1. Mechanical Engineer
MUHAMMAD AHMAD YASEEN,MUHAMMAD AHMAD YASEEN, BSC, MSCBSC, MSC
Mobile: +9660503859106
E-mail: muhammad.yaseen27974@gmail.com
Mohamed.yassen@Worleyparsons.com
Skype: Muhammad.yaseen27974
SUMMARY OF QUALIFICATIONS
1. Construction Manager for Processing Gas plant, Pressure Reduction Gas plant,
Compressors Gas plant – Natural Gas Transmission Pipeline (Steel / HDPE100).
2. Lead Mechanical Piping Fabrication, Installation, Flushing and Testing Engineer.
3. Commissioning And Start up Engineer – For Oil and Gas Pipelines and Plants.
4. B.SC. of Mechanical Engineering 1998 – Design & Production Department.
5. Post Graduate – Diploma – In Machine Design 2002 to 2004.
6. M.Sc. In Mechanical Engineering – Benha University - Fluid Power - 2011
WORK EXPERIENCE
Worley Parsons – Consultant and Project Management (PMC)
Title Lead Mechanical Engineer (Standardizing Engineer)
1, Jan 2015 – Current – Khobar Branch, KSA
2. Location Saudi Arabia, Jubil, Ras Elkheer
JOB DETAILS AND AREA OF RESPONSIBILITIES
1 – Review and Merge all Clients and project Mechanical Specifications to comply with API and
ASME standards.
2 – Initiate All Missing Project Specification (Mechanical) and Compare the Compliance between
Installed Equipment’s And Client Specifications.
3 – Supervise, Review and Monitoring on all mechanical activity related to expansion of MAADEN
projects as Client Representative.
4 – Advisor for All MOC (management of changes) for mechanical discipline.
Client: MAADEN Aluminum / Phosphate Plant – Ras El Kheer, Al Jubil, Dammam.
Reported to: Project Director.
RWE Dea Egypt – (PMC)
Title Site / Construction Manager - Gas plant CTP
Jun, 2012 – Dec, 2014
Location Egypt, Kafr Elshekh
JOB DETAILS AND AREA OF RESPONSIBILITIES
1. Overall management of owner's responsibilities and EPC contractor supervision during
construction phase in order to ensure compliance with contract requirements.
2. Review and Comment on all Plot Plan, FEED, PFD and AFC drawings before starting
construction.
2
3. 3. Mange and monitoring project scope, budget, milestones and deliverables up to final
completion - during construction phase.
4. Define and manage all project resources and requirements.
5. Ensure adherence to design and construction standards.
6. Ensure coordination between project function groups including, but not limited to Design,
Construction, Operation and Planning.
7. Solve and find solutions for any construction problems sharing with discipline engineers and
engineering office.
8. Follow up material receiving at site yard with Material receiving procedure and reports
(Sorting depend on installation priority, visual check, handling and laying methods)
9. Ensure proper project documentation and reporting.
10. Manage, arrange and record all site meetings (daily, weekly, monthly)
11. Follow up and analysis of time schedules, monthly reports, progress measurements.
12. Overall management responsibility over work site safety to ensure an accident free
project.
13. Ensuring safe working practices by applying all HSEQ rules and regulations.
14. Ensure contractor and subcontractors compliance with QA/QC obligations under the
associated contracts.
15. Directing and guidance to third party consultants and engineers.
16. Follow up all sub-contractors activities at site (resources, material, time plan, QC
plans, daily work permits, progress reports, ITP, method statement, risk assessment
for work package, lifting plans, PPE…)
17. Directing and manage all Owner discipline Engineers teams at site as (Civil,
Mechanical, E and I, Loss prevention, HVAC, Welding, Painting, Pre Commissioning)
.
18. Support activities post – construction and ensure that project closings are done in
timely fashion in accordance with company policy and within target date.
19. Follow up and monitoring piping and steel structure fabrication in workshops with
client discipline engineer, contractor and third party teams
3
4. 20. Participate in gas pre commissioning and gas commissioning procedures and plans.
