SlideShare a Scribd company logo
1 of 5
10000
8000
8000
8000
13100
13100
13100
13100
4500
4000
4000
4000
4000
3000
12000
3500
1000
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES.
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING
INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
NORTH EAST CO-ORDINATION OF CABLES ROUTING.
NORTH EAST CO-ORDINATION OF THE PIERS.
NORTH EAST CO-ORDINATION OF JOINT POINTS OF RELOCATED CABLES.
NUMBER OF CABLES AND THEIR TYPES.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING
WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES.
26
MFRR-MV-MHR-RL-26-001
ENG. Mohamed Azzam 31-07-2014
NTS00
CABLES INSIDE PVC PIPES
UNDER CONSTRUCTION STORM
CULVERT
3 X 185 MM2 M.V CABLE
3 X 300 MM2 M.V CABLE
3 X 185 MM2 M.V CABLE JOINT
3 X 300 MM2 M.V CABLE JOINT
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS
AND SUPERVISION.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
10- ALL DIMENTIONS ARE IN CM.
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS
AND SUPERVISION.
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
10- ALL DIMENTIONS ARE IN CM.
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
ONEFEEDER
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE
LAYING INFORMATION AND QUANTITIES TAKEOFFS.
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
NAME OF CABLES.
NUMBER OF CABLES AND THEIR TYPES.
9- ALL FEEDERS CONSIST OF 1 CABLE EXCEPT FOR FEEDER# AH06, AH26, AH45, AH38,
AH39, AH40, AH04, AH44 & AH25 WHICH CONSIST OF 2 CABLES.
10- REFER TO ATTACHED 'INGAZ CERTIFICATE' PROVIDED BY SCECO FOR FURTHER
DETAILS ON EACH FEEDER SOURCE & DESTINATION.
11- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
6
12
12
18
6
66
6 12
12
CONTRACTOR :
CONSULTANT :
LEGEND:
GENERAL NOTES:-
Kingdom of Saudi Arabia
1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS:
MFRR-MV-MHR-RL-26-001
MFRR-MV-MHR-RL-26-002
MFRR-MV-MHR-RL-26-003
MFRR-MV-MHR-RL-26-004
MFRR-MV-MHR-RL-26-005
2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY
CO-ORDINATION RELOCATION .
3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES.
4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF
METHOD OF LAYING THE DIRECT BURIED CABLES .
5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING
VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE .
6- ALL RELOCATED CABLES ARE M.V CABLES OF:
3 X 185 MM2 CROSS SECTION (26 NOS.)
3 X 300 MM2 CROSS SECTION (6 NOS.)
7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING
FREQUENCIES OF 60 HZ.
8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING:
TOTAL LENGTH OF THE RELOCATED M.V CABLES FOR EACH TYPE.
TOTAL NUMBER & LENGTH OF PVC PIPES USED (PIPE UNIT = 6 METER).
TOTAL VOLUME OF EXCAVATED GROUND TRENCH IN M3.
TOTAL ROUTE OF THE RELOCATED M.V CABLES (555 METER).
9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING
WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES.
10- ALL VARIOUS DIMENTIONS ARE IN METER UNIT.
26
MFRR-MV-MHR-RL-26-005
ENG. Mohamed Azzam 31-07-2014
NTS00
CABLES INSIDE PVC PIPES
UNDER CONSTRUCTION STORM
CULVERT
3 X 185 MM2 M.V CABLE
3 X 300 MM2 M.V CABLE
3 X 185 MM2 M.V CABLE JOINT
3 X 300 MM2 M.V CABLE JOINT

More Related Content

What's hot

Inertia dynamics sfc1525f_specsheet
Inertia dynamics sfc1525f_specsheetInertia dynamics sfc1525f_specsheet
Inertia dynamics sfc1525f_specsheet
Electromate
 
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
uujjfjjkskmme
 

What's hot (12)

Underground cabling installation
Underground cabling installationUnderground cabling installation
Underground cabling installation
 
