Submitted to:
Mr. Haroon Waheed




 [PAKISTAN RAILWAYS – THE
 LIFE LINE OF THE COUNTRY]
 Prepared By: Maria Jawed (9689)
              Safia AbdulAziz (9613)
              Sumaiya Farooqui (9570)
              Javeria Siddiq (xxxx)
TABLE OF CONTENTS


S. #                          Topics                    Page #
             Executive Summary                            2
 1.          Pakistan Railways – the life line of the     3
             country
       1.1   History
       1.2   At Present
       1.3   Organizational Structure
       1.4   Human Resource
2.           Problems faced by Pakistan Railways          5
       2.1   Shortage of Locomotives
       2.2   Eroding Market Share
       2.3   Soaring Budget Deficit
 3.          Entering & Contracting                       6
       3.1   Organizational Issues
       3.2   Key Clients
       3.3   OD Process
       3.4   Time & Resources
 4.          Diagnosis of Pakistan Railways               7
       4.1   Huge Losses and Budget Deficit
       4.2   Mismanagement
       4.3   Decreased Market share
       4.4   Corruption
 5.          Action Planning                             10
       5.1   Structural Design
       5.2   Downsizing
       5.3   Reengineering
       5.4   Alliance Intervention
       5.5   Network Intervention
 6.          Conclusion                                  12
             Bibliography                                13


Organization Development & Change                        Page 2
EXECUTIVE SUMMARY

Pakistan Railways (PR) is the state owned railway company of Pakistan. It is a
large organization under the administration of Ministry of Railways. Pakistan
Railways provides an important mode of transportation in the farthest corners of
the country and brings them closer for business, sightseeing, pilgrimage and
education. He current Chairman is Raja Shahid Hussain.

Over the past many years, Pakistan Railways has been facing problems and is now
on the verge of bankruptcy. With budget deficit of billions, eroding market share
and corruption scandals, the future of Pakistan Railways – once the life line of the
country – is grim. At the time of independence, both India and Pakistan, inherited
the Railway Network laid down by British. While Indian Railways has emerged as
a highly profitable organization, Pakistan Railways is struggling to keep itself
running.

This report summarizes how organization development can help Pakistan
Railways revamp its image and goodwill. It is based on facts and hypothetical
situations created by the group members to evaluate the applicability of OD
interventions. He data is collected from various sources including books,
newspaper articles and internet.

The report provides introduction of Pakistan Railways, its history, organizational
structure which is then followed by how the concepts of entering and contracting
can be applied to this case. Diagnosis of the organization has been done with the
help of data collected and hypothetical situations. Based on the diagnosis, OD
interventions have been suggested for Pakistan railways which include techno-
structural interventions and collaborative interventions.




Organization Development & Change                                            Page 3
1.   PAKISTAN RAILWAYS – THE LIFE LINE OF THE
        COUNTRY


   1.1 History

The possibility of Karachi as a sea port was first noticed in the middle of 19th
century. Sir Henry Edward Frere was appointed Commissioner of Sindh after its
annexation with Bombay in 1847 and sought permission from Lord Dalhousie to
begin a survey for a sea port. He also initiated the survey for a railway line in
1858. It was proposed that a railway line from Karachi City to Kotri, steam
navigation up the Indus and Chenab rivers up to Multan and from there another
railway       to      Lahore        and        beyond       be        constructed.

It was on 13 May 1861, that the first railway line was opened for public traffic
between Karachi City and Kotri, a distance of 105 miles (169 km). The line
between Karachi City and Keamari was opened on 16 June 1889. During 1897 the
line from Keamari to Kotri was doubled.

The railway line from Peshawar to Karachi closely follows Alexander’s line of
march through the Hindukush Mountains to the Arabian Sea. Different sections on
the existing main line from Peshawar to Lahore and Multan and branch lines were
constructed in the last quarter of 19th century and early years of 20th century.

The four sections, i.e., Scinde (Sindh) Railways, Indian Flotilla Company, Punjab
Railway and Delhi Railways, working in a single company, were later on
amalgamated into the Scinde, Punjab & Delhi Railways Company and purchased
by the Secretary of State for India in 1885, and in January 1886, it was named
North Western State Railways, which was later on renamed as North Western
Railway.

At the time of independence, 1,947 route miles (3,133 km) of North Western
Railways were transferred to India, leaving 5,048 route miles (8,122 km) to
Pakistan. In 1954, the railway line was extended to Mardan and Charsada, and in
1956 the Jacobabad-Kashmore 2 ft 6 in (762 mm) gauge line was converted into
broad gauge. In 1961, the Pakistani portion of North Western Railways was
renamed Pakistan Railways. The Kot Adu-Kashmore line was constructed
between 1969 and 1973 providing an alternative route from Karachi up the
country.




Organization Development & Change                                          Page 4
1.2 At Present

At present Pakistan Railway comprises of 8,163 route km, 1,212 stations and 42
train halts. It has a fleet of 546 diesel electric locomotives, 25,815 wagons and
2,099 passenger coaches. Maintenance is provided by three major locomotive
workshops and thirty-five smaller workshops. Signaling facilities at important
stations are track circulated within interlocking limits. Most routes have VHF
radio coverage for communication between train dispatchers and trains. Telephone
Communication is over wire lines and microwave. Pakistan Railways is multi
system and operates on three gauges, i.e. broad gauge, meter-gauge and narrow
gauge.

   1.3 Organizational Structure

Ministry of Railway is responsible for overall control of Pakistan Railways as well
as to guide the overall policy. There are four (4) Directorates in this PR namely
Administrative Directorate, Technical Directorate, Planning Directorate, and
Finance Directorate.

The following officers also report directly to the Secretary Railways:-

a. General Manager (Operations)

b. General Manager/Manufacture and Services

c. Federal Government Inspector of Railways

Railway Board is the highest body for technical matters of the Railways and
consists of Chairman and five Members out of which three are from the private
sector. Secretary to the Government of Pakistan, Ministry of Railways is the ex-
officio Chairman of Railway Board and the General Manager, Railways is the
Chief Executive Officer. Organization Structure of Pakistan Railways is of
functional type, headed by GM and assisted by four Addl. General Managers.