21. Ensure project billing is completed and contractor invoices are submitted for payment.
22. Review and monitoring all camp rules and security plans
Reported to Project Manager.
Project
Kafr El Shekh - Desoqu Natural Gas Treatment plant
Total Budget 300 Million Euro
Client
SUCO – Suez Oil Company
EGAS - Egyptian Natural Gas Holding Company
Hill International Egypt – PMC
Title Senior Mechanical, Piping Engineer
Oct, 2010 to May, 2012
Location Egypt, Giza
JOB DETAILS AND AREA OF RESPONSABILITIES
1. Review and check all piping engineering documents and drawings.
2. Check and supervise on all mechanical piping spool fabrication (fit up, dimension,
orientation, and alignment).
3. Arrange and control all site welders' exams and certifications according to ASME IX
with third party as (BV or SGS).
4. Check on calibration certificate for welding machines, heat treatment electric ovens
and also piping and fitting material certificate.
4
5. 5. Arrange with contractors at site, manpower and resources which meet the target
productivity of project.
6. Check on Material tractability plan and bill of material per each spool to be sure from
right material for right spool.
7. Follow up daily progress spool piping fabrication by dial inch or tone.
8. Follow up and monitoring at site (pipe rack, piping supports, piping line up, piping
coating / cladding for hot / cold systems and assembly of all valves with accessories –
by loops or by systems ).
9. Supervise on all UG piping construction and test (facilities and infrastructure) as
sewage network, potable water network, firefighting network and hydrants, open drain
and closed drain).
10. Installation and placing of heavy equipment and skid mounted packages as Slug
catcher, LTS units (low temperature separation units), heat exchangers, gas
compressors, gas turbines, gas scrubbers, knock out drum, glycol skid units and flare
stack.
11. Supervise on site tank building (pressurized and non-pressurized) as settlement, nozzle
orientation, hydrostatic test, vacuum test and review all QC/ QA reports related to
tanks.
12. Check, Review, Supervise and Approve All Hydrostatic Tests procedure for All Piping
Systems.
13. Prepare And Review All mechanical Punch Lists and Follow Punch Clearance for All
Mechanical Systems as HVAC, Potable /Utility water, Utility Air, Nitrogen network,
OD,CD , Raw Gas piping system, all Firefighting network, Cold/Hot insulation,….
14. Check, Supervise and Approve all Piping Flushing, Chemical Cleaning, Blowing And
Rupture Tests. As per NORSOK STD. L-004-Ed2Sep2012
15. Mechanical P& ID checker before pre commissioning phase.
16. Prepare all check lists for all mechanical systems (hydrocarbons piping, pumping
skids, HVAC, utility piping systems, infrastructure piping UG, tanks, pipe racks,…)
17. Review tagging numbering systems for all valves, filters, scrapers, packages.
18. Supervise on All Piping Chemical Cleaning And hot Oil Flushing Activities.
19. Supervise on CLT (commissioning leak test) And GLT (gross leak test) Activities.
5
6. 20. Review all bolts torque values according to ASME B16.5 specially for skids terminal
flanges
21. Supervise on flange management activities for all flanges at plant.
22. Prepare And Participate In Pre-Commissioning, Commissioning and start up Plans.
23. Review and Check All Commissioning Vendor Procedure, SAT (site acceptance test)
and performance test for 72 hr. at least.
24. Preparing and participate in HAND OVER Report.
Reported to Project Manager.
Project
Dahshour Natural Gas Compressor Station
Total budget (300 million US $)
Client GASCO - EGAS
QATAR GAS GROUP – TAQA ARABIA – EPC
Title Construction Manager (Jan, 2009 to Oct, 2010).
Location Qatar - Doha
JOB DETAILS AND AREA OF RESPONSABILITIES
1. Prepare and supervise on all gas pipeline project technical proposal ( Design, Material
Selection, Routing, Hydraulic Calculation, Construction method statement, Test Procedures,
Pigging sequences, Drying, Commissioning). In tender phase
2. Prepare and review all commercial proposals and cash flow for pipeline projects.
6
7. 3. Supervise on all technical activities related to projects (human resources, construction
procedures, QC/QA plans, HSEQ, ITP, Hydrostatic tests, Cleaning, Drying up to Gas
commission.
