Hiap Seng Engineering (thailand) co ltdHiap Seng Engineering (thailand) co.,ltd.
Corporate Presentation
BUSINESSBUSINESS
PresentationPresentation
Keynote
Our FactoryOur Factory
Formed 30 january 2003Formed 30 january 2003
HiapSeng Engineering from Singapore own 48%HiapSeng Engineering from Singapore own 48%
Thai Partners own 52% | Capitalinjection of 125m THB
Restructure 16 May 2012
HiapSeng Engineering increase shares to 85%
ThaiPartners reduce shares to 15%ThaiPartners reduce shares to 15%
Capital increase to 175m THB
CHANGE NAME1December 2014
CHANGE COMPANY NAME TO HIAP SENG ENGINEERING (THAILAND)CO.,LTD.
Our PhilosophyOur Philosophy
T t i f ti i t th h ffi i t ff tTo strive for continuous improvement through efficient effort
and business processes to meet client requirements
with safety, quality and schedule as key drivers.
Key DirectorsKey Directors
The Directors at Hiap Seng Engineering (Thailand) Co.,Ltd.
RichardTan
Managing Director
Mak Chew Ming
Executive Director
TanHak Jin
Finance Director
SongTan
Director
Surat Kham-ngern
Safety Quality Environment Director
ORGANIZATIONAL Chart
M iManaging
Director
Richard Tan
Finance
Director
Executive
Director
M k C M
Director
Tan Hak Jin
Finance
Chatchai W.
Mak C.M.
SQSQE Director
Surat Kham-
ngern
Factory
Manager
Natthanat J.
LogisticHSE QA/QCProduction Tendering Engineering PurchasingHR
Factory Map & FacilitiesFactory Map & Facilities
Our Interactive and Informative Map
InteractiveFactory Map
**Please double click on the area you would like to view
CORPORATE OFFICE:
AREA: 400m2 over two levelsAREA: 400m2 over two levels.
OCCUPANTS: The purchasing,
tendering, engineering,
accounting, and management
teams.
MAP EXIT
WORKSHOP 1:
AREA: 7 200m2AREA: 7,200m2.
DESCRIPTION: Consisting of
three bays each 20m x 120m.
EQUIPMENT: 4 x gantry
cranes SWL 7.5 tonnes, 6 x
gantry cranes SWL 5 tonnesgantry cranes SWL 5 tonnes,
20 x gantry cranes SWL, 1
tonne, 1 x profile pipe cutter,
and 70 x welding machines.
MAP EXIT
WORKSHOP 2:
AREA: 7 200m2AREA: 7,200m2.
DESCRIPTION: Consisting of
three bays each 20m x 120m.
EQUIPMENT: 2 x gantry
cranes SWL 10 tonnes, 4 x
gantry cranes SWL 7 5gantry cranes SWL 7.5
tonnes, and 70 x welding
machines.
MAP EXIT
WORKSHOP 3:
AREA: 4 535m2AREA: 4,535m2.
DESCRIPTION: Consisting of
three bays with a current
configuration of one bay being
used for an automatic cutting
line, one bay being used for a
built-up beam line and one baybuilt up beam line, and one bay
being used for pro-arc cutting
and fabrication.
EQUIPMENT: 12 x gantry
cranes SWL 5 tonnes, 2 x high-
speed band saws, 1 x CNC
punch machine 1 x CNCpunch machine, 1 x CNC
drilling machine, 1 x robot
coupling cutting machine, 1 x
CNC plate pro-arc cutting
hi 1 imachine, 1 x gas cutting
machine, and 30 x welding
machines.
MAP EXIT
WORKSHOP 4:
AREA: 1 500m2AREA: 1,500m2.
DESCRIPTION: This workshop
is used for the fabrication of
small components.
EQUIPMENT: 2 x gantry
cranes SWL 5 tonnes and 4 xcranes SWL 5 tonnes and 4 x
gantry cranes SWL 3 tonnes.
MAP EXIT
LAYDOWN AREA 1:
AREA: 3 850m2AREA: 3,850m2.
EQUIPMENT: 1 x gantry crane
SWL 10 tonnes and 1 x gantry
crane SWL 5 tonnes.
MAP EXIT
LAYDOWN AREA 2:
AREA: 1 500m2AREA: 1,500m2.
MAP EXIT
LAYDOWN AREA 3:
AREA: 7 973m2AREA: 7,973m2.
MAP EXIT
LAYDOWN AREA 4 /
PAINTING AREA:
AREA: 14,136m2.
DESCRIPTION: A dedicated
painting area with a permanent
paint shop together with 5 x
movable paint sheds and a
laydown area for paintedlaydown area for painted