Pakistan Railways at this time is a vertically integrated organization and has four
business units:

   1.   Infrastructure Business Unit
   2.   Passenger Business Unit
   3.   Freight Business Unit
   4.   Manufacturing and Services Unit



Organization Development & Change                                           Page 5
1.4 Human Resource

Pakistan Railways is the largest civil employer in the country and has about
90,000 employees consisting of staff and officers as of 2008). 71% of the total
employees are working in Civil, Mechanical and Transportation departments. All
the hierarchy positions are held by graduate Engineers.


   2. PROBLEMS FACED BY PAKISTAN RAILWAYS
Since 1861 when the first railway line was laid down between Karachi and Kotri,
the expansion of the railway network by the British came at a rapid pace up until
1947. The driving factors for this growth were strategic and economic in nature.
For instance to thwart the Russians from the West, the British built the Khojak
tunnel, the fourth largest at that time, in seemingly inaccessible areas of
Balochistan to reach Chaman railway station. But after 1947, little has been done
to expand and maintain this network.

   2.1 Shortage of Locomotives:

The Pakistan Railways has a total of 546 locomotives but only 290 are on track
while the rest are out of order. Similarly, 70 per cent carriages are out of service.
In a report submitted to Railway Ministry, it has been disclosed that as many as 70
locomotives are awaiting spares at Pakistan Locomotive Factory, Risalpur since
2004.

   2.2 Eroding Market Share:

Railway sector in Pakistan has not maintained its position in the transport sector.
The market share of Pakistan Railways kept on declining with the passage of time.
For example, annual passenger volume carried by Pakistan Railways in late 1970’s
was approx. 145 million, which has come down to 59 million in 1992/93. The
freight business was of PR was 15 million tons in late 1960’s but has come down
to 7 million tons. Roads have steadily become the more preferred form of
transportation. An example of PR’s declining market share is that it is moving
only 11% of total petroleum products and 2% of the total containers. A more
professionally managed and independent railways have immense growth potential.

   2.3 Soaring Budget Deficit:

The biggest problem for Pakistan Railways is the soaring budget deficit. Although
railways are traditionally not expected to earn profit. However, it is legitimate to
expect from railways to meet at least operational expenses. Today Pakistan
Organization Development & Change                                             Page 6
Railways with Rs.334 billion liabilities is at the verge of bankruptcy because of
corruption, shortage of locomotives and losses incurred due to the running
expenses. According to one report Rs 21 billion is spent on wages and pensions
every month leaving the department less or nothing for maintenance of power and
rolling stocks.

In the light of above problems the Railway Board decided to hire external OD
consultants to design interventions that can help in turning around the organization
into a successful commercial entity.

   3. ENTERING & CONTRACTING
A group of four OD practitioners has been approached by the Railway Board to
help Pakistan Railways recover from the verge of bankruptcy. As OD consultants
for Pakistan Railways (PR), the first and foremost task for us is to understand the
current structure of the organization and the issues. A meeting with the Chairman
of Pakistan Railways, Raja Shahid Hussain and other members of Railway Board
was conducted to discuss the issues.

   3.1 Organizational Issues:

We conducted meetings with the members of Railway Board, General Manager
Railways, and Additional General Managers of each business unit of Pakistan
Railway and found out the following issues:

   -   Huge financial losses
   -   Decreased market share
   -   Inefficient operations
   -   Corruption

   3.2 Key Clients

In case of Pakistan Railways, our main client is the Railway Board. Other
important key clients include GM Railways, Addl. GM of each business unit, and
representatives from Railway Employees Union, Railway Workshop Worker’s
Union, and Association of Station Masters etc.

   3.3 OD Process

To fix the problems faced by Pakistan Railways (PR), we recommend the process
with following key steps:



Organization Development & Change                                            Page 7
-   Selecting a design team: A team of 8-10 individuals will be selected which
       will include key policy makers for Pakistan Railways, representatives from
       various functional areas of the organization and worker’s unions.
   -   Diagnosing: Once the team is selected a joint diagnosis of the organization
       will be conducted which will include understanding organization’s current
       strength and weaknesses, growth opportunities, organization culture and
       values etc.
   -   Action Planning: The first key output of the team is a 5 year action plan
       that describes where Pakistan Railway should move to, key activities and
       milestones, assigned responsibilities/accountabilities for those activities,
       and contingencies/assumptions that need to be monitored.
   -   Implementation, Monitoring & Evaluation: As the plan is implemented,
       new information, changes in the environment and other issues always arise
       that need adjustment. In this phase the OD consultants along with the
       design team will monitor the implementations and collect feedback to
       evaluate whether action plan is on track or not and will fix any deviations.
       Also design team will conduct formal evaluation processes and discuss
       their learning about organization structure and change.

   3.4 Time & Resources

As OD consultants, we will provide consultancy services up to and including
development of action plan. Additional time beyond that time can be contracted.
Apart from the consultancy fee Pakistan Railways will also be responsible for all
the direct expenses including airfares, hotels, etc. for the research. The complete
process including diagnosis and development of action plan might take six to eight
months subject to:

   -   Access to key information and people.
   -   Commitment from PR management
   -   Access to sensitive information like HR records, PR policies, PR contracts
       etc.
   -   Prompt response/feedback from key clients.



   4. DIAGNOSIS OF PAKISTAN RAILWAYS
In order to carry out a detailed diagnosis of Pakistan Railways, the OD
Consultants along with the design team gather the key information through:

   -   Questionnaires
   -   Interviews

Organization Development & Change                                           Page 8
-   Observations
   -   Unobtrusive measures

The data collected help us in identifying the root causes behind the problems faced
by Pakistan railways. Since the overall organization is facing problems, the
diagnosis is carried out at organizational level. The findings of diagnosis are
discussed in detailed as below:

   4.1 Huge Losses & Budget Deficit

The reason for this loss is the presence of unnecessary departments which are
white elephant for Pakistan Railways. The biggest among those is the Railways
Police that takes over Rs 1.5 billion including emoluments and other facilities
followed by Stores and Purchase. These departments should be abolished from
Railways without further delay. Their utility for railways is marginal at best. The
Audit and Accounts, Railways Workshops Division, and General Administration
staff need drastic cuts. These organizations are heavily overstaffed. If they will
continue to ignore the presence of non-productive over staffed departments with
very insignificant contribution in overall performance of Pakistan Railways, the
department will continue to decline. It shall never be in a position to meet the
expectations of public.