4. Holding meetings (weekly / monthly) with Client to discuss progress status by S curve, site
challenges, billing and commercial issues.
5. Supervise and follow up for all site logistics as material delivery, welding machines and
generators maintenance plans, hand tools availabilities,)
6. Hand over and close out for project with client teams.
Reported To General Manager
Projects:
1. Development of small and medium industrial zone (80Km NG pipelines HDPE100)
2. Main pressure reduction station (PRS) with capacity 32 000 m3/ hr.
3. Luseil City (25Km pipe network – HDPE100)
Client Qatar Ministry of Energy, Woqod, Qatar Petroleum, Qatar El Diar
NAT GAS (Oct, 2007 – Jan, 2009) – (PMCO).
Title Operation Manager for El Mokattam Zone
Location Egypt, Cairo
JOB DETAILS AND AREA OF RESPONSABILITIES
1. Supervise All Project Activities as Main Pressure Pipeline 7 Bar, All Poly
Ethylene Low Pressure Networks (100 Km), Internal and External Installation,
Conversion off All Domestic apparatus.
2. Monitoring On All Progress Plans In Project.
7
8. 3. Supervise and Monitoring and Participate On All Operation and Maintenance Plans
as Polyethylene Network and Gas Regulators Maintenance.
4. Supervise On Gas Emergency And Operation Room – 24 Hr. Service – 30,000
Customers.
5. Prepare All Technical And Cost Proposals For All Poly Ethylene Networks And
Pipelines.
HOUSE GAS (Jan, 2005 – Oct, 2007) - TAQA GROUP (EPC)
Title Head of Technical Tests and Commissioning Department
Location Egypt, Cairo, Suez, Bani Swief, Fayoum, Kafr Elshekh
JOB DETAILS AND AREA OF RESPONSABILTIES
1. Design, testing, commissioning, technical inspection and
Maintenance for gas networks and pipelines (poly ethylene PE100 and Carbon Steel).
2. Testing and commissioning with very wide range of working pressure
Up to 70 bar. (Operating pressure)
3. Pneumatic test & hydrostatic tests for (transmission pipelines lines) up to 105 bar.
4. Pipeline cleaning, pigging, watering, dewatering, drying, commissioning and gas in.
5. Selection, assembly, testing, setting and maintenance of the pressure reduction
Stations (domestic PRMS, industrial PRMS and small pressure modules).
6. Construction of nature gas poly ethylene networks PE80, PE100.
7. Prepare special procedure for gas network repair and maintenance in emergency cases.
8
9. 8. Test and commissioning for LPG networks in resorts and compounds.
9. Complete design for single carbon steel pipeline which used in industrial factories
(Material selection, hydraulic calculation, wall thickness and cathodic protection).
10. Prepare ITP (inspection test plan) and all HSE related permits and risk assessments.
11. Develop and initiate P/V plots, P/T charts, P/T records to check soundness and integrity of
transmission pipelines.
12. Good user for Dead weight Tester. (For calibration pressure gauges, pressure leakage
measurement in transmission pipelines and NG piping systems).
13. Prepare and implement procedures for cleaning, gauging, water filling and dewatering
pigging system.
14. Prepare a hot taping procedure for tie in points for new pipeline branching (steps and
material selection) according to IGE TD1.
15. Prepare and implement pipeline drying procedures using superheated hot air and nitrogen
methods
16. Prepare Natural Gas commissioning procedure for transmission pipeline according to ASME
31.8 and IGE TD 1 edition 4.
17. Selection, installation, setting and maintenance of all type pressure regulators and control
valves. Such as Petrofurentini, Tartarini, Axial flow valve, Fisher and Moony )
Reported To General Projects Manager
EGYPTIAN TOWN GAS (2000 - 2006) – (PMCO)
Title Pressure Reduction and odorant injection Stations Engineer
9
10. JOB DETAILS
1. Operation, maintenance & setting of pressure reduction stations
(70 bar to 7 bar or 40 bar to 4 bar and small regulators) single and double stage.