products.
MAP EXIT
LAYDOWN AREA 5:
AREA: 12 160 m2AREA: 12,160 m2
DESCRIPTION: A general
purpose laydown area that can
be used as an extension to the
painting yard, for storage of
raw materials, or as a pre-
assembly areaassembly area.
MAP EXIT
BLASTING CHAMBER AREA:
AREA: 1 200m2AREA: 1,200m2.
EQUIPMENT: 2 x gantry
cranes SWL 5 tonnes.
MAP EXIT
BEAM LINE
BLASTING AREA:
AREA: 1,200m2.
EQUIPMENT: 2 x gantry
cranes SWL 5 tonnes.
MAP EXIT
WELDER QUALIFICATION
TEST AREA:
AREA: 500m2.
DESCRIPTION: A dedicated
area where our welders are
tested and qualified for each
project.
EQUIPMENT: 1 x gantry crane
SWL 2.5 tonnes.
MAP EXIT
PRODUCTION OFFICE:
AREA: 720m2AREA: 720m2.
OCCUPANTS: The production,
Human Resources, Safety,
Logistics, and Quality Control
teams.
MAP EXIT
CANTEEN BUILDING &
CLIENT OFFICES:
AREA: 960m2.
OCCUPANTS: Canteen
facilities and spare offices for
client use.
MAP EXIT
WAREHOUSE:
AREA: 1 536m2AREA: 1,536m2.
EQUIPMENT: 2 x gantry
cranes SWL 2.5 tonnes.
MAP EXIT
Our ServicesOur Services
The Range of Services Available
ServicesPipingServicesPiping
Hiap Seng - Thailand has a large and experienced
labour force qualified to undertake all kinds oflabour force qualified to undertake all kinds of
welding to carbon steel, stainless steel, and alloy
pipe systems.
We employ all available management tools including
QR di t l titiQR coding to process large quantities
of components. We have produced up to 90,000
weld diameter inches per month in previous projectsweld diameter inches per month in previous projects
including export packing into 40’ sea containers for
shipping from the nearby Laem Chabang
International Port.
ServicesPipingServicesPiping
ServicesPlateServicesPlate
Hiap Seng - Thailand’s versatility means that our
plate work products range from bodies for tipperplate work products range from bodies for tipper
trucks to pressure rated process and utility
equipment.q p
ServicesPlateServicesPlate
ServicesStructureServicesStructure
Hiap Seng - Thailand’s large workshops and
laydown areas together with our extensive array oflaydown areas together with our extensive array of
automatic profile cutting and other machines makes
us one of the premier structural steel fabrications inp
the region.
ServicesStructureServicesStructure
ServicesPaintingServicesPainting
Hiap Seng - Thailand has extensive blasting and
painting facilities Our auto-blasting chamber canpainting facilities. Our auto-blasting chamber can
accommodate sizes up to 30m x 7m and many of
our painting sheds are rail mounted to providep g p
optimum versatility.
ServicesPaintingServicesPainting
Case StudiesCase Studies
Four Major Case Studies Revealed
ProjectCase Studies
Tokuyama Malaysia Piping Fabrication
for Chiyoda Sarawak
Steel Structure Fabrication and
Modularisation for CUEL Limited
Steel Structure Fabrication of Access
Jetty &Wharf for John Holland
Power Diverter Fabrication for
NEM Power-Systems
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 1
Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited
ProjectDetailsProjectDetails
Scope:
Fabrication of Steel Structures
Pre-Assembly of Modules
Output:Output:
1,000 Tonnes per month
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 2
Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd.
ProjectDetailsProjectDetails
Feature 1:
Administration of the importation of
raw material and re-exportation of
fabrication pipe spools in
accordance with the Thailand Boardaccordance with the Thailand Board
