SlideShare ist ein Scribd-Unternehmen logo
1 von 10
Downloaden Sie, um offline zu lesen
Name: M
Address:
Projects
Nationa
Mailing
Birth Da
Mobile:
Home:
Marital
Spec
1- Qual
plant
work
2- Cons
Powe
fabric
3- Rota
4- Field
5- HVA
6- Fire f
7- Mech
plant
Educ
1. B.Sc
Profe
1. Diplo
No. 1
2. Ame
3. Weld
quali
4. CSW
5. Ame
Mohamme
147 Estethm
s Quality C
ality: Egypt
Address. f
ate: 22/Sep
+2- 01001
+2-02-337
: Married a
cialist
lity control M
ts - cement
k& stamped
struction Ma
er plants - c
cation stee
ating equipm
d engineerin
AC system
fighting sys
hanical ma
t and ceme
cation
c. in Power
ession
oma of lean
1201179.
rican Union
ding techno
ity control tr
WIP Certified
rican Weld
d Fathi Su
mary Buildin
Control De
tian
fathim@ar
wwwcitade
p./1964
1333322
760845
and suppo
Manager fo
t plant - and
d vessels.
anager for
cement pla
l structure &
ment &static
ng.
constructio
stem.
intenance a
nt plant.
Mechanica
nal Tra
n six sigma
n of Busine
ology, Weld
raining cou
d welding in
ing Society
R
ltan
ngs Remaya-
puty Direc
resco.com
el@yahoo.
rt.
or Mechanic
d workshop
petroleum
nt –Refiner
&spools pip
c equipmen
n and desig
and rehabil
al Engineeri
ining A
a Green Be
ss Adminis
ing metallu
rse by ISES
nspector –E
y -Certificat
Page 1 of 10
Resum
-Haram-Giz
ctor
.eg
.com
cal construc
ps fabricatio
m (steam inj
ry plant-fert
ping &plate
nt
gn
itation for, f
ng - May
And W
elt. Nivad U
stration . Lic
rgy, Non de
S ( PT-UT-
EXPIRY: 11
te No.0904
me
za-Egypt
ction-Liquid
on steel stru
jection syst
tilizer plant
work& stam
fans; pump
1988
Worksh
niversity –A
cense No.#
estructive t
MT-RT-VT)
1 -04- 2018
5701 –Exp
d Nature Ga
ucture &spo
tem - Liquid
and work
mped vess
ps, valves,
ops
Ain shams
#545-555-3
testing, Insp
)
8
piration Date
as - power
ools piping
d Nature Ga
kshops
els
for the pow
University .
3145-9262
pection, and
e April 2012
r
&plate
as -
wer
. ID
d
2
Page 2 of 10
6. Radiographic RT level II.
7. liquid penetrant PT level II.
8. Magnetic Particles MT level II
9. OSHA- Construction Safety & Health (001063573).
10.OSHA- General Industry Safety & Health (900053988).
11.OSHA- Disaster Site Worker (WK 0020014) .
12.OSHA- Disaster Site worker training Program (DS 0000408).
13.NASP- The National Association Of Safety Professionals.
14.Certificate Of Training( Internal Auditor) According to: ISO 9001:2000
Codes and standards
Experience in using the following standards .
1. ASME code sec.v
2. ASME code sec. I
3. ASME code sec.IX.
4.ASME code sec. VIII
5. ASME code sec.B31.1
6.ASME code sec.B31.3
7. AWS D1.1 .&AWS D1.6
8. ASTEM
9. API 650
10. DIN
11. NFPA
Care
1
F
E
Jo
P
eer Rel
ROM
mployer
ob Title
rojects
ated EExperie
Nov. -200
ARESCO
Projects
-Egyptian
&constru
- SCIMIT
-AL-Shab
-West De
)
-Demitta
-Sinai Ce
cement F
- Cairo N
“1” and
Hassan
- Egyptia
- Alex. Fi
- Egyptia
- Alex. So
-Cairo ai
-Sharm a
- Fabrica
Tanks- V
-New Tal
750 MW
-EL-Krum
750 MW
-Fire wat
-AL-ATF
750 MW
-Sinai ce
- Jordan
JORDAN
-SCIMITA
-AL-TKA
-Mass glo
Page 3 of 10
ence
00 TO Pre
O- ASEC
Quality Co
n Refinery
uction
TAR field (s
bab Gas Tu
emitta Gas
Gas Turbi
ement- Helw
FLS
North Powe
d Module “
n Allam So
an Liquid n
iber 18000
an Petroch
odium Car
r port.(TAV
air port.
ation Work
Vessels
kha Power
HRSG
mat Power
HRSG
ter system
Power sta
HRSG
ement plan
(EL-rashd
N
AR field
MOL Ceme
obal Ceme
esent
ontrol Dep
y Company
steam inject
urbine 8x1
Turbine 4
ine 4x125 M
wan Ceme
er Plant Co
“2” 2x750
on &CCC)
natural gas
TPA Acry
emical.
rbonate
V airport)
k Shop(Ste
r station co
1&2
station co
1&2
(proctel&g
ation comb
1&2
t .
daya-EL-foh
ent plan(S
ent Plant(S
puty Directo
y with GS E
tion system
25 MW-Ta
4X125 MW-
MW-Tanks
ent Line I&
ombined c
MW –Stee
s ELNG (B
lic Fiber P
eel structur
ombined c
(CMI )
ombined cy
(CMI )
gumple)
bined cycle
(NEM )
hose ceme
udan) FLS
Sudan)KHD
MAN
or
Engineerin
m with 7 boi
nks (Khar
Tanks (Kh
s (Kharafi)
&II -Al-amra
cycle Modu
el structure
Bechtel)
lant.
re-Plate wo
cycle Proje
ycle Projec
e Project
ent plant)
S
D
NUFACTURING
ng
lers)
rafi)
harafi
aya
ule
e
ork-
ect
ct
&
Page 4 of 10
Job Description And Responsibility for job # 1:
1. Prepare necessary documentation for installation.
2. Represent subcontractor and liaise with contractor on day to day matters.
3. Establish overall work plans. S-curve and detailed schedules along ARESCO
mobilization plan , and review them periodically to ensure that project performance
