The IF Strategy that determines the various stratification of the Project into an Agile Plan is capable of incorporating streams of componentization and scientific assets to determine the outcome of building the glass table and other production requirements.
1. Glass Impact
SerializedTuning in Ark Design
MDIA
Glass Design Series
V1 Componentization Theory
V2 Making Solid State
V3 Table Design Outcomes
Parts I & II: Keys andTools
2. The Glass Impact of Agile Design
Transform Project- STRABO Content
• InV1 we will discuss the Componentization
Theory and the Blend over process in
Strabo in B
• InV2 we will notice the making
requirement of solid-state engineering in C
• InV3 we will pursue theTable Design from
the process chart and new Strabo
deliverables in E
Glass Design Series
V1 Componentization Theory
V2 Making Solid State
V3 Table Design Outcomes
12/20/2022 Brij Consulting, LLC Jean A. Marshall 2
CASCADE CARRIAGE APPLIANCE THREAD
CANDLE STONE
GE: Green
3. GROWTH STRATEGY
How we’ll scale in the future
FIRST GLASS CAR MODEL: OCT 2034
Roll out product to high profile or top-level participants to help establish
the product
GLASS HOUSE: MAY 2059
Release of the product to the general public and monitor with release
on Ark Media Dimensional Television
REMOTE PORTALS: MAY 2069
Gather feedback and adjust product design as necessary
12/20/2022 Brij Consulting, LLC Jean A. Marshall 3
Manual prefigures
5. Graphic ProcessTheory in Build Design
• The ProcessTheory in Build Design is
using a sideways task orientation
process (horizontal spectrum)
Simul-cast
Layers
Evolve
Cloud fluency is the
next state to evolve
12/20/2022 Brij Consulting, LLC Jean A. Marshall 5
6. Engineering Captivation
Volume (dark blue) acts like a
Driver with changing design
(Mu) providing model carriage
(orange.)The Supply Chain
and at some point, the Blue
Cloud absorbs all processes
fluently (higher adaptation).
Notice theArcing ends and
full engineering parameters.
Continuous
Crossover
Network
--T3 &T4Tasks-- --T1 &T2Tasks-- --Fin & BRTasks-
-
12/20/2022
Brij Consulting, LLC Jean A. Marshall
6
7. Group B:T3 &T4
• GreenWall, Infrastructure Upgrade
• Big push for GE,Car and Road SyncThread,
Encryption, Secant Engineering
Group C:T1 &T2
• Portals and Partners,Warehouse Remote
• Build Cases, InstanceTiming, Multi-form
Group E: Fin and Br
• Branch IP and Assembly, Streamline
• Morning Star Partnership, Blue Cloud Certs.
• Specific Relevant Groupings supply the INSIDE TRACK to
metric accomplishment across the Glass Spectrum
2S
2S
Priority order
12/20/2022 Brij Consulting, LLC Jean A. Marshall 7
More on this…
8. Context of
Secant
Engineering
S A
TC
Secant Engineering is based on theArk
Design described biblically as doctrine
to be observed. And we are shown
tasks in glass that conform to the
theory and practice that we have
observed.
Our Learning Series has 50 papers on this topic
12/20/2022
Brij Consulting, LLC Jean A. Marshall
8
9. Add a SlideTitle - 1
Various levels of mathematics
can be done using the wheel
construction as well as
determining the best
engineering, especially at the
level of table arrangements
Process
Configurations
Filtered Examples
Towards
Fulfillment
12/20/2022 Brij Consulting, LLC Jean A. Marshall 9
Storyboard
Prototype
Production Book
IP
10. OriginatingTask Order
12/20/2022 Brij Consulting, LLC Jean A. Marshall 10
From Small Form to Large
Form Componentization
Streams of
Componentizations
The Strabo Mechanic may become part of the
componentized product to assimilate it
11. Project Startup and Origin of Events
The Green Wall begins here, and all
events have their source inT3&T4
12/20/2022 Brij Consulting, LLC Jean A. Marshall 11
Wall
Relational Context to
compiled outcomes
2[e(b)-.004]=[W(m)+.0056]
Transom = .0016
Transform = .0016 x [2x 10^5]
[W(b)=T +.903]
.903/3 = .301
[Glass notation]
12. Glass Design Series
V1 Componentization Theory
V2 Making Solid State
V3 Table Design Outcomes
Making Solid
State
All Glass and Build Case Remote
See this paper
when available
Appliance Branching
13. Making SSE
TheTheory of making solid state assemblage
comes from:
A determination of the market ready state of it
– A combination of the engineering testing of a fully
assembled series of componentized arrangements
and their resemblance to a synergized and ready
state of functional performance
– An ability to reproduce it in whole or in deliverable
parts to the installer or assembler of a market ready
product
– An ability to achieve product subscription at an
optimal rate and asset valuation or some variety of
sale and leaseback arrangement to a dealer. Assets
become like software in a cloud (i.e., star-cloud
arrangement.)
