SlideShare ist ein Scribd-Unternehmen logo
1 von 35
BERR INDUSTRY provides a Skilled Manpower Labor to the Oil & Gas industry, for upstream,
midstream and downstream Projects and Operations, on a short or long-term basis. Their highly
qualified professionals and skilled labors can support the best top, middle and lower level workforce
so in general that is Turkish, Pakistani and Indian ManPower.
BERR INDUSTRY, identifies the manpower requirements, in line with their customers needs, utilizing
appropriate screening and matching methods to ensure that only suitably qualified personnel are
recommended, in a timely fashion. They bring together the sources with oil and gas companies who are
in search of forwarding their operations, with a productive future in mind.
With dependability and the suitability of Skilled Manpower Supply being key to operational continuity,
BERR INDUSTRY is a reliable partner, that customers can rely on to respond to their needs and to deliver
a quality service
Throughout the period, during which BERR INDUSTRY’ staff works on customers’ operations, a full
transfer of knowledge takes place, to local staff.
3
MANPOWER SERVICES
A- MANAGEMENT STAFF & ENGINEERS B- FOREMEN & TECHNICIANS
 Project Manager
 Project Coordinator
 Manager Assistant Engineer
 Design Engineers
 Document Controllers
 Planning Engineers
 IT Engineers
 Welding Engineers
 Mechanical Engineers
 Electrical Engineers
 Civil Engineers
 Automation Engineers
 Inspection Engineers
 Supervisors
• Site Chiefs
• Mechanical Formen
• Electrical Formen
• Civil Formen
• Topographers / Surveys
• Mechanical Techinicians
• Electrical Technicians
• Automation Technicians
• Inspection Technicians
• Pipe Welders
• Pipe Fitters
• Rigger – Spanners
• Forklift Drivers
• Store Keepers
We are an established recruitment business with over 30 years experience providing innovative, cost
effective recruitment solutions to global leaders in Oil & Gas, Marine, Engineering & Construction.
By utilizing their skilled manpower supply to tackle their customers’ ongoing and short-notice proficiency
gaps (to be assessed), they provide assurance, that world-class knowledge and highly skilled labor, is
enhancing the oil and gas industry.
The founders of the BERR Industry are a global player that has held close and trusting relations with its
approved suppliers, since 30 years, and can provide support to its customers, through the provision of
dedicated procurement services.
Their experience, in developing a worldwide Supply Chain Management Processes, has allowed them to be able
to offer their services competitively worldwide.
The Procurement Management Team is in charge of sourcing new and old suppliers, buying, expediting,
inspecting as well as organizing the shipping and logistics of the goods required. They constantly review and
improve existing procedures and processes to improve competitiveness.
BERR Industry takes upon themselves, the general logistical responsibilities from departure sites to customer’s
warehouse :
ASSESSMENT & SITE SURVEY
WORKFORCE PLANNING
IDENTIFICATION THE
TERMS & CONDITIONS
SERVICE
AGREEMENT
WORK
COMMENCEMENT
• Site Survey and Inspection
• Assessment Reporting
• Risk Analyzing
• Workforce Planning
• Equipment an Tools Planning
• Time Scheduling
• Estimated Conditions Reporting
• Project Draft Works
• Technical T&C
• Methode of Statements
• Tasks & Work Arrangement
• Maintenance & Refurbishment
• Equipment and Tools
• Financial T&C
• Progress Payments
• Penalties
Gannt Diaphrgam, Time Schedule, Swot Analysis, Risk Assessment, Industrial Project Management and Planning Tools
"Zero Accident" policy is both a goal and an achievement at BERR. The company implements its
comprehensive Health Safety and Environment (HSE) policy to protect all employees and associates
working at BERR offices, construction sites and related facilities. It includes protection from every