matches with contractual schedule requirements
4. Represent subcontractor and liaise with contractor on day to day matters.
5. Monitor and control ARESCO work schedule, manpower, machinery production,
productivity and quality.
6. Co-ordinate between various functions like administration, project control, engineering,
construction and finance, so as to ensure that target dates are set for various action /
programs and implemented in timely manner to meet the project schedule
7. Establish overall work plans. S-curve and detailed schedules along ARESCO
mobilization plan , and review them periodically to ensure that project performance
matches with contractual schedule requirements
8.
9. Prepare inspection test plane for construction (rotating equipment-static equipment-
steel structure –piping) and fabrication.
10.prepare quality document .
11.Checks manufactures -erection drawings and data for compliance according to
specifications.
12.Assists in development and verification of project control documents and status
reports.
13.Assists supervision and project engineer in preparation of short schedules .
14.Assists in performing inspections and preparing documentation of work progress
15.Material receiving inspection requirements (MRI)
16.Disposition of defective or damaged equipment and material
17.Check the completion of the final P&ID checks prior to turn over
18.Any special requirements for special materials (ASMI section I and ASME section
VIII materials) including documentation requirement.
19.Check equipment receiving.
20.Erection status reporting.
21.Control the release of equipment for job installation.
22.Develop the program in coordination with site engineering and the responsible
superintendents.
23.Check the materials grade for bolts and nuts.
24.Check the co lour code and materials identification (heat number or manufacturing
number) for piping &fittings &valves and blind flanges& rotating equipment &static
equipment).
25.Check the co lour code for gaskets
26.Certification and trace ability requirement for steel structure.
27.Qualifies all welders tested on site –prepares and maintains welder qualification
records.
28.Responsible for all weld quality and welding procedures interpretations and records
conflicts the project field engineer.
29.Maintains qualification records on all NDE
30.Main
31.Main
up of
32.Dete
33.Com
corre
34.Repo
35.Com
36.Moni
the s
37.Ensu
38.be or
39.Deve
resul
40.Revi
sprin
41.Inspe
spec
42.safe
43.Issue
2
FR
E
Jo
P
Job Des
1. Exec
to the
spec
2. Prep
3. Awar
requ
4. Dete
ntains all we
ntains rando
f all ASME
ermines are
mmunicate w
ect a quality
orts weekly
mmunicate w
itor the offs
site..
ure access
rdered by t
elop hydro-
lts as per th
ew Piping S
ng hanger, c
ect the critic
cifications .
and ready
e field chan
ROM
mployer
ob Title
roject
scription A
cute field ta
e quantity t
cification.
pare necess
reness of fu
irements.
ermines are
elding recor
om inspecti
section I or
a priorities
with the pro
y problem.
y installed q
with the Pip
site spool fa
to code and
he field and
test packag
he standard
Supports , a
constant sp
cal and non
for mainten
nge notice (
SE
Ka
Me
Si
And Respo
ke-off from
tracking sys
sary quality
ull contract
a priorities
rds –radiog
on of field f
r ASME sec
for piping i
oject manag
uantities to
ping Design
abrication to
d standard
d issues fie
ge for the p
d code.
adjustment
pring hange
n-critical pip
nance work
(F.C.N.), So
EP.2000
ahromica h
ech. & Pip
di Krir Ste
nsibility fo
Design dra
stem and is
document
specificatio
for piping i
Page 5 of 10
graphs-preh
fit up of we
ction VIII w
nstallation
gement whe
o the Cost E
Group to r
o coordinate
applicable
ld material
piping syste
travel posi
er, and shoc
ping system
k.
olve non-co
TO
hired to Be
ing Constr
eam Power
or jobs # 2:
awing and I
ssue materi
for installat
ons and ens
nstallation
heat and po
lds for gene
work as requ
through co
en correctiv
Engineer.
resolve des
e the prope
to base lin
requisitions
em and acce
ition and ca
ck absorbe
ms to confir
onformance
NOV
echtel
ruction Fie
r Plant unit
:
Isometric d
al requisitio
tion( ITP- W
sure implem
through co
ost heat cha
eral piping
uired by cod
nsultation w
ve action is
sign problem
er priority flo
e performa
s as require
ept hydro-te
alibrated loa
r]
m complian
e report (N.C
V. 2000
eld Engine
ts 3&4 (2x