Sdcs 02 part1
Sdcs 02 part1Sdcs 02 part1
Sdcs 02 part1
 
Construction manual for sub stations
Construction manual for sub stationsConstruction manual for sub stations
Construction manual for sub stations
 
Busbar Configuarations
Busbar ConfiguarationsBusbar Configuarations
Busbar Configuarations
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Inertia dynamics sfc1525f_specsheet
Inertia dynamics sfc1525f_specsheetInertia dynamics sfc1525f_specsheet
Inertia dynamics sfc1525f_specsheet
 
Limitorque WG Series Installation, Operation, and Maintenance
Limitorque WG Series Installation, Operation, and MaintenanceLimitorque WG Series Installation, Operation, and Maintenance
Limitorque WG Series Installation, Operation, and Maintenance
 
Kubota b2110 d tractor service repair manual
Kubota b2110 d tractor service repair manualKubota b2110 d tractor service repair manual
Kubota b2110 d tractor service repair manual
 
Kubota b1710 d tractor service repair manual
Kubota b1710 d tractor service repair manualKubota b1710 d tractor service repair manual
Kubota b1710 d tractor service repair manual
 
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
Caterpillar cat 320 c excavator (prefix pab) service repair manual (pab00001 ...
 
Seminar report main page 2
Seminar report main page 2Seminar report main page 2
Seminar report main page 2
 
2010 GMC Canyon Madison
2010 GMC Canyon Madison2010 GMC Canyon Madison
2010 GMC Canyon Madison
 

Viewers also liked

TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
Nick Hyde CEng MIMechE
 

Viewers also liked (10)

Diversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad HaramDiversifying source feeding loads for chiller Ajyad Haram
Diversifying source feeding loads for chiller Ajyad Haram
 
3D Renderings
3D Renderings3D Renderings
3D Renderings
 
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
TGI LEICESTER SQUARE ELECTRICAL DRAWING XREF C6 17 9 15-A0 Electrical ONE LIN...
 
Haram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources ScenrioHaram Expansion M.V substations diversified feeding sources Scenrio
Haram Expansion M.V substations diversified feeding sources Scenrio
 
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
110 K.V SIEMENS TRANSFORMER JACKING AND SLIDING SCENARIO
 
1 Generral Layout
1 Generral Layout1 Generral Layout
1 Generral Layout
 
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
STAINES AP-PLANS PHDD C2-A0 HVAC  MECHSTAINES AP-PLANS PHDD C2-A0 HVAC  MECH
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
 
Pinnacle Infotech partaking at 2017 PCI Convention
 Pinnacle Infotech partaking at 2017 PCI Convention  Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech partaking at 2017 PCI Convention
 
Honeymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferryHoneymoon suite bedroom tutorial ferry
Honeymoon suite bedroom tutorial ferry
 
How to write a good business letter
How to write a good business letter   How to write a good business letter
How to write a good business letter
 

Similar to Construction Coordination Underground M.V Relocation works

4.0 ground maneuvering boeing
4.0 ground maneuvering boeing4.0 ground maneuvering boeing
4.0 ground maneuvering boeing
eddy santos
 
VINITH S RESUME
VINITH S RESUMEVINITH S RESUME
VINITH S RESUME
VINITH S
 
C-4 UTILITY PLAN-UTILITY
C-4 UTILITY PLAN-UTILITYC-4 UTILITY PLAN-UTILITY
C-4 UTILITY PLAN-UTILITY
Ed Mahony
 

Similar to Construction Coordination Underground M.V Relocation works (20)

Alert Service Bulletin - ASB 407-13-99 - Bell 407
Alert Service Bulletin - ASB 407-13-99 - Bell 407Alert Service Bulletin - ASB 407-13-99 - Bell 407
Alert Service Bulletin - ASB 407-13-99 - Bell 407
 
Rudraksha Enterprises - Leading Supplier of Mitsubishi Servo Drive/Motor/Modu...
Rudraksha Enterprises - Leading Supplier of Mitsubishi Servo Drive/Motor/Modu...Rudraksha Enterprises - Leading Supplier of Mitsubishi Servo Drive/Motor/Modu...
Rudraksha Enterprises - Leading Supplier of Mitsubishi Servo Drive/Motor/Modu...
 
