Height of Collimation
      method

   Mohammed Kareem
Leveling :- is the process used to determine a difference
in elevation between two points.
 A Level is an instrument with a telescope that can be
leveled with a spirit bubble. The optical line of sight
forms a horizontal plane, which is at the same elevation
as the telescope crosshair. By reading a graduated rod
held vertically on a point of known elevation (Bench
Mark) a difference in elevation can be measured and a
height of instrument (H.I.) calculated by adding the
rod reading to the elevation of the bench mark. Once
the height of instrument is established, rod readings
can be taken on subsequent points and their elevations
calculated by simply subtracting the readings from the
height of instrument.
Devices are classified leveling in terms of accuracy
into three categories:
1 - Precision: the settlement where the bubble is very
sensitive as are high magnification power and uses
this type of work and Geodetic Survey businesses that
require high precision.
2 - Precision medium: It is less accurate than the first
category and dominated the use of this type in most
engineering projects.
3 - low-precision devices: and make this kind of
hardware specifically for the purposes of settlement
approximate as in building projects Ltd. and
settlement cases within short distance.
Datum line ( M.S.L. ) :- Is the level (line), which are
attributed to it points levels on the surface of the Earth.
Which is the average sea level.
Reduced level ( R.L) :- Is the high point from datum line.
Benchmark (B .M ) :- Are fixed points information site and
attributed placed in different places until you start racing
them when conducting settlement .
Back sight ( B.S.) :- Is the first reading taken after placing
the device in any position so that we see the greatest
possible number of points required to find the elevation .
Fore sight (F.S) :- Is the last reading taken before the
transfer device
Benchmarks
Intermediate sight ( I.S.) :- Is reading taken between the
back sight and fore sight reading .
Elevation of line of sight ( H.I) :- Is the imaginary vertical
level determined by the line of sight to the amount of
increase or decrease for sea level .
Tripod :- is a portable three-legged frame, used as a platform
for supporting the weight and maintaining the stability of
some other object                (( plumb bob))
tripod




A level is an instrument giving horizontal line of
sight and magnifying the reading at a far away
distance. It consists of the following parts:
(i) A telescope to provide a line of sight
(ii) A level tube to make the line of sight
horizontal and
(iii) A leveling head to level the instrument
Staff :-Is a wooden or metal ruler one side runway to meters
and centimeters. And is a ruler of solid wood 2 , 3 , 4 , 5
meters in length and usually 4 meters .
Leveling of the instrument is done to make the vertical
axis of the instrument truly vertical. It is achieved by
carrying out the following steps:

Step 1: The level tube is brought parallel to any two of the
foot screws, by rotating the upper part of the instrument.
Step 2: The bubble is brought to the centre of the level
tube by rotating both the foot screws either inward or
outward. (The bubble moves in the same direction as the
left thumb.)
Step 3: The level tube is then brought over the third foot
screw again by rotating the upper part of the instrument.
Step 4: The bubble is then again brought to the centre of
the level tube by rotating the third foot screw either
inward or outward.
Step 8: By rotating the upper part of the instrument
through 180 ° , the level tube is brought parallel to first
two foot screws in reverse order. The bubble will remain in
the centre if the instrument is in permanent adjustment.
Method of taking readings on a ruler settlement
 1 – direct leveling a back sight is taken on the rod held at
the bench mark ( A ) .
  H..I = E.L.V of B.M. ( A ) + B.S.
  Turning the telescope to bring into view the rod held on
point B afore sight is taken .
   elev. Point B = H .I – F .S
  check the work by the following equation :-

 ∑ B.S. - ∑ F.S. = Last R.L. – First R.L.
Closing the Level Loop
A level loop is closed either to another Benchmark or
back to the starting Benchmark. To check for errors in
the loop sum the Back sights (BS) and the Foresights
(FS). Calculate the difference between the BS and FS
(BSFS). Algebraically add this difference to the starting
elevation, to yield the closing elevation. This elevation
should be within accepted industry standards tolerances
of the closing Benchmark’s published elevation.
Height of Collimation method
Azimuth:-
The azimuth of a line on the ground is its horizontal angle
measured from the meridian to the line.
In plane surveying, azimuths are generally measured from the
north.
Azimuths may have values between 0 and 360 degrees.
Bearings :-
The bearing states whether the angle is measured from
the north or the south and also whether the angle is
measured toward the east or west. For example, if a line
has a bearing of S 47° E, the bearing angle 47° is measured
from the south meridian eastward.
N.E. Quadrant: Bearing equals Azimuth
S.E. Quadrant: 180° -Azimuth = Bearing and 180° -
Bearing = Azimuth
S.W. Quadrant: Azimuth - 180° = Bearing and Bearing +
180° = Azimuth
N.W. Quadrant: 360° -Azimuth = Bearing and 360° -
Bearing = Azimuth
Mohammed kareem
Mohammed kareem