drawings an
ons with co
W.P.S).
mentation o
nsultation w
arts or reco
and inspec
des
with superv
required to
ms.
ow of spoo
ance.
ed.
est (leak te
ad for. [Var
nce with
C.R.).
er
x320M.W.)
nd provide i
orrect
of contract
with superv
ords.
cts fit
visors.
o
ls to
est)
riable
nput
visors.
Page 6 of 10
5. Communicate with the project management when corrective action is required to
correct a quality problem.
6. Review the project schedule and working with the piping team to achieve the time
schedule.
7. Communicate with the Piping Design Group to resolve design problems.
8. Assist Procurement team in the inspection of piping material, fittings and equipment.
9. Monitor the offsite spool fabrication to coordinate the proper priority flow of spools to
the site. Also maintain update delivery schedules from the fabricator.
10.Supervise the safe work practices and handle the safety walk down & meetings.
11.Reports weekly installed quantities to the Cost Engineer.
12.Mechanical inspection of equipment installation.
13.Issue field change notice (F.C.N.), Solve non-conformance report (N.C.R.).
14.Ensure access to code and standard applicable to base line performance.
15.Establish with the design office, those permit materials and construction materials to
be ordered by the field and issues field material requisitions as required.
16.Develop hydro-test package for the piping system and accept hydro-test (leak test)
results as per the standard code.
17.Inspect the critical and non-critical piping systems to confirm compliance with
specifications and develop punch list for completed systems prior to handover, and
then handle walk downs with the client to turnover.
18.equipment coordinates.
3
FROM November 1997 TO April 1998
Employer I TC
Job Title Project Manager.
Project Construction of SEMARAMIS INTER CONTANENTAL
HOTEL
Job Description And Responsibility for jobs # (3):
1. Prepare necessary documentation for installation.
2. Reports weekly installed quantities to the Main office.
3. Review the project schedule and working with the piping team to achieve the
time schedule
4. Installation of chillier and chillier piping system.
5. Installation of diesel and diesel piping system.
6. Installation of exhaust fan and ventilation fan.
7. Installation of pumps for fire fighting.
8. Installation of sprinkler system.
9. Installation of smoke and exhaust system.
10.Installation of Fire Fighting system.
11.Installation of fire alarm system.
12.Develop hydro-test package for the piping system and accept hydro-test (leak
test) results as per the standard code.
13.
Page 7 of 10
4
FROM January 1994 TO January 1997
Employer MITSUOBISEU HEVEY INDUSTRIAL LEMITED M H I
Job Title Mechanical construction Engineer.
Project ALLEPO power station. 210 MW X5
Job Description and Responsibility for job # 4:
1. Quality control ENG. of fifth heat recovery steam generators 5x110MW steam turbine
units.
2. Establish with the design office, those permit materials and construction materials to
be ordered by the field and issues field material requisitions as required.
3. Develop hydro-test package for the piping system and accept hydro-test (leak test)
results as per the standard code.
4. Inspect the non-critical piping-under grout-fire fighting-circulating pipe systems to
confirm compliance with specifications and develop punch list for completed systems
prior to handover, and then handle walk downs with the client to turnover.
5. Reports weekly installed quantities to the Office Engineer.
6. Mechanical inspection of equipment installation.
7. Issue field change notice (F.C.N.), Solve non-conformance report (N.C.R.).
5
FROM January 1992 TO December, 1993
Employer
African consultant
Job Title Electro mechanical manager
Project Mina garden city 6 th. Of October
Job Description And Responsibility for job # 5:
1. Establish with the designer, those permit materials and construction
materials to be ordered by the field and issues field material requisitions as
required with consultants group DR.Shaker El-Markaby and Abd El-wareth group
2. Mechanical inspection of equipment installation.
3. Electrical inspection of equipment and MDC-MDCC –low current-low voltage
4. Review the project schedule and working with the contractors
5. Execute field take-off from Design drawing and Isometric drawings and provide
input to the quantity tracking system and issue material requisitions with correct