of Investment rules allowing
exemption from export tax
Feature 2:
The use of a QR Code (‘barcode’)The use of a QR Code ( barcode )
labeling system to administer the
fabrication, testing, packing,
shipment, warehousing, and
installation (by others) of the pipe
spools.
Scope:
Receiving of free issued materials,
fabrication, testing, grit blasting,
painting, export packing, and
shipping.
Output:
60,000 weld diameter inches per
month.
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 3
Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Steel Structures
•Pre-Assembly of Structures
•Blasting and PaintingBlasting and Painting
•Export Packing
Output:
•1,800 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Case Study 4
Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems
ProjectDetailsProjectDetails
Scope:
•Material Supply
•Fabrication of Casings/ Blades/
Seal Air Ducts/ Shafts and Toggle
Arms/ Cladding PlateArms/ Cladding Plate
•Assembly of Diverters
•Blasting and Painting
•Functional Testing
•Export Packing and Shipping
Output:
•One Diverter Every 6 weeks
•400 Tonnes per month
EXIT
Our RevenueOur Revenue
Substantial and Continual Growth
Turnover history
552m508m
345m
332m
445m
332m
2008
508
2009
332
2010
345
2011
445
2012
332
2013
508m 332m 345m 445m 332m 552m
Revenue since2008 2,500m THB
Sales DistributionSales Distribution
International & National Performance
Sales Distribution
25% Average overseas sales for the past 5 years25%
85% Overseas sales Increase since 201285% Overseas sales Increase since 2012
Our WorkforceOur Workforce
The Cornerstone to our Success
Overall Workforce
DirectWorkforce 1000+ Office Staff 100+
250+ Indirect
Supervision
1 76 Office1
200+ Welders2 35 QC2
480+ Other
Trade
3 20 Safety3
90% 10%
Special MachinerySpecial Machinery
Cutting-Edge Hardware
Machinery That Deliversresults
1 Daito CNC Coping Robot1
2
p g
Automatic H-Beam Drilling Machine2 Automatic H-Beam Drilling Machine
H B B d S P i Li3 H-Beam Band Saw Processing Line
4 Built Up Beam Fabrication Line
5 Plasma Plate Cutting Machine
6 Pipe Coaster Profile Cutting Machine
Our ClientsOur Clients
Delivering Beyond Expectations
Our Clients
Client Name
Theiss
John Holland
Country
Australia
Australia
Nature of Work
ModuleStructure / Piping
Falseworks - CapeLambertJohn Holland
United Group
Nems PowerSystems
Chiyoda
Australia
Germany
Japan
Falseworks CapeLambert
Piping
Diverter/ Damper/ PlateWork
PipingChiyoda
JGC Corporation
Samsung Engineering
GS Engineering & Construction
Japan
Japan
Korea
Korea
Piping
Diverter/ Damper/ PlateWork
Structure
StructureGS Engineering & Construction
CTCI
CUEL
UOP LLC
Korea
Taiwan
Thailand
USA
Structure
Structure/ Piping
Structure/ Piping
ModuleStructure / Piping
Experienceworkingwith globaland regionalclients
UOP LLC USA ModuleStructure / Piping
Safety recordSafety record
Outstanding Statistics
Past 5 years accumulated Man hours 8.1m
LTI 0LTI = 0
Our CertificatesOur Certificates
Standards, Certificates & Awards
Our Certificates
The company achieved ISO 9001 Registered certification in 2008. The company
holds Thailand Board of Investment Certification and is registered with the Department of
Foreign Trade.
Our LocationOur Location
Only 15km from Laem Chabang International Port
Our LocationOur Location
We are located 15km from Laem Chabang International Port
allowing easy export of fabricated metals
THANKYOUTHANKYOU
PresentationPresentation
Concluded