Railways are operating at low rates. A flexible policy for rates and fare requires to
be adopted whereby freight rates could be varied according to the type of
commodities as well as direction.

   4.2 Mismanagement

Currently Pakistan Railways is facing acute shortage of locomotives and spare
parts for maintenance of out of service locomotives. Since independence little has
been done to expand the railway network in Pakistan. As per the reports compiled
by the design team, Pakistan Railways need 40 – 50 locomotives annually to run
its operations effectively. However, during the past two decades only 100
locomotives have been added. The management of PR has failed to generate
revenues through use of assets like land, locomotive factory, carriage factory etc.

The focus of Railway officials is on getting new locomotives while ignoring the
improvement in operations and maintenance of existing locomotives. The plans to
change broad gauge into standard gauge at this stage are not just costly but also
unnecessary.

   4.3 Decreased Market Share


Organization Development & Change                                             Page 9
Over the years, Pakistan Railways could not maintain its share in the country’s
transport sector. With Railway ministry shutting down operations of various trains,
it is no wonder that the market share of Pakistan Railways in cargo transport has
fall to mere 5% from 75% in 1960s and 1970s.

Around the world, railways are the cheapest and safest mode of transport and
majority of goods transport is carried out via railways. However, in Pakistan the
situation is completely different. The indifferent attitude of various governments,
direct competition from NLC, container mafia and bus mafia are all behind the
drastic condition of Pakistan Railways today. Railways and NLC need to
coordinate their operation and also compete in their operations to economize on
the inter – modal movement of goods traffic. The Railway should carry goods in
bulk in the plains, while NLC and private road transport should take over further
distribution from these points in to the hilly regions. This will help the railway to
concentrate its resources of locomotives and wagons on the main line in the plains,
after withdrawing them from the hilly regions. This is in fact the best and most
economical rail road mix for the country.


   4.4 Corruption

Corruption is the biggest problem Pakistan Railways is facing today. The Railway
Department has been suffering losses since years long. Contractor system is one of
the causes of such losses. Moreover, there are enormous irregularities in local
purchases. The number of officers’ cadre has increased considerably since 1977,
mostly due to political appointments. It has been revealed that the crises are self
generated creating a space for more corruption and PRACS-Pakistan Railways
Advisory Commute Services is responsible for this mess.

Selective services have been privatized by allotting its contract to different private
parties to operate those privatized trains. Ironically the contract has been awarded
only for ticketing and like buss conductors those private firms after selling out the
ticket deposits payments into the Railways account. As per agreement after
deducting its commission the contractors are legally bound to deposit the funds
into the Railway account but due to the nexuses between Railways bosses and
private contractors deposit the funds in private accounts. This illegal practice has
confronted Railways with financial crunch where as the officials of Railways are
least bothered for the interest of Pakistan. Some Railways circles insist that
Pakistan Railways is still a viable and progressive organization, provided the
rampant corruption could be controlled.

In short Pakistan Railways is a classic example of bad governance, poor policies,
corruption and mismanagement.

Organization Development & Change                                             Page 10
5. ACTION PLANNING
After a careful diagnosis, the results were feedback to the main clients. Several
meetings were conducted with key clients to determine the type of OD
interventions that will most appropriately suit the needs of Pakistan Railways. The
clients and consultants jointly agree that Pakistan Railways need a mixture of
techno-structural and collaborative interventions to recover from the current crisis.

   5.1 Structural Design

Pakistan Railways is a vertically integrated highly bureaucratic organization. The
current organizational structure is a mixture of functional and divisional structures.
The positions are divided into four classes:

   -   Officer Cadre
   -   Station Masters
   -   Running Staff
   -   Class Four comprises of labors, signal operators etc.

The structure needs to be revamped into a more leaner and flexible one. A
combination of divisional and network structure will be most appropriate for
Pakistan railways. The PR management can retain the structure based on current
divisions and create a network of these divisions for better management of
operations and resources.

   5.2 Downsizing

The Pakistan Railways is an over staffed organization. Political appointments over
the years have added to the problem and are the major reason behind
organization’s financial troubles. Departments like Railway Police, Stores &
Purchase need to be abolished. Other over staffed departments like Audit &
Accounts, General Administration etc. need drastic cuts in workforce. For
successful implementation of downsizing, the PR management must follow the
following steps:

   -   Clarify organization’s strategy to its members and provide ample
       opportunities for them to voice their concerns ask questions and obtain
       counseling.
   -   In case of PR, the structural change will help in eliminating unnecessary
       layers, merge units and non productive staff can be reduced through layoffs
       and buyout packages.

Organization Development & Change                                             Page 11
-   While implementing methods of downsizing, management should use a top
       down approach. It should target inefficient and high cost areas. Keep people
       informed throughout the process about restructuring activities.
   -   Address the needs of survivors and those who leave to help them overcome
       the stress of structural changes.



   5.3 Reengineering

Pakistan Railways have great potential for growth. However, the current process
and technology does not provide much room for implementing growth strategies.
Pakistan Railways can improve the performance of its various functions and
department through proper use of information technology. The areas where
information technology can play a vital role include:

   -   Seat Reservations
   -   Freight Management
   -   Asset Management
   -   Track Management
   -   Rolling stock inventory
   -   Electric Billing
   -   Timetable

During diagnosis many members of Pakistan Railways suggested that the
organization should be privatized like PTCL to improve performance efficiency.
However, research suggested that key state owned enterprises like Railways,
Airlines, and Road Transport etc. should remained publically owned for the
overall benefit of the customers. However, Pakistan Railways can privatize some
of its units like The Locomotive Factory, The Carriage Factory and other large
manufacturing units.


   5.4 Alliance Interventions

Apart from techno-structural interventions, Pakistan Railways can make good use
of collaborative interventions to improve productivity. Instead of hiring
information technology and database experts, Pakistan Railways can create an
alliance with National Database & Registration Authority (NADRA) for
developing Track Management and Seat Reservation Systems.

Similarly Pakistan Railways can create alliance with China Railway Engineering
Corporation (CREC) for expansion of railway tracks in Pakistan.

Organization Development & Change                                          Page 12
5.5 Network Interventions

With the help of Public-Private Partnership, Pakistan Railways can create
networks to operate some of its route for privatized trains. For creating such a
network, PR can call for a private investor’s convention and brief those about the
available opportunities select the organizations that can fit in the network best and
implement networking strategies and evaluate the performance of networks
periodically.

