4. Belgrade Métro
BELGRADE METRO SYSTEM
Given demographic shift- must do transport infra Master Plan.
Defines development of entire transport network (roads, bridges, tunnels) and
public transport systems for 2021, 2027 and 2031.
SMART plan to be completed Q4 2015 - financed in part by EBRD
Three Phases of Metro Construction 3-year completion for each phase
Phase I: by 2021- first line of the Belgrade Métro
Compatibility with existing BG:Voz suburban-urban rail
Value of Investment ~ EUR 2.2B
5. Waste to Energy PPP
Value of WtE Project is ~EUR 250M
CoB is structuring PPP deal with the IFC, and project is well-advanced.
The Vinča WM project is generating strong investor and IFI interest.
International tender process will be fully transparent and accessible for all major
companies. Pre-tender process commenced in March of 2015.
6. STRONG INTEREST AT PRE-BID CONFERENCE IN MARCH 2015
Directorate of Waste Management of Secretariat of Environmental
Protection leading the project, working with the IFC
More than 55 companies have submitted Expressions of Interest
WtE PPP Investor Interest
7. PPP transaction is being structured, in an International tender supported by
the EBRD. Short-list announcement very soon.
~16 Underground parking garages to be built, first four on sites:
Djeram Pijaca (Major Green Market)
Kosovska St. (The National Assembly)
Skerlićeva (The National Library)
Studentski Trg (University Quadrangle)
Underground Garages
8. • EBRD funding secured to complete the Makiš II water pipeline expansion
and reconstruction- will increase water supply and enable new filtration
capacities.
• Municipal water supply and sewage network will be a strategic investment
for many years.
• Very strong investor and IFI interest
Water Infrastructure
Belgrade Water and Sewerage Company
9. Waste Water Treatment Plants
Five WWTPs to be built:
1. Veliko Selo (84M)
2. Krnjača (10.8M)
3. Bolečki sistem – Vinča (3.7M)
4. Batajnica (16.5M)
5. Ostružnica (5.5M)
Investment value: ~EUR 120.5M
Sewerage System
Network
Collectors (Interceptor to be completed)
Pumping stations
Investment value of EUR 886M
Total value of investments: ~EUR 1.0B
Water Infrastructure
10. District Heating
By-law being introduced to allow ESCO financing as a model for
investment in the district heating and/or cooling sector.
Municipal water supply and sewage network also a potential sector for
ESCO transactions.
ESCO Investments
Heat and Water
11. Plans to work with private partner to light suburban-urban areas.
Seeking more energy efficient solutions
ESCO Investments
Public Street Lighting
12. District Heating
• Beoelektrane has a District Heating network of ~1,500 km.
• We are strategically evaluating how to more aggressively develop the
DH network.
• The Company will undertake several RE investment projects that may
include GT sources of energy and biomass plants.
• GT can be used for district heating/cooling and energy prod.2,000
MW+ of GT energy can be produced in Belgrade alone.
Beogradske Elektrane District Heating
13. Main Station to be moved from City center to spacious New Belgrade, near
suburban-urban rail connections.
Alleviates heavy traffic congestion, increases mobility.
Detailed Urban Plan being prepared.
Land ownership being defined.
Will seek private investors once complete.
Construction deadline: 2017
New Central Bus Station on Novi Beograd
Central Bus Station
14. Existing central train station to be moved to the
“Beograd Centar” (Prokop) area
Must clear the way for Belgrade Waterfront Development
Prokop is located at the entrance to City Center, between Senjak and
the E-75 Hwy.
Total investment: ~ €25M
To be completed: 2016
Central Train Station
15. • Passenger and Cargo Terminals to be constructed.
• Analyzing regional privatization models, involving PPP or
PFIs.
• National Air Carrier: Recent sale of JAT minority stake to
Etihad who has added new routes and fleet.