More Related Content

What's hot

Nuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical ProjectsNuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical Projects
Nuberg Engineering
 
Drill Rig Drive Spindle Laser Clad
Drill Rig Drive Spindle Laser CladDrill Rig Drive Spindle Laser Clad
Drill Rig Drive Spindle Laser Clad
Terry Sandford
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
Aamer Pathan
 

What's hot (17)

Chlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu DhabiChlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
 
Plant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantPlant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plant
 
Nuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical ProjectsNuberg EPC Plants & Turnkey Chemical Projects
Nuberg EPC Plants & Turnkey Chemical Projects
 
Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)
 
Projects Executed by Nuberg in Bangladesh
Projects Executed by Nuberg in BangladeshProjects Executed by Nuberg in Bangladesh
Projects Executed by Nuberg in Bangladesh
 
Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)
 
Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Manish engg ppt 26.04.16
Manish engg ppt 26.04.16
 
EPC LSTK Projects Portfolio
EPC LSTK Projects PortfolioEPC LSTK Projects Portfolio
EPC LSTK Projects Portfolio
 
Nuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate BrochureNuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate Brochure
 
Nuberg Company Profile
Nuberg Company ProfileNuberg Company Profile
Nuberg Company Profile
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
 
GGAG Corporate Presentation FY 2020-21
GGAG Corporate Presentation FY 2020-21GGAG Corporate Presentation FY 2020-21
GGAG Corporate Presentation FY 2020-21
 
Drill Rig Drive Spindle Laser Clad
Drill Rig Drive Spindle Laser CladDrill Rig Drive Spindle Laser Clad
Drill Rig Drive Spindle Laser Clad
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & Services
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
Lefebvre engineering presentation-all
Lefebvre engineering   presentation-allLefebvre engineering   presentation-all
Lefebvre engineering presentation-all
 

Viewers also liked

Education ppt-template-024
Education ppt-template-024Education ppt-template-024
Education ppt-template-024
try anugrah
 
Microsoft excel beginner
Microsoft excel beginnerMicrosoft excel beginner
Microsoft excel beginner
Sushate Sandal
 
Jazmedia Materi umum narkoba #napza (2)
Jazmedia Materi umum narkoba #napza (2)Jazmedia Materi umum narkoba #napza (2)
Jazmedia Materi umum narkoba #napza (2)
Masyrifah Jazm
 
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
Claudio Rama
 
1. pemateri kesehatan reproduksi remaja pada mos 0
1. pemateri kesehatan reproduksi remaja pada mos 01. pemateri kesehatan reproduksi remaja pada mos 0
1. pemateri kesehatan reproduksi remaja pada mos 0
Agit Fusg
 

Viewers also liked (20)

Bio treez 1
Bio treez 1Bio treez 1
Bio treez 1
 
JUnit 5 - The Next Generation of JUnit - Ted's Tool Time
JUnit 5 - The Next Generation of JUnit - Ted's Tool TimeJUnit 5 - The Next Generation of JUnit - Ted's Tool Time
JUnit 5 - The Next Generation of JUnit - Ted's Tool Time
 
Education ppt-template-024
Education ppt-template-024Education ppt-template-024
Education ppt-template-024
 
openMagazin 7-8/2012
openMagazin 7-8/2012openMagazin 7-8/2012
openMagazin 7-8/2012
 
Foto ware 02 - software for photo workflow and dam for m+p
Foto ware   02 - software for photo workflow and dam for m+pFoto ware   02 - software for photo workflow and dam for m+p
Foto ware 02 - software for photo workflow and dam for m+p
 