kind of pollution, hazard and accident that may result from its business. HSE Management System, is
based on the standards of ISO 14001:2004 Environment Management System and OHSAS 18001
Occupational Health and Safety Management System.
Health, safety and environment are, in fact, its highest priority. BERR recognizes and acknowledges
the importance of achieving world-class performance with respect to protection of HSE on every
project as an integral part of its organizational culture. All personnel are encouraged to actively
engage in all the HSE programs and every conceivable effort is made to provide all the necessary
training and development to enforce the project requirements to attain its “Zero Accident” policy.
8
All trainings are conducted accordingly to EN ISO 9712:2012 and UE PED directive. To meet the growing
international demand for workers who are trained to the highest professional standards we provide
high quality education and training.
The courses will give our workers the tools their need to further your professional development. At the
same time we’re helping the heavy duty industry to build more efficient and competent workforce.
Each member of our team shares enthusiasm to see a job well done, a dedication to health & safety
and a commitment to pass their knowledge to others.
10
11
20 Mechanicians for Maintenance Works of the 600MW Yatagan
Thermal Power Plants in Turkey.
Condensing Pumps Replacement, High Pressure Steam Pipeline
Revision, Steam Turbine Removal
3 Engineers, 8 Mechanicians, 4 Electricians for Relocation of the
Gates Hose Factory from Belgium to Turkey.
Relocation of High Pressure Rubber Hose Process/Machine Lines
2 Engineers, 5 Mechanicians, 1 Electricians for Erection and
Installation Works of the 200MW MAN Diesel HFO Power Plant in
Iraq.
Tank Farm Piping, Lube Oil, HFO Pipelines Prefabrication and
Installation
www.euas.gov.tr
www.gates.com
www.escom.com.tr
600 MWYATAGAN TERMAL
POWER PLANT OVERHAOUL
RUBBER HOSE PROCESSING
MACHINE LINES
200 MW DIESEL POWER PLANT
ERECTION
4 Engineers, 40 Mechanicians for Erection and Installation Works
of the 200MW Combined Cycle Power Plant in Turkey.
Gas Turbine, Auxiliaries, G.T. Piping, Heat Recovery Steam
Generator, Medium & High Pressure Pipelines
3 Engineers, 21 Mechanicians, 5 Electricians for Relocation of the
Aluminium Processing Factory from Ukrania to Turkey.
Relocation of Aluminium Processing Machine Lines and Heavy Duty
Equipment
4 Engineers, 25 Mechanicians, 7 Electricians for Erection and
Installation Works of the 12MW Wartsilla Diesel HFO Power Plant in
Turkey
Generator House, All Piping Works, All Cabling & Instrumentation
Works, Automation Works.
www.m-powerstationservices.com
www.garexindustries.com
www.piem.com.tr
20MW CCPP RELOCATION
RUBBER HOSE PROCESSING
MACHINE LINES
12 MW DIESEL POWER PLANT
ERECTION
4 Engineers, 8 Mechanicians for Erection and Installation Works of
the 100MW Combined Cycle Power Plant in Iraq.
Gas Turbine, Auxiliaries, G.T. Piping, Heat Recovery Steam
Generator, Medium & High Pressure Pipelines
1 Engineers, 8 Mechanicians, 1 Electricians for Removal Works of
the GE Gas Turbines in the Baiji Refinery.
Turbine Removal, Auxiliary Units Replacement.
2 Engineers, 12 Mechanicians, 2 Electricians for Erection and
Installation Works of the 125MW GE9E Dual Fuel Power Plant in
Basrah Iraq
1.250MW Power Plant Project’s Erection Works
www.noc.oil.gov.iq
www.soc.gov.iq
www.mrc.oil.gov.iq
 Planning Engineers
 Document Controller Engineers
 Assessment Engineers
 Mechanical Engineers
 Electrical Engineers
 Chemical Engineers
 Material Engineers
 Mechatronics Engineers
 Automation Engineers
 Shift Engineers
 HSE Engineers & Technicians
 Inspectors & Auditors
 Site Chiefs & Formens
 Mechanical Technicians
 Steel Construction Technicians
 High Alloy Welders & Fitters
