TIS- PLANT SERVICES - TURNAROUND PLANNING DEPARTMENT
0 0
LOST TIME INJURY
THIS WEEK
1584
0
TO DATE
3828
0
ENGINEERING:
1- APPROVED GA DWG SUBMITTED TO SEPCO-III, FOR IFC (ISSUED FOR CONSTRUCTION STAMP). SEPCO RESPONSE IS AWAITED.
2- FABRICATION DETAIL DRAWINGS WERE RE-SUBMITTED TO SEPCO-III ON DEC 22, 2021 POST DOCUMENT NUMBERING CORRECTION.SEPCO RESPONSE IS
AWAITED.
QA/QC:
1- ITP AND RELAETD WPS APPROVED HAVE BEEN APPROVED BY SEPCO.
2- PROCEDURE FOR VACCUM BOX TESTING AND PRCEDURE FOR SAND BLASTING / PAINTING SUBMITTED TO SEPCO-III FOR ARPPROVAL ON DEC 22, 2021.
RESPONSE IS AWAITED FROM SEPCO-III.
PROCUREMENT:
1- DIRECT MATERIAL PO HAS ALREADY BEEN ISSUED WHEREAS MATERIAL DELIVERY IS AWAITED TO START THE FABRICAITON ACTIVITY.
2- PAINTING AND NDT RENTAL SERVICES PO HAS BEEN ISSUED.
ENGNEERING:
1- GA DRAWING WITH IFC STAMP TO BE ISSUED BY SEPCO.
2- DETAIL ENGINEERING DRAWINGS TO BE ISSUED FOR CONSTRUCTION POST SEPCO APPROVAL.
QA/QC:
1- TIS QC TO RAISE THE FIRST (RFI) OF RECEVIED MATERIAL FOR SEPCO-III WITNESS AS PER ITP.
2- INSPECTION OF DELIVERED MATERIAL TO BE CARRIED OUT IN TAMIMI WORKSHOP/PAINTING YARD.
PROCUREMENT:
1- PLATE MATERIAL FOR TANK FABRICAITON IS EXPECTED TO BE DELIVERD IN WORKSHOP.
2- PIPING, FLNAGES AND PIPE FITTINGS MATERIAL IS EXPECTED TO BE DELIVRED IN WORKSHOP.
SHOP FABRICAITON OF TANKS:
1- POST QC APPROVAL, FABRICATION OF TANK BOTTOM PLATES TO BE STARTED IN PAINTYARD/DESIGNATED AREA IN TIS WORKSHOP.
1- TO DAT OVERALL PLAN PROGRESS REACHED (46.3%) WHEREAS ACHIEVED PROGRESS ONLY 17.0% AND TOTAL (- 29.3%) PROGRESS BEHIND THE SCHEDULE.
2- DELIVERY OF PLATE MATERIAL HAS BEEN BADLY DELAYED FOR OVER 30 DAYS AND ALL PROJECT FABRICATION ACTIVITIES ARE HALTED.
TOTAL PROJECT PROGRESS 100.00% 5.0% 1.2% 51.3% 18.3%
AGREEMENT/PO REF# : SA007-SS-058-01
6 ROLLER MACHINE 1
THIS WEEK
CUMM.
SITE INSTALLATION OF TANK NO. 2 9.00% 0.0% 0.0% 0.0% 0.0%
PROJECT HANDOVER 2.00% 0.00% 0.00% 0.00% 0.00%
SITE WORK
SITE WORK 18.00% 0.0% 0.0% 0.0% 0.0%
SITE INSTALLATION OF TANK NO. 1 9.00%
PLAN 24 - 24.00
4.99%
51.32%
1.22%
18.25%
-3.77%
-33.07% 0 - -
ACTUAL
12
DESCR. PLAN ACTUAL VARIANCE
WEEKLY WEATHER REPORT
BOOM TRUCK 1 8
5 DOUBLE CABIN 1 11
4 TRAILER 1 10
ACTIVITIES CARRIED OUT THIS WEEK ACTIVITIES PLANNED FOR NEXT WEEK MAJOR EQUIPMENT/VEHICLE STATUS
SR.# DESCRIPTION QTY SR.# DESCRIPTION QTY
1 DIESEL WELDING M/C 2 7 POWER GENERATOR (100 KVA) 1
3 DIESEL TANKER 1 9
2
0 0
DIRECT MANHRS
ACTUAL
INSTALLATION OF TANK NO.1
INSTALLATION OF TANK NO.2
EA
EA
1 - -
- -
0.0% 0.0% 0.0% 0.0%
0
OBSERVATION
0
0
TRANSPORTATION TO SITE 3.00% 0.0% 0.0% 0.0% 0.0%
PLAN
