CURRENT TRANSFORMER(CT)
WHY CT S2 SHOULD EARTHED
• If secondary side of CT Open
Circuited(OC) the secondary
side current will be zero(I=0) and
the voltage will be very high
because of primary.
• It leads to Insulation damage
• To avoid the capacitive coupling
between primary and secondary
of CT.
CT POLARITY & I FLOW
NOTE:
• All CT’s are subtractive
• H1-should face primary current
Line facing direction
• H2-should face primary current
Load facing direction
• X1-secondary current
• Subtractive polarity-H1&x1 same
side of T/F
POLARITY CHECKING METHOD
PROCEDURE
• Connect analog voltmeter in secondary of CT(x1- +ve, x2- -ve)ire
• Run the piece of wire through the CT and consider as a primary then
connect the 9V battery (H1- “+ve”, H2- “-ve”) in primary wire using
switch.
• NOTE-avoid continuous contact because it will short circuit(SC) the
battery.
• If polarity is correct small deflection in +ve side in voltmeter if –ve the
polarity is reversed so x1&x2 to be reversed
ACCURACY
TYPES
METERING:
1. 0.2 or 0.2s class
Where,
0.2- 0.2% error
Class- 0.1,0.2,0.2s,0.5s,0.5,1&3
What is 0.2 & 0.2s?
0.2- 0.2% error in b/w 5% to 120% of rated current
0.2s- 0.2% error in b/w 1% to 120% of rated current
PROTECTION:
2.5P10
Where,
5-Accuracy of Ratio error (in %)
P-Protection class
10-ALF (Accuracy Limit Factor)
ALF for 5P10 – CT will give ratio error of 5% even if fault I
reaches 10 times the nominal value after CT will saturate.
AC-5P ,10P
ALF-5,10,15,20,30
3.PS (Protection Special PX)
Use:
Differential Relay
Distance Relay
Where,
Vk-Knee point V
Ie or Im-Excitation I
CT BURDEN
INTERPOSING CT(ICT)
ICT
IN 3MW
• SEF – CTR 50/1A, 5P20, 10VA
• REF – CTR 50/1A, CBCT
• Rev. Power relay – CTR 250/1A, CLASS 0.2, 30VA
POTENTIAL TRANSFORMERS(PT)
ACCURACY CLASS
Metering-0.1, 0.2, 0.5, 1, 3
Protection-3P, 6P
The error % is guarantied when,
V= 80 to 120%
load=25 to 100% (for 3P,6P-5
to 100%)
Pf=0.8 lag
Application:
• Very acc. Metering - 0.1 to 0.2
• Tariff – 0.2 to 0.5
• Instruments and ctrl- 1
• Protection- 1,3P,6P (UV&OV,
UF&OF, 59D, etc)
POLARITY CHECK
Errors in PT & Burden
• RATIO ERROR-Error in secondary
voltage
• PHASE ANGLE ERROR-Phase different
b/w primary and secondary
IMPORTANT TO BE NOTE:
Protection-Ratio Error
Metering-Ratio error & Phase angle
error
IMPACT OF BURDEN:
If, Burden increase so,
Py&Sy I increase since,
Py V-const so,
Sy V-decrease so,
If Burden increase - Ratio error will
increase
Burden:
10,15,25,30,50,75,100,150,200,300,400,
500VA @ 0.8lag

Weitere ähnliche Inhalte

Was ist angesagt?

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers PremanandDesai
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costEklavya Sharma
 
Tripping and control of impulse generators
Tripping and control of impulse generatorsTripping and control of impulse generators
Tripping and control of impulse generatorsFariza Zahari
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsPower System Operation
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settingsmichaeljmack
 
Generator and Transformer Protection (PART 1)
Generator and Transformer Protection (PART 1)Generator and Transformer Protection (PART 1)
Generator and Transformer Protection (PART 1)Dr. Rohit Babu
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 

Was ist angesagt? (20)

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Power quality
Power qualityPower quality
Power quality
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental cost
 
Tripping and control of impulse generators
Tripping and control of impulse generatorsTripping and control of impulse generators
Tripping and control of impulse generators
 
Static relay
Static relayStatic relay
Static relay
 
Power system security
Power system security Power system security
Power system security
 
Protection of Transmission lines
Protection of Transmission linesProtection of Transmission lines
Protection of Transmission lines
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
EXCITATION SYSTEMS
EXCITATION SYSTEMSEXCITATION SYSTEMS
EXCITATION SYSTEMS
 
Current Transformer
Current TransformerCurrent Transformer
Current Transformer
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Generator and Transformer Protection (PART 1)
Generator and Transformer Protection (PART 1)Generator and Transformer Protection (PART 1)
Generator and Transformer Protection (PART 1)
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 

Ähnlich wie Electrical Current transformer(CT) and Potential transformer(PT) basics for Relay learning

CURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxCURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxManishPandya29
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6Nageswar Rao
 
Mini project submission
Mini project submissionMini project submission
Mini project submissionAkshay Ajay
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]Md Irshad Ahmad
 
Restricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRestricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRAMESHG901836
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaKumarChaturvedula
 