 TIG - SMAW Welders
 Scaffolders & Riggers
 Gas Turbine Assembly Team
 Steam Turbine Assembly Team
 Diesel Engine Assembly Team
 B.O.P. Assembly Team
 Commissioning & Startup Team
 Maintenance Team
MECHANICAL MANPOWER
 Inspection & Assessment
 Disassembly & Dismantling Works
 Removal & Replacing Works
 Tightening and Torquing Works
 Repair & Refitment Works
 Overhaul / On-Site Repair
 Grinding & Polishing Works
 Pickling & Flushing Works
 Alignment Works
 Hydrostatic & Ultrasonic Tests
 Radiographic Tests
 Gas Turbines,
 Pratt&Whitney SwiftPack FT8
 GE LM 6000
 GE LM 2500
 GE Frame 5
 GE Frame 6F
 GE Frame 9E
 Siemens 94.2V
 Steam Turbines
 Siemens / GE / Ansaldo / Skoda
 KKK / MAN / Mitsubishi
MAINTENANCE TEAM
MECHANICAL WORKS / WELDING WORKS
• WELDING ENGINEERS
• WELDING INSPECTORS
• SPECIAL PIPE WELDERS
• STRUCTURAL PLATE WELDERS
• TIG – MIG – MAG WELDERS
• ALUMINIUM WELDERS
International/European Welding Specialist (EWS)
International/European Welding Technologist (EWT)
International/European Welding Engineer (EWE)
MECHANICAL WORKS / PIPING WORKS
Plumbers, pipefitters, and steamfitters typically do the following:
• Install pipes and fixtures according to the Isometric Drawings and PnID
• Study blueprints and follow state and local building codes
• Determine the amount of material and type of equipment needed
• Inspect and test installed pipe systems and pipelines
• Troubleshoot systems that are not working
• Replace worn parts
MECHANICAL WORKS / TURBINE REMOVAL WORKS
Gas & Steam Turbines Dismantling Works. Rotary Equipment Disassembly, Loading, Lifting Works
MECHANICAL WORKS / TURBINE REMOVAL WORKS
Major Parts, Heavy Duty Machines, Turbines, Engines, Balance of Plant Equipment
MECHANICAL WORKS / MAINTENANCE WORKS
Diesel, H.F.O. Engines, Natural Gas Engines, Gas Reducing and Metering Skids
MECHANICAL WORKS / B.O.P. WORKS
Cooling Water Towers, Dry Air Coolers, Condensers, Air Intake Filters, Presurrused Air Systems
Our Skilled ManPower Providing Services consist of high experienced electrical engineers
and technicians for High – Medium – Low Voltage Electrical Works
 LV Works Electricians
 HV & MV Works Technicians
 Substation & Relay Electricians
 Swicthgear Facility Electricians
 Transformator Electricians
 Synchronization System Electricians
 Automation Technicians
 Sensoring & Monitoring Technicians
 SCADA & PLC Programmers
 Instrumentation and Control Technicians
 Test and Calibration Technicians
MECHANICAL WORKS / B.O.P. WORKS
MECHANICAL WORKS / B.O.P. WORKS
MECHANICAL WORKS / B.O.P. WORKS
Pipeline Welding and Inspection Works
Diesel Engine and Auxiliaries Assembly
Major Parts Overhauling
Revision of the MCC &Electrical Panels
MECHANICAL WORKS / B.O.P. WORKS
Measurement & Tests
Measurement & Tests
Relocation of the Machine Lines
Relocation of the Cooling Towers
DISASSEMBLY – ASSEMBLY WORKS
Gas Turbine and Auxiliaries Mounting and Assembly Works
INSULATION WORKS
Exhaust Systems, Stacks, Chimneys, Heat Recovery Systems, Silencers, Acoustic Walls
ELECTRICAL ERECTION WORKS
HV & MV Electrical Systems, Site Panels and Instrumentation
WHAT DO YOU PREFER US
 MORE THAN 300 SKILLED / EXPERIENCED TECHNICAL LABOR FORCE
 MANPOWER PLANNING & SCHEDULING SERVICE
 7/24 TECHNICAL SUPPORT SERVICE ALL AROUND THE WORLD
 QUALIFICATION CONTROL AND PERSONNEL TRAINING SERVICE
 BEST MANHOUR PRICING FOR OIL&GAS / ENERGY INDUSTRY
Adress:
TR - Postane, Levent Sitesi, I6 No:7 34940 Tuzla, Istanbul, Turkey
UK - Kingston Upon Hull (England) United Kingdom
Telephones:
Headquarters Pbx : +90 216 395 20 34
Support Center : +90 532 163 62 90 ( TR ) & +44 743 246 14 62 ( UK )
URL:
http://www.berrindustry.com
E-Mail:
General Information
UK Contact
Business Development
Skype:
Berr.Industry
SlideShare Link for all brochures and referances Go >>>
35
: info@berrindustry.com
: r.moore@berrindustry.com
: k.edes@berrindustry.com