specification.
6. Prepare necessary documentation for contractors.
7. Awareness of full contract specifications and ensure implementation of contract
requirements.
8.
Page 8 of 10
J
o
b
D
e
s
c
ription And Responsibility for jobs # 6:
1. Execute field take-off from Design drawing and Isometric drawings and provide input
to the quantity tracking system and issue material requisitions with correct
specification.
2. Prepare necessary documentation for installation.
are working to the latest revision for drawings.
3 . Awareness of full contract specifications and ensure implementation of contract
requirements.
4.Determines area priorities for piping installation through consultation with supervisors.
5.Communicate with the project management when corrective action is required to correct
a quality problem.
6-Communicate with the Piping Design Group to resolve design problems.
7.Monitor the offsite spool fabrication to coordinate the proper priority flow of spools to the
site..
8.Reports weekly installed quantities to the Cost Engineer.
9.Ensure access to code and standard applicable to base line performance.
10.be ordered by the field and issues field material requisitions as required.
11.Develop hydro-test package for the piping system and accept hydro-test (leak test)
results as per the standard code.
12.Review Piping Supports, adjustment travel position and calibrated load for. [Variable
spring hanger, constant spring hanger, and shock absorber]
13Inspect the critical and non-critical piping systems to confirm compliance with
specifications .
14safe and ready for maintenance work.
6
FROM July1995 TO December 1996
Employer
ABB Asia Browne Bovari(ABB SOUSA)
Job Title Piping Engineer.
Project Cairo south power station (steam cycle, combined
cycle, simple gas cycle)
Page 9 of 10
7
FROM July1990 TO Oct. 1995
Employer
Kahromica –Skoda Export
Job Title Senior mechanical engineer
Project TALKHA power station (steam cycle, 210 MW )
Job Description And Responsibility for jobs # 7:
1 .Execute field take-off from Design drawing and Isometric drawings and provide input
to the quantity tracking system and issue material requisitions with correct specification.
2. Prepare necessary documentation for installation.
3. Understanding the document control/submittal system to assure that the contractors
are working to the latest revision for drawings.
4. Determines area priorities for piping installation through consultation with supervisors.
5. Review the project schedule and working with the our team and skoda export to
achieve the time schedule.
6. preparation installation of turbine (lower casing - shaft -upper casing)
7. preparation installation of condenser.
8. Mechanical inspection of equipment installation.
9. Establish with the design office, those permit materials and construction materials to
be ordered by the field and issues field material requisitions as required.
10.Develop hydro-test package for the piping system
11.Review Piping Supports analysis, adjustment travel position and calibrated load for.
[Variable spring hanger, constant spring hanger, and shock absorber]
12.Inspect the critical and non-critical piping systems to confirm compliance with
specifications and develop punch list for completed systems prior to handover, and
then handle walk downs with the client to turnover.
8
FROM July1988 TO December 1990
Employer
Kahromica
Job Title Steel structure and Piping Engineer.
Project TALKHA power station (steam cycle, 210 MW
Job Description And Responsibility for job # 8:
Page 10 of 10
1. Erection of steel structure for machine hall 2500 tons (main columns –main girder –
staircase –plate forms
2.Erection of vertical heat exchangers and feed tank and condensate tank with diarator
3.Erection of feed pump and boaster pump
4.fabrication of spools
5.Install of HP piping including hangers
6.Prepration for chemical cleaning and blow out
7. Manage the operation of the plant to the requirements of dispatch control center.
8. Proceed with the work permits to isolate the equipment and assure that the area is safe
and ready for maintenance work.
Language Skills
English: good command of written and spoken.
Arabic: Mother tongue.
Computer Skills
Microsoft Windows.
Microsoft Office.
Outlook
PTS. (Procurement tracking system) Bechtel.
INFO.WORK. Bechtel
TEAM WORK. Bechtel
MAX TRAX. Bechtel

