SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Downloaden Sie, um offline zu lesen
Ro   blitz
DESCRIPTION
This event is about robot racing. Two teams are going
to fight for the victory. Both the teams have to race against
time. They have to cross all the obstacles which is going to
be real fun.
EVENT ROUNDS:
The event comprises of 2 rounds:
1. Prelims
2. Final
The First round will be the preliminary round & the
number of teams in the finals will depend on the number of
teams entering the competition in the preliminary level.
BOT SPECIFICATION
 The bot should fit in a box of 25cm*25cm*25cm / 10” * 10” * 10” (l*b*h).
 External remote control will not be considered in the size constraint.
 The participants will be provided with a 220V, 50Hz single phase power supply.
 The robots can be wired or wireless. In case of wired bot sufficient amount of wire
must be brought by the participants. If the machine is wired then the wire should
remain slack under all circumstances during the competition. All the wires coming
out of the machine should be stacked as a single unit. Improper wiring may lead to
direct disqualification even before the event.
 The bot specification must be maintained strictly during the entire event, failing to
which will lead to immediate disqualification.
 A bot may weigh up to 4 Kg but not more than that.
Bots cannot be constructed using ready made Lego kits or any ready made
mechanism. Violating this clause will lead to the disqualification of the machine.
 Use of IC (Internal Combustion) Engines are prohibited.
 If the judges consider that a robot runs high risk of damaging or ruining the arena,
they will not permit it to run.
 No fans & weaponries can be used in the game. But the bots can overtake the other
by legal means.
Problem Statement: Designing of a manually controlled robot (wire or wireless) that
can traverse through every possible terrain; obstacles, bumpers, bridges, sand,
pebbles, marbles, lubricant, glass etc.
GENERAL RULES
• The maximum number of members in a team must not exceed 4. Participants can
belong to different colleges.
• But only one person can control the bot at any instant of time.
• An individual cannot be a member of more than one team for the event.
• Each member of the team must bring their own college ID cards.
ARENA
THANK YOU

Weitere ähnliche Inhalte

Ähnlich wie Ro blitz

Ähnlich wie Ro blitz (12)

T'12_robotics_Robocalypse
T'12_robotics_RobocalypseT'12_robotics_Robocalypse
T'12_robotics_Robocalypse
 
Robophonia[2]
Robophonia[2]Robophonia[2]
Robophonia[2]
 
R O B O R A C E
R O B O R A C ER O B O R A C E
R O B O R A C E
 
Robopool
RobopoolRobopool
Robopool
 
General rules
General rulesGeneral rules
General rules
 
R O B O R A C E
R O B O R A C ER O B O R A C E
R O B O R A C E
 
Segregare
SegregareSegregare
Segregare
 
ROBO WAR MTM
ROBO WAR  MTMROBO WAR  MTM
ROBO WAR MTM
 
Problem statement - Prison Break
Problem statement - Prison BreakProblem statement - Prison Break
Problem statement - Prison Break
 
Robowarz 2
Robowarz 2Robowarz 2
Robowarz 2
 
Machine specifications - Engineering Games 2016 V2.0
Machine specifications - Engineering Games 2016 V2.0Machine specifications - Engineering Games 2016 V2.0
Machine specifications - Engineering Games 2016 V2.0
 
T'12_robotics_Pacman
T'12_robotics_PacmanT'12_robotics_Pacman
T'12_robotics_Pacman
 

Kürzlich hochgeladen

Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvementVijayMuni2
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxHome
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxJoseeMusabyimana
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptxMUKULKUMAR210
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Amil baba
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxYogeshKumarKJMIT
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfGiovanaGhasary1
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 

Kürzlich hochgeladen (20)

Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvement
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptx
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptx
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
Présentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdfPrésentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdf
 
Lecture 4 .pdf
Lecture 4                              .pdfLecture 4                              .pdf
Lecture 4 .pdf
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Design of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptxDesign of Clutches and Brakes in Design of Machine Elements.pptx
Design of Clutches and Brakes in Design of Machine Elements.pptx
 
Multicomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdfMulticomponent Spiral Wound Membrane Separation Model.pdf
Multicomponent Spiral Wound Membrane Separation Model.pdf
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 

Ro blitz

  • 2. DESCRIPTION This event is about robot racing. Two teams are going to fight for the victory. Both the teams have to race against time. They have to cross all the obstacles which is going to be real fun. EVENT ROUNDS: The event comprises of 2 rounds: 1. Prelims 2. Final The First round will be the preliminary round & the number of teams in the finals will depend on the number of teams entering the competition in the preliminary level.
  • 3. BOT SPECIFICATION  The bot should fit in a box of 25cm*25cm*25cm / 10” * 10” * 10” (l*b*h).  External remote control will not be considered in the size constraint.  The participants will be provided with a 220V, 50Hz single phase power supply.  The robots can be wired or wireless. In case of wired bot sufficient amount of wire must be brought by the participants. If the machine is wired then the wire should remain slack under all circumstances during the competition. All the wires coming out of the machine should be stacked as a single unit. Improper wiring may lead to direct disqualification even before the event.  The bot specification must be maintained strictly during the entire event, failing to which will lead to immediate disqualification.
  • 4.  A bot may weigh up to 4 Kg but not more than that. Bots cannot be constructed using ready made Lego kits or any ready made mechanism. Violating this clause will lead to the disqualification of the machine.  Use of IC (Internal Combustion) Engines are prohibited.  If the judges consider that a robot runs high risk of damaging or ruining the arena, they will not permit it to run.  No fans & weaponries can be used in the game. But the bots can overtake the other by legal means. Problem Statement: Designing of a manually controlled robot (wire or wireless) that can traverse through every possible terrain; obstacles, bumpers, bridges, sand, pebbles, marbles, lubricant, glass etc.
  • 5. GENERAL RULES • The maximum number of members in a team must not exceed 4. Participants can belong to different colleges. • But only one person can control the bot at any instant of time. • An individual cannot be a member of more than one team for the event. • Each member of the team must bring their own college ID cards.