Weitere ähnliche Inhalte

Was ist angesagt?

OnRecruit-RPO PowerPoint Presentation
OnRecruit-RPO PowerPoint PresentationOnRecruit-RPO PowerPoint Presentation
OnRecruit-RPO PowerPoint PresentationChris Kitterman
 
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation SlidesCorporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation SlidesSlideTeam
 
HR Induction PowerPoint Presentation Slides
HR Induction PowerPoint Presentation Slides HR Induction PowerPoint Presentation Slides
HR Induction PowerPoint Presentation Slides SlideTeam
 
Recruitment proposal
Recruitment proposalRecruitment proposal
Recruitment proposalAnkur Pathak
 
Triti manpower proposal
Triti manpower proposalTriti manpower proposal
Triti manpower proposalAvijeet Kar
 
Alliance Staffing Solutions Power Point Presentation
Alliance Staffing Solutions   Power Point PresentationAlliance Staffing Solutions   Power Point Presentation
Alliance Staffing Solutions Power Point Presentationkmasin
 
Sample network engineer resume
Sample network engineer resumeSample network engineer resume
Sample network engineer resumeAmbuj Rai
 
Offshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case StudyOffshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case StudyFaichi Solutions
 
Kawal Career Connections - Recruitment proposal
Kawal Career Connections - Recruitment proposalKawal Career Connections - Recruitment proposal
Kawal Career Connections - Recruitment proposalKawalpreet Sethi
 
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer Stage
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer StageRecruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer Stage
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer StageEverest Group
 
Sigma Recruitment Agency- company presentation
Sigma Recruitment Agency-  company presentationSigma Recruitment Agency-  company presentation
Sigma Recruitment Agency- company presentationsteppingstones
 
Dee Recruitment Company Presentation
Dee Recruitment Company PresentationDee Recruitment Company Presentation
Dee Recruitment Company PresentationGarethCurnow
 
Employee Orientation Ppt Final
Employee Orientation Ppt FinalEmployee Orientation Ppt Final
Employee Orientation Ppt FinalShruthi Choudary
 
RPO - Recruitment Process Outsourcing
RPO - Recruitment Process OutsourcingRPO - Recruitment Process Outsourcing
RPO - Recruitment Process OutsourcingH.Syed
 

Was ist angesagt? (20)

OnRecruit-RPO PowerPoint Presentation
OnRecruit-RPO PowerPoint PresentationOnRecruit-RPO PowerPoint Presentation
OnRecruit-RPO PowerPoint Presentation
 
Rpo presentation
Rpo presentationRpo presentation
Rpo presentation
 
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation SlidesCorporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
 
Profile HR Consultancy
Profile HR ConsultancyProfile HR Consultancy
Profile HR Consultancy
 
HR Induction PowerPoint Presentation Slides
HR Induction PowerPoint Presentation Slides HR Induction PowerPoint Presentation Slides
HR Induction PowerPoint Presentation Slides
 
Recruitment proposal
Recruitment proposalRecruitment proposal
Recruitment proposal
 
Triti manpower proposal
Triti manpower proposalTriti manpower proposal
Triti manpower proposal
 
Offshore Development Center Proposal Easycom
Offshore Development Center Proposal EasycomOffshore Development Center Proposal Easycom
Offshore Development Center Proposal Easycom
 
Alliance Staffing Solutions Power Point Presentation
Alliance Staffing Solutions   Power Point PresentationAlliance Staffing Solutions   Power Point Presentation
Alliance Staffing Solutions Power Point Presentation
 
Sample network engineer resume
Sample network engineer resumeSample network engineer resume
Sample network engineer resume
 
Offshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case StudyOffshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case Study
 
Kawal Career Connections - Recruitment proposal
Kawal Career Connections - Recruitment proposalKawal Career Connections - Recruitment proposal
Kawal Career Connections - Recruitment proposal
 
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer Stage
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer StageRecruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer Stage
Recruitment Process Outsourcing (RPO) – Moving Beyond the Pioneer Stage
 
New employee induction
New employee induction  New employee induction
New employee induction
 
Sigma Recruitment Agency- company presentation
Sigma Recruitment Agency-  company presentationSigma Recruitment Agency-  company presentation
Sigma Recruitment Agency- company presentation
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
Helix Executive Search brochure
Helix Executive Search brochureHelix Executive Search brochure
Helix Executive Search brochure
 
Dee Recruitment Company Presentation
Dee Recruitment Company PresentationDee Recruitment Company Presentation
Dee Recruitment Company Presentation
 
Employee Orientation Ppt Final
Employee Orientation Ppt FinalEmployee Orientation Ppt Final
Employee Orientation Ppt Final
 
RPO - Recruitment Process Outsourcing
RPO - Recruitment Process OutsourcingRPO - Recruitment Process Outsourcing
RPO - Recruitment Process Outsourcing
 

Andere mochten auch

Ppt db electrical
Ppt db electricalPpt db electrical
Ppt db electricalRechalhyan
 
Rights Topics Ppt
Rights Topics PptRights Topics Ppt
Rights Topics PptMsB
 
Presentation Personnel Executive 2010
Presentation Personnel Executive 2010Presentation Personnel Executive 2010
Presentation Personnel Executive 2010Vbodashko
 
Manpower VIetnam Presentation
Manpower VIetnam PresentationManpower VIetnam Presentation
Manpower VIetnam PresentationManpower Vietnam
 
Recrutment & selection HR PRESENTATION
Recrutment & selection HR PRESENTATIONRecrutment & selection HR PRESENTATION
Recrutment & selection HR PRESENTATIONDimple Ramnani
 
Touchless Touchscreen
Touchless TouchscreenTouchless Touchscreen
Touchless TouchscreenSaptarshi Dey
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission lineDhananjay Jha
 
Recruitment and selection
Recruitment and selectionRecruitment and selection
Recruitment and selectionNitin Dhariwal
 