Weitere ähnliche Inhalte

Was ist angesagt?

RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson
 
RESUME - DAVID SILVA (1) (1)
RESUME -  DAVID SILVA (1) (1)RESUME -  DAVID SILVA (1) (1)
RESUME - DAVID SILVA (1) (1)David Silva Polo
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015prakash vijayan
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Nitin Lonkar
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
PRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.CPRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.Canil prashanth
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 

Was ist angesagt? (20)

RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Mitch Nelson Resume 2015
Mitch Nelson Resume 2015Mitch Nelson Resume 2015
Mitch Nelson Resume 2015
 
RESUME - DAVID SILVA (1) (1)
RESUME -  DAVID SILVA (1) (1)RESUME -  DAVID SILVA (1) (1)
RESUME - DAVID SILVA (1) (1)
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
EL-SAYES_CV
EL-SAYES_CV EL-SAYES_CV
EL-SAYES_CV
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
PRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.CPRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.C
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Full report (Petronas Prai)
Full report (Petronas Prai)Full report (Petronas Prai)
Full report (Petronas Prai)
 

Andere mochten auch

Andere mochten auch (13)

Candidatos
CandidatosCandidatos
Candidatos
 
Videoconference1
Videoconference1Videoconference1
Videoconference1
 
Corporate_Pamphlet
Corporate_PamphletCorporate_Pamphlet
Corporate_Pamphlet
 
WarrensCV
WarrensCVWarrensCV
WarrensCV
 
10 powerful reasons to eat watermelon
10 powerful reasons to eat watermelon10 powerful reasons to eat watermelon
10 powerful reasons to eat watermelon
 
Ip Office Brochure
Ip Office BrochureIp Office Brochure
Ip Office Brochure
 
Introduction To Marketing
Introduction To MarketingIntroduction To Marketing
Introduction To Marketing
 
Vodafone Xone Presentation
Vodafone Xone PresentationVodafone Xone Presentation
Vodafone Xone Presentation
 
Proses kawalan minda
Proses  kawalan  mindaProses  kawalan  minda
Proses kawalan minda
 
Two minutes silence
Two minutes silenceTwo minutes silence
Two minutes silence
 
Kp2417961805
Kp2417961805Kp2417961805
Kp2417961805
 
KM & KO breve
KM & KO breveKM & KO breve
KM & KO breve
 
Editing graphics 10.31.13
Editing graphics 10.31.13Editing graphics 10.31.13
Editing graphics 10.31.13
 

Ähnlich wie 03 Mohamed_fathi (20)

E & I QA QC SUPERVISOR
E & I QA QC SUPERVISORE & I QA QC SUPERVISOR
E & I QA QC SUPERVISOR
 
Ahmed.Lepda
Ahmed.LepdaAhmed.Lepda
Ahmed.Lepda
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Tabrez
TabrezTabrez
Tabrez
 
Tabrez
TabrezTabrez
Tabrez
 
M Imran
M ImranM Imran
M Imran
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
CV.
CV.CV.
CV.
 
adrian cv
adrian cvadrian cv
adrian cv
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Elsayed Amer CV
Elsayed  Amer CVElsayed  Amer CV
Elsayed Amer CV
 