For small routes Automatic Train Operation System can be implemented by
creating a network of Pakistan Railways with US General Railway Signal
Corporation (GRS), UK Westing House and Siemens Germany.


   6. CONCLUSION
With growing interest in the development of Trans-Asian rail links, one might
think that Pakistan Railways has a promising future. However, the Railway
Ministry, the Railway Board and all the relevant agencies have to play their role to
return Pakistan Railways to its glorious days. Before allocating any further funds
to bail out the organization, government should force the management to undergo
vast structural changes as recommended by OD consultants in this report. These
changes can be implemented within a period of 3 – 5 years and once the changes
have been made and evaluated then new investment plans can be made.




Organization Development & Change                                            Page 13
BIBLIOGRAPHY

   - Organization Development & Change – 8th Edition by Cummings &
     Worley.
   - www.pakrail.com
   - www.railwaygazette.com
   - www.wikipedia.com
   - www.pakistaniat.com
   - Article “Corruption in Pakistan Railways” published in Pukhtoonistan
     Gazette on Friday, 26 November, 2010
   - http://pak1stanfirst.com/201102253236/pakistan/economy/fixing-
     pakistan-railways.html
   - Various articles and editorials published in Daily Dawn and The
     Nation from July 2010 – March 2011
   - http://www.privatisation.gov.pk/Transport/Pakistan%20Railways.htm




Organization Development & Change                                 Page 14

More Related Content

What's hot

Pakistan railways history
Pakistan railways historyPakistan railways history
Pakistan railways historyNajeeb Uttra
 
Pakistan railway project (tqm)
Pakistan railway project (tqm)Pakistan railway project (tqm)
Pakistan railway project (tqm)Sufi Nouman Riaz
 
PAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEPAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEfaizyelectrical
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTABDUL SAMAD
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistanAwais Munir
 
Pakistan transport slideshare
Pakistan transport slidesharePakistan transport slideshare
Pakistan transport slideshareNJUSTAiMo
 
Pakistan china relations
Pakistan china relationsPakistan china relations
Pakistan china relationskashifnaveed225
 
Infrastructure of transportation
Infrastructure of transportationInfrastructure of transportation
Infrastructure of transportationSiddhi Vakharia
 
Pakistan railways past - present - future - cpec
Pakistan railways   past - present - future - cpecPakistan railways   past - present - future - cpec
Pakistan railways past - present - future - cpecMaqsood Khan
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railwayKhusro_khan
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railwaysjags_champ
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and DamsRaees Shah
 
Geo political importance of pakistan and problems
Geo political importance of pakistan and problemsGeo political importance of pakistan and problems
Geo political importance of pakistan and problemsAndleebNayyar
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARBhavik khakhkhar
 
decade of development
 decade of development decade of development
decade of developmentNazish Jamali
 
Top 10 works of pm imran khan
Top 10 works of pm imran khanTop 10 works of pm imran khan
Top 10 works of pm imran khanUzair Ahmad
 
Pakistan China Economic Corridor
Pakistan China Economic CorridorPakistan China Economic Corridor
Pakistan China Economic CorridorAtif Nauman
 
China Pakistan Economic Corridor (CPEC)
China Pakistan Economic Corridor (CPEC)China Pakistan Economic Corridor (CPEC)
China Pakistan Economic Corridor (CPEC)Asad Afridi
 

What's hot (20)

Pakistan railways history
Pakistan railways historyPakistan railways history
Pakistan railways history
 
Pakistan railway project (tqm)
Pakistan railway project (tqm)Pakistan railway project (tqm)
Pakistan railway project (tqm)
 
PAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINEPAKISTAN RAILWAYS DECLINE
PAKISTAN RAILWAYS DECLINE
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPT
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistan
 
Pakistan transport slideshare
Pakistan transport slidesharePakistan transport slideshare
Pakistan transport slideshare
 
Pakistan china relations
Pakistan china relationsPakistan china relations
Pakistan china relations
 
Infrastructure of transportation
Infrastructure of transportationInfrastructure of transportation
Infrastructure of transportation
 
Pakistan railways past - present - future - cpec
Pakistan railways   past - present - future - cpecPakistan railways   past - present - future - cpec
Pakistan railways past - present - future - cpec
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
Presentation railways
Presentation railwaysPresentation railways
Presentation railways
 
Link canals, Baraages and Dams
Link canals, Baraages and DamsLink canals, Baraages and Dams
Link canals, Baraages and Dams
 
Pak army
Pak armyPak army
Pak army
 
Geo political importance of pakistan and problems
Geo political importance of pakistan and problemsGeo political importance of pakistan and problems
Geo political importance of pakistan and problems
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
decade of development
 decade of development decade of development
decade of development
 
Top 10 works of pm imran khan
Top 10 works of pm imran khanTop 10 works of pm imran khan
Top 10 works of pm imran khan
 
Pakistan China Economic Corridor
Pakistan China Economic CorridorPakistan China Economic Corridor
Pakistan China Economic Corridor
 
China Pakistan Economic Corridor (CPEC)
China Pakistan Economic Corridor (CPEC)China Pakistan Economic Corridor (CPEC)
China Pakistan Economic Corridor (CPEC)
 
Cpec, by Egr Khalil Dawar
Cpec,  by Egr Khalil DawarCpec,  by Egr Khalil Dawar
Cpec, by Egr Khalil Dawar
 

Viewers also liked

Case study of pakistan international airline(pia) downfalls
Case study of pakistan international airline(pia) downfallsCase study of pakistan international airline(pia) downfalls
Case study of pakistan international airline(pia) downfallsTauseef Gillani
 
Building Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresBuilding Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresRithika Ravishankar
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways0wais777
 
Structural Weaknesses of Pakistan Economy
Structural Weaknesses of Pakistan EconomyStructural Weaknesses of Pakistan Economy
Structural Weaknesses of Pakistan EconomyVaqar Ahmed
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentAzher Malik
 
Agricultural development in PAKISTAN
Agricultural development in PAKISTANAgricultural development in PAKISTAN
Agricultural development in PAKISTANArifa
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistanAYAZ AHMAD
 
Vintage Pakistan photos
Vintage Pakistan photosVintage Pakistan photos
Vintage Pakistan photosZaid Hamid
 
