Diese Präsentation wurde erfolgreich gemeldet.
Die SlideShare-Präsentation wird heruntergeladen. ×

CV_Fayle_Mark _Rev.1

Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Anzeige
Wird geladen in …3
×

Hier ansehen

1 von 7 Anzeige
Anzeige

Weitere Verwandte Inhalte

Diashows für Sie (19)

Anzeige

Ähnlich wie CV_Fayle_Mark _Rev.1 (20)

CV_Fayle_Mark _Rev.1

  1. 1. MF Estimating & Procurement Services ABN 3494 2900 863 Ph. +61 44 898 777 0 Mark.fayle51@outlook.com MARK FAYLE Estimating and Procurement Manager Overview Mark has a long history in industrial engineering projects focusing primarily on the power and water industries. Following many years as a design engineer, project engineer, estimator and project manager and lately with Veolia, a tenure of over 14 years in total, initially as Senior Estimator in the Tenders team. In April, 2009 Mark became Veolia Water Solutions & Technologies’ Procurement Manager for the Design & Build team a position he held till December 2011 before taking over as Estimating Manager. He held this position until December 2014. • Key Attributes • Proven estimating, procurement management and contract management skills • Sound knowledge of the water industry and good working knowledge of water treatment processes • Effective management of Procurement Teams and the production and regulation of Procurement procedures • Experience with sourcing and delivery of plant, equipment & services, cost estimation and resources planning. • Pioneered the successful sourcing and delivery of fabricated pressure vessels and mechanical skid assemblies in the People’s Republic of China • Skills • Proficient in Estimating and Procurement • Well-liked by team, approachable and with an easy mentoring approach to other employees • Flexible approach, not silo oriented and happy to take on an expanded role as required • Achievements • 2012-2014 successful bid APLNG PTF project – sourced potential Thai and Chinese fabricators, managed evaluations and coordinated estimates for two offers to client – one for offshore fabrication and the other a premium for Australian manufacture • 2009 - 2012 - Initiated and managed company's entry into the China market, at a time when this was a new approach to doing business. Negotiated the successful approval of this strategy through Senior Management team, which subsequent contract worth over $20m overall. • Managed estimating for Bayswater Power Station Tender, worth over $60m, through 18 months of bidding, re-bidding and eventually winning this high value client. Managed up to 3 Procurement Engineers, employing a mentoring approach to ensure effective leverage of own expertise through the team and flow of knowledge.
  2. 2. Ph. +61 44 898 777 0 Mark.fayle51@outlook.com • Employed a rigorous approach to costings, enabling clear decision making through using an interrogative approach to new contracts and investigative methods to developing estimations. • Incorporated cash-flow projections in estimations, enabling better management decision making and contribution to overall company strategic process • Key Experience • Project Role • Worsley Multifuel Cogen Project – Condensate Treatment Plant • Procurement Manager • Overall supervision of procurement team and directly managed fabrication in China from the pre- qualification, through placement of supply agreements, manufacture and delivery for 3 ion exchange trains – Cation/Anion/Mixed Bed – 9 carbon steel rubber lined pressure vessels in total complete with internals. Directly managed also the Chinese fabrication of all prefabricated interconnecting pipe spools (carbon & stainless steel) and delivery (15 off 40’ shipping containers) to construction site. Significant logistical issues were managed by the VWS procurement team. • Savings in the order of $1.6 million • • Project Role • Rosehill & Camellia Recycled Water Treatment plant • Procurement Manager • Managed procurement team for full turnkey design and build of 20 MLD reuse plant including civil works, site erected tanks, submerged continuous microfiltration plant with innovative stainless steel cell design, cation exchange for ammonia removal, Reverse Osmosis, degassing and chemical dosing. • Project Role • Fluor Santos – Upstream GLNG Desalination Plant • Procurement Manager – successfully completed contract for coal seam gas water. Overall supervision of the procurement team. Directly managed the placement of supply agreements in China and management of ongoing fabrication of both multimedia filter vessels (9 off) and cation exchange softener vessels (7 off) for 2 separate Santos sites. Instigated the partnering of a new Chinese fabricator, experienced in the local Chinese market in RO, to manufacture RO skids to international expectations along with appropriate documentation. . 2 CV Mark Fayle