Is SEO Evil? - Web Directions 2007
Is SEO Evil? - Web Directions 2007Is SEO Evil? - Web Directions 2007
Is SEO Evil? - Web Directions 2007gleddy
 
Best topics for seminar
Best topics for seminarBest topics for seminar
Best topics for seminarshilpi nagpal
 
Heart sounds and murmur
Heart sounds and murmurHeart sounds and murmur
Heart sounds and murmurVitrag Shah
 

Andere mochten auch (16)

Ppt db electrical
Ppt db electricalPpt db electrical
Ppt db electrical
 
Rights Topics Ppt
Rights Topics PptRights Topics Ppt
Rights Topics Ppt
 
Presentation Personnel Executive 2010
Presentation Personnel Executive 2010Presentation Personnel Executive 2010
Presentation Personnel Executive 2010
 
Manpower VIetnam Presentation
Manpower VIetnam PresentationManpower VIetnam Presentation
Manpower VIetnam Presentation
 
Gynkana
GynkanaGynkana
Gynkana
 
Solar panels
Solar panelsSolar panels
Solar panels
 
Recrutment & selection HR PRESENTATION
Recrutment & selection HR PRESENTATIONRecrutment & selection HR PRESENTATION
Recrutment & selection HR PRESENTATION
 
Touchless Touchscreen
Touchless TouchscreenTouchless Touchscreen
Touchless Touchscreen
 
Electrical car ppt
Electrical car pptElectrical car ppt
Electrical car ppt
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Recruitment and selection
Recruitment and selectionRecruitment and selection
Recruitment and selection
 
Touchscreen PPT
Touchscreen PPTTouchscreen PPT
Touchscreen PPT
 
Manpower Planning
Manpower PlanningManpower Planning
Manpower Planning
 
Is SEO Evil? - Web Directions 2007
Is SEO Evil? - Web Directions 2007Is SEO Evil? - Web Directions 2007
Is SEO Evil? - Web Directions 2007
 
Best topics for seminar
Best topics for seminarBest topics for seminar
Best topics for seminar
 
Heart sounds and murmur
Heart sounds and murmurHeart sounds and murmur
Heart sounds and murmur
 

Ähnlich wie Manpower Services for Oil & Gas Industry

MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGBerr Industry
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationMurat Cengiz
 
Ark international oil gas brochure (2)
Ark international   oil  gas brochure (2)Ark international   oil  gas brochure (2)
Ark international oil gas brochure (2)Daniel D'Souza
 
Ark international oil & gas brochure
Ark international   oil & gas brochureArk international   oil & gas brochure
Ark international oil & gas brochurem_bone
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arbaaz Malik
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYBerr Industry
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh Kumar
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa
 

Ähnlich wie Manpower Services for Oil & Gas Industry (20)

MANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDINGMANPOWER - SKILLED LABOR FORCE PROVIDING
MANPOWER - SKILLED LABOR FORCE PROVIDING
 
EXPERIENCED MANPOWER SOLUTION
EXPERIENCED MANPOWER SOLUTIONEXPERIENCED MANPOWER SOLUTION
EXPERIENCED MANPOWER SOLUTION
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN Presentation
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_New
 
Ark international oil gas brochure (2)
Ark international   oil  gas brochure (2)Ark international   oil  gas brochure (2)
Ark international oil gas brochure (2)
 
Ark international oil & gas brochure
Ark international   oil & gas brochureArk international   oil & gas brochure
Ark international oil & gas brochure
 
Yasin - Resume
Yasin - ResumeYasin - Resume
Yasin - Resume
 
Gapesco Profile 2021
Gapesco Profile 2021Gapesco Profile 2021
Gapesco Profile 2021
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
INDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONSINDUSTRIAL ENGINEERING SOLUTIONS
INDUSTRIAL ENGINEERING SOLUTIONS
 
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRYGENERAL PRESENTATION FILE of THE BERR INDUSTRY
GENERAL PRESENTATION FILE of THE BERR INDUSTRY
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project Engineer
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
company profile
company profilecompany profile
company profile
 
2015 Company Profile
2015 Company Profile2015 Company Profile
2015 Company Profile
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 

Mehr von Murat Cengiz

Pipe & Equipment 2018
Pipe & Equipment 2018Pipe & Equipment 2018
Pipe & Equipment 2018Murat Cengiz
 
Industrial Valves 2018
Industrial Valves 2018Industrial Valves 2018
Industrial Valves 2018Murat Cengiz
 
Industrial Equipment 2017
Industrial Equipment   2017Industrial Equipment   2017
Industrial Equipment 2017Murat Cengiz
 
Izgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilIzgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilMurat Cengiz
 
