SlideShare ist ein Scribd-Unternehmen logo
1 von 14
Downloaden Sie, um offline zu lesen
FY 2008 Budget




 February 5, 2007

                    1
Key Governance Documents




 National Aeronautics    Presidential Policy Directive   NASA Strategic Plan
       & Space           Vision for Space Exploration      February 2006        Exploration
      Act of 1958                January 2004                                    Systems
      P.L. 85-568                                                               Architecture National Academy
       July 1958                                                                   Study     of Sciences Reports

NASA Authorization Act
    P.L. 109-155
   December 2005

Annual Appropriations

                              National Aeronautics
                                   R&D Policy
                                                                      Annual Budget Requests
                                 December 2006
            NASA implements a balanced portfolio of space and aeronautics programs
                 for the President and Congress within the resources provided
                            in a “go-as-we-can-afford-to-pay” strategy
                                                                                                            2
FY2008 Budget Request Summary
 $ In millions                            FY 2007           FY 2008      FY 2009      FY 2010      FY 2011      FY 2012
TOTAL NASA                                16,792           17,309        17,614       18,026       18,460       18,905
 Percent change year-to-year                                  3.1%          1.8%         2.3%         2.4%         2.4%

 NASA’s FY 2008 budget demonstrates the President’s commitment to our Nation’s leadership in space and
    aeronautics research. The FY 2008 budget is a 3.1% increase from the FY 2007 budget request.

 NASA is on track and making progress. No strategic changes in the FY 2008 budget request.
 •  Three Space Shuttle missions last year, and four-five Shuttle missions planned in 2007 to continue International
    Space Station assembly. Carefully-considered Shuttle transition to Orion CEV underway.
 •  Orion CEV contract awarded last August. Plan to release Ares I CLV upper stage RFP in February.
 •  Aeronautics Research aligned with the recent President’s policy, with projects, programs, and a robust budget
    profile that will advance U.S. technological leadership in aeronautics.
 •  Science continues to develop world-class missions and research results, based on the priorities from the National
    Academy of Sciences decadal surveys. During FY 2008, NASA plans to launch ten new missions, with over 50
    Earth Science, Heliophysics, Planetary Science, and Astrophysics missions in operations. Most of these missions
    involve international partners and other U.S. Government agencies.

 NASA’s Greatest Challenge: Safely flying the Space Shuttle to assemble the International Space Station and honor
    our commitment to our partners prior to retiring the Shuttle in 2010 while bringing new human spaceflight
    capabilities on-line not later than 2014.

 The impact of the FY 2007 appropriation on NASA’s multi-year programs, including those funded in the FY 2008
      request, is not yet known. NASA expects an appropriation of approximately $545 million less than the
      President’s FY 2007 request.
 •    Once the FY 2007 appropriation is enacted, NASA will keep stakeholders informed of the impacts via a FY 2007
      operating plan.
 •    FY 2007 appropriation may have serious effects on people, projects, and programs. A careful balance across all
      priorities is required with the resources made available.
 •    The potential reduction to Exploration Systems in the FY 2007 appropriations jeopardizes NASA’s ability to safely
      and effectively transition from the Shuttle to Orion CEV operations not later than 2014.


                                                                                                                          3
Full Cost Simplification
NASA has changed its overhead allocations to simplify how it manages the Agency under full
cost accounting. All Center overhead is now allocated at a single unified rate across all
projects. This has eliminated the disparity in Center rates, and the associated incentive to
move work to Centers with lower rates. This approach was communicated to the Congress in
the September 2006 Operating Plan.
            Facilities Services Pool
              $0.4B (sq footage)
               IT Services Pool                               Corporate G&A &
                 $0.2B (seats)                             Institutional Investments
                                       ($4M)                      $1.0B (NOA)
            Corporate G&A/Inst Inv
   ($10M)       $1.0B (NOA)            ($12M)

                                        ($66M)            Center Management & Ops
                                                                 $2.0B (NOA)
      Total NOA less corporate
                 Center G&A
    ($63M)    $1.1B (workforce)        ($87M)

        Direct NOA
           Technical Service Pools                              Direct Projects
                   $0.4B                                            $13.8B
                Direct Projects
                    $13.8B


                   Previous                                         New

 The core principle behind Full Cost Simplification is to ensure a uniform rate of cost for
     all NASA civil servants regardless of what Government Field Center they work.
                                                                                               4
Budget Adjustments
                                                              $ In Millions             FY 07 PB FY 2008 Request
FY07 PB                $ In Millions
                                                                                        Simplified Full Cost
 10,524.4 Exploration, Science, & Aeronautics
                                                  Exploration, Science, & Aeronautics   FY 2007          FY 2008
                                                                                        10,650.6         10,483.1
  5,330.0 SCIENCE                                                                         5466.8           5,516.1
                                                  SCIENCE
  1,610.2   Solar System Exploration                                                     1,411.2           1,395.8
                                                    Planetary
  1,509.2   Universe
                                                    Astrophysics                         1,563.0           1,565.8
  2,210.6   Earth-Sun System                                                                               1,057.2
                                                    Heliophysics                         1,028.1
  3,978.3 EXPLORATION SYSTEMS                       Earth Science                        1,464.5           1,497.3
  3,057.6   Constellation Systems                 EXPLORATION SYSTEMS                    4,152.5           3,923.8
    646.1   Exploration Sys Research & Tech         Constellation Systems                 3232.5           3,068.0
    274.6   Human Systems Research & Tech                                                                      855.8
                                                    Advanced Capabilities                  920.0