Electronics and Communication Engineering
Electronics and Communication EngineeringElectronics and Communication Engineering
Electronics and Communication EngineeringEkeeda
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................hiiarindam
 
Current Transformer Concepts
Current Transformer ConceptsCurrent Transformer Concepts
Current Transformer ConceptsVijay Badireddi
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptxThien Phan Bản
 
1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docxjackiewalcutt
 

Ähnlich wie Electrical Current transformer(CT) and Potential transformer(PT) basics for Relay learning (20)

CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
CURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptxCURRENT TRANSFORMER.pptx
CURRENT TRANSFORMER.pptx
 
Mayur kumar
Mayur kumarMayur kumar
Mayur kumar
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6
 
Switched capacitor circuits_shish
Switched capacitor circuits_shishSwitched capacitor circuits_shish
Switched capacitor circuits_shish
 
Mini project submission
Mini project submissionMini project submission
Mini project submission
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
 
Restricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptxRestricted Earth Fault(REF) Protection.pptx
Restricted Earth Fault(REF) Protection.pptx
 
Transformers Protection
Transformers ProtectionTransformers Protection
Transformers Protection
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedula
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
Overcurrent protection
Overcurrent protectionOvercurrent protection
Overcurrent protection
 
Electronics and Communication Engineering
Electronics and Communication EngineeringElectronics and Communication Engineering
Electronics and Communication Engineering
 
Current transformers theory
Current transformers theoryCurrent transformers theory
Current transformers theory
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
Uc3845
Uc3845Uc3845
Uc3845
 
CURRENT VOLTAGE TRANSFORMER BASICS.pdf
CURRENT VOLTAGE TRANSFORMER BASICS.pdfCURRENT VOLTAGE TRANSFORMER BASICS.pdf
CURRENT VOLTAGE TRANSFORMER BASICS.pdf
 
Current Transformer Concepts
Current Transformer ConceptsCurrent Transformer Concepts
Current Transformer Concepts
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
 
1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx
 

Kürzlich hochgeladen

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 

Kürzlich hochgeladen (20)

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 

Electrical Current transformer(CT) and Potential transformer(PT) basics for Relay learning

  • 2. WHY CT S2 SHOULD EARTHED • If secondary side of CT Open Circuited(OC) the secondary side current will be zero(I=0) and the voltage will be very high because of primary. • It leads to Insulation damage • To avoid the capacitive coupling between primary and secondary of CT.
  • 3. CT POLARITY & I FLOW
  • 4. NOTE: • All CT’s are subtractive • H1-should face primary current Line facing direction • H2-should face primary current Load facing direction • X1-secondary current • Subtractive polarity-H1&x1 same side of T/F
  • 6. PROCEDURE • Connect analog voltmeter in secondary of CT(x1- +ve, x2- -ve)ire • Run the piece of wire through the CT and consider as a primary then connect the 9V battery (H1- “+ve”, H2- “-ve”) in primary wire using switch. • NOTE-avoid continuous contact because it will short circuit(SC) the battery. • If polarity is correct small deflection in +ve side in voltmeter if –ve the polarity is reversed so x1&x2 to be reversed
  • 7. ACCURACY TYPES METERING: 1. 0.2 or 0.2s class Where, 0.2- 0.2% error Class- 0.1,0.2,0.2s,0.5s,0.5,1&3 What is 0.2 & 0.2s? 0.2- 0.2% error in b/w 5% to 120% of rated current 0.2s- 0.2% error in b/w 1% to 120% of rated current
  • 8. PROTECTION: 2.5P10 Where, 5-Accuracy of Ratio error (in %) P-Protection class 10-ALF (Accuracy Limit Factor) ALF for 5P10 – CT will give ratio error of 5% even if fault I reaches 10 times the nominal value after CT will saturate. AC-5P ,10P ALF-5,10,15,20,30
  • 9. 3.PS (Protection Special PX) Use: Differential Relay Distance Relay Where, Vk-Knee point V Ie or Im-Excitation I
  • 12. ICT
  • 13. IN 3MW • SEF – CTR 50/1A, 5P20, 10VA • REF – CTR 50/1A, CBCT • Rev. Power relay – CTR 250/1A, CLASS 0.2, 30VA
  • 15. ACCURACY CLASS Metering-0.1, 0.2, 0.5, 1, 3 Protection-3P, 6P The error % is guarantied when, V= 80 to 120% load=25 to 100% (for 3P,6P-5 to 100%) Pf=0.8 lag Application: • Very acc. Metering - 0.1 to 0.2 • Tariff – 0.2 to 0.5 • Instruments and ctrl- 1 • Protection- 1,3P,6P (UV&OV, UF&OF, 59D, etc)
  • 17. Errors in PT & Burden • RATIO ERROR-Error in secondary voltage • PHASE ANGLE ERROR-Phase different b/w primary and secondary IMPORTANT TO BE NOTE: Protection-Ratio Error Metering-Ratio error & Phase angle error IMPACT OF BURDEN: If, Burden increase so, Py&Sy I increase since, Py V-const so, Sy V-decrease so, If Burden increase - Ratio error will increase Burden: 10,15,25,30,50,75,100,150,200,300,400, 500VA @ 0.8lag