SAND BLASTING AND PAINTING SEQ.MTR 0 FIRST AID 0 0
THIS WEEK TILL DATE
TANK ASSEMBLY TON 0
SB. PAINTING OF TANK NO. 2 2.50% 0.0% 0.0% 0.0% 0.0%
WEEKLY DIRECT MANHOURS STATUS
HSE STATISTICS
SB. PAINTING OF TANK NO. 1 2.50% 0.0% 0.0% 0.0% 0.0%
DESCRIPTION
FABRICATION OF TANK STRUCTURE (STAIRCASE)
FABRICATION OF BOTTOM AND SHELL PLATES TON
FABRICATION OF TANK NOZZLES AND MANWAYS TON
0
0
TON 0
0.0% 0.0%
HYDROTESTING OF TANK NO.2 2.00% 0.0% 0.0% 0.0% 0.0%
SAND BLASTING AND PAINTING 5.00% 0.0% 0.0% TANK NO. 2
SAND BLASTING AND PAINTING
HYDROTESTING OF TANK NO.1 2.00% 0.0% 0.0% 0.0% 0.0% TANK ASSEMBLY
FABRICATION OF TANK STRUCTURE (STAIRCASE, HANDRAIL,
STIFFNER TINGS)
0.0%
HYDROTESTING 4.00% 0.0% 0.0% 0.0% 0.0%
FABRICATION OF TANK NO. 2 14.00% 19.4% 0.0% 40.7%
28.00% 17.9% 0.0% 40.5% 0.0%
SHOP EXECUTION 40.00% 12.5% 0.0% 28.3% 0.0%
FABRICATION OF TANK NO. 1 14.00% 16.3% 0.0% 40.2% 0.0%
FABRICATION OF TANK NOZZLES AND MANWAYS
PROCUREMENT 30.00% 0.0% 0.0% 100.0% 36.7%
SHOP PHASE
DOCUMENTS SUBMITTALS
FABRICATION
10.00% 0.0% 12.2% 100.0% 72.5%
THIS WEEK TO-DATE
DESCR. DAY SHIFT NIGHT SHIFT TOTAL
DESCRIPTION
PROJECT
WEIGHTAGE
WEEKLY-PLAN
WEEKLY-
ACTUAL
CUMM. PLAN CUMM. ACTUAL DESCRIPTION UOM
TOTAL
QUANTITY
WEEKLY STAGE WISE PROJECT PROGRESS STATUS QUANTITY WISE PROGRESS PERCENTAGE OVERALL PROGRESS PERCENTAGE OVERALL PROGRESS
DIRECT MANPOWER (LABOUR) STATUS
WEEKLY PROGRESS REPORT
578-29- SEPCO-III-EPC SULFURIC ACID STORAGE TANKS (02 NOS.) FOR SWRO-2, JUBAIL
TOOL BOX TALK TOPICS : WPR # 02 Date 1-Jan-22
TANK NO. 1
FABRICATION OF BOTTOM AND SHELL PLATES
S-CURVE OVERALL
34 0
TON
SEQ.MTR
TON 0
TON 0
0
0
TON
18.3%
81.7%
COMPLETED
BALANCE
23-Oct-21 30-Oct-21 6-Nov-21 13-Nov-21 20-Nov-21 27-Nov-21 4-Dec-21 11-Dec-21 18-Dec-21 25-Dec-21 1-Jan-22 8-Jan-22 15-Jan-22 22-Jan-22 29-Jan-22 5-Feb-22 12-Feb-22 19-Feb-22 26-Feb-22 5-Mar-22 12-Mar-22 19-Mar-22 26-Mar-22 2-Apr-22 9-Apr-22 16-Apr-22
Planned For The Week 0.0% 0.8% 1.3% 1.4% 1.4% 5.8% 6.1% 12.1% 12.8% 4.7% 5.0% 4.2% 3.1% 3.7% 1.9% 0.8% 1.7% 1.4% 7.0% 6.9% 13.7% 4.3%
Actual For the Week 0.0% 0.6% 1.3% 1.3% 1.3% 2.7% 2.0% 2.4% 2.9% 2.5%
Cummulative Planned 0.0% 0.77% 2.11% 3.49% 4.86% 10.64% 16.74% 28.80% 41.61% 46.33% 51.32% 55.48% 58.55% 62.29% 64.16% 65.01% 66.74% 68.10% 75.12% 81.99% 95.69% 100.00%
Cummulative Actual 0.0% 0.6% 1.9% 3.2% 4.5% 7.2% 9.2% 11.7% 14.5% 17.0%
Latest Forecast -LF 0.0% 0.0% 0.0% 0.0% 0.5% 1.7% 5.0% 9.1% 13.2% 17.7% 30.2% 37.9% 48.0% 54.5% 57.9% 62.6% 64.3% 65.0% 66.6% 67.9% 71.7% 77.0% 80.6% 88.2% 97.0% 100.0%
-10.0%
10.0%
30.0%
50.0%
70.0%
90.0%
110.0%
-1%
1%
3%
5%
7%
9%
11%
13%
15%
Weekly
%
PLAN
ACTUAL
LATEST FORECAST