Pakistan Strengths.... lets promote Pakistan and discuss positives
Pakistan Strengths.... lets promote Pakistan and discuss positives Pakistan Strengths.... lets promote Pakistan and discuss positives
Pakistan Strengths.... lets promote Pakistan and discuss positives muhammadadnankhan
 
D ch58
D ch58D ch58
D ch58rodolv
 
The case study of benetton
The case study of benettonThe case study of benetton
The case study of benettonMustafa Watar
 

Viewers also liked (15)

Case study of pakistan international airline(pia) downfalls
Case study of pakistan international airline(pia) downfallsCase study of pakistan international airline(pia) downfalls
Case study of pakistan international airline(pia) downfalls
 
Building Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresBuilding Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structures
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways
 
Structural Weaknesses of Pakistan Economy
Structural Weaknesses of Pakistan EconomyStructural Weaknesses of Pakistan Economy
Structural Weaknesses of Pakistan Economy
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd Development
 
Agricultural development in PAKISTAN
Agricultural development in PAKISTANAgricultural development in PAKISTAN
Agricultural development in PAKISTAN
 
Types of tracks in pakistan
Types of tracks in pakistanTypes of tracks in pakistan
Types of tracks in pakistan
 
anadyn-en-4p-2016
anadyn-en-4p-2016anadyn-en-4p-2016
anadyn-en-4p-2016
 
Vintage Pakistan photos
Vintage Pakistan photosVintage Pakistan photos
Vintage Pakistan photos
 
Pakistan Strengths.... lets promote Pakistan and discuss positives
Pakistan Strengths.... lets promote Pakistan and discuss positives Pakistan Strengths.... lets promote Pakistan and discuss positives
Pakistan Strengths.... lets promote Pakistan and discuss positives
 
D ch58
D ch58D ch58
D ch58
 
The case study of benetton
The case study of benettonThe case study of benetton
The case study of benetton
 
Lok Virsa
Lok VirsaLok Virsa
Lok Virsa
 
TUSHAR SAINI
TUSHAR SAINITUSHAR SAINI
TUSHAR SAINI
 
Paktel
PaktelPaktel
Paktel
 

Similar to Pakistan railways

Transportation system in pakistan
Transportation system in pakistanTransportation system in pakistan
Transportation system in pakistanAsraHafeez
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESPawan Sharma
 
Industrial training by nakul
Industrial training by nakulIndustrial training by nakul
Industrial training by nakulNakul Adhikari
 
Indian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the NationIndian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the NationDINESH GERA
 
Turnaround Of Indian Railways
Turnaround Of Indian RailwaysTurnaround Of Indian Railways
Turnaround Of Indian RailwaysRushabh Thakker
 
Summer training report_on_indian_railway
Summer training report_on_indian_railwaySummer training report_on_indian_railway
Summer training report_on_indian_railwayanirudh patel
 
Indian Railway Infrastracture
Indian Railway InfrastractureIndian Railway Infrastracture
Indian Railway Infrastracturemaheshrotale
 
A Study on High Speed Rails in India
A Study on High Speed Rails in IndiaA Study on High Speed Rails in India
A Study on High Speed Rails in IndiaSelladurai Muthusamy
 
IRJET- Problem of Indian Railway Management System
IRJET-  	  Problem of Indian Railway Management SystemIRJET-  	  Problem of Indian Railway Management System
IRJET- Problem of Indian Railway Management SystemIRJET Journal
 
Indian Railway
Indian  RailwayIndian  Railway
Indian Railwayanupam
 
report on loco workshop ajmer
report on loco workshop ajmerreport on loco workshop ajmer
report on loco workshop ajmerYashRajSingh41
 

Similar to Pakistan railways (20)

Transportation system in pakistan
Transportation system in pakistanTransportation system in pakistan
Transportation system in pakistan
 
Pk railway
Pk railwayPk railway
Pk railway
 
Pk railway
Pk railwayPk railway
Pk railway
 
Training Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCESTraining Report on indian railways on AC COACH MAINTANCES
Training Report on indian railways on AC COACH MAINTANCES
 
Railway
RailwayRailway
Railway
 
Industrial training by nakul
Industrial training by nakulIndustrial training by nakul
Industrial training by nakul
 
Indian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the NationIndian Railways - Lifeline of the Nation
Indian Railways - Lifeline of the Nation
 
Turnaround Of Indian Railways
Turnaround Of Indian RailwaysTurnaround Of Indian Railways
Turnaround Of Indian Railways
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Summer training report_on_indian_railway
Summer training report_on_indian_railwaySummer training report_on_indian_railway
Summer training report_on_indian_railway
 
Nagesh.pptx
Nagesh.pptxNagesh.pptx
Nagesh.pptx
 
THE INDIAN RAILWAYS
THE INDIAN RAILWAYSTHE INDIAN RAILWAYS
THE INDIAN RAILWAYS
 
Indian Railway Infrastracture
Indian Railway InfrastractureIndian Railway Infrastracture
Indian Railway Infrastracture
 
A Study on High Speed Rails in India
A Study on High Speed Rails in IndiaA Study on High Speed Rails in India
A Study on High Speed Rails in India
 
Bangladeshi Rail (by Robin)
Bangladeshi Rail (by Robin)Bangladeshi Rail (by Robin)
Bangladeshi Rail (by Robin)
 
IRJET- Problem of Indian Railway Management System
IRJET-  	  Problem of Indian Railway Management SystemIRJET-  	  Problem of Indian Railway Management System
IRJET- Problem of Indian Railway Management System
 
Indian Railway
Indian  RailwayIndian  Railway
Indian Railway
 
report on loco workshop ajmer
report on loco workshop ajmerreport on loco workshop ajmer
report on loco workshop ajmer
 
railways.pptx
railways.pptxrailways.pptx
railways.pptx
 
Transport system ..
Transport system ..Transport system ..
Transport system ..
 