   724.4    AERONAUTICS RESEARCH
                                                  AERONAUTICS RESEARCH                     529.3               554.0
   491.7 Cross-Agency Support Prgs
   153.3   Education                              Cross-Agency Support Prgs                502.0               489.2
   108.2   IEMP                                     Education                              167.4               153.7

   197.9   Innovative Partnerships                  IEMP                                    97.4               103.1

    32.2   Shared Capabilities                      Innovative Partnerships                215.1               198.1

                                                    Shared Capabilities                     22.1                34.3
  6,234.4   Exploration Capabilities
                                                  Exploration Capabilities               6,108.3           6,791.7
  6,234.4 SPACE OPERATIONS
  1,811.3   Space Station                         SPACE OPERATIONS                       6,108.3           6,791.7
                                                    Space Station                        1,762.6           2,238.6
  4,056.7   Space Shuttle
                                                    Space Shuttle                        4,017.6           4,007.5
    366.5   Space & Flight Support
                                                    Space & Flight Support                 328.1               545.7
    33.5    Inspector General
                                                  Inspector General                         33.5                34.6
 16,792.3   TOTAL NASA
                                                  TOTAL NASA                            16,792.3          17,309.4
                                                                              .


                                                                                                               5
FY 2008 Budget Request
                                        FY 2007     FY 2008     FY 2009     FY 2010     FY 2011     FY 2012
Budget Authority (millions)
Science, Aeronautics and Exploration   $10,650.6   $10,483.1   $10,868.4   $11,364.1   $15,386.5   $15,888.6


Science                                 $5,466.8    $5,516.1    $5,555.3    $5,600.6    $5,656.9    $5,802.7
Planetary Science                       $1,411.2    $1,395.8    $1,676.9    $1,720.3    $1,738.3    $1,748.2
Heliophysics                            $1,028.1    $1,057.2    $1,028.4    $1,091.3    $1,241.2    $1,307.5
Astrophysics                            $1,563.0    $1,565.8    $1,304.2    $1,268.9    $1,266.2    $1,393.8
Earth Science                           $1,464.5    $1,497.3    $1,545.8    $1,520.1    $1,411.2    $1,353.2

Exploration Systems                     $4,152.5    $3,923.8    $4,312.8    $4,757.8    $8,725.2    $9,076.8
Constellation Systems                   $3,232.5    $3,068.0    $3,451.2    $3,784.9    $7,666.0    $7,993.0
Advanced Capabilities                     $920.0      $855.8      $861.6      $973.0    $1,059.1    $1,083.9

Aeronautics Research                     $529.3      $554.0      $546.7      $545.3      $549.8      $554.7
Aeronautics Technology                    $529.3      $554.0      $546.7      $545.3      $549.8      $554.7

Cross-Agency Support Programs            $502.0      $489.2      $453.5      $460.4      $454.7      $454.4
Education                                 $167.4      $153.7      $152.8      $152.7      $149.8      $149.6
Advanced Business Systems                  $97.4      $103.1       $69.4       $71.6       $67.6       $67.5
Innovative Partnerships Program           $215.1      $198.1      $197.2      $199.8      $200.0      $200.0
Shared Capability Assets Program           $22.1       $34.3       $34.2       $36.2       $37.3       $37.2

Exploration Capabilities                $6,108.3    $6,791.7    $6,710.3    $6,625.7    $3,036.6    $2,978.0


Space Operations                        $6,108.3    $6,791.7    $6,710.3    $6,625.7    $3,036.6    $2,978.0
Space Shuttle                           $4,017.6    $4,007.5    $3,650.9    $3,634.4      $116.2        $0.0
International Space Station             $1,762.6    $2,238.6    $2,515.1    $2,609.2    $2,547.5    $2,600.8
Space and Flight Support (SFS)            $328.1      $545.7      $544.3      $382.0      $372.9      $377.2

Inspector General                         $33.5       $34.6       $35.5       $36.4       $37.3       $38.3


Inspector General                         $33.5       $34.6       $35.5       $36.4       $37.3       $38.3

NASA FY 2008                           $16,792.3   $17,309.4   $17,614.2   $18,026.3   $18,460.4   $18,905.0
Year to year increase                                  3.1%         1.8%        2.3%        2.4%        2.4%