More Related Content

What's hot

What's hot (19)

Types of level
Types of levelTypes of level
Types of level
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Levelling
LevellingLevelling
Levelling
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Levelling
LevellingLevelling
Levelling
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 leveling
 
Surveying
Surveying Surveying
Surveying
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Levelling
LevellingLevelling
Levelling
 
Levelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingLevelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 

Similar to Mohammed kareem

Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfLeulDamtew
 
chapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdfchapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdfsandipanpaul16
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingPhurba Tamang
 
Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Sunilkumar Mandal
 
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...divyapriya balasubramani
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfAlwandBarzani
 
3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptxMartin Murimi
 
Chapter 4 Levelling
Chapter 4 LevellingChapter 4 Levelling
Chapter 4 LevellingAbhay Abhale
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.pptivargarud
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Doreen Yeo
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESBahzad5
 

Similar to Mohammed kareem (20)

Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
 
Module-IV SURVEYING-I [BTCVC304]
Module-IV SURVEYING-I [BTCVC304]Module-IV SURVEYING-I [BTCVC304]
Module-IV SURVEYING-I [BTCVC304]
 
chapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdfchapter 3 levelling @etconp.pdf
chapter 3 levelling @etconp.pdf
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
1 st report
1 st report1 st report
1 st report
 
Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01Basicsofsurveying 090509013902-phpapp01
Basicsofsurveying 090509013902-phpapp01
 
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
 
chapter 4angle.pdf
chapter 4angle.pdfchapter 4angle.pdf
chapter 4angle.pdf
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
 
Levelling
LevellingLevelling
Levelling
 
3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx
 
Chapter 4 Levelling
Chapter 4 LevellingChapter 4 Levelling
Chapter 4 Levelling
 
Leveling
LevelingLeveling
Leveling
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.ppt
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Levelling
LevellingLevelling
Levelling
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 

More from Mohammed_82

9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf
9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf
9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdfMohammed_82
 
Geodatabase with GIS & RS
Geodatabase with GIS & RSGeodatabase with GIS & RS
Geodatabase with GIS & RSMohammed_82
 
the relation of GIS and GPS
the relation of GIS and GPSthe relation of GIS and GPS
the relation of GIS and GPSMohammed_82
 
Remote sensing with all fundamentals
Remote sensing with all  fundamentalsRemote sensing with all  fundamentals
Remote sensing with all fundamentalsMohammed_82
 
Remote Sensing fundamentals
Remote Sensing fundamentalsRemote Sensing fundamentals
Remote Sensing fundamentalsMohammed_82
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveyingMohammed_82
 

More from Mohammed_82 (10)

9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf
9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf
9-IJTPE-Issue53-Vol14-No4-Dec2022-pp75-79.pdf
 
digital map
digital mapdigital map
digital map
 
Geodatabase with GIS & RS
Geodatabase with GIS & RSGeodatabase with GIS & RS
Geodatabase with GIS & RS
 
Satellites 1
Satellites 1Satellites 1
Satellites 1
 
the relation of GIS and GPS
the relation of GIS and GPSthe relation of GIS and GPS
the relation of GIS and GPS
 
Soil moistur
Soil moisturSoil moistur
Soil moistur
 
Remote sensing with all fundamentals
Remote sensing with all  fundamentalsRemote sensing with all  fundamentals
Remote sensing with all fundamentals
 
Rs fundamentals
Rs fundamentalsRs fundamentals
Rs fundamentals
 
Remote Sensing fundamentals
Remote Sensing fundamentalsRemote Sensing fundamentals
Remote Sensing fundamentals
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 