Recently uploaded

General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 

Recently uploaded (20)

General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Pakistan railways

  • 1. 2011 Submitted to: Mr. Haroon Waheed [PAKISTAN RAILWAYS – THE LIFE LINE OF THE COUNTRY] Prepared By: Maria Jawed (9689) Safia AbdulAziz (9613) Sumaiya Farooqui (9570) Javeria Siddiq (xxxx)
  • 2. TABLE OF CONTENTS S. # Topics Page # Executive Summary 2 1. Pakistan Railways – the life line of the 3 country 1.1 History 1.2 At Present 1.3 Organizational Structure 1.4 Human Resource 2. Problems faced by Pakistan Railways 5 2.1 Shortage of Locomotives 2.2 Eroding Market Share 2.3 Soaring Budget Deficit 3. Entering & Contracting 6 3.1 Organizational Issues 3.2 Key Clients 3.3 OD Process 3.4 Time & Resources 4. Diagnosis of Pakistan Railways 7 4.1 Huge Losses and Budget Deficit 4.2 Mismanagement 4.3 Decreased Market share 4.4 Corruption 5. Action Planning 10 5.1 Structural Design 5.2 Downsizing 5.3 Reengineering 5.4 Alliance Intervention 5.5 Network Intervention 6. Conclusion 12 Bibliography 13 Organization Development & Change Page 2
  • 3. EXECUTIVE SUMMARY Pakistan Railways (PR) is the state owned railway company of Pakistan. It is a large organization under the administration of Ministry of Railways. Pakistan Railways provides an important mode of transportation in the farthest corners of the country and brings them closer for business, sightseeing, pilgrimage and education. He current Chairman is Raja Shahid Hussain. Over the past many years, Pakistan Railways has been facing problems and is now on the verge of bankruptcy. With budget deficit of billions, eroding market share and corruption scandals, the future of Pakistan Railways – once the life line of the country – is grim. At the time of independence, both India and Pakistan, inherited the Railway Network laid down by British. While Indian Railways has emerged as a highly profitable organization, Pakistan Railways is struggling to keep itself running. This report summarizes how organization development can help Pakistan Railways revamp its image and goodwill. It is based on facts and hypothetical situations created by the group members to evaluate the applicability of OD interventions. He data is collected from various sources including books, newspaper articles and internet. The report provides introduction of Pakistan Railways, its history, organizational structure which is then followed by how the concepts of entering and contracting can be applied to this case. Diagnosis of the organization has been done with the help of data collected and hypothetical situations. Based on the diagnosis, OD interventions have been suggested for Pakistan railways which include techno- structural interventions and collaborative interventions. Organization Development & Change Page 3
  • 4. 1. PAKISTAN RAILWAYS – THE LIFE LINE OF THE COUNTRY 1.1 History The possibility of Karachi as a sea port was first noticed in the middle of 19th century. Sir Henry Edward Frere was appointed Commissioner of Sindh after its annexation with Bombay in 1847 and sought permission from Lord Dalhousie to begin a survey for a sea port. He also initiated the survey for a railway line in 1858. It was proposed that a railway line from Karachi City to Kotri, steam navigation up the Indus and Chenab rivers up to Multan and from there another railway to Lahore and beyond be constructed. It was on 13 May 1861, that the first railway line was opened for public traffic between Karachi City and Kotri, a distance of 105 miles (169 km). The line between Karachi City and Keamari was opened on 16 June 1889. During 1897 the line from Keamari to Kotri was doubled. The railway line from Peshawar to Karachi closely follows Alexander’s line of march through the Hindukush Mountains to the Arabian Sea. Different sections on the existing main line from Peshawar to Lahore and Multan and branch lines were constructed in the last quarter of 19th century and early years of 20th century. The four sections, i.e., Scinde (Sindh) Railways, Indian Flotilla Company, Punjab Railway and Delhi Railways, working in a single company, were later on amalgamated into the Scinde, Punjab & Delhi Railways Company and purchased by the Secretary of State for India in 1885, and in January 1886, it was named North Western State Railways, which was later on renamed as North Western Railway. At the time of independence, 1,947 route miles (3,133 km) of North Western Railways were transferred to India, leaving 5,048 route miles (8,122 km) to Pakistan. In 1954, the railway line was extended to Mardan and Charsada, and in 1956 the Jacobabad-Kashmore 2 ft 6 in (762 mm) gauge line was converted into broad gauge. In 1961, the Pakistani portion of North Western Railways was renamed Pakistan Railways. The Kot Adu-Kashmore line was constructed between 1969 and 1973 providing an alternative route from Karachi up the country. Organization Development & Change Page 4
  • 5. 1.2 At Present At present Pakistan Railway comprises of 8,163 route km, 1,212 stations and 42 train halts. It has a fleet of 546 diesel electric locomotives, 25,815 wagons and 2,099 passenger coaches. Maintenance is provided by three major locomotive workshops and thirty-five smaller workshops. Signaling facilities at important stations are track circulated within interlocking limits. Most routes have VHF radio coverage for communication between train dispatchers and trains. Telephone Communication is over wire lines and microwave. Pakistan Railways is multi system and operates on three gauges, i.e. broad gauge, meter-gauge and narrow gauge. 1.3 Organizational Structure Ministry of Railway is responsible for overall control of Pakistan Railways as well as to guide the overall policy. There are four (4) Directorates in this PR namely Administrative Directorate, Technical Directorate, Planning Directorate, and Finance Directorate. The following officers also report directly to the Secretary Railways:- a. General Manager (Operations) b. General Manager/Manufacture and Services c. Federal Government Inspector of Railways Railway Board is the highest body for technical matters of the Railways and consists of Chairman and five Members out of which three are from the private sector. Secretary to the Government of Pakistan, Ministry of Railways is the ex- officio Chairman of Railway Board and the General Manager, Railways is the Chief Executive Officer. Organization Structure of Pakistan Railways is of functional type, headed by GM and assisted by four Addl. General Managers. Pakistan Railways at this time is a vertically integrated organization and has four business units: 1. Infrastructure Business Unit 2. Passenger Business Unit 3. Freight Business Unit 4. Manufacturing and Services Unit Organization Development & Change Page 5