*All fiscal year budgets shown are Full Cost Simplified                                                        6
Highlights of FY 2008 Budget Request
Science -- $5,516.1M
•   Programmatic funding for Science (without regard to changes in full cost allocations) remains at 1%
    per year from FY2008 through FY2011, and begins to grow by 2.4% thereafter. The Science budget
    balances investments based on National Academy of Sciences priorities and programmatic needs.
•   The Earth Science program will launch the Ocean Surface Topography Mission (OSTM) to measure
    sea surface height and the Orbiting Carbon Observatory in 2008
•   Global Precipitation Measurement (GPM) on track for a launch no later than 2013 of Core
    spacecraft and 2014 launch of Constellation spacecraft
•   Provides additional funds for Landsat follow-on and Glory missions to maintain schedules.
•   The Astrophysics program will launch Herschel, Plank, GLAST, and the Hubble servicing mission.
•   SOFIA reinstated with initial operations planned to begin in 2010, but program baseline still needs to
    be finalized in Spring 2007.
•   The Heliophysics program will launch Solar Dynamics Observatory, IBEX, and CINDI.
•   The Planetary program creates a new Lunar Science project, providing $351M in FY08-12 for data
    archiving, research, and missions of opportunity or instruments to take advantage of NASA and
    international missions planned for moon.
•   Mars Phoenix Lander set to launch in August, arriving at Mars in May 2008
•   Dawn mission to asteroids Ceres and Vesta set to launch this summer
Aeronautics Research -- $554.0M
•   Stable budget profile starting in FY 2008, with a 4.6% budget increase from FY 2007 President’s
    Budget Request
•   $51M of FY 2008 budget is for competitive NASA Research Announcement Awards, which is more
    than 11% of the Aeronautics Research direct program budget.


                                                                                                        7
Highlights of FY 2008 Budget Request, cont.
Exploration Systems -- $3,923.8M
•   Orion CEV and Ares I CLV development have been on track for IOC not later than 2014, but this
    schedule may be jeopardized due to potential funding reductions in FY 2007 appropriations
•   Commitment to purchasing commercial cargo and crew services to support the Space Station,
    assuming those services are successfully demonstrated and cost-effective
      – NASA has accepted a management challenge to identify cost savings in Space Operations
         and will defer some Advanced Capabilities efforts if commercial service costs exceed the
         current program budget.
      – COTS demonstrations still managed by ESMD, but transfer management of ISS Crew/Cargo
         Services purchases to Space Operations
•   Lunar Reconnaissance Orbiter (LRO) with Lunar CRater Observation and Sensing Satellite
    (LCROSS) secondary payload mission planned for launch in late 2008.


Space Operations -- $6,791.7M
•   Approximately 55% of the International Space Station assembly is completed.
•   Number of Shuttle Flights Planned for ISS Assembly: 4-5 in 2007; 4-5 in 2008 (including Hubble);
    4 in 2009; and 1 in 2010. Contingency flights in 2010 may be manifested, if necessary.
•   Space Shuttle Atlantis may be retired after Hubble Servicing Mission
•   Lien of $308 million (in FY09-12) in Space Operations starting in FY09
•   Beginning development of two replenishment Tracking and Data Relay Satellite System (TDRSS)
•   Plans underway for carefully-considered Shuttle transition to new Exploration systems


                                                                                                       8
Challenges Ahead
•   Flying the Space Shuttle Safely, International Space Station Assembly, Hubble Servicing
    Mission

•   Space Shuttle Retirement and Transition to New Exploration Capabilities
     – Preserving the Shuttle workforce necessary to fly the Shuttle through Space Station assembly
     – Transitioning key elements of the highly-skilled engineering and technician workforce (appx.
        16,000 contractors and 2,000 civil servants) to the new Exploration systems
     – Exploration Systems funding uncertainty with the FY 2007 appropriation and ability to carryover
        funds during busy development years of FY09-10
     – Operating and maintaining the Space Station post-2010
     – Fully understanding Space Shuttle retirement costs with the disposition of Space Shuttle
        facilities and equipment (valued at approximately $5.7B and $12B, respectively)
     – Beyond our budget request, NASA is preparing a package of legislative and
        administrative tools to help in the transition from the Space Shuttle to these new
        systems.

•   Affordable, Executable, World-Class Missions
     – “Go-As-We-Can-Afford-To-Pay” for all NASA Science, Exploration, and Aeronautics Research
         missions
     – Consistent with the priorities from the National Academy of Sciences’ Decadal Surveys
     – Need to fully understand technical requirements and develop credible cost estimates before
         initiating development, because technical problems and cost growth hurt credibility
     – While international and interagency collaboration improves the effectiveness of many Science
         and Exploration missions, dependence also comes with certain management risks in carrying
         out the missions
      NASA’s FY 2008 budget demonstrates the President’s commitment to our
     Nation’s leadership in space and aeronautics research with a 3.1% increase
                                                                                                      9
•   For more information:

                 www.nasa.govbudget




                                       10
BACKUP




         11
Perspective on Science and Exploration
                                                                    NASA BUDGET: Sandchart from FY 1993
                       20,000
                                                                         Real Year Budget Authority in Millions


