to effective knowledge management than just enabling Copilot, but building actual solutions to prepare the knowledge that Copilot and your employees can use.
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Drew Madelung
Tech Trends Report 2024 Future Today Institute
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
hans926745
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
The Digital Insurer
Discord is a free app offering voice, video, and text chat functionalities, primarily catering to the gaming community. It serves as a hub for users to create and join servers tailored to their interests. Discord’s ecosystem comprises servers, each functioning as a distinct online community with its own channels dedicated to specific topics or activities. Users can engage in text-based discussions, voice calls, or video chats within these channels. Understanding Discord Servers Discord servers are virtual spaces where users congregate to interact, share content, and build communities. Servers may revolve around gaming, hobbies, interests, or fandoms, providing a platform for like-minded individuals to connect. Communication Features Discord offers a range of communication tools, including text channels for messaging, voice channels for real-time audio conversations, and video channels for face-to-face interactions. These features facilitate seamless communication and collaboration. What Does NSFW Mean? The acronym NSFW stands for “Not Safe For Work,” indicating content that may be inappropriate for professional or public settings. NSFW Content NSFW content encompasses material that is sexually explicit, violent, or otherwise graphic in nature. It often includes nudity, profanity, or depictions of sensitive topics.
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
UK Journal
The value of a flexible API Management solution for Open Banking Steve Melan, Manager for IT Innovation and Architecture - State's and Saving's Bank of Luxembourg Apidays New York 2024: The API Economy in the AI Era (April 30 & May 1, 2024) ------ Check out our conferences at https://www.apidays.global/ Do you want to sponsor or talk at one of our conferences? https://apidays.typeform.com/to/ILJeAaV8 Learn more on APIscene, the global media made by the community for the community: https://www.apiscene.io Explore the API ecosystem with the API Landscape: https://apilandscape.apiscene.io/
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
apidays
My presentation at the Lehigh Carbon Community College (LCCC) NSA GenCyber Cyber Security Day event that is intended to foster an interest in the cyber security field amongst college students.
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
Michael W. Hawkins
Enterprise Knowledge’s Urmi Majumder, Principal Data Architecture Consultant, and Fernando Aguilar Islas, Senior Data Science Consultant, presented "Driving Behavioral Change for Information Management through Data-Driven Green Strategy" on March 27, 2024 at Enterprise Data World (EDW) in Orlando, Florida. In this presentation, Urmi and Fernando discussed a case study describing how the information management division in a large supply chain organization drove user behavior change through awareness of the carbon footprint of their duplicated and near-duplicated content, identified via advanced data analytics. Check out their presentation to gain valuable perspectives on utilizing data-driven strategies to influence positive behavioral shifts and support sustainability initiatives within your organization. In this session, participants gained answers to the following questions: - What is a Green Information Management (IM) Strategy, and why should you have one? - How can Artificial Intelligence (AI) and Machine Learning (ML) support your Green IM Strategy through content deduplication? - How can an organization use insights into their data to influence employee behavior for IM? - How can you reap additional benefits from content reduction that go beyond Green IM?
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
Enterprise Knowledge
Presented by Mike Hicks
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
ThousandEyes
As privacy and data protection regulations evolve rapidly, organizations operating in multiple jurisdictions face mounting challenges to ensure compliance and safeguard customer data. With state-specific privacy laws coming up in multiple states this year, it is essential to understand what their unique data protection regulations will require clearly. How will data privacy evolve in the US in 2024? How to stay compliant? Our panellists will guide you through the intricacies of these states' specific data privacy laws, clarifying complex legal frameworks and compliance requirements. This webinar will review: - The essential aspects of each state's privacy landscape and the latest updates - Common compliance challenges faced by organizations operating in multiple states and best practices to achieve regulatory adherence - Valuable insights into potential changes to existing regulations and prepare your organization for the evolving landscape
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
The Digital Insurer
Three things you will take away from the session: • How to run an effective tenant-to-tenant migration • Best practices for before, during, and after migration • Tips for using migration as a springboard to prepare for Copilot in Microsoft 365 Main ideas: Migration Overview: The presentation covers the current reality of cross-tenant migrations, the triggers, phases, best practices, and benefits of a successful tenant migration Considerations: When considering a migration, it is important to consider the migration scope, performance, customization, flexibility, user-friendly interface, automation, monitoring, support, training, scalability, data integrity, data security, cost, and licensing structure Next Wave: The next wave of change includes the launch of Copilot, which requires businesses to be prepared for upcoming changes related to Copilot and the cloud, and to consolidate data and tighten governance ShareGate: ShareGate can help with pre-migration analysis, configurable migration tool, and automated, end-user driven collaborative governance
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
sammart93
Stay safe, grab a drink and join us virtually for our upcoming "GenAI Risks & Security" Meetup to hear about how to uncover critical GenAI risks and vulnerabilities, AI security considerations in every company, and how a CISO should navigate through GenAI Risks.