– Vendors can branch in appliance mechanic
Solid State Engineering
12/20/2022 Brij Consulting, LLC Jean A. Marshall 13
Good Systems have good controls over
access and use, competent operation and
value-based compensations. This can be
achieved largely through the thread
arrangements that cause people to be
knowledgeable and bearing the correct
thread path iconic design and encryption
patterns to allow delivery of the end
product or services.
Modern Lathe
SSE build
media
All Glass
14. Cascade Outcome
Once the CascadeTheory is learned with
the GreenWall it can be applied to the
component driven assembly of the solid-
state engineering strategy, to see the
impacts on each requirement. Graphical
Analysis and Interpolation is the whole
length of the project using data driven
metrics and equations. Cascade in the Ark
Wall is a different form of Cascade, but one
built upon the former GreenWall.
12/20/2022 Brij Consulting, LLC Jean A. Marshall 14
Models supply
a tan line
Wall
Table Requirements
Table Requirements:
1. Simulations
2. Tan LineTracking
3. Trig and Secant Relations
15. Glass Design Series
V1 Componentization Theory
V2 Making Solid State
V3 Table Design Outcomes
Table Design
Outcomes
Glass Modeling, dimensional
table-top and portal layout
See this paper
when available
16. Cloud/Star Evolution
Portal Composition Starter Set
To meet GlassTable Arrangement
12/20/2022 Brij Consulting, LLC Jean A. Marshall 16
TheWall running throughout the
project changes from the GreenWall to
a full engagement as the ArkWall so
that the StreamingWarehouse and
other Scientific and BranchingAssets
are delivered
Wall-Wall-
Important to
have tools for
measuring
secant wheel
and project
evolution
17. PART II
TOOLS FOR ASSESSMENT
12/20/2022 Brij Consulting, LLC Jean A. Marshall 17
Tools to Measure 0.00
50.00
100.00
150.00
200.00
250.00
ARCHITECT
DRAW
&…
START
REPAIR
AND
CONSTRUCT…
BIG
PUSH
THREAD
AND
ENCRYPT…
GREEN
AND
BLUE
WAVE…
MATERIAL
TESTING
AND…
NETWORK
MULTIPLE…
CLOUD
STAR
MULTI-FORM…
PROGRESSION
MODELS
TO…
STREAM
NET
STAR
PROPENSITY
FOR
STREAM…
CHANGEOVER
TO
NEW
SYSTEM…
UNION
WITH
MORNING
STAR
Table Landscape
BRIDGE-GATE
WALL
REPLICATION
MODELS
CLOUD-STAR
WINDOW
DIM PORT
BRANCH
SUPPLY CHAIN
MU PROPERTIES
NETWORK
Count
0.00
20.00
40.00
60.00
80.00
100.00
120.00
ARCHITECT
DRAW
&…
BIG
PUSH
SECANT
ENGINEERING
BIG
PUSH
THREAD
AND…
STORYBOARD
FORMS
AND…
Table Landscape
BRIDGE-GATE
WALL
REPLICATION
MODELS
CLOUD-STAR
WINDOW
DIM PORT
BRANCH
SUPPLY CHAIN
Model
Mu Sic
18. Impact ofWindow
and Lens
Independent Assessment to
Strategize Development
12/20/2022 Brij Consulting, LLC Jean A. Marshall 18
Compare toWaterfall Map APP III
• Measurements become key to the
whole process byT2 and theWindow
to view the project model has a
highly correlated requirement for
design capability. And so, tools for
these assessments and comparisons
require high end development and
resource
• Tools needed to assess project
development and assessment of
strategy to find correlated template
and Key Performance Indicators for
dimensional layers
Small Interior Lens and
Window Measurement
Tasks and T&MM
19. Relational
Instances
Forms and Scale Metrics in Mu Properties
covers Replications of Product Media, the
volumi-zation technique. Supply Chain
begins after this, in the sequence of learning.
12/20/2022 Brij Consulting, LLC Jean A. Marshall 19
Relational patterns permit the study of timing and
correlated arguments that enable an increasing
intelligence about forming an agile and productive
glass table. These can be called for withAI but
need to be studied with the human gift of
Intelligence
Tools
20. Supply Chain:Trig
Metrics forT1&T2 plus all other
12/20/2022 Brij Consulting, LLC Jean A. Marshall 20
Proof
T&M Standard
Q&A1 Secant Load Calc
21. Supply Chain
Part of the Build Equation
12/20/2022 Brij Consulting, LLC Jean A. Marshall 21
120
330-
210=
120
120
Proof Scale
difference of
96 is related
to the clock
and plaits out
Is M = imputed
rate? We will
develop a proof
775 isTable Related
Q&A:2
22. ModelsTan Line
The natural tan line develops
within the agile relationship here is
in the Models of Fin and Branch
12/20/2022 Brij Consulting, LLC Jean A. Marshall 22
y = 9.1382x - 2.5717
R² = 0.2376
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
BU PT MOD PROD GE BU PROD PRT PRT
STREAMING IP STREAM NET NEW CLOUD
ASSEMBLIES
STAR
PROPENSITY FOR
STREAM
RELATIONS
MOVE TO BLUE
CLOUD
CHANGEOVER TO
NEW SYSTEM
DELIVERY
CHANGEOVER TO
NEW SYSTEM
MODS
UNION WITH
MORNING STAR
START NEW
PROCESS
CONVERSION
BR.
