Weitere ähnliche Inhalte
Ähnlich wie BackcountryTrailFloodRehabilitation-May2014
Ähnlich wie BackcountryTrailFloodRehabilitation-May2014 (20)
BackcountryTrailFloodRehabilitation-May2014
- 2. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 1 of 9
Summary
In June 2013, parts of Southern Alberta were devastated from significant flooding. The Government of
Alberta responded to this catastrophe with a number of funding programs to address a wide range of
recovery activities.
The South Saskatchewan Region and Red Deer North Saskatchewan Region along the eastern slopes
sustained significant impacts from the June Flood Event of 2013. Damage to main arterial recreation
corridors has reduced access to backcountry areas and increased natural and man-made hazards that
compromise Albertans’ recreational experience.
The June 2013 flood has affected all backcountry users, from off-highway vehicle users to non-
motorized users to random campers, and has restricted or discouraged significant tourism and
recreation in the seasons that followed. All backcountry uses, including but not limited to equestrian,
hiking, cross country skiing, off-highway vehicle and snowmobiling have been impacted by the 2013
floods. Restoring the trail systems in these flood affected areas serves not only to maintain recreational
opportunities in Alberta’s backyard but also provides critical support to the economic, environmental
and social benefits that were compromised by the flood. Providing Albertans with an opportunity to
return to a sense of normality and providing wilderness opportunities for all is an important part of that
recovery.
Purpose
Environment and Sustainable Resource Development is leading a $10 million program to restore and
repair backcountry trail systems on public lands as a result of the 2013 flood events. The Backcountry
Trail Flood Rehabilitation Program will commence in 2014 and be completed by March 2017. The
program aims to restore priority trails and trails systems along the eastern slopes for both motorized
and non-motorized recreational users. This program will provide an opportunity to restore important
recreational trail systems – a critical economic and tourism driver for the Province of Alberta. The
program will also afford the department an opportunity to re-establish some trail systems in more
ecologically appropriate and sustainable areas. Re-establishing trail systems outside of sensitive riparian
and/or highly erodible areas results in trail systems better suited to withstand future flood events.
The program will take a collaborative, partnership-based approach to planning and project
implementation such that projects planned by Government, partners or stakeholders are prioritized and
leveraged to maximum effect as they are the ultimate users of the trail systems.
Environment and Sustainable Resource Development will be partnering closely with Alberta Tourism,
Parks and Recreation to deliver an integrated flood recovery program, with the understanding that
many of the flood affected areas occur on both public and park lands. The Departments will be engaging
in joint recovery planning, training, and construction activities to ensure efficiencies are identified and
optimized.
- 3. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 2 of 9
This program has been developed with consideration to the four essential elements of recovery, as
described in the Provincial Recovery Framework:
People – To ensure the right resources are available to support the overall physical, mental and
social well-being of communities, municipalities, First Nations, families and individual Albertans
affected by the floods.
Economy – To nurture an environment that supports the rehabilitation of and reinvestment in
disrupted economies and businesses.
Reconstruction – To enable the safe and orderly restoration of flood damaged infrastructure
within the affected areas.
Environment – To protect and re-establish the environment to a healthy state and mitigate
long-term environmental impacts and risks.
Vision
Trails and recreational opportunities located on public lands along the Eastern Slopes that were
damaged by the 2013 floods are restored in a way that is sustainable; users are satisfied; and the health
of the environment is maintained.
Mission
Environment and Sustainable Resource Development, in collaboration with users, will restore priority
recreational trails on Public Lands that were damaged by the 2013 flood event to ensure sustainable
trail access is restored for user enjoyment. At the same time, environmental conditions in and around
the flood damaged potions of these trail system will be maintained or improved.
Environment and Sustainable Resource Development’s management approach to recreational systems
on Public Lands is currently under review. It is acknowledged that while the Backcountry Trail Flood
Rehabilitation program is a discrete program with a defined end date, this program will inform the long
term management regime for trails and recreation on Public Lands. As the program progresses, it will
look to transition work from rehabilitation works within the program to its long-term application to
recreation management systems on Public Lands.