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
lior mazor
I've been in the field of "Cyber Security" in its many incarnations for about 25 years. In that time I've learned some lessons, some the hard way. Here are my slides presented at BSides New Orleans in April 2024.
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
Rafal Los
How to get Oracle DBA Job as fresher.
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
Remote DBA Services
ICT role in 21 century education. How to ICT help in education
presentation ICT roal in 21st century education
presentation ICT roal in 21st century education
jfdjdjcjdnsjd
Created by Mozilla Research in 2012 and now part of Linux Foundation Europe, the Servo project is an experimental rendering engine written in Rust. It combines memory safety and concurrency to create an independent, modular, and embeddable rendering engine that adheres to web standards. Stewardship of Servo moved from Mozilla Research to the Linux Foundation in 2020, where its mission remains unchanged. After some slow years, in 2023 there has been renewed activity on the project, with a roadmap now focused on improving the engine’s CSS 2 conformance, exploring Android support, and making Servo a practical embeddable rendering engine. In this presentation, Rakhi Sharma reviews the status of the project, our recent developments in 2023, our collaboration with Tauri to make Servo an easy-to-use embeddable rendering engine, and our plans for the future to make Servo an alternative web rendering engine for the embedded devices industry. (c) Embedded Open Source Summit 2024 April 16-18, 2024 Seattle, Washington (US) https://events.linuxfoundation.org/embedded-open-source-summit/ https://ossna2024.sched.com/event/1aBNF/a-year-of-servo-reboot-where-are-we-now-rakhi-sharma-igalia
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
Igalia
This project focuses on implementing real-time object detection using Raspberry Pi and OpenCV. Real-time object detection is a critical aspect of computer vision applications, allowing systems to identify and locate objects within a live video stream instantly.
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
Khem
45-60 minute session deck from introducing Google Apps Script to developers, IT leadership, and other technical professionals.
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
wesley chun
What is a good lead in your organisation? Which leads are priority? What happens to leads? When sales and marketing give different answers to these questions, or perhaps aren't sure of the answers at all, frustrations build and opportunities are left on the table. Join us for an illuminating session with Cian McLoughlin, HubSpot Principal Customer Success Manager, as we look at that crucial piece of the customer journey in which leads are transferred from marketing to sales.
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
HampshireHUG
Effective data discovery is crucial for maintaining compliance and mitigating risks in today's rapidly evolving privacy landscape. However, traditional manual approaches often struggle to keep pace with the growing volume and complexity of data. Join us for an insightful webinar where industry leaders from TrustArc and Privya will share their expertise on leveraging AI-powered solutions to revolutionize data discovery. You'll learn how to: - Effortlessly maintain a comprehensive, up-to-date data inventory - Harness code scanning insights to gain complete visibility into data flows leveraging the advantages of code scanning over DB scanning - Simplify compliance by leveraging Privya's integration with TrustArc - Implement proven strategies to mitigate third-party risks Our panel of experts will discuss real-world case studies and share practical strategies for overcoming common data discovery challenges. They'll also explore the latest trends and innovations in AI-driven data management, and how these technologies can help organizations stay ahead of the curve in an ever-changing privacy landscape.
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc
Recently uploaded
(20)
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
presentation ICT roal in 21st century education
presentation ICT roal in 21st century education
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
J brennan kmc_laurin_aprince
1.
Presented by:
Jesse Brennan, Kathryn McLaurin, Angela Prince
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Titanium Alloy Burning
in 8 psia Oxygen Propellant Testing
13.
LOX Methane Engine
Test
14.
15.
16.
Editor's Notes
Want to Add headlines from news articles and article images
STAR 48 High pressure oxygen poses a fire hazard Mir Space Station Aircraft Life support Medical applications Must be assessed and mitigated to ensure personnel safety
Download now