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitma
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitmaEnerji̇ santrali̇ buhar jeneratörü doğalgaz isitma
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitmaMurat Cengiz
 
BERR INDUSTRY / HEAVY DUTY SERVICES
BERR INDUSTRY / HEAVY DUTY SERVICESBERR INDUSTRY / HEAVY DUTY SERVICES
BERR INDUSTRY / HEAVY DUTY SERVICESMurat Cengiz
 

Mehr von Murat Cengiz (6)

Pipe & Equipment 2018
Pipe & Equipment 2018Pipe & Equipment 2018
Pipe & Equipment 2018
 
Industrial Valves 2018
Industrial Valves 2018Industrial Valves 2018
Industrial Valves 2018
 
Industrial Equipment 2017
Industrial Equipment   2017Industrial Equipment   2017
Industrial Equipment 2017
 
Izgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilIzgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - April
 
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitma
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitmaEnerji̇ santrali̇ buhar jeneratörü doğalgaz isitma
Enerji̇ santrali̇ buhar jeneratörü doğalgaz isitma
 
BERR INDUSTRY / HEAVY DUTY SERVICES
BERR INDUSTRY / HEAVY DUTY SERVICESBERR INDUSTRY / HEAVY DUTY SERVICES
BERR INDUSTRY / HEAVY DUTY SERVICES
 

Kürzlich hochgeladen

Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Kürzlich hochgeladen (20)

Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

Manpower Services for Oil & Gas Industry

  • 1.
  • 2. BERR INDUSTRY provides a Skilled Manpower Labor to the Oil & Gas industry, for upstream, midstream and downstream Projects and Operations, on a short or long-term basis. Their highly qualified professionals and skilled labors can support the best top, middle and lower level workforce so in general that is Turkish, Pakistani and Indian ManPower. BERR INDUSTRY, identifies the manpower requirements, in line with their customers needs, utilizing appropriate screening and matching methods to ensure that only suitably qualified personnel are recommended, in a timely fashion. They bring together the sources with oil and gas companies who are in search of forwarding their operations, with a productive future in mind. With dependability and the suitability of Skilled Manpower Supply being key to operational continuity, BERR INDUSTRY is a reliable partner, that customers can rely on to respond to their needs and to deliver a quality service Throughout the period, during which BERR INDUSTRY’ staff works on customers’ operations, a full transfer of knowledge takes place, to local staff.
  • 3. 3 MANPOWER SERVICES A- MANAGEMENT STAFF & ENGINEERS B- FOREMEN & TECHNICIANS  Project Manager  Project Coordinator  Manager Assistant Engineer  Design Engineers  Document Controllers  Planning Engineers  IT Engineers  Welding Engineers  Mechanical Engineers  Electrical Engineers  Civil Engineers  Automation Engineers  Inspection Engineers  Supervisors • Site Chiefs • Mechanical Formen • Electrical Formen • Civil Formen • Topographers / Surveys • Mechanical Techinicians • Electrical Technicians • Automation Technicians • Inspection Technicians • Pipe Welders • Pipe Fitters • Rigger – Spanners • Forklift Drivers • Store Keepers
  • 4. We are an established recruitment business with over 30 years experience providing innovative, cost effective recruitment solutions to global leaders in Oil & Gas, Marine, Engineering & Construction. By utilizing their skilled manpower supply to tackle their customers’ ongoing and short-notice proficiency gaps (to be assessed), they provide assurance, that world-class knowledge and highly skilled labor, is enhancing the oil and gas industry.
  • 5. The founders of the BERR Industry are a global player that has held close and trusting relations with its approved suppliers, since 30 years, and can provide support to its customers, through the provision of dedicated procurement services. Their experience, in developing a worldwide Supply Chain Management Processes, has allowed them to be able to offer their services competitively worldwide. The Procurement Management Team is in charge of sourcing new and old suppliers, buying, expediting, inspecting as well as organizing the shipping and logistics of the goods required. They constantly review and improve existing procedures and processes to improve competitiveness. BERR Industry takes upon themselves, the general logistical responsibilities from departure sites to customer’s warehouse :
  • 6. ASSESSMENT & SITE SURVEY WORKFORCE PLANNING IDENTIFICATION THE TERMS & CONDITIONS SERVICE AGREEMENT WORK COMMENCEMENT • Site Survey and Inspection • Assessment Reporting • Risk Analyzing • Workforce Planning • Equipment an Tools Planning • Time Scheduling • Estimated Conditions Reporting • Project Draft Works • Technical T&C • Methode of Statements • Tasks & Work Arrangement • Maintenance & Refurbishment • Equipment and Tools • Financial T&C • Progress Payments • Penalties
  • 7. Gannt Diaphrgam, Time Schedule, Swot Analysis, Risk Assessment, Industrial Project Management and Planning Tools
  • 8. "Zero Accident" policy is both a goal and an achievement at BERR. The company implements its comprehensive Health Safety and Environment (HSE) policy to protect all employees and associates working at BERR offices, construction sites and related facilities. It includes protection from every kind of pollution, hazard and accident that may result from its business. HSE Management System, is based on the standards of ISO 14001:2004 Environment Management System and OHSAS 18001 Occupational Health and Safety Management System. Health, safety and environment are, in fact, its highest priority. BERR recognizes and acknowledges the importance of achieving world-class performance with respect to protection of HSE on every project as an integral part of its organizational culture. All personnel are encouraged to actively engage in all the HSE programs and every conceivable effort is made to provide all the necessary training and development to enforce the project requirements to attain its “Zero Accident” policy. 8
  • 9.
  • 10. All trainings are conducted accordingly to EN ISO 9712:2012 and UE PED directive. To meet the growing international demand for workers who are trained to the highest professional standards we provide high quality education and training. The courses will give our workers the tools their need to further your professional development. At the same time we’re helping the heavy duty industry to build more efficient and competent workforce. Each member of our team shares enthusiasm to see a job well done, a dedication to health & safety and a commitment to pass their knowledge to others. 10
  • 11. 11
  • 12. 20 Mechanicians for Maintenance Works of the 600MW Yatagan Thermal Power Plants in Turkey. Condensing Pumps Replacement, High Pressure Steam Pipeline Revision, Steam Turbine Removal 3 Engineers, 8 Mechanicians, 4 Electricians for Relocation of the Gates Hose Factory from Belgium to Turkey. Relocation of High Pressure Rubber Hose Process/Machine Lines 2 Engineers, 5 Mechanicians, 1 Electricians for Erection and Installation Works of the 200MW MAN Diesel HFO Power Plant in Iraq. Tank Farm Piping, Lube Oil, HFO Pipelines Prefabrication and Installation www.euas.gov.tr www.gates.com www.escom.com.tr 600 MWYATAGAN TERMAL POWER PLANT OVERHAOUL RUBBER HOSE PROCESSING MACHINE LINES 200 MW DIESEL POWER PLANT ERECTION