03 Mohamed_fathi

  • 1. Name: M Address: Projects Nationa Mailing Birth Da Mobile: Home: Marital Spec 1- Qual plant work 2- Cons Powe fabric 3- Rota 4- Field 5- HVA 6- Fire f 7- Mech plant Educ 1. B.Sc Profe 1. Diplo No. 1 2. Ame 3. Weld quali 4. CSW 5. Ame Mohamme 147 Estethm s Quality C ality: Egypt Address. f ate: 22/Sep +2- 01001 +2-02-337 : Married a cialist lity control M ts - cement k& stamped struction Ma er plants - c cation stee ating equipm d engineerin AC system fighting sys hanical ma t and ceme cation c. in Power ession oma of lean 1201179. rican Union ding techno ity control tr WIP Certified rican Weld d Fathi Su mary Buildin Control De tian fathim@ar wwwcitade p./1964 1333322 760845 and suppo Manager fo t plant - and d vessels. anager for cement pla l structure & ment &static ng. constructio stem. intenance a nt plant. Mechanica nal Tra n six sigma n of Busine ology, Weld raining cou d welding in ing Society R ltan ngs Remaya- puty Direc resco.com el@yahoo. rt. or Mechanic d workshop petroleum nt –Refiner &spools pip c equipmen n and desig and rehabil al Engineeri ining A a Green Be ss Adminis ing metallu rse by ISES nspector –E y -Certificat Page 1 of 10 Resum -Haram-Giz ctor .eg .com cal construc ps fabricatio m (steam inj ry plant-fert ping &plate nt gn itation for, f ng - May And W elt. Nivad U stration . Lic rgy, Non de S ( PT-UT- EXPIRY: 11 te No.0904 me za-Egypt ction-Liquid on steel stru jection syst tilizer plant work& stam fans; pump 1988 Worksh niversity –A cense No.# estructive t MT-RT-VT) 1 -04- 2018 5701 –Exp d Nature Ga ucture &spo tem - Liquid and work mped vess ps, valves, ops Ain shams #545-555-3 testing, Insp ) 8 piration Date as - power ools piping d Nature Ga kshops els for the pow University . 3145-9262 pection, and e April 2012 r &plate as - wer . ID d 2
  • 2. Page 2 of 10 6. Radiographic RT level II. 7. liquid penetrant PT level II. 8. Magnetic Particles MT level II 9. OSHA- Construction Safety & Health (001063573). 10.OSHA- General Industry Safety & Health (900053988). 11.OSHA- Disaster Site Worker (WK 0020014) . 12.OSHA- Disaster Site worker training Program (DS 0000408). 13.NASP- The National Association Of Safety Professionals. 14.Certificate Of Training( Internal Auditor) According to: ISO 9001:2000 Codes and standards Experience in using the following standards . 1. ASME code sec.v 2. ASME code sec. I 3. ASME code sec.IX. 4.ASME code sec. VIII 5. ASME code sec.B31.1 6.ASME code sec.B31.3 7. AWS D1.1 .&AWS D1.6 8. ASTEM 9. API 650 10. DIN 11. NFPA
  • 3. Care 1 F E Jo P eer Rel ROM mployer ob Title rojects ated EExperie Nov. -200 ARESCO Projects -Egyptian &constru - SCIMIT -AL-Shab -West De ) -Demitta -Sinai Ce cement F - Cairo N “1” and Hassan - Egyptia - Alex. Fi - Egyptia - Alex. So -Cairo ai -Sharm a - Fabrica Tanks- V -New Tal 750 MW -EL-Krum 750 MW -Fire wat -AL-ATF 750 MW -Sinai ce - Jordan JORDAN -SCIMITA -AL-TKA -Mass glo Page 3 of 10 ence 00 TO Pre O- ASEC Quality Co n Refinery uction TAR field (s bab Gas Tu emitta Gas Gas Turbi ement- Helw FLS North Powe d Module “ n Allam So an Liquid n iber 18000 an Petroch odium Car r port.(TAV air port. ation Work Vessels kha Power HRSG mat Power HRSG ter system Power sta HRSG ement plan (EL-rashd N AR field MOL Ceme obal Ceme esent ontrol Dep y Company steam inject urbine 8x1 Turbine 4 ine 4x125 M wan Ceme er Plant Co “2” 2x750 on &CCC) natural gas TPA Acry emical. rbonate V airport) k Shop(Ste r station co 1&2 station co 1&2 (proctel&g ation comb 1&2 t . daya-EL-foh ent plan(S ent Plant(S puty Directo y with GS E tion system 25 MW-Ta 4X125 MW- MW-Tanks ent Line I& ombined c MW –Stee s ELNG (B lic Fiber P eel structur ombined c (CMI ) ombined cy (CMI ) gumple) bined cycle (NEM ) hose ceme udan) FLS Sudan)KHD MAN or Engineerin m with 7 boi nks (Khar Tanks (Kh s (Kharafi) &II -Al-amra cycle Modu el structure Bechtel) lant. re-Plate wo cycle Proje ycle Projec e Project ent plant) S D NUFACTURING ng lers) rafi) harafi aya ule e ork- ect ct &
  • 4. Page 4 of 10 Job Description And Responsibility for job # 1: 1. Prepare necessary documentation for installation. 2. Represent subcontractor and liaise with contractor on day to day matters. 3. Establish overall work plans. S-curve and detailed schedules along ARESCO mobilization plan , and review them periodically to ensure that project performance matches with contractual schedule requirements 4. Represent subcontractor and liaise with contractor on day to day matters. 5. Monitor and control ARESCO work schedule, manpower, machinery production, productivity and quality. 6. Co-ordinate between various functions like administration, project control, engineering, construction and finance, so as to ensure that target dates are set for various action / programs and implemented in timely manner to meet the project schedule 7. Establish overall work plans. S-curve and detailed schedules along ARESCO mobilization plan , and review them periodically to ensure that project performance matches with contractual schedule requirements 8. 9. Prepare inspection test plane for construction (rotating equipment-static equipment- steel structure –piping) and fabrication. 10.prepare quality document . 11.Checks manufactures -erection drawings and data for compliance according to specifications. 12.Assists in development and verification of project control documents and status reports. 13.Assists supervision and project engineer in preparation of short schedules . 14.Assists in performing inspections and preparing documentation of work progress 15.Material receiving inspection requirements (MRI) 16.Disposition of defective or damaged equipment and material 17.Check the completion of the final P&ID checks prior to turn over 18.Any special requirements for special materials (ASMI section I and ASME section VIII materials) including documentation requirement. 19.Check equipment receiving. 20.Erection status reporting. 21.Control the release of equipment for job installation. 22.Develop the program in coordination with site engineering and the responsible superintendents. 23.Check the materials grade for bolts and nuts. 24.Check the co lour code and materials identification (heat number or manufacturing number) for piping &fittings &valves and blind flanges& rotating equipment &static equipment). 25.Check the co lour code for gaskets 26.Certification and trace ability requirement for steel structure. 27.Qualifies all welders tested on site –prepares and maintains welder qualification records. 28.Responsible for all weld quality and welding procedures interpretations and records conflicts the project field engineer. 29.Maintains qualification records on all NDE