                       18,000



                       16,000
                                          Cross Agency Supt Programs & IG
                                                                                                                                EXPLORATION SYSTEMS
                       14,000

                                          EXPLORATION-RELATE C
                                                            D ONTENT
     Ra Ya $i Ml o s




                                                                                                                           Shuttle Recovery
      el er n i i n




                       12,000
               l




                       10,000


                                          SPACE OPERATIONS
                        8,000



                        6,000


                                         AERONAUTICS
                        4,000



                        2,000
                                         SCIENCE


                           0
                           1993   1994   1995    1996    1997     1998    1999    2000    2001     2002      2003   2004     2005    2006     2007   2008     2009     2010     2011        2012
                                   Total C Labor & All O
                                          S             verrheads Allocated in Proportion to Procurement $            Full Cost O P
                                                                                                                                 p lan         Current Estimate, Full Cost Simplification



•   The retirement of the Space Shuttle in 2010 and development of new human spaceflight systems occurs once-
    in-a-generation. A slower rate of budget growth for Science missions is necessary to avoid a prolonged gap in
    strategic capability of U.S. human spaceflight.
      – Science program budget is moderated to 1% annual growth in FY08-11, and then growing consistent with NASA’s
          topline growth thereafter (2.4% in FY12).
      – The Science budget is 32% of the total NASA budget today. In 1992, Science was only 24% of NASA’s budget.

•   The rate of growth previously planned for Science was not sustainable, given the need to complete
    International Space Station assembly with the Space Shuttle and need to retire the Space Shuttle by 2010.
      – In the FY 2007 budget for FY07-11, the Science budget paid $2.44B and the Exploration budget paid $1.26B to
          make up the difference in the previous, placeholder estimated costs for Space Shuttle and ISS operations
          (additional $2.2B and $1.5B needed in FY06-10, respectively).


                                                                                                                                                                                                   12
NASA Science Missions




                        13
Exploration Roadmap
          NOW
05      06  07            08       09       10       11      12       13        14     15   16      17   18    19   20    21   22   23    24   25

                CEV Contract Award                                                                                         Lunar Outpost Buildup
                                                                                      Orion/Ares
                                                                                      Operational             7th Human
                                                                                                              Lunar
                                                                                                              Landing
                             Lunar Robotic Missions


                                     Science Robotic Missions                                                                  Mars Expedition Design


                      Commercial Crew/Cargo for ISS


      Space Shuttle Operations


           Orion CEV Development
           Orion CEV Development
  ARES II Launch Vehicle Development
  ARES Launch Vehicle Development
                                                                         Orion Production and Operations
                                                                         Orion Production and Operations



               Early Design Activity                      Lunar Lander Development
                                                          Lunar Lander Development
                                                          Lunar Heavy Launch Development
                                                          Lunar Heavy Launch Development
                                                        Earth Departure Stage Development
                                                        Earth Departure Stage Development
Note: Specific dates and milestones not yet established. CEV/CLV availability        Surface Systems Development
                                                                                     Surface Systems Development
planned for as close to 2010 as possible, but NLT 2014. Return to the moon as
early as 2018 , but NLT 2020.
                                                                                                                                               14

Weitere ähnliche Inhalte

Ähnlich wie Cathy claunch

740512main fy2014 cj for online
740512main fy2014 cj for online740512main fy2014 cj for online
740512main fy2014 cj for onlineSérgio Sacani
 
Nasa fy 2016_budget_estimates
Nasa fy 2016_budget_estimatesNasa fy 2016_budget_estimates
Nasa fy 2016_budget_estimatesSérgio Sacani
 
740427main nasafy2014 summarybrieffinal
740427main nasafy2014 summarybrieffinal740427main nasafy2014 summarybrieffinal
740427main nasafy2014 summarybrieffinalSérgio Sacani
 
NASA FY 2014 Budget Estimate Presentation
NASA FY 2014 Budget Estimate PresentationNASA FY 2014 Budget Estimate Presentation
NASA FY 2014 Budget Estimate PresentationNASA Dryden
 
SPATIAL_DATA_INTEGRITY_SIS_A1
SPATIAL_DATA_INTEGRITY_SIS_A1SPATIAL_DATA_INTEGRITY_SIS_A1
SPATIAL_DATA_INTEGRITY_SIS_A1Yudi Syahnur
 
SMD FY 2019 President’s Budget Request to Congress
SMD FY 2019 President’s Budget Request to Congress SMD FY 2019 President’s Budget Request to Congress
SMD FY 2019 President’s Budget Request to Congress Peerasak C.
 