  3. 3. Ph. +61 44 898 777 0 Mark.fayle51@outlook.com • Tenders • Bayswater Power Station Cooling Water Treatment • Senior Estimator • Responsible for the entire capital works estimate, pricing schedules, tender programme & cash flow projections for the CW upgrade (4 units) including lime softening, addition of Actiflo clarification, refurbishment of filtration vessels, uprate of RO plant feed pumps and coordination and integration of sister company input for the uprate of the Brine Concentration Plant downstream of RO Reject. • Tenders • Stanwell Power Station Cooling Water Treatment • Senior Estimator - Responsible for the entire capital works estimate, pricing schedules, tender programme & cash flow projections for the CW upgrade including Actiflo and sludge management systems • • Tenders • Illawarra Wastewater Treatment • Senior Estimator and Project Engineer - Responsible for the entire mechanical and electrical works estimate, pricing schedules, tender programme & cash flow projections for the uprate of 3 sewage treatment plant sites, Bellambi, Wollongong & Port Kembla for Sydney Water in coordination with civil construction consortium partner. At the contract stage assisted the Project Manager through the design phase with contract administration, budget set up and recruitment of staff. • Tenders • Orica Kooragang Island Mixed Bed Train • Procurement Manager & singly responsible for the complete purchase of all fabricated and bought out equipment, assembly and manufacture in New Zealand and delivery to Kooragang Island site of a Mixed Bed ion exchange train. 3 CV Mark Fayle
  4. 4. Ph. +61 44 898 777 0 Mark.fayle51@outlook.com April 2000 – April 2009 Employed as Senior Estimator for Veolia Water Solutions (formerly Vivendi Water systems & OTV-Kruger Pty Ltd). • Successful Bids • Bayswater Power Station Water Treatment Plant • Client: Macquarie Generation • Contract Value: $72 million • Design, Refurbish, Build Operate & Maintain (5 years) of the power station existing WTP (Clarification, Media Filtration, Ion Exchange, Reverse Osmosis & Brine Concentration) • Llanberris Mine Water Treatment Plant • Client: Ballarat goldfields NL • Contract Value:$2.8 million • Turnkey Design & Build of groundwater treatment plant (Oxidation, Clarification, Microscreening & Primary Sludge Dewatering). • Tarong Power Station Water Treatment Plant • Client: Tarong Energy • Contract Value: $2.5 million • Design & Build - Upgrade existing Demin Plant with 2 x 1 MLD MF/RO Trains & upgrade existing Domestic water Plant with 250 kL/d MF system. Feedwater is from the Cooling Towers • Woy Woy Water Treatment Plant • Client: Gosford City Council • Contract Value: $3.1 million • Design & Build Mechanical & Electrical only for 5 MLD WTP incorporating aeration, Managanese removal, Flocculation, MF, post chlorination & pH adjustment. • Alcan Gove Gove 3rd Stage Expansion WTP • Client: Alcan • Contract Value: $1.35 million • Design & Ex Works supply of 2 x 100 m3/hr Mixed Bed Ion Exchanger c/w Regen Water Pumps & dosing pumps fully mounted & assembled on skids. • Bendigo Mining WTP • Client; Bendigo Mining • Contract Value: $4.7 million • 5.1 MLD WTP – Raw Water from mine dewatering. Turnkey: Clarification, Pressure Filtration& Reverse Osmosis • Orica Groundwater Treatment • Client: Orica • Contract Value: $7.5 million • Design, supply & delivery of 15 MLD filtration, GAC Contactors, RO units & sludge handling at Orica facility at Botany to treat the contaminated ground water after the stripper. • Illawarra Wastewater Strategy – Contract Delivery November 2001 to May 2002, Retained in the project delivery team to assist the set up of the cost control system, recruit personnel & management of a contractual dispute with a major subcontractor. • Illawarra Wastewater Strategy - • Client: Sydney Water • Contract Value: $152 million 4 CV Mark Fayle