BEG International
Hub
Nikola Tesla Int'l Airport– BEG
16. Expansion of existing Suburban-Urban rail is planned in III phases.
Seeking funding from investors (and IFIs) to expand the entire commuter
rail network (new stations, parking lots, etc).
Phase I: ~ €13M
Phase II: €12M-€14M (mid-2015) 15 km
Phase III: 45 km – connecting the south suburbs
Suburban-Urban Rail
17. BEG International
Hub
In 2014, JAT re-branded to AIR SERBIA
Results: +82% increase in passengers during first 8
months
Direct transoceanic flights to Beijing, NY, Toronto
planned in 2015
18. .
The City Hall of Belgrade is working hard
to better your experience in our City
.
.
Come Visit Belgrade
Our doors are open for both
business and cultural events.
We hope to see you again soon.
Visit Belgrade, S
Editor's Notes
Project was presented at MIPIM Cannes
Preparation of all planning and zoning documentation is underway
Construction set to begin in 2015
Phase I – Construction of the highest tower on the Sava River - a luxury hotel with residential and commercial suites (180 meters tall). Completion within 3.5 years
Entire development to be completed within ~10 years
Tower co-financed and constructed by Eagle Hills Group, Abu Dhabi.
Total investment planned: €4B
Total construction land area: 1.8M m2
50,000 workers to be employed
45,000 new jobs created following construction
This accounts for a planned increase in the City’s GDP of 5%
Project was presented at MIPIM Cannes
Preparation of all planning and zoning documentation is underway
Construction set to begin in 2015
Phase I – Construction of the highest tower on the Sava River - a luxury hotel with residential and commercial suites (180 meters tall). Completion within 3.5 years
Entire development to be completed within ~10 years
Tower co-financed and constructed by Eagle Hills Group, Abu Dhabi.
Total investment planned: €4B
Total construction land area: 1.8M m2
50,000 workers to be employed
45,000 new jobs created following construction
This accounts for a planned increase in the City’s GDP of 5%
Construction would involve OUR construction companies and would have a positive direct effect on job creation and local economy GDP. Serbian construction companies would, via this experience as sub-contractors, would achieve necessary international references in Metro System Construction. This is not possible without the involvement of a Foreign, large construction company from this sector.
BELGRADE PUBLIC TRANSPORT MASTER PLAN: SHOULD BE REGARDED AS A STRATEGIC DOCUMENT IN THE PLANNED PUBLIC TRANSPORT SYSTEM OF BELGRADE, ON A LONG-TERM BASIS, BY WHICH THE ROLE AND FURHTER DIRECTIONS FOR DEVELOPMENT WOULD BE DEFINED FOR EACH SUB-SYSTEM OF PUBLIC MUNICIPAL TRANSPORT, AS WELL AS A PRECISELY DEFINED LOCATION AND ROLE OF THE FUTURE BELGRADE METRO, AS A PART OF THE INTEGRATED SYSTM OF THE CITY’S PUBLIC TRANSPORT SYSTEM. WITHOUT SUCH A PROJECT IT IS NOT POSSIBLE TO PREPARE A QUALITY STUDY WITH RESPECT TO THE DESIGN OF THE FIRST LINE OF THE METRO.
TO DATE, WE HAVE NOT HAD ANY COOPERATION WITH RUSSIAN PARTNERS ON THE DESIGN OF OUR METRO SYSTEM. (SEE BG: VOZ TALKING PTS)S
INTERCEPTOR – 3 additional units to be completed with a value of EUR 37 million. The WWT FACILITIES ARE ESTIMATED AT EUR 144M.
INTERCEPTOR – 3 additional units to be completed with a value of EUR 37 million. The WWT FACILITIES ARE ESTIMATED AT EUR 120.5
VELIKO SELO IMA INDUSTRIJU, I IMA MNOGO VISE STANOVNISTVA – PEOPLE EQUIVALENT: 1,364,000 pop. (tkz People equivalent). Ovo je generalno resenje.
PROCENA SVE STO NEDOSTAJE.