- 4. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 3 of 9
Program Area
- 5. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 4 of 9
Program Objectives
The Backcountry Trail Flood Rehabilitation Program will focus on 2013 flood damaged trails, beginning
with the inventory and assessment of flood damage to designated trail systems and infrastructure and
existing recognized (non-designated) trail systems (motorized and non-motorized). The Backcountry
Trail Flood Rehabilitation Program will prioritize trails and infrastructure that require restoration with
input from stakeholders. It will design trails in a manner that is sustainable and re-build trails to a
defined standard. This exercise will be conducted in collaboration with volunteers and user groups and
is expected to be active from spring 2014 to March 31, 2017.
Outcomes
It is the program’s intention to inventory all designated and recognized trail damaged by the 2013 floods
by November 30, 2014 and develop a prioritized list of restoration projects.
All priority recreational trails and other infrastructure are to be restored by December 2016, subject to
the available program funding. Trails will be restored sustainably and located in a manner that
compliments the desired land use and surrounding environment.
The public will be made aware of the level of damage. Support from the public is critical to the success
of this program. Program staff will work closely with the public and user groups to ensure they remain
informed on the status of trail restoration projects and are given adequate opportunities to be involved.
Please note that while distribution of funding across all flood-affected Public Land Use Zone (PLUZ) areas
is important and taken into consideration, funding from this program will be allocated to the highest
priority projects. This may result in one or more PLUZ area receiving a disproportional amount of
funding based on the levels of flood damage trails.
Scope
This program is limited to the South Saskatchewan and Red Deer – North Saskatchewan Regions and
only includes Public Land Use Zones and non-public land use zones damaged by the 2013 flood event
identified below:
Ghost PLUZ
McLean PLUZ
Kananaskis PLUZ
Sibbald PLUZ
Cataract Creek PLUZ
Panther PLUZ
Livingstone Area
Poll Haven
Porcupine Hills Area
Willow Creek PLUZ
Crowsnest Pass Corridor
Castle PLUZ
- 6. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 5 of 9
Bighorn Backcountry Area, including
o Blackstone/Wapiabi PLUZ
o Job/Cline PLUZ
o Kiska/Willson PLUZ
o Upper Clearwater/Ram PLUZ
o Panther Corners PLUZ
o Dormer Sheep PLUZ
Only designated and recognized motorized and non-motorized trails will be included in the program.
Infrastructure damaged during the 2013 flood, including staging areas, structures (i.e. bridges) and trails
located on Public Lands along the Eastern Slopes will be considered, as will major erosion damage on or
adjacent to the trail system. Please note that ESRD will not be able to restore all trails to pre-2013 flood
conditions – there will be some trail closures and relocations, and there will be trails left as is, with
signage to inform users of its status.
New trail development – trails that access new areas, that are not part of the relocation of flood
damaged trails – is considered to be “out of scope” for this program. Legislation and regulation changes
will not be addressed by this program, nor will it address the development of provincial trail standards
and enforcement programs.
- 7. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 6 of 9
Implementation Framework: Pathway to Success
Assess
Following the 2013 flood event, ESRD conducted surveys of flood damage trails and infrastructure. This
work will continue throughout 2014 and will result in a complete inventory of all designated and
recognized motorized and non-motorized trails within the Program Area. Note that we will only assess
non-designated, recognized trails that are deemed a priority by ESRD staff or the public (hiking, cross-
country trails, mountain biking, etc.).
ESRD will be documenting the following information as part of its trail inventory:
Trail location;
Severity and type of damage sustained; and
Preliminary options for rehabilitation (including replacement, relocation or closure).
Prioritize and Plan
ESRD will assess and prioritize damaged trails, and plan rehabilitation works using a standardized set of
project selection criteria. These criteria will be weighted according to their importance and will be
applied consistently to all eligible projects. These criteria have been established to ensure the project
selection process is fair, and will ensure that public funds are allocated to the highest priorities.
Projects will be prioritized using the following criteria:
Severity of damage sustained in 2013 event
Level of Engineering Required
Level of Environmental Impact
Level of Trail Connectivity
Level of Use
Level of Volunteer Interest
Local Priority
Timeline for Completion
Long-term Sustainability
Projects will be prioritized as inventory information becomes available. To date, inventory data has been
collected in the following areas. As such, project plans for the 2014 field season are being developed for
the following areas:
Ghost PLUZ
Cataract PLUZ
MacLean PLUZ
Castle PLUZ
- 8. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 7 of 9
Kananaskis PLUZ
Upper Clearwater PLUZ
ESRD will complete its inventory of flood damaged trails in 2014. Once the inventory is complete, a
comprehensive prioritization exercise will occur and project plans will be developed to inform
rehabilitation works for 2015 and 2016. Stakeholders will be consulted during the development of the
project plans to ensure their priorities are discussed and considered.