  • 6. 1.4 Human Resource Pakistan Railways is the largest civil employer in the country and has about 90,000 employees consisting of staff and officers as of 2008). 71% of the total employees are working in Civil, Mechanical and Transportation departments. All the hierarchy positions are held by graduate Engineers. 2. PROBLEMS FACED BY PAKISTAN RAILWAYS Since 1861 when the first railway line was laid down between Karachi and Kotri, the expansion of the railway network by the British came at a rapid pace up until 1947. The driving factors for this growth were strategic and economic in nature. For instance to thwart the Russians from the West, the British built the Khojak tunnel, the fourth largest at that time, in seemingly inaccessible areas of Balochistan to reach Chaman railway station. But after 1947, little has been done to expand and maintain this network. 2.1 Shortage of Locomotives: The Pakistan Railways has a total of 546 locomotives but only 290 are on track while the rest are out of order. Similarly, 70 per cent carriages are out of service. In a report submitted to Railway Ministry, it has been disclosed that as many as 70 locomotives are awaiting spares at Pakistan Locomotive Factory, Risalpur since 2004. 2.2 Eroding Market Share: Railway sector in Pakistan has not maintained its position in the transport sector. The market share of Pakistan Railways kept on declining with the passage of time. For example, annual passenger volume carried by Pakistan Railways in late 1970’s was approx. 145 million, which has come down to 59 million in 1992/93. The freight business was of PR was 15 million tons in late 1960’s but has come down to 7 million tons. Roads have steadily become the more preferred form of transportation. An example of PR’s declining market share is that it is moving only 11% of total petroleum products and 2% of the total containers. A more professionally managed and independent railways have immense growth potential. 2.3 Soaring Budget Deficit: The biggest problem for Pakistan Railways is the soaring budget deficit. Although railways are traditionally not expected to earn profit. However, it is legitimate to expect from railways to meet at least operational expenses. Today Pakistan Organization Development & Change Page 6
  • 7. Railways with Rs.334 billion liabilities is at the verge of bankruptcy because of corruption, shortage of locomotives and losses incurred due to the running expenses. According to one report Rs 21 billion is spent on wages and pensions every month leaving the department less or nothing for maintenance of power and rolling stocks. In the light of above problems the Railway Board decided to hire external OD consultants to design interventions that can help in turning around the organization into a successful commercial entity. 3. ENTERING & CONTRACTING A group of four OD practitioners has been approached by the Railway Board to help Pakistan Railways recover from the verge of bankruptcy. As OD consultants for Pakistan Railways (PR), the first and foremost task for us is to understand the current structure of the organization and the issues. A meeting with the Chairman of Pakistan Railways, Raja Shahid Hussain and other members of Railway Board was conducted to discuss the issues. 3.1 Organizational Issues: We conducted meetings with the members of Railway Board, General Manager Railways, and Additional General Managers of each business unit of Pakistan Railway and found out the following issues: - Huge financial losses - Decreased market share - Inefficient operations - Corruption 3.2 Key Clients In case of Pakistan Railways, our main client is the Railway Board. Other important key clients include GM Railways, Addl. GM of each business unit, and representatives from Railway Employees Union, Railway Workshop Worker’s Union, and Association of Station Masters etc. 3.3 OD Process To fix the problems faced by Pakistan Railways (PR), we recommend the process with following key steps: Organization Development & Change Page 7
  • 8. - Selecting a design team: A team of 8-10 individuals will be selected which will include key policy makers for Pakistan Railways, representatives from various functional areas of the organization and worker’s unions. - Diagnosing: Once the team is selected a joint diagnosis of the organization will be conducted which will include understanding organization’s current strength and weaknesses, growth opportunities, organization culture and values etc. - Action Planning: The first key output of the team is a 5 year action plan that describes where Pakistan Railway should move to, key activities and milestones, assigned responsibilities/accountabilities for those activities, and contingencies/assumptions that need to be monitored. - Implementation, Monitoring & Evaluation: As the plan is implemented, new information, changes in the environment and other issues always arise that need adjustment. In this phase the OD consultants along with the design team will monitor the implementations and collect feedback to evaluate whether action plan is on track or not and will fix any deviations. Also design team will conduct formal evaluation processes and discuss their learning about organization structure and change. 3.4 Time & Resources As OD consultants, we will provide consultancy services up to and including development of action plan. Additional time beyond that time can be contracted. Apart from the consultancy fee Pakistan Railways will also be responsible for all the direct expenses including airfares, hotels, etc. for the research. The complete process including diagnosis and development of action plan might take six to eight months subject to: - Access to key information and people. - Commitment from PR management - Access to sensitive information like HR records, PR policies, PR contracts etc. - Prompt response/feedback from key clients. 4. DIAGNOSIS OF PAKISTAN RAILWAYS In order to carry out a detailed diagnosis of Pakistan Railways, the OD Consultants along with the design team gather the key information through: - Questionnaires - Interviews Organization Development & Change Page 8
  • 9. - Observations - Unobtrusive measures The data collected help us in identifying the root causes behind the problems faced by Pakistan railways. Since the overall organization is facing problems, the diagnosis is carried out at organizational level. The findings of diagnosis are discussed in detailed as below: 4.1 Huge Losses & Budget Deficit The reason for this loss is the presence of unnecessary departments which are white elephant for Pakistan Railways. The biggest among those is the Railways Police that takes over Rs 1.5 billion including emoluments and other facilities followed by Stores and Purchase. These departments should be abolished from Railways without further delay. Their utility for railways is marginal at best. The Audit and Accounts, Railways Workshops Division, and General Administration staff need drastic cuts. These organizations are heavily overstaffed. If they will continue to ignore the presence of non-productive over staffed departments with very insignificant contribution in overall performance of Pakistan Railways, the department will continue to decline. It shall never be in a position to meet the expectations of public. Railways are operating at low rates. A flexible policy for rates and fare requires to be adopted whereby freight rates could be varied according to the type of commodities as well as direction. 4.2 Mismanagement Currently Pakistan Railways is facing acute shortage of locomotives and spare parts for maintenance of out of service locomotives. Since independence little has been done to expand the railway network in Pakistan. As per the reports compiled by the design team, Pakistan Railways need 40 – 50 locomotives annually to run its operations effectively. However, during the past two decades only 100 locomotives have been added. The management of PR has failed to generate revenues through use of assets like land, locomotive factory, carriage factory etc. The focus of Railway officials is on getting new locomotives while ignoring the improvement in operations and maintenance of existing locomotives. The plans to change broad gauge into standard gauge at this stage are not just costly but also unnecessary. 4.3 Decreased Market Share Organization Development & Change Page 9