  • 5. 30.Main 31.Main up of 32.Dete 33.Com corre 34.Repo 35.Com 36.Moni the s 37.Ensu 38.be or 39.Deve resul 40.Revi sprin 41.Inspe spec 42.safe 43.Issue 2 FR E Jo P Job Des 1. Exec to the spec 2. Prep 3. Awar requ 4. Dete ntains all we ntains rando f all ASME ermines are mmunicate w ect a quality orts weekly mmunicate w itor the offs site.. ure access rdered by t elop hydro- lts as per th ew Piping S ng hanger, c ect the critic cifications . and ready e field chan ROM mployer ob Title roject scription A cute field ta e quantity t cification. pare necess reness of fu irements. ermines are elding recor om inspecti section I or a priorities with the pro y problem. y installed q with the Pip site spool fa to code and he field and test packag he standard Supports , a constant sp cal and non for mainten nge notice ( SE Ka Me Si And Respo ke-off from tracking sys sary quality ull contract a priorities rds –radiog on of field f r ASME sec for piping i oject manag uantities to ping Design abrication to d standard d issues fie ge for the p d code. adjustment pring hange n-critical pip nance work (F.C.N.), So EP.2000 ahromica h ech. & Pip di Krir Ste nsibility fo Design dra stem and is document specificatio for piping i Page 5 of 10 graphs-preh fit up of we ction VIII w nstallation gement whe o the Cost E Group to r o coordinate applicable ld material piping syste travel posi er, and shoc ping system k. olve non-co TO hired to Be ing Constr eam Power or jobs # 2: awing and I ssue materi for installat ons and ens nstallation heat and po lds for gene work as requ through co en correctiv Engineer. resolve des e the prope to base lin requisitions em and acce ition and ca ck absorbe ms to confir onformance NOV echtel ruction Fie r Plant unit : Isometric d al requisitio tion( ITP- W sure implem through co ost heat cha eral piping uired by cod nsultation w ve action is sign problem er priority flo e performa s as require ept hydro-te alibrated loa r] m complian e report (N.C V. 2000 eld Engine ts 3&4 (2x drawings an ons with co W.P.S). mentation o nsultation w arts or reco and inspec des with superv required to ms. ow of spoo ance. ed. est (leak te ad for. [Var nce with C.R.). er x320M.W.) nd provide i orrect of contract with superv ords. cts fit visors. o ls to est) riable nput visors.
  • 6. Page 6 of 10 5. Communicate with the project management when corrective action is required to correct a quality problem. 6. Review the project schedule and working with the piping team to achieve the time schedule. 7. Communicate with the Piping Design Group to resolve design problems. 8. Assist Procurement team in the inspection of piping material, fittings and equipment. 9. Monitor the offsite spool fabrication to coordinate the proper priority flow of spools to the site. Also maintain update delivery schedules from the fabricator. 10.Supervise the safe work practices and handle the safety walk down & meetings. 11.Reports weekly installed quantities to the Cost Engineer. 12.Mechanical inspection of equipment installation. 13.Issue field change notice (F.C.N.), Solve non-conformance report (N.C.R.). 14.Ensure access to code and standard applicable to base line performance. 15.Establish with the design office, those permit materials and construction materials to be ordered by the field and issues field material requisitions as required. 16.Develop hydro-test package for the piping system and accept hydro-test (leak test) results as per the standard code. 17.Inspect the critical and non-critical piping systems to confirm compliance with specifications and develop punch list for completed systems prior to handover, and then handle walk downs with the client to turnover. 18.equipment coordinates. 3 FROM November 1997 TO April 1998 Employer I TC Job Title Project Manager. Project Construction of SEMARAMIS INTER CONTANENTAL HOTEL Job Description And Responsibility for jobs # (3): 1. Prepare necessary documentation for installation. 2. Reports weekly installed quantities to the Main office. 3. Review the project schedule and working with the piping team to achieve the time schedule 4. Installation of chillier and chillier piping system. 5. Installation of diesel and diesel piping system. 6. Installation of exhaust fan and ventilation fan. 7. Installation of pumps for fire fighting. 8. Installation of sprinkler system. 9. Installation of smoke and exhaust system. 10.Installation of Fire Fighting system. 11.Installation of fire alarm system. 12.Develop hydro-test package for the piping system and accept hydro-test (leak test) results as per the standard code. 13.