Climate architecture final
Climate architecture finalClimate architecture final
Climate architecture finalJaume Satorra
 
Conferencia 9 andreas_hueni
Conferencia 9 andreas_hueniConferencia 9 andreas_hueni
Conferencia 9 andreas_huenimontaval
 
Drones in the Earth Sciences - Opportunities and issues
Drones in the Earth Sciences - Opportunities and issuesDrones in the Earth Sciences - Opportunities and issues
Drones in the Earth Sciences - Opportunities and issuesARDC
 
110510 aq co_p_network
110510 aq co_p_network110510 aq co_p_network
110510 aq co_p_networkRudolf Husar
 
Nasa fy2016 summary_briefing
Nasa fy2016 summary_briefingNasa fy2016 summary_briefing
Nasa fy2016 summary_briefingSérgio Sacani
 
Earth science knowledge graph
Earth science knowledge graphEarth science knowledge graph
Earth science knowledge graphYongyao Jiang
 
Dumbacher2012 pmchallenge
Dumbacher2012 pmchallengeDumbacher2012 pmchallenge
Dumbacher2012 pmchallengeNASAPMC
 
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiON
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiONNATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiON
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiONwebhostingguy
 
EUNAWE Presentation Project Officer
EUNAWE Presentation Project OfficerEUNAWE Presentation Project Officer
EUNAWE Presentation Project Officerunawe
 
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...American Astronautical Society
 
110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dcRudolf Husar
 
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...EarthCube
 

Ähnlich wie Cathy claunch (20)

740512main fy2014 cj for online
740512main fy2014 cj for online740512main fy2014 cj for online
740512main fy2014 cj for online
 
Nasa fy 2016_budget_estimates
Nasa fy 2016_budget_estimatesNasa fy 2016_budget_estimates
Nasa fy 2016_budget_estimates
 
NASA Budget Request Fiscal Year 2012
NASA Budget Request Fiscal Year 2012NASA Budget Request Fiscal Year 2012
NASA Budget Request Fiscal Year 2012
 
740427main nasafy2014 summarybrieffinal
740427main nasafy2014 summarybrieffinal740427main nasafy2014 summarybrieffinal
740427main nasafy2014 summarybrieffinal
 
NASA FY 2014 Budget Estimate Presentation
NASA FY 2014 Budget Estimate PresentationNASA FY 2014 Budget Estimate Presentation
NASA FY 2014 Budget Estimate Presentation
 
SPATIAL_DATA_INTEGRITY_SIS_A1
SPATIAL_DATA_INTEGRITY_SIS_A1SPATIAL_DATA_INTEGRITY_SIS_A1
SPATIAL_DATA_INTEGRITY_SIS_A1
 
SMD FY 2019 President’s Budget Request to Congress
SMD FY 2019 President’s Budget Request to Congress SMD FY 2019 President’s Budget Request to Congress
SMD FY 2019 President’s Budget Request to Congress
 
Climate architecture final
Climate architecture finalClimate architecture final
Climate architecture final
 
Russell - Welcome & Introduction - AFOSR Overview - Spring Review 2012
Russell - Welcome & Introduction - AFOSR Overview - Spring Review 2012Russell - Welcome & Introduction - AFOSR Overview - Spring Review 2012
Russell - Welcome & Introduction - AFOSR Overview - Spring Review 2012
 
Conferencia 9 andreas_hueni
Conferencia 9 andreas_hueniConferencia 9 andreas_hueni
Conferencia 9 andreas_hueni
 
Drones in the Earth Sciences - Opportunities and issues
Drones in the Earth Sciences - Opportunities and issuesDrones in the Earth Sciences - Opportunities and issues
Drones in the Earth Sciences - Opportunities and issues
 
110510 aq co_p_network
110510 aq co_p_network110510 aq co_p_network
110510 aq co_p_network
 
Nasa fy2016 summary_briefing
Nasa fy2016 summary_briefingNasa fy2016 summary_briefing
Nasa fy2016 summary_briefing
 
Earth science knowledge graph
Earth science knowledge graphEarth science knowledge graph
Earth science knowledge graph
 
Dumbacher2012 pmchallenge
Dumbacher2012 pmchallengeDumbacher2012 pmchallenge
Dumbacher2012 pmchallenge
 
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiON
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiONNATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiON
NATiONAL AERONAuTiCS ANd SPACE AdMiNiSTRATiON
 
EUNAWE Presentation Project Officer
EUNAWE Presentation Project OfficerEUNAWE Presentation Project Officer
EUNAWE Presentation Project Officer
 
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
NASA Headquarters Associate Administrators' Panel: Exploration Systems Missio...
 
110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc110105 htap pilot_aqco_p_esip_dc
110105 htap pilot_aqco_p_esip_dc
 
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...
Data Facilities Workshop - Panel on Current Concepts in Data Sharing & Intero...
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Kürzlich hochgeladen

Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 

Kürzlich hochgeladen (20)

Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 

Cathy claunch

  • 1. FY 2008 Budget February 5, 2007 1
  • 2. Key Governance Documents National Aeronautics Presidential Policy Directive NASA Strategic Plan & Space Vision for Space Exploration February 2006 Exploration Act of 1958 January 2004 Systems P.L. 85-568 Architecture National Academy July 1958 Study of Sciences Reports NASA Authorization Act P.L. 109-155 December 2005 Annual Appropriations National Aeronautics R&D Policy Annual Budget Requests December 2006 NASA implements a balanced portfolio of space and aeronautics programs for the President and Congress within the resources provided in a “go-as-we-can-afford-to-pay” strategy 2
  • 3. FY2008 Budget Request Summary $ In millions FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TOTAL NASA 16,792 17,309 17,614 18,026 18,460 18,905 Percent change year-to-year 3.1% 1.8% 2.3% 2.4% 2.4% NASA’s FY 2008 budget demonstrates the President’s commitment to our Nation’s leadership in space and aeronautics research. The FY 2008 budget is a 3.1% increase from the FY 2007 budget request. NASA is on track and making progress. No strategic changes in the FY 2008 budget request. • Three Space Shuttle missions last year, and four-five Shuttle missions planned in 2007 to continue International Space Station assembly. Carefully-considered Shuttle transition to Orion CEV underway. • Orion CEV contract awarded last August. Plan to release Ares I CLV upper stage RFP in February. • Aeronautics Research aligned with the recent President’s policy, with projects, programs, and a robust budget profile that will advance U.S. technological leadership in aeronautics. • Science continues to develop world-class missions and research results, based on the priorities from the National Academy of Sciences decadal surveys. During FY 2008, NASA plans to launch ten new missions, with over 50 Earth Science, Heliophysics, Planetary Science, and Astrophysics missions in operations. Most of these missions involve international partners and other U.S. Government agencies. NASA’s Greatest Challenge: Safely flying the Space Shuttle to assemble the International Space Station and honor our commitment to our partners prior to retiring the Shuttle in 2010 while bringing new human spaceflight capabilities on-line not later than 2014. The impact of the FY 2007 appropriation on NASA’s multi-year programs, including those funded in the FY 2008 request, is not yet known. NASA expects an appropriation of approximately $545 million less than the President’s FY 2007 request. • Once the FY 2007 appropriation is enacted, NASA will keep stakeholders informed of the impacts via a FY 2007 operating plan. • FY 2007 appropriation may have serious effects on people, projects, and programs. A careful balance across all priorities is required with the resources made available. • The potential reduction to Exploration Systems in the FY 2007 appropriations jeopardizes NASA’s ability to safely and effectively transition from the Shuttle to Orion CEV operations not later than 2014. 3
  • 4. Full Cost Simplification NASA has changed its overhead allocations to simplify how it manages the Agency under full cost accounting. All Center overhead is now allocated at a single unified rate across all projects. This has eliminated the disparity in Center rates, and the associated incentive to move work to Centers with lower rates. This approach was communicated to the Congress in the September 2006 Operating Plan. Facilities Services Pool $0.4B (sq footage) IT Services Pool Corporate G&A & $0.2B (seats) Institutional Investments ($4M) $1.0B (NOA) Corporate G&A/Inst Inv ($10M) $1.0B (NOA) ($12M) ($66M) Center Management & Ops $2.0B (NOA) Total NOA less corporate Center G&A ($63M) $1.1B (workforce) ($87M) Direct NOA Technical Service Pools Direct Projects $0.4B $13.8B Direct Projects $13.8B Previous New The core principle behind Full Cost Simplification is to ensure a uniform rate of cost for all NASA civil servants regardless of what Government Field Center they work. 4
  • 5. Budget Adjustments $ In Millions FY 07 PB FY 2008 Request FY07 PB $ In Millions Simplified Full Cost 10,524.4 Exploration, Science, & Aeronautics Exploration, Science, & Aeronautics FY 2007 FY 2008 10,650.6 10,483.1 5,330.0 SCIENCE 5466.8 5,516.1 SCIENCE 1,610.2 Solar System Exploration 1,411.2 1,395.8 Planetary 1,509.2 Universe Astrophysics 1,563.0 1,565.8 2,210.6 Earth-Sun System 1,057.2 Heliophysics 1,028.1 3,978.3 EXPLORATION SYSTEMS Earth Science 1,464.5 1,497.3 3,057.6 Constellation Systems EXPLORATION SYSTEMS 4,152.5 3,923.8 646.1 Exploration Sys Research & Tech Constellation Systems 3232.5 3,068.0 274.6 Human Systems Research & Tech 855.8 Advanced Capabilities 920.0 724.4 AERONAUTICS RESEARCH AERONAUTICS RESEARCH 529.3 554.0 491.7 Cross-Agency Support Prgs 153.3 Education Cross-Agency Support Prgs 502.0 489.2 108.2 IEMP Education 167.4 153.7 197.9 Innovative Partnerships IEMP 97.4 103.1 32.2 Shared Capabilities Innovative Partnerships 215.1 198.1 Shared Capabilities 22.1 34.3 6,234.4 Exploration Capabilities Exploration Capabilities 6,108.3 6,791.7 6,234.4 SPACE OPERATIONS 1,811.3 Space Station SPACE OPERATIONS 6,108.3 6,791.7 Space Station 1,762.6 2,238.6 4,056.7 Space Shuttle Space Shuttle 4,017.6 4,007.5 366.5 Space & Flight Support Space & Flight Support 328.1 545.7 33.5 Inspector General Inspector General 33.5 34.6 16,792.3 TOTAL NASA TOTAL NASA 16,792.3 17,309.4 . 5