  • 10. Over the years, Pakistan Railways could not maintain its share in the country’s transport sector. With Railway ministry shutting down operations of various trains, it is no wonder that the market share of Pakistan Railways in cargo transport has fall to mere 5% from 75% in 1960s and 1970s. Around the world, railways are the cheapest and safest mode of transport and majority of goods transport is carried out via railways. However, in Pakistan the situation is completely different. The indifferent attitude of various governments, direct competition from NLC, container mafia and bus mafia are all behind the drastic condition of Pakistan Railways today. Railways and NLC need to coordinate their operation and also compete in their operations to economize on the inter – modal movement of goods traffic. The Railway should carry goods in bulk in the plains, while NLC and private road transport should take over further distribution from these points in to the hilly regions. This will help the railway to concentrate its resources of locomotives and wagons on the main line in the plains, after withdrawing them from the hilly regions. This is in fact the best and most economical rail road mix for the country. 4.4 Corruption Corruption is the biggest problem Pakistan Railways is facing today. The Railway Department has been suffering losses since years long. Contractor system is one of the causes of such losses. Moreover, there are enormous irregularities in local purchases. The number of officers’ cadre has increased considerably since 1977, mostly due to political appointments. It has been revealed that the crises are self generated creating a space for more corruption and PRACS-Pakistan Railways Advisory Commute Services is responsible for this mess. Selective services have been privatized by allotting its contract to different private parties to operate those privatized trains. Ironically the contract has been awarded only for ticketing and like buss conductors those private firms after selling out the ticket deposits payments into the Railways account. As per agreement after deducting its commission the contractors are legally bound to deposit the funds into the Railway account but due to the nexuses between Railways bosses and private contractors deposit the funds in private accounts. This illegal practice has confronted Railways with financial crunch where as the officials of Railways are least bothered for the interest of Pakistan. Some Railways circles insist that Pakistan Railways is still a viable and progressive organization, provided the rampant corruption could be controlled. In short Pakistan Railways is a classic example of bad governance, poor policies, corruption and mismanagement. Organization Development & Change Page 10
  • 11. 5. ACTION PLANNING After a careful diagnosis, the results were feedback to the main clients. Several meetings were conducted with key clients to determine the type of OD interventions that will most appropriately suit the needs of Pakistan Railways. The clients and consultants jointly agree that Pakistan Railways need a mixture of techno-structural and collaborative interventions to recover from the current crisis. 5.1 Structural Design Pakistan Railways is a vertically integrated highly bureaucratic organization. The current organizational structure is a mixture of functional and divisional structures. The positions are divided into four classes: - Officer Cadre - Station Masters - Running Staff - Class Four comprises of labors, signal operators etc. The structure needs to be revamped into a more leaner and flexible one. A combination of divisional and network structure will be most appropriate for Pakistan railways. The PR management can retain the structure based on current divisions and create a network of these divisions for better management of operations and resources. 5.2 Downsizing The Pakistan Railways is an over staffed organization. Political appointments over the years have added to the problem and are the major reason behind organization’s financial troubles. Departments like Railway Police, Stores & Purchase need to be abolished. Other over staffed departments like Audit & Accounts, General Administration etc. need drastic cuts in workforce. For successful implementation of downsizing, the PR management must follow the following steps: - Clarify organization’s strategy to its members and provide ample opportunities for them to voice their concerns ask questions and obtain counseling. - In case of PR, the structural change will help in eliminating unnecessary layers, merge units and non productive staff can be reduced through layoffs and buyout packages. Organization Development & Change Page 11
  • 12. - While implementing methods of downsizing, management should use a top down approach. It should target inefficient and high cost areas. Keep people informed throughout the process about restructuring activities. - Address the needs of survivors and those who leave to help them overcome the stress of structural changes. 5.3 Reengineering Pakistan Railways have great potential for growth. However, the current process and technology does not provide much room for implementing growth strategies. Pakistan Railways can improve the performance of its various functions and department through proper use of information technology. The areas where information technology can play a vital role include: - Seat Reservations - Freight Management - Asset Management - Track Management - Rolling stock inventory - Electric Billing - Timetable During diagnosis many members of Pakistan Railways suggested that the organization should be privatized like PTCL to improve performance efficiency. However, research suggested that key state owned enterprises like Railways, Airlines, and Road Transport etc. should remained publically owned for the overall benefit of the customers. However, Pakistan Railways can privatize some of its units like The Locomotive Factory, The Carriage Factory and other large manufacturing units. 5.4 Alliance Interventions Apart from techno-structural interventions, Pakistan Railways can make good use of collaborative interventions to improve productivity. Instead of hiring information technology and database experts, Pakistan Railways can create an alliance with National Database & Registration Authority (NADRA) for developing Track Management and Seat Reservation Systems. Similarly Pakistan Railways can create alliance with China Railway Engineering Corporation (CREC) for expansion of railway tracks in Pakistan. Organization Development & Change Page 12
  • 13. 5.5 Network Interventions With the help of Public-Private Partnership, Pakistan Railways can create networks to operate some of its route for privatized trains. For creating such a network, PR can call for a private investor’s convention and brief those about the available opportunities select the organizations that can fit in the network best and implement networking strategies and evaluate the performance of networks periodically. For small routes Automatic Train Operation System can be implemented by creating a network of Pakistan Railways with US General Railway Signal Corporation (GRS), UK Westing House and Siemens Germany. 6. CONCLUSION With growing interest in the development of Trans-Asian rail links, one might think that Pakistan Railways has a promising future. However, the Railway Ministry, the Railway Board and all the relevant agencies have to play their role to return Pakistan Railways to its glorious days. Before allocating any further funds to bail out the organization, government should force the management to undergo vast structural changes as recommended by OD consultants in this report. These changes can be implemented within a period of 3 – 5 years and once the changes have been made and evaluated then new investment plans can be made. Organization Development & Change Page 13
  • 14. BIBLIOGRAPHY - Organization Development & Change – 8th Edition by Cummings & Worley. - www.pakrail.com - www.railwaygazette.com - www.wikipedia.com - www.pakistaniat.com - Article “Corruption in Pakistan Railways” published in Pukhtoonistan Gazette on Friday, 26 November, 2010 - http://pak1stanfirst.com/201102253236/pakistan/economy/fixing- pakistan-railways.html - Various articles and editorials published in Daily Dawn and The Nation from July 2010 – March 2011 - http://www.privatisation.gov.pk/Transport/Pakistan%20Railways.htm Organization Development & Change Page 14