INTELLECTUAL
PROPERTIES
BRANCH
CORRELATE
NETWORKS
BRANCH
STREAMLINE
PROCESS
BR. ASSEMBLE
COMMODITIES
ACCOMODATE
GREEN WALL
REQ.
CONTINUING
MATCH
PORTALS, ETC
OBSERVE NEW
MODEL
PROGRESSION
COMMUNITY
PARTNERING
ARR.
FINISH ALL
PRODUCTION
CONVERSION
BRANCH M1 BRANCH M2 BRANCH M3 BRANCH M4 FINISH M1 FINISH M2 FINISH M3 FINISH M4 FINISH P-
FIN & BR IP FIN & BR
NETWORK
FIN & BR
BUILDING
COMPLEXITY
FIN & BR
PROGRESSIONS
FIN & BR WALL FIN & BR
STREAMING
MEDIA
FIN & BR TYPES FIN & BR
FEDERATED
FIN & BR
DECIDUOUS :
CONTINUOUS
Table Evolution: Fin & Br
BRIDGE-GATE WALL REPLICATION MODELS CLOUD-STAR
WINDOW DIM PORT BRANCH SUPPLY CHAIN MU PROPERTIES
NETWORK Count Cost Volumized Linear (MODELS)
Linear (MU PROPERTIES) Linear (Cost) Linear (Volumized)
23. Q&A
Q&A1: Secant Load Calc
• How can we calculate the Secant
Load Relationship to our graph?
This is an engineering problem and
not a financial engineering solution.
We need better tools to enable an
engineering solution such as an
accurate lens instructed template.
Glass is equipped with such tools^.
Q&A2: Imputed Rate
• Is the m in the Build Equation an
imputed rate for the Financial
Engineering Equation?Yes
12/20/2022 Brij Consulting, LLC Jean A. Marshall 23
Build Rate
Future Papers:Work
with the 10 cm
diameter
Until we can attain
more refinement
Synergy
^according to the Morning Star
1.138 x 2
= 2.276
Scrum
Gain
24. QUIZ FOCUS: ARK SCIENCE
12/20/2022 Brij Consulting, LLC Jean A. Marshall 24
There is a ONE
PATH, and this is
known at the next
level of Adaptation,
not now
The ONE PATH is
Continuous, The
Branch Path is
Contiguous
The beginning of the
Branch Path was the Star-
based Warehouse
Indicates the stage or
state of the project
dimensional
attribution
As the performance is
upgradedthe stream
tightens up and
shortens the distance
or time to completion
Events sponsor
outcomes, NT
measures these
events
Events sponsor
actual outcomes
tasked to engage
efficient relational
threads
Glass is componentized
to fulfill the solid-state
engineering
requirement
STRABO is used as a
method based on
graphicalthreaded
relationships in glass
Both Streams of
componentizationsand scientific
assets are required to go to the
level of remote building
D
26. NewWalk
Brij Consulting, LLC, Jean Marshall
• The New Walk is added to the
pre-conditioned walk of the
simulated productions and is
streamlined and converged
supplying a perfect branch
correlation.
12/20/2022
49
509
247
1
2
3
7WS-C
Interim Price Change +Transition
705/687 = 1.03 + 4.06 = 5.09 = Interior Margin
2
IP
C T
From “Crossover Conveyance”
See Also Slide 18
28. PROOFINGTHE FORWARD
T&M
In the case of glass, the supply-
chain based market is not built
on a volumizedproduct and so
is most accurate for this
spectrum
Subtotal1
Subtotal2
Appendix I
12/20/2022 Brij Consulting, LLC Jean Marshall 28
App III
App III
Analog to Digital Proof, 2018
Proof
29. Our Next Paper in Design Series
12/20/2022 Brij Consulting, LLC Jean A. Marshall 29
1. The Scope of Glass Projects: Benchmarking and IF Factor for
the scope determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid
State Assemblage, Table Design Outcomes
AFTER
31. 12/20/2022 Brij Consulting, LLC Jean A. Marshall 31
Isaiah 2:2 In the
last days the
mountain of the
house of the LORD
will be established
as the chief of the
mountains; it will
be raised above
the hills, and all
nations will stream
to it.