  • 13. 4 Engineers, 40 Mechanicians for Erection and Installation Works of the 200MW Combined Cycle Power Plant in Turkey. Gas Turbine, Auxiliaries, G.T. Piping, Heat Recovery Steam Generator, Medium & High Pressure Pipelines 3 Engineers, 21 Mechanicians, 5 Electricians for Relocation of the Aluminium Processing Factory from Ukrania to Turkey. Relocation of Aluminium Processing Machine Lines and Heavy Duty Equipment 4 Engineers, 25 Mechanicians, 7 Electricians for Erection and Installation Works of the 12MW Wartsilla Diesel HFO Power Plant in Turkey Generator House, All Piping Works, All Cabling & Instrumentation Works, Automation Works. www.m-powerstationservices.com www.garexindustries.com www.piem.com.tr 20MW CCPP RELOCATION RUBBER HOSE PROCESSING MACHINE LINES 12 MW DIESEL POWER PLANT ERECTION
  • 14. 4 Engineers, 8 Mechanicians for Erection and Installation Works of the 100MW Combined Cycle Power Plant in Iraq. Gas Turbine, Auxiliaries, G.T. Piping, Heat Recovery Steam Generator, Medium & High Pressure Pipelines 1 Engineers, 8 Mechanicians, 1 Electricians for Removal Works of the GE Gas Turbines in the Baiji Refinery. Turbine Removal, Auxiliary Units Replacement. 2 Engineers, 12 Mechanicians, 2 Electricians for Erection and Installation Works of the 125MW GE9E Dual Fuel Power Plant in Basrah Iraq 1.250MW Power Plant Project’s Erection Works www.noc.oil.gov.iq www.soc.gov.iq www.mrc.oil.gov.iq
  • 15.
  • 16.  Planning Engineers  Document Controller Engineers  Assessment Engineers  Mechanical Engineers  Electrical Engineers  Chemical Engineers  Material Engineers  Mechatronics Engineers  Automation Engineers  Shift Engineers  HSE Engineers & Technicians  Inspectors & Auditors  Site Chiefs & Formens  Mechanical Technicians  Steel Construction Technicians  High Alloy Welders & Fitters  TIG - SMAW Welders  Scaffolders & Riggers  Gas Turbine Assembly Team  Steam Turbine Assembly Team  Diesel Engine Assembly Team  B.O.P. Assembly Team  Commissioning & Startup Team  Maintenance Team MECHANICAL MANPOWER
  • 17.  Inspection & Assessment  Disassembly & Dismantling Works  Removal & Replacing Works  Tightening and Torquing Works  Repair & Refitment Works  Overhaul / On-Site Repair  Grinding & Polishing Works  Pickling & Flushing Works  Alignment Works  Hydrostatic & Ultrasonic Tests  Radiographic Tests  Gas Turbines,  Pratt&Whitney SwiftPack FT8  GE LM 6000  GE LM 2500  GE Frame 5  GE Frame 6F  GE Frame 9E  Siemens 94.2V  Steam Turbines  Siemens / GE / Ansaldo / Skoda  KKK / MAN / Mitsubishi MAINTENANCE TEAM
  • 18. MECHANICAL WORKS / WELDING WORKS • WELDING ENGINEERS • WELDING INSPECTORS • SPECIAL PIPE WELDERS • STRUCTURAL PLATE WELDERS • TIG – MIG – MAG WELDERS • ALUMINIUM WELDERS International/European Welding Specialist (EWS) International/European Welding Technologist (EWT) International/European Welding Engineer (EWE)
  • 19. MECHANICAL WORKS / PIPING WORKS Plumbers, pipefitters, and steamfitters typically do the following: • Install pipes and fixtures according to the Isometric Drawings and PnID • Study blueprints and follow state and local building codes • Determine the amount of material and type of equipment needed • Inspect and test installed pipe systems and pipelines • Troubleshoot systems that are not working • Replace worn parts
  • 20. MECHANICAL WORKS / TURBINE REMOVAL WORKS Gas & Steam Turbines Dismantling Works. Rotary Equipment Disassembly, Loading, Lifting Works
  • 21. MECHANICAL WORKS / TURBINE REMOVAL WORKS Major Parts, Heavy Duty Machines, Turbines, Engines, Balance of Plant Equipment
  • 22. MECHANICAL WORKS / MAINTENANCE WORKS Diesel, H.F.O. Engines, Natural Gas Engines, Gas Reducing and Metering Skids
  • 23. MECHANICAL WORKS / B.O.P. WORKS Cooling Water Towers, Dry Air Coolers, Condensers, Air Intake Filters, Presurrused Air Systems
  • 24.
  • 25. Our Skilled ManPower Providing Services consist of high experienced electrical engineers and technicians for High – Medium – Low Voltage Electrical Works  LV Works Electricians  HV & MV Works Technicians  Substation & Relay Electricians  Swicthgear Facility Electricians  Transformator Electricians  Synchronization System Electricians  Automation Technicians  Sensoring & Monitoring Technicians  SCADA & PLC Programmers  Instrumentation and Control Technicians  Test and Calibration Technicians
  • 26. MECHANICAL WORKS / B.O.P. WORKS
  • 27. MECHANICAL WORKS / B.O.P. WORKS
  • 28.
  • 29. MECHANICAL WORKS / B.O.P. WORKS Pipeline Welding and Inspection Works Diesel Engine and Auxiliaries Assembly Major Parts Overhauling Revision of the MCC &Electrical Panels
  • 30. MECHANICAL WORKS / B.O.P. WORKS Measurement & Tests Measurement & Tests Relocation of the Machine Lines Relocation of the Cooling Towers
  • 31. DISASSEMBLY – ASSEMBLY WORKS Gas Turbine and Auxiliaries Mounting and Assembly Works
  • 32. INSULATION WORKS Exhaust Systems, Stacks, Chimneys, Heat Recovery Systems, Silencers, Acoustic Walls
  • 33. ELECTRICAL ERECTION WORKS HV & MV Electrical Systems, Site Panels and Instrumentation
  • 34. WHAT DO YOU PREFER US  MORE THAN 300 SKILLED / EXPERIENCED TECHNICAL LABOR FORCE  MANPOWER PLANNING & SCHEDULING SERVICE  7/24 TECHNICAL SUPPORT SERVICE ALL AROUND THE WORLD  QUALIFICATION CONTROL AND PERSONNEL TRAINING SERVICE  BEST MANHOUR PRICING FOR OIL&GAS / ENERGY INDUSTRY
  • 35. Adress: TR - Postane, Levent Sitesi, I6 No:7 34940 Tuzla, Istanbul, Turkey UK - Kingston Upon Hull (England) United Kingdom Telephones: Headquarters Pbx : +90 216 395 20 34 Support Center : +90 532 163 62 90 ( TR ) & +44 743 246 14 62 ( UK ) URL: http://www.berrindustry.com E-Mail: General Information UK Contact Business Development Skype: Berr.Industry SlideShare Link for all brochures and referances Go >>> 35 : info@berrindustry.com : r.moore@berrindustry.com : k.edes@berrindustry.com