Tarbela Dam Project
Group Members
Muhammad Talha 12023322-050
Shahroze Nadeem 12023322-014
Hafiaz Hassan Nawaz 12023322-038
History of Tarbela Dam
 Tarbela Dam is one of
the world’s largest earth
and rock filled Dam.
 Greatest water
resources
The Dam is built on one
of the World’s largest
rivers – the Indus known as
the “Abbasin” or the father
of rivers
History of Tarbela Dam
 General consultant of
WAPDA is HAZARA
ENGINEERING COMPANY
 The World Bank
accepted Tarbela Dam
Project in 1965
Built between 1968 and
1976
Project Constrain
• Cost
The total cost of project including power
units (1-14) amount to US $ 2.63 billion.
• Time
– 8.3 year’s
The Project Main Feature
Project Consists of a 9,000 (2,743
meters) long.
 spillway capacity 6.5millan cuescs
 The dam is 469 feet (143 m) high.
 The Dam is 8,997 feet (2,743 m)
wide at its crest.
 The total spillway capacity is
1,500,000
Reservoir Aria 80km
Tunnels
• Total number of Tunnels 4
• Length half mile
• Tunnel 1, 2, 3 for power generation and
tunnel 4 for irrigation
Spillway
• Two Spillway (Service spillway auxiliary
spillway)
• Spillway is flood routing structure
• Spillways capacity is 1500,000 cusecs
Spillway
• Service spillway has 44% of total capacity
• Discharge capacity of service spillway is
650,000 cusecs.
• Discharge capacity of auxiliary spillway is
850,000 cusecs.
Power Generation
Four power units of 175 MW installed on each
of the tunnels 1, 2, and 3.
The project has thus been enhanced from
2100 MW, as originally planned to 3478 MW.
TURBINE
• Convert to potential energy to mechnical
energy
• No of turbine/Units; 14
• Output (BHP); First 10 unit produce 23900 H.p
and last 4 units produce 586000 H.P
Generator
• Convert to mechanical energy into electrical
energy
• No of pole: 44
• Rated Frequency: 50c/s
Generator 1-10 11-14
Output(P.F) 0.85 0.85
Output(MW) 175 432
Rated Voltage(KV) 13.8 13.8
Transformer
• 3 phase Transformer used to purpose of step
up voltage
Transformer 1-4 5-14
Capability
(MVA/Phase)
79 71
Voltage Ratio 13.8/220 13.8/500
Transmission and distribution
• No. of 500 KV feeder = 4
• No. of 220 KV feeder = 6
• Scheme Layout = Double Bus bar/ One and
half breaker system
500 KV Power Transmission &
Distribution
• Tarbela - Faisalabad (1st Circuit)
• Tarbela - Faisalabad (2nd Circuit)
• Tarbela – Peshawar
• Tarbela – Lahore – Multan- jamshoro
220 KV Power Transmission &
Distribution
• Tarbela – Mangla (Double circuit Line)
• Tarblea - Mardan (Double circuit Line)
• Tarblea – Kala shah kaku
Tarbela Dam Project History and Power Generation

Weitere ähnliche Inhalte

Was ist angesagt?

Warsak Hydro Power Plant
Warsak Hydro Power PlantWarsak Hydro Power Plant
Warsak Hydro Power PlantMoiz Rao
 
Polavaram project
Polavaram projectPolavaram project
Polavaram projectHari Harish
 
polavaram and pattiseema project's
 polavaram and pattiseema project's polavaram and pattiseema project's
polavaram and pattiseema project'sAravindVankadaru
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013apndesai
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower projectMuhammad Aqeel
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectRubnawaz Bhatti
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPPSaad Raja
 

Was ist angesagt? (20)

mangla dam
mangla dammangla dam
mangla dam
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Warsak Hydro Power Plant
Warsak Hydro Power PlantWarsak Hydro Power Plant
Warsak Hydro Power Plant
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Polavaram Irrigation Project
Polavaram Irrigation ProjectPolavaram Irrigation Project
Polavaram Irrigation Project
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Kurram garhi Dam
Kurram garhi DamKurram garhi Dam
Kurram garhi Dam
 
dam
damdam
dam
 
Dams%20report
Dams%20reportDams%20report
Dams%20report
 
POLAVARAM PROJECT
POLAVARAM PROJECTPOLAVARAM PROJECT
POLAVARAM PROJECT
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Great man-made-river
Great man-made-riverGreat man-made-river
Great man-made-river
 
polavaram and pattiseema project's
 polavaram and pattiseema project's polavaram and pattiseema project's
polavaram and pattiseema project's
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh dam
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
internship report on NJHPP
internship report on NJHPPinternship report on NJHPP
internship report on NJHPP
 
Small dam projects in pakistan
Small dam projects in pakistanSmall dam projects in pakistan
Small dam projects in pakistan
 