Mohammed kareem

  • 1. Height of Collimation method Mohammed Kareem
  • 2. Leveling :- is the process used to determine a difference in elevation between two points. A Level is an instrument with a telescope that can be leveled with a spirit bubble. The optical line of sight forms a horizontal plane, which is at the same elevation as the telescope crosshair. By reading a graduated rod held vertically on a point of known elevation (Bench Mark) a difference in elevation can be measured and a height of instrument (H.I.) calculated by adding the rod reading to the elevation of the bench mark. Once the height of instrument is established, rod readings can be taken on subsequent points and their elevations calculated by simply subtracting the readings from the height of instrument.
  • 3.
  • 4. Devices are classified leveling in terms of accuracy into three categories: 1 - Precision: the settlement where the bubble is very sensitive as are high magnification power and uses this type of work and Geodetic Survey businesses that require high precision. 2 - Precision medium: It is less accurate than the first category and dominated the use of this type in most engineering projects. 3 - low-precision devices: and make this kind of hardware specifically for the purposes of settlement approximate as in building projects Ltd. and settlement cases within short distance.
  • 5. Datum line ( M.S.L. ) :- Is the level (line), which are attributed to it points levels on the surface of the Earth. Which is the average sea level. Reduced level ( R.L) :- Is the high point from datum line. Benchmark (B .M ) :- Are fixed points information site and attributed placed in different places until you start racing them when conducting settlement . Back sight ( B.S.) :- Is the first reading taken after placing the device in any position so that we see the greatest possible number of points required to find the elevation . Fore sight (F.S) :- Is the last reading taken before the transfer device
  • 7. Intermediate sight ( I.S.) :- Is reading taken between the back sight and fore sight reading . Elevation of line of sight ( H.I) :- Is the imaginary vertical level determined by the line of sight to the amount of increase or decrease for sea level . Tripod :- is a portable three-legged frame, used as a platform for supporting the weight and maintaining the stability of some other object (( plumb bob))
  • 8. tripod A level is an instrument giving horizontal line of sight and magnifying the reading at a far away distance. It consists of the following parts: (i) A telescope to provide a line of sight (ii) A level tube to make the line of sight horizontal and (iii) A leveling head to level the instrument
  • 9.
  • 10. Staff :-Is a wooden or metal ruler one side runway to meters and centimeters. And is a ruler of solid wood 2 , 3 , 4 , 5 meters in length and usually 4 meters .
  • 11. Leveling of the instrument is done to make the vertical axis of the instrument truly vertical. It is achieved by carrying out the following steps: Step 1: The level tube is brought parallel to any two of the foot screws, by rotating the upper part of the instrument. Step 2: The bubble is brought to the centre of the level tube by rotating both the foot screws either inward or outward. (The bubble moves in the same direction as the left thumb.) Step 3: The level tube is then brought over the third foot screw again by rotating the upper part of the instrument. Step 4: The bubble is then again brought to the centre of the level tube by rotating the third foot screw either inward or outward.
  • 12. Step 8: By rotating the upper part of the instrument through 180 ° , the level tube is brought parallel to first two foot screws in reverse order. The bubble will remain in the centre if the instrument is in permanent adjustment.
  • 13.
  • 14. Method of taking readings on a ruler settlement 1 – direct leveling a back sight is taken on the rod held at the bench mark ( A ) . H..I = E.L.V of B.M. ( A ) + B.S. Turning the telescope to bring into view the rod held on point B afore sight is taken . elev. Point B = H .I – F .S check the work by the following equation :- ∑ B.S. - ∑ F.S. = Last R.L. – First R.L.
  • 15. Closing the Level Loop A level loop is closed either to another Benchmark or back to the starting Benchmark. To check for errors in the loop sum the Back sights (BS) and the Foresights (FS). Calculate the difference between the BS and FS (BSFS). Algebraically add this difference to the starting elevation, to yield the closing elevation. This elevation should be within accepted industry standards tolerances of the closing Benchmark’s published elevation.
  • 17. Azimuth:- The azimuth of a line on the ground is its horizontal angle measured from the meridian to the line. In plane surveying, azimuths are generally measured from the north. Azimuths may have values between 0 and 360 degrees.
  • 18. Bearings :- The bearing states whether the angle is measured from the north or the south and also whether the angle is measured toward the east or west. For example, if a line has a bearing of S 47° E, the bearing angle 47° is measured from the south meridian eastward.
  • 19.
  • 20. N.E. Quadrant: Bearing equals Azimuth S.E. Quadrant: 180° -Azimuth = Bearing and 180° - Bearing = Azimuth S.W. Quadrant: Azimuth - 180° = Bearing and Bearing + 180° = Azimuth N.W. Quadrant: 360° -Azimuth = Bearing and 360° - Bearing = Azimuth