4.0 ground maneuvering boeing
4.0 ground maneuvering boeing4.0 ground maneuvering boeing
4.0 ground maneuvering boeing
 
VINITH S RESUME
VINITH S RESUMEVINITH S RESUME
VINITH S RESUME
 
ABB CMF Indoor Fuses IEC Standard 3.6kV-12kV - High Voltage Current Limiting ...
ABB CMF Indoor Fuses IEC Standard 3.6kV-12kV - High Voltage Current Limiting ...ABB CMF Indoor Fuses IEC Standard 3.6kV-12kV - High Voltage Current Limiting ...
ABB CMF Indoor Fuses IEC Standard 3.6kV-12kV - High Voltage Current Limiting ...
 
SUPREME ELECTRICALS & CABLES - L&T Price List
SUPREME ELECTRICALS & CABLES - L&T Price ListSUPREME ELECTRICALS & CABLES - L&T Price List
SUPREME ELECTRICALS & CABLES - L&T Price List
 
Raw mill bridge welding & inspection(frm) acl-mundwa
Raw mill bridge welding & inspection(frm) acl-mundwaRaw mill bridge welding & inspection(frm) acl-mundwa
Raw mill bridge welding & inspection(frm) acl-mundwa
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 
Thông số kĩ thuật siemens rccb 5 sm
Thông số kĩ thuật siemens rccb 5 smThông số kĩ thuật siemens rccb 5 sm
Thông số kĩ thuật siemens rccb 5 sm
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER Energy
 
C-4 UTILITY PLAN-UTILITY
C-4 UTILITY PLAN-UTILITYC-4 UTILITY PLAN-UTILITY
C-4 UTILITY PLAN-UTILITY
 
Induction motors
Induction motorsInduction motors
Induction motors
 
Du mont ra-103-sams-90-3
Du mont ra-103-sams-90-3Du mont ra-103-sams-90-3
Du mont ra-103-sams-90-3
 
1-3-phacMC Pres-EDAS
1-3-phacMC Pres-EDAS1-3-phacMC Pres-EDAS
1-3-phacMC Pres-EDAS
 
Building up voltage self excited shunt generator
Building up voltage self excited shunt  generator Building up voltage self excited shunt  generator
Building up voltage self excited shunt generator
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
Power screw
Power screw Power screw
Power screw
 
Lewden Electrical Palazzoli - Plugs & Sockets, Control Stations, Terminals, E...
Lewden Electrical Palazzoli - Plugs & Sockets, Control Stations, Terminals, E...Lewden Electrical Palazzoli - Plugs & Sockets, Control Stations, Terminals, E...
Lewden Electrical Palazzoli - Plugs & Sockets, Control Stations, Terminals, E...
 
IRJET- dsPIC based Implementation of Sinusoidal Pulse Width Modulation Techni...
IRJET- dsPIC based Implementation of Sinusoidal Pulse Width Modulation Techni...IRJET- dsPIC based Implementation of Sinusoidal Pulse Width Modulation Techni...
IRJET- dsPIC based Implementation of Sinusoidal Pulse Width Modulation Techni...
 
Topological Advancement in DVR; A review
Topological Advancement in DVR; A reviewTopological Advancement in DVR; A review
Topological Advancement in DVR; A review
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 