Ähnlich wie Tarbela Dam Project History and Power Generation

Tarbela Dam.pptx
Tarbela Dam.pptxTarbela Dam.pptx
Tarbela Dam.pptxZESHANALI85
 
Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)lochan Shrestha
 
Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaSaikat Ghosh
 
SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH THDC IHET
 
Hydro Electric project
Hydro Electric projectHydro Electric project
Hydro Electric projectRanjeet Verma
 
tarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppttarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.pptLeenaMujahed
 
Renewable energy course#06
Renewable energy course#06Renewable energy course#06
Renewable energy course#06Syed_Sajjad_Raza
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plantRahul Rathod
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirAaquib Firdous
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecAbdul Majid
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptaryan5808
 
KOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTKOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTuzma shaikh
 

Ähnlich wie Tarbela Dam Project History and Power Generation (20)

Tarbela Dam.pptx
Tarbela Dam.pptxTarbela Dam.pptx
Tarbela Dam.pptx
 
Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)Hydropower field visi report, pokhara (Presentation slide)
Hydropower field visi report, pokhara (Presentation slide)
 
Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
 
SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Hydro Electric project
Hydro Electric projectHydro Electric project
Hydro Electric project
 
tarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppttarbela-dam-project97-2003.ppt
tarbela-dam-project97-2003.ppt
 
Hydropower palnts
Hydropower palntsHydropower palnts
Hydropower palnts
 
Chanakya
ChanakyaChanakya
Chanakya
 
Renewable energy course#06
Renewable energy course#06Renewable energy course#06
Renewable energy course#06
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and Kashmir
 
Ghazi Barotha Hydro power Projec
Ghazi Barotha Hydro power ProjecGhazi Barotha Hydro power Projec
Ghazi Barotha Hydro power Projec
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
KOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANTKOYNA HYDROELECTRIC POWER PLANT
KOYNA HYDROELECTRIC POWER PLANT
 

Kürzlich hochgeladen

Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 

Kürzlich hochgeladen (20)

Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 

Tarbela Dam Project History and Power Generation

  • 2. Group Members Muhammad Talha 12023322-050 Shahroze Nadeem 12023322-014 Hafiaz Hassan Nawaz 12023322-038
  • 3. History of Tarbela Dam  Tarbela Dam is one of the world’s largest earth and rock filled Dam.  Greatest water resources The Dam is built on one of the World’s largest rivers – the Indus known as the “Abbasin” or the father of rivers
  • 4. History of Tarbela Dam  General consultant of WAPDA is HAZARA ENGINEERING COMPANY  The World Bank accepted Tarbela Dam Project in 1965 Built between 1968 and 1976
  • 5. Project Constrain • Cost The total cost of project including power units (1-14) amount to US $ 2.63 billion. • Time – 8.3 year’s
  • 6. The Project Main Feature Project Consists of a 9,000 (2,743 meters) long.  spillway capacity 6.5millan cuescs  The dam is 469 feet (143 m) high.  The Dam is 8,997 feet (2,743 m) wide at its crest.  The total spillway capacity is 1,500,000 Reservoir Aria 80km
  • 7. Tunnels • Total number of Tunnels 4 • Length half mile • Tunnel 1, 2, 3 for power generation and tunnel 4 for irrigation
  • 8. Spillway • Two Spillway (Service spillway auxiliary spillway) • Spillway is flood routing structure • Spillways capacity is 1500,000 cusecs
  • 9. Spillway • Service spillway has 44% of total capacity • Discharge capacity of service spillway is 650,000 cusecs. • Discharge capacity of auxiliary spillway is 850,000 cusecs.
  • 10. Power Generation Four power units of 175 MW installed on each of the tunnels 1, 2, and 3. The project has thus been enhanced from 2100 MW, as originally planned to 3478 MW.
  • 11. TURBINE • Convert to potential energy to mechnical energy • No of turbine/Units; 14 • Output (BHP); First 10 unit produce 23900 H.p and last 4 units produce 586000 H.P
  • 12. Generator • Convert to mechanical energy into electrical energy • No of pole: 44 • Rated Frequency: 50c/s Generator 1-10 11-14 Output(P.F) 0.85 0.85 Output(MW) 175 432 Rated Voltage(KV) 13.8 13.8
  • 13. Transformer • 3 phase Transformer used to purpose of step up voltage Transformer 1-4 5-14 Capability (MVA/Phase) 79 71 Voltage Ratio 13.8/220 13.8/500
  • 14. Transmission and distribution • No. of 500 KV feeder = 4 • No. of 220 KV feeder = 6 • Scheme Layout = Double Bus bar/ One and half breaker system
  • 15. 500 KV Power Transmission & Distribution • Tarbela - Faisalabad (1st Circuit) • Tarbela - Faisalabad (2nd Circuit) • Tarbela – Peshawar • Tarbela – Lahore – Multan- jamshoro
  • 16. 220 KV Power Transmission & Distribution • Tarbela – Mangla (Double circuit Line) • Tarblea - Mardan (Double circuit Line) • Tarblea – Kala shah kaku