Partner
In addition to the ESRD’s commitment to the project, it is anticipated that public volunteers and user
groups will be actively involved and contribute to flood-damaged trail restoration. Our partners are
critical to the success of the Backcountry Trail Flood Rehabilitation Program - it is our intention to
involve user groups, the public and other stakeholders on an on-going basis.
ESRD will engage the public and stakeholder groups in:
Identification of flood damage
Program planning and establishment of priorities
Rehabilitation work
Evaluation and assessment of restored trails in subsequent field seasons
ESRD will hire Recreation Stewardship Coordinators for Blairmore, Calgary and Rocky Mountain House.
These coordinators will work closely with user groups, stakeholders and the general public in their local
areas to both inform and solicit feedback.
ESRD will involve user groups and the public in trail restoration activities and look for opportunities to
collaborate and partner on projects to maximize the amount of trails restored following the 2013 floods.
- 9. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 8 of 9
Build
Rehabilitation work is scheduled to begin during the 2014 field season – trails will be restored, improved,
relocated or closed. Trail construction will be completed will the help of ESRD trail crews, contractors
and volunteers.
Trail Standards
The Backcountry Trail Flood Rehabilitation Program will use the Kananaskis Country, Alberta Parks
Standards as the guideline for all rehabilitation work occurring. The guidelines were intended for non-
motorized trails. The same guidelines, techniques and approaches will be applied to the applicable
motorized trails, though modifications will be made to account for wider trail widths. The intent is that
the trails are adequately integrated in the existing trail system, including those that are not improved by
the Backcountry Trail Flood Rehabilitation Program. Trail widths and style will attempt to match the
surrounding trail conditions as much as possible, while creating a sustainable trail system in the sections
reclaimed and maintaining environmental integrity of the system as a whole.
Trail Closures
Temporary Closure Notifications will be posted and updated on the Environment and Sustainable
Resource Development website. Local notices will be placed at staging areas, and on sandwich boards
on the trail to notify when construction is underway.
In some cases, trails may have to be permanently closed due to the magnitude of the flood damage. The
associated environmental impacts and rehabilitation may be prohibitive to proceeding with the trail
rehabilitation under this program. Stakeholders and user groups will be consulted prior to a decision to
close a trail. Once a decision is made to close an individual trail, the closure will follow standard ESRD
procedures.
Trail Reclamation
Reclamation of trails that are unsustainable, being relocated or permanently closed as a result of flood
damage will be reclaimed to the greatest extent possible to eliminate user traffic on the trail.
Reclamation of trails not associated with flood rehabilitation works is considered out of scope for this
program.
Evaluate
Trail Audits
As part of program delivery, a trail audit program will be developed for post-construction trails to ensure
the constructed works are completed in accordance with the site work plan; result in improvements to
the trails system in the area; result in sustained or improved environmental conditions; and the
individual trails are restored to a similar or better state than before.
- 10. My 2014 Backcountry Trail Flood Rehabilitation Program
© 2014 Government of Alberta
Page 9 of 9
The trail audit program will be completed each year and will assess the works undertaken during the
previous construction season. Trail audits will be reviewed and opportunities for improvement will be
assessed each year after the construction season. An adaptive management approach will be applied
and the project plans will be updated as necessary to ensure that the project outcomes are achieved.
Reporting
The status of all trails that are inventoried or rehabilitated as part of this program will be reported on
ESRD’s website
The success of the program as a whole will be assessed against the outcomes defined in this document
and reported to the public annually.
Get Involved
To volunteer or submit questions or feedback you can email:
ESRD.BackcountryFloodInfo@gov.ab.ca.
For more information on the Backcountry Trail Rehabilitation Program, please visit the ESRD website:
ESRD 2013 Flood Recovery Programs
ESRD will provide the most up-to-date information to all Albertans on the following website:
esrd.alberta.ca