  • 6. FY 2008 Budget Request FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Budget Authority (millions) Science, Aeronautics and Exploration $10,650.6 $10,483.1 $10,868.4 $11,364.1 $15,386.5 $15,888.6 Science $5,466.8 $5,516.1 $5,555.3 $5,600.6 $5,656.9 $5,802.7 Planetary Science $1,411.2 $1,395.8 $1,676.9 $1,720.3 $1,738.3 $1,748.2 Heliophysics $1,028.1 $1,057.2 $1,028.4 $1,091.3 $1,241.2 $1,307.5 Astrophysics $1,563.0 $1,565.8 $1,304.2 $1,268.9 $1,266.2 $1,393.8 Earth Science $1,464.5 $1,497.3 $1,545.8 $1,520.1 $1,411.2 $1,353.2 Exploration Systems $4,152.5 $3,923.8 $4,312.8 $4,757.8 $8,725.2 $9,076.8 Constellation Systems $3,232.5 $3,068.0 $3,451.2 $3,784.9 $7,666.0 $7,993.0 Advanced Capabilities $920.0 $855.8 $861.6 $973.0 $1,059.1 $1,083.9 Aeronautics Research $529.3 $554.0 $546.7 $545.3 $549.8 $554.7 Aeronautics Technology $529.3 $554.0 $546.7 $545.3 $549.8 $554.7 Cross-Agency Support Programs $502.0 $489.2 $453.5 $460.4 $454.7 $454.4 Education $167.4 $153.7 $152.8 $152.7 $149.8 $149.6 Advanced Business Systems $97.4 $103.1 $69.4 $71.6 $67.6 $67.5 Innovative Partnerships Program $215.1 $198.1 $197.2 $199.8 $200.0 $200.0 Shared Capability Assets Program $22.1 $34.3 $34.2 $36.2 $37.3 $37.2 Exploration Capabilities $6,108.3 $6,791.7 $6,710.3 $6,625.7 $3,036.6 $2,978.0 Space Operations $6,108.3 $6,791.7 $6,710.3 $6,625.7 $3,036.6 $2,978.0 Space Shuttle $4,017.6 $4,007.5 $3,650.9 $3,634.4 $116.2 $0.0 International Space Station $1,762.6 $2,238.6 $2,515.1 $2,609.2 $2,547.5 $2,600.8 Space and Flight Support (SFS) $328.1 $545.7 $544.3 $382.0 $372.9 $377.2 Inspector General $33.5 $34.6 $35.5 $36.4 $37.3 $38.3 Inspector General $33.5 $34.6 $35.5 $36.4 $37.3 $38.3 NASA FY 2008 $16,792.3 $17,309.4 $17,614.2 $18,026.3 $18,460.4 $18,905.0 Year to year increase 3.1% 1.8% 2.3% 2.4% 2.4% *All fiscal year budgets shown are Full Cost Simplified 6
  • 7. Highlights of FY 2008 Budget Request Science -- $5,516.1M • Programmatic funding for Science (without regard to changes in full cost allocations) remains at 1% per year from FY2008 through FY2011, and begins to grow by 2.4% thereafter. The Science budget balances investments based on National Academy of Sciences priorities and programmatic needs. • The Earth Science program will launch the Ocean Surface Topography Mission (OSTM) to measure sea surface height and the Orbiting Carbon Observatory in 2008 • Global Precipitation Measurement (GPM) on track for a launch no later than 2013 of Core spacecraft and 2014 launch of Constellation spacecraft • Provides additional funds for Landsat follow-on and Glory missions to maintain schedules. • The Astrophysics program will launch Herschel, Plank, GLAST, and the Hubble servicing mission. • SOFIA reinstated with initial operations planned to begin in 2010, but program baseline still needs to be finalized in Spring 2007. • The Heliophysics program will launch Solar Dynamics Observatory, IBEX, and CINDI. • The Planetary program creates a new Lunar Science project, providing $351M in FY08-12 for data archiving, research, and missions of opportunity or instruments to take advantage of NASA and international missions planned for moon. • Mars Phoenix Lander set to launch in August, arriving at Mars in May 2008 • Dawn mission to asteroids Ceres and Vesta set to launch this summer Aeronautics Research -- $554.0M • Stable budget profile starting in FY 2008, with a 4.6% budget increase from FY 2007 President’s Budget Request • $51M of FY 2008 budget is for competitive NASA Research Announcement Awards, which is more than 11% of the Aeronautics Research direct program budget. 7
  • 8. Highlights of FY 2008 Budget Request, cont. Exploration Systems -- $3,923.8M • Orion CEV and Ares I CLV development have been on track for IOC not later than 2014, but this schedule may be jeopardized due to potential funding reductions in FY 2007 appropriations • Commitment to purchasing commercial cargo and crew services to support the Space Station, assuming those services are successfully demonstrated and cost-effective – NASA has accepted a management challenge to identify cost savings in Space Operations and will defer some Advanced Capabilities efforts if commercial service costs exceed the current program budget. – COTS demonstrations still managed by ESMD, but transfer management of ISS Crew/Cargo Services purchases to Space Operations • Lunar Reconnaissance Orbiter (LRO) with Lunar CRater Observation and Sensing Satellite (LCROSS) secondary payload mission planned for launch in late 2008. Space Operations -- $6,791.7M • Approximately 55% of the International Space Station assembly is completed. • Number of Shuttle Flights Planned for ISS Assembly: 4-5 in 2007; 4-5 in 2008 (including Hubble); 4 in 2009; and 1 in 2010. Contingency flights in 2010 may be manifested, if necessary. • Space Shuttle Atlantis may be retired after Hubble Servicing Mission • Lien of $308 million (in FY09-12) in Space Operations starting in FY09 • Beginning development of two replenishment Tracking and Data Relay Satellite System (TDRSS) • Plans underway for carefully-considered Shuttle transition to new Exploration systems 8