  5. 5. Ph. +61 44 898 777 0 Mark.fayle51@outlook.com • Mechanical & Electrical Portion, approx. $63 million • Bid in Joint Venture with Walter Construction Group as Walter Vivendi JV. The project for Sydney Water was their major infrastructure project to be awarded in the Year 2001. It includes the upgrading of the existing Wollongong Sewage Treatment Plant to accept flow from the Wollongong, Bellambi & Port Kembla catchments. • Revalidation of US Filter Bid – Oropi Road Water Treatment.- • Client: Tauranga District Council, NZ. Subject to “open book” negotiation of contract. • Contract Value: $8million. • Revalidation & consolidation of US Filter Bid – • Client:Coliban Water, Vic. • For the Coliban BITS project for the upgrade of 6 regional potable water treatment plants. • Contract Value: $16 million (unknown outcome) • Gerringong Wastewater Treatment Plant  Client: Walter Construction Group  Contract Awarded • Contract Value: $10 million for Design & Construct – Mechanical & Electrical Works • Wodonga Wastewater Treatment Plant  Client: North Eastern Region Water Authority  Design, Build & Operate for 15 years  Contract Value: Confidential • Career with Transfield (Transfield Power Projects, Transfield Energy & Transfield Maintenance) • June 1999 – April 2000 Transferred from Transfield Energy to Transfield Maintenance – New Southern Railway Project. PROJECT CLIENT VALUE ROLE DIRECT REPORT BRIEF DESCRIPTION New Southern Railway Project Airport Link & Rail Access Corp Variable formula Alliance Project Engineer David Wheeler – Project Manager Maintenance Contract with Rail Access Corporation. Costing, planning and subcontractor bids Coal Seam Methane Development Transfield Energy (Internal) $1.2 million per well + $90- $150 million pipelines Project Estimator & Planner Dr Mike Sargeant - CEO Provide fast conceptual cost estimates for possible power plant developments. Additional responsibility Planning Engineer - “SureTrak” plan for gas field development, Durham Downs to Wallumbilla Pipeline and Planet Downs to Townsville Pipeline. TiWest Cogeneration Plant Western Power $18m Senior Estimating Engineer Paul Radin – Manager Estimating Gas turbine + HRSG Kwinana, WA South West Cogeneration Plant South West Cogeneratio n JV $70m Senior Estimating Engineer Paul Radin – Manager Estimating • April 1995 – March 1997 Simon Carves Australia • Succesful Tenders: Hydraulic Davy John $5 m Principal Trevor Matsinos Supply & installation 5 CV Mark Fayle
  6. 6. Ph. +61 44 898 777 0 Mark.fayle51@outlook.com Pipework Installation #6 Blast Furnace Port Kembla Brown (on behalf of BHP) Estimator 2IC Chief Estimator Installation of Mechanical Plant, Supply & Installation of structural steelwork Connell Wagner on behalf of Laminex $7m Principal Estimator 2IC Trevor Matsinos Chief Estimator Part design, and mechanical installation. Gympie, Qld Boyne Island Aluminium Smelter Upgrade Bechtel Minenco JV $12 m + Reimbursa ble Principal Estimator 2IC Trevor Matsinos Chief Estimator Erection & Part Supply – Cast House • January 1989 – March 1995 Employed by John Thompson Australia (Rolls Royce Industrial Power Pacific) 650 tonnes Cane Per Hour Bagasse Diffuser CSR $11m Proposal Manager, Estimator & Project Manager Les Lloyd/Charle s Munro – Manager Water Treatment Fast track – 11 months. Invicta Sugar Mill expansion. Supply, mechanical installation of BMA (Germany) designed diffuser & conveyors Emergency Demineralised Water Plant Pacific Power $1 m + $1.2m additional plant Estimator & Project Manager Les Lloyd – Manager Water Treatment Ion exchange Trains – Vales Point & Munmorah Power Stations Waste Water Treatment Plant $12 m Project Estimator Les Lloyd – Manager Water Treatment Turnkey Reverse Osmosis/Brine Concentration Plant Muja Power Station, WA 6.9 ML/Day Brine Concentration Plant Transfield Permutit JV $21 m Project Estimator. Acting PM Bob Moore – Manager Water Treatment Mt Piper Power Station Brine Concentration Plant Dealkylisation Plant Racecourse Sugar Mill $200 K Project estimator Les Lloyd – Manager Water Treatment Ion exchange – boiler feedwater. Mackay, Queensland Dealkylisation Plant Caltex $1m Project estimator Les Lloyd – Manager Water Treatment Ion exchange – boiler feedwater. Kurnell, NSW • June 1980 – October 1988 Employed by West’s Australasia Ltd (later renamed West’s Process Engineering Pty Ltd after a management buy out). • Position: Initially, Research Assistant at Pilot Plant, then upgraded to Project Engineer reporting to: Various projects: • Prototype Coal Gasification Unit, Design & Project Management Contract for PVA Plant, Wacol, Qld.,Fuidised Bed Waxing Unit – Kooragang Island, Lime Slaking & Milk of Lime Recirculation Plant, Paid Study: cost estimates for upgrade of PVA Plant, Altona, Vic., Redesign of existing Photochemicals Plant, Ventilation & Exhaust System, Fluidised Bed Drying & Cooling of Heat Beads, Feasibility & capital budget estimating & preliminary design for total rationalisation & upgrade of AC Hatrick Chemicals Homebush, Botany & Springvale facilities into two sites at Botany & Springvale only. 6 CV Mark Fayle