Construction Coordination Underground M.V Relocation works

  • 1. 10000 8000 8000 8000 13100 13100 13100 13100 4500 4000 4000 4000 4000 3000 12000 3500 1000 CONTRACTOR : CONSULTANT : LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES. 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: NORTH EAST CO-ORDINATION OF CABLES ROUTING. NORTH EAST CO-ORDINATION OF THE PIERS. NORTH EAST CO-ORDINATION OF JOINT POINTS OF RELOCATED CABLES. NUMBER OF CABLES AND THEIR TYPES. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES. 26 MFRR-MV-MHR-RL-26-001 ENG. Mohamed Azzam 31-07-2014 NTS00 CABLES INSIDE PVC PIPES UNDER CONSTRUCTION STORM CULVERT 3 X 185 MM2 M.V CABLE 3 X 300 MM2 M.V CABLE 3 X 185 MM2 M.V CABLE JOINT 3 X 300 MM2 M.V CABLE JOINT
  • 2. CONTRACTOR : CONSULTANT : LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS AND SUPERVISION. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. 10- ALL DIMENTIONS ARE IN CM.
  • 3. CONTRACTOR : CONSULTANT : LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- CABLES DIRECT BURIED LAYING WERE IMPLEMENTED AS PER SCECO STANDARDS AND SUPERVISION. 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. 10- ALL DIMENTIONS ARE IN CM.
  • 4. ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER ONEFEEDER CONTRACTOR : CONSULTANT : LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-005 FOR AS-BUILT CABLE LAYING INFORMATION AND QUANTITIES TAKEOFFS. 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: NAME OF CABLES. NUMBER OF CABLES AND THEIR TYPES. 9- ALL FEEDERS CONSIST OF 1 CABLE EXCEPT FOR FEEDER# AH06, AH26, AH45, AH38, AH39, AH40, AH04, AH44 & AH25 WHICH CONSIST OF 2 CABLES. 10- REFER TO ATTACHED 'INGAZ CERTIFICATE' PROVIDED BY SCECO FOR FURTHER DETAILS ON EACH FEEDER SOURCE & DESTINATION. 11- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY.
  • 5. 6 12 12 18 6 66 6 12 12 CONTRACTOR : CONSULTANT : LEGEND: GENERAL NOTES:- Kingdom of Saudi Arabia 1- THIS DRAWING IS PART OF SHEETSET CONSISTING OF THE FOLLOWING DRAWINGS: MFRR-MV-MHR-RL-26-001 MFRR-MV-MHR-RL-26-002 MFRR-MV-MHR-RL-26-003 MFRR-MV-MHR-RL-26-004 MFRR-MV-MHR-RL-26-005 2- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-001 FOR PLAN SITE SURVEY CO-ORDINATION RELOCATION . 3- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-002 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES. 4- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-003 FOR SECTIONS OF METHOD OF LAYING THE DIRECT BURIED CABLES . 5- REFER TO AS-BUILT DRAWING # MFRR-MV-MHR-RL-26-004 FOR SECTIONS SHOWING VARIOUS FEEDER NAMES, TYPES AND THEIR USAGE . 6- ALL RELOCATED CABLES ARE M.V CABLES OF: 3 X 185 MM2 CROSS SECTION (26 NOS.) 3 X 300 MM2 CROSS SECTION (6 NOS.) 7-ALL RELOCATED CABLES ARE WORKING ON 13.8 KV VOLTAGE RATE AND HAVING FREQUENCIES OF 60 HZ. 8- FIND OUT FEEDERS INFORMATION LOCATED AT DRAWING: TOTAL LENGTH OF THE RELOCATED M.V CABLES FOR EACH TYPE. TOTAL NUMBER & LENGTH OF PVC PIPES USED (PIPE UNIT = 6 METER). TOTAL VOLUME OF EXCAVATED GROUND TRENCH IN M3. TOTAL ROUTE OF THE RELOCATED M.V CABLES (555 METER). 9- ALL AS-BUILT DRAWINGS ARE BASED ON SITE SURVEY. DESIGN DRAWING WAS NOT ACCURATE IN TERMS OF NUMBER & TYPE OF CONTRADICTED M.V CABLES. 10- ALL VARIOUS DIMENTIONS ARE IN METER UNIT. 26 MFRR-MV-MHR-RL-26-005 ENG. Mohamed Azzam 31-07-2014 NTS00 CABLES INSIDE PVC PIPES UNDER CONSTRUCTION STORM CULVERT 3 X 185 MM2 M.V CABLE 3 X 300 MM2 M.V CABLE 3 X 185 MM2 M.V CABLE JOINT 3 X 300 MM2 M.V CABLE JOINT