  • 7. Page 7 of 10 4 FROM January 1994 TO January 1997 Employer MITSUOBISEU HEVEY INDUSTRIAL LEMITED M H I Job Title Mechanical construction Engineer. Project ALLEPO power station. 210 MW X5 Job Description and Responsibility for job # 4: 1. Quality control ENG. of fifth heat recovery steam generators 5x110MW steam turbine units. 2. Establish with the design office, those permit materials and construction materials to be ordered by the field and issues field material requisitions as required. 3. Develop hydro-test package for the piping system and accept hydro-test (leak test) results as per the standard code. 4. Inspect the non-critical piping-under grout-fire fighting-circulating pipe systems to confirm compliance with specifications and develop punch list for completed systems prior to handover, and then handle walk downs with the client to turnover. 5. Reports weekly installed quantities to the Office Engineer. 6. Mechanical inspection of equipment installation. 7. Issue field change notice (F.C.N.), Solve non-conformance report (N.C.R.). 5 FROM January 1992 TO December, 1993 Employer African consultant Job Title Electro mechanical manager Project Mina garden city 6 th. Of October Job Description And Responsibility for job # 5: 1. Establish with the designer, those permit materials and construction materials to be ordered by the field and issues field material requisitions as required with consultants group DR.Shaker El-Markaby and Abd El-wareth group 2. Mechanical inspection of equipment installation. 3. Electrical inspection of equipment and MDC-MDCC –low current-low voltage 4. Review the project schedule and working with the contractors 5. Execute field take-off from Design drawing and Isometric drawings and provide input to the quantity tracking system and issue material requisitions with correct specification. 6. Prepare necessary documentation for contractors. 7. Awareness of full contract specifications and ensure implementation of contract requirements. 8.
  • 8. Page 8 of 10 J o b D e s c ription And Responsibility for jobs # 6: 1. Execute field take-off from Design drawing and Isometric drawings and provide input to the quantity tracking system and issue material requisitions with correct specification. 2. Prepare necessary documentation for installation. are working to the latest revision for drawings. 3 . Awareness of full contract specifications and ensure implementation of contract requirements. 4.Determines area priorities for piping installation through consultation with supervisors. 5.Communicate with the project management when corrective action is required to correct a quality problem. 6-Communicate with the Piping Design Group to resolve design problems. 7.Monitor the offsite spool fabrication to coordinate the proper priority flow of spools to the site.. 8.Reports weekly installed quantities to the Cost Engineer. 9.Ensure access to code and standard applicable to base line performance. 10.be ordered by the field and issues field material requisitions as required. 11.Develop hydro-test package for the piping system and accept hydro-test (leak test) results as per the standard code. 12.Review Piping Supports, adjustment travel position and calibrated load for. [Variable spring hanger, constant spring hanger, and shock absorber] 13Inspect the critical and non-critical piping systems to confirm compliance with specifications . 14safe and ready for maintenance work. 6 FROM July1995 TO December 1996 Employer ABB Asia Browne Bovari(ABB SOUSA) Job Title Piping Engineer. Project Cairo south power station (steam cycle, combined cycle, simple gas cycle)
  • 9. Page 9 of 10 7 FROM July1990 TO Oct. 1995 Employer Kahromica –Skoda Export Job Title Senior mechanical engineer Project TALKHA power station (steam cycle, 210 MW ) Job Description And Responsibility for jobs # 7: 1 .Execute field take-off from Design drawing and Isometric drawings and provide input to the quantity tracking system and issue material requisitions with correct specification. 2. Prepare necessary documentation for installation. 3. Understanding the document control/submittal system to assure that the contractors are working to the latest revision for drawings. 4. Determines area priorities for piping installation through consultation with supervisors. 5. Review the project schedule and working with the our team and skoda export to achieve the time schedule. 6. preparation installation of turbine (lower casing - shaft -upper casing) 7. preparation installation of condenser. 8. Mechanical inspection of equipment installation. 9. Establish with the design office, those permit materials and construction materials to be ordered by the field and issues field material requisitions as required. 10.Develop hydro-test package for the piping system 11.Review Piping Supports analysis, adjustment travel position and calibrated load for. [Variable spring hanger, constant spring hanger, and shock absorber] 12.Inspect the critical and non-critical piping systems to confirm compliance with specifications and develop punch list for completed systems prior to handover, and then handle walk downs with the client to turnover. 8 FROM July1988 TO December 1990 Employer Kahromica Job Title Steel structure and Piping Engineer. Project TALKHA power station (steam cycle, 210 MW Job Description And Responsibility for job # 8:
  • 10. Page 10 of 10 1. Erection of steel structure for machine hall 2500 tons (main columns –main girder – staircase –plate forms 2.Erection of vertical heat exchangers and feed tank and condensate tank with diarator 3.Erection of feed pump and boaster pump 4.fabrication of spools 5.Install of HP piping including hangers 6.Prepration for chemical cleaning and blow out 7. Manage the operation of the plant to the requirements of dispatch control center. 8. Proceed with the work permits to isolate the equipment and assure that the area is safe and ready for maintenance work. Language Skills English: good command of written and spoken. Arabic: Mother tongue. Computer Skills Microsoft Windows. Microsoft Office. Outlook PTS. (Procurement tracking system) Bechtel. INFO.WORK. Bechtel TEAM WORK. Bechtel MAX TRAX. Bechtel