  • 9. Challenges Ahead • Flying the Space Shuttle Safely, International Space Station Assembly, Hubble Servicing Mission • Space Shuttle Retirement and Transition to New Exploration Capabilities – Preserving the Shuttle workforce necessary to fly the Shuttle through Space Station assembly – Transitioning key elements of the highly-skilled engineering and technician workforce (appx. 16,000 contractors and 2,000 civil servants) to the new Exploration systems – Exploration Systems funding uncertainty with the FY 2007 appropriation and ability to carryover funds during busy development years of FY09-10 – Operating and maintaining the Space Station post-2010 – Fully understanding Space Shuttle retirement costs with the disposition of Space Shuttle facilities and equipment (valued at approximately $5.7B and $12B, respectively) – Beyond our budget request, NASA is preparing a package of legislative and administrative tools to help in the transition from the Space Shuttle to these new systems. • Affordable, Executable, World-Class Missions – “Go-As-We-Can-Afford-To-Pay” for all NASA Science, Exploration, and Aeronautics Research missions – Consistent with the priorities from the National Academy of Sciences’ Decadal Surveys – Need to fully understand technical requirements and develop credible cost estimates before initiating development, because technical problems and cost growth hurt credibility – While international and interagency collaboration improves the effectiveness of many Science and Exploration missions, dependence also comes with certain management risks in carrying out the missions NASA’s FY 2008 budget demonstrates the President’s commitment to our Nation’s leadership in space and aeronautics research with a 3.1% increase 9
  • 10. For more information: www.nasa.govbudget 10
  • 11. BACKUP 11
  • 12. Perspective on Science and Exploration NASA BUDGET: Sandchart from FY 1993 20,000 Real Year Budget Authority in Millions 18,000 16,000 Cross Agency Supt Programs & IG EXPLORATION SYSTEMS 14,000 EXPLORATION-RELATE C D ONTENT Ra Ya $i Ml o s Shuttle Recovery el er n i i n 12,000 l 10,000 SPACE OPERATIONS 8,000 6,000 AERONAUTICS 4,000 2,000 SCIENCE 0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Total C Labor & All O S verrheads Allocated in Proportion to Procurement $ Full Cost O P p lan Current Estimate, Full Cost Simplification • The retirement of the Space Shuttle in 2010 and development of new human spaceflight systems occurs once- in-a-generation. A slower rate of budget growth for Science missions is necessary to avoid a prolonged gap in strategic capability of U.S. human spaceflight. – Science program budget is moderated to 1% annual growth in FY08-11, and then growing consistent with NASA’s topline growth thereafter (2.4% in FY12). – The Science budget is 32% of the total NASA budget today. In 1992, Science was only 24% of NASA’s budget. • The rate of growth previously planned for Science was not sustainable, given the need to complete International Space Station assembly with the Space Shuttle and need to retire the Space Shuttle by 2010. – In the FY 2007 budget for FY07-11, the Science budget paid $2.44B and the Exploration budget paid $1.26B to make up the difference in the previous, placeholder estimated costs for Space Shuttle and ISS operations (additional $2.2B and $1.5B needed in FY06-10, respectively). 12
  • 14. Exploration Roadmap NOW 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 CEV Contract Award Lunar Outpost Buildup Orion/Ares Operational 7th Human Lunar Landing Lunar Robotic Missions Science Robotic Missions Mars Expedition Design Commercial Crew/Cargo for ISS Space Shuttle Operations Orion CEV Development Orion CEV Development ARES II Launch Vehicle Development ARES Launch Vehicle Development Orion Production and Operations Orion Production and Operations Early Design Activity Lunar Lander Development Lunar Lander Development Lunar Heavy Launch Development Lunar Heavy Launch Development Earth Departure Stage Development Earth Departure Stage Development Note: Specific dates and milestones not yet established. CEV/CLV availability Surface Systems Development Surface Systems Development planned for as close to 2010 as possible, but NLT 2014. Return to the moon as early as 2018 , but NLT 2020. 14