2. Operation & maintenance of natural gas odorant stations.
3. Setting and maintenance of gas / liquid CONTROL VALVES as fisher type with PI and PID
controllers.
4. Operation & setting of flow computers as daniel – instromet– sarasota- solartron
5. Calibration of pressure transmitters with hydraulic pump & voltmeter.
6. Calibration and setting all gas relief valves by using dead weight tester.
7. Good dealing with hydro pneumatic (gas over oil) actuators single and double acting
"Operation – maintenance “as biffi and rotork which used with large ball valve.
8. Maintenance of polyethylene pipelines and networks.
9. Calculation of gas quantity based on volume flow rate equation.
10. Responsible for south industrial zone (Helwan and al Tabeen) maintenance and
Operation for large PRS in factories as national steel, al Qawmeiya cement factory,
Helwan cement factory, Torah cement factory, south Cairo power station, al Tabeen power
station, Aiad for steel factory, and all CNG modules in this area.
11. Cathodic protection
-Monitoring the cathodic protection readings for the buried pipeline using copper /
copper sulphate cell, for sacrificial anode (Zn,Mg) cathodic protection systems.
-Design cathodic protection systems using anodes systems for buried pipes
Reported To: PRS Department Manager.
10
11. SPECIAL SKILLS
1. Maintenance all Type of Hydraulic Pumps as Axial Piston, Vane, Gear.
2. Design And Manufacture Of Power Units And Large Pneumatic Circuits
3. Design and Manufacture of Presses Up To 1000 Tons.
4. Complete Design for Hydraulic and Pneumatic Circuits and Cylinders
5. Good Dealing with All Types Of Workshop Machines As Turning, Milling Shaper,
Drilling, Shear, Metal Saws and Bending Machine.
LANGUAGE
Arabic Mother Tongue
English Very Good
TRAINING COURSES
1. General Maintenance for Petroleum Engineer “Suez Petroleum Comp.”
2. Introduction To NDT “Egyptian Town Gas Comp. “
3. Introduction to Programming IBM Certificate.
4. Programming C++ Advanced C++ IBM Certificate.
5. Tofel Course Scores 523 Local.
6. Preparation Course PMP in PMI institute in Egypt
COMPUTER SKILLS
WIN XP, WORD, EXCEL, POWER POINT, INTERNET, HARDWARE SETUP.
AUTOCAD 2010, C++, FLOWPIPE EXPERTS, GAS WORK
11
12. HOBBIES AND INTERESTS
Reading Handbooks, Several Local Championships in Karate
Completing Post Graduate Studies Ph.D. Is Very Important Goal.
Very Good In Driving Cars.
STANDARD
In Natural Gas Field Dealing With Several Standard As
IGE TD3, IGE TD 13, IGE TD1, API 5L, TRANSCO BG DIS5.5,
BG DIS 5.6, ASMI 31.8, ASME 31.3, ASME 31.4, ASME B16 all group , GIS PL2 ALL PARTS,
EN 1555 ALL PARTS,API 1104, API 650, API 617, API 618, NORSOK for on / offshore plants
Standards,
ALL GAS SPECS. FOR ADNOC, WOQOD, QP AND GULF AREA RECOMMENDATION
PERSONAL INFORMATION
Nationality : Egyptian.
Religion : Moslem.
Date of Birth : 27th
Sep, 1974.
Place of Birth : Elsayida Zienab – Cairo
Address : 5 Khalil Sadek St.-Ahmed Esmat – Ain Shams El Sharkia
Marital Status : Married.
Military Status : Finished Since 1 St
, Mar 2000
EDUCATIONAL INFORMATION
All under Graduate from Modern School – Cairo
All Graduate Studies from Zagazig University – Shoubra Branch
All Post Graduate Studies from Zagazig University – Shoubra Branch
12