INTEGRADORA NOVENO
INTEGRADORA NOVENOINTEGRADORA NOVENO
INTEGRADORA NOVENO
 
1 1 básico físico matemático
1 1 básico físico matemático1 1 básico físico matemático
1 1 básico físico matemático
 
Tanveer aali
Tanveer aaliTanveer aali
Tanveer aali
 
Microsoft excel beginner
Microsoft excel beginnerMicrosoft excel beginner
Microsoft excel beginner
 
Case Study: Increase the accuracy, compliance and timeliness of member commun...
Case Study: Increase the accuracy, compliance and timeliness of member commun...Case Study: Increase the accuracy, compliance and timeliness of member commun...
Case Study: Increase the accuracy, compliance and timeliness of member commun...
 
planeacion didactica de situación de aprendizaje
planeacion didactica  de situación de aprendizajeplaneacion didactica  de situación de aprendizaje
planeacion didactica de situación de aprendizaje
 
Spring 3.1 and MVC Testing Support
Spring 3.1 and MVC Testing SupportSpring 3.1 and MVC Testing Support
Spring 3.1 and MVC Testing Support
 
Expansion Joint Catalogue
Expansion Joint CatalogueExpansion Joint Catalogue
Expansion Joint Catalogue
 
Jazmedia Materi umum narkoba #napza (2)
Jazmedia Materi umum narkoba #napza (2)Jazmedia Materi umum narkoba #napza (2)
Jazmedia Materi umum narkoba #napza (2)
 
Mapping with Adobe CC
Mapping with Adobe CCMapping with Adobe CC
Mapping with Adobe CC
 
JUnit 5 - from Lambda to Alpha and beyond
JUnit 5 - from Lambda to Alpha and beyondJUnit 5 - from Lambda to Alpha and beyond
JUnit 5 - from Lambda to Alpha and beyond
 
Expansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth WebinarExpansion Joint Applications for Thermal Growth Webinar
Expansion Joint Applications for Thermal Growth Webinar
 
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
La nueva fase de la educación virtual. Recursos de aprendizaje, Moocs y globo...
 
Mewarna kem membaca
Mewarna kem membacaMewarna kem membaca
Mewarna kem membaca
 
1. pemateri kesehatan reproduksi remaja pada mos 0
1. pemateri kesehatan reproduksi remaja pada mos 01. pemateri kesehatan reproduksi remaja pada mos 0
1. pemateri kesehatan reproduksi remaja pada mos 0
 

Similar to Company Profile - 15 Dec 2014

Abc heavy engineering capability statement
Abc heavy engineering capability statement Abc heavy engineering capability statement
Abc heavy engineering capability statement
Brett Oar
 
TQF Solutions Presentation FINAL MASTER 12 11 15 AC
TQF Solutions Presentation FINAL MASTER 12 11 15 ACTQF Solutions Presentation FINAL MASTER 12 11 15 AC
TQF Solutions Presentation FINAL MASTER 12 11 15 AC
Angus Cameron
 
new SDR plastic mould company presentation-2016
new SDR plastic mould company presentation-2016new SDR plastic mould company presentation-2016
new SDR plastic mould company presentation-2016
Jailyn VKE
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
HAIDER YOUNIS
 
Compnay Profile - Akura Engineering Services
Compnay Profile - Akura Engineering ServicesCompnay Profile - Akura Engineering Services
Compnay Profile - Akura Engineering Services
Umesh Jogad
 
DWSI (FMD) profile and project details 20140528
DWSI (FMD) profile and project details 20140528DWSI (FMD) profile and project details 20140528
DWSI (FMD) profile and project details 20140528
Sasi K
 

Similar to Company Profile - 15 Dec 2014 (20)

Abc heavy engineering capability statement
Abc heavy engineering capability statement Abc heavy engineering capability statement
Abc heavy engineering capability statement
 
Company Profile new 4
Company Profile new 4Company Profile new 4
Company Profile new 4
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Latest_PEC_Presentation
Latest_PEC_PresentationLatest_PEC_Presentation
Latest_PEC_Presentation
 
Konzert - Performance Beyond Expectations.........
Konzert -  Performance Beyond Expectations.........Konzert -  Performance Beyond Expectations.........
Konzert - Performance Beyond Expectations.........
 
INTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptxINTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptx
 
Minova UK Presentation
Minova UK PresentationMinova UK Presentation
Minova UK Presentation
 
TQF Solutions Presentation FINAL MASTER 12 11 15 AC
TQF Solutions Presentation FINAL MASTER 12 11 15 ACTQF Solutions Presentation FINAL MASTER 12 11 15 AC
TQF Solutions Presentation FINAL MASTER 12 11 15 AC
 
new SDR plastic mould company presentation-2016
new SDR plastic mould company presentation-2016new SDR plastic mould company presentation-2016
new SDR plastic mould company presentation-2016
 
Newburgh Engineering capabillities
Newburgh Engineering capabillitiesNewburgh Engineering capabillities
Newburgh Engineering capabillities
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
Dtk group of industries
Dtk group of industriesDtk group of industries
Dtk group of industries
 
PEB Steel Profile.pdf
PEB Steel Profile.pdfPEB Steel Profile.pdf
PEB Steel Profile.pdf
 
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
 
Compnay Profile - Akura Engineering Services
Compnay Profile - Akura Engineering ServicesCompnay Profile - Akura Engineering Services
Compnay Profile - Akura Engineering Services
 
DWSI (FMD) profile and project details 20140528
DWSI (FMD) profile and project details 20140528DWSI (FMD) profile and project details 20140528
DWSI (FMD) profile and project details 20140528
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
Company presentation precitech equipments india pvt ltd
Company presentation   precitech equipments india pvt ltdCompany presentation   precitech equipments india pvt ltd
Company presentation precitech equipments india pvt ltd
 
APOEM PLANT LAUNCH
APOEM PLANT LAUNCHAPOEM PLANT LAUNCH
APOEM PLANT LAUNCH
 

Company Profile - 15 Dec 2014

  • 1. Hiap Seng Engineering (thailand) co ltdHiap Seng Engineering (thailand) co.,ltd. Corporate Presentation
  • 4. Formed 30 january 2003Formed 30 january 2003 HiapSeng Engineering from Singapore own 48%HiapSeng Engineering from Singapore own 48% Thai Partners own 52% | Capitalinjection of 125m THB Restructure 16 May 2012 HiapSeng Engineering increase shares to 85% ThaiPartners reduce shares to 15%ThaiPartners reduce shares to 15% Capital increase to 175m THB CHANGE NAME1December 2014 CHANGE COMPANY NAME TO HIAP SENG ENGINEERING (THAILAND)CO.,LTD.
  • 5. Our PhilosophyOur Philosophy T t i f ti i t th h ffi i t ff tTo strive for continuous improvement through efficient effort and business processes to meet client requirements with safety, quality and schedule as key drivers.
  • 6. Key DirectorsKey Directors The Directors at Hiap Seng Engineering (Thailand) Co.,Ltd. RichardTan Managing Director Mak Chew Ming Executive Director TanHak Jin Finance Director SongTan Director Surat Kham-ngern Safety Quality Environment Director
  • 7. ORGANIZATIONAL Chart M iManaging Director Richard Tan Finance Director Executive Director M k C M Director Tan Hak Jin Finance Chatchai W. Mak C.M. SQSQE Director Surat Kham- ngern Factory Manager Natthanat J. LogisticHSE QA/QCProduction Tendering Engineering PurchasingHR
  • 8. Factory Map & FacilitiesFactory Map & Facilities Our Interactive and Informative Map
  • 9. InteractiveFactory Map **Please double click on the area you would like to view
  • 10. CORPORATE OFFICE: AREA: 400m2 over two levelsAREA: 400m2 over two levels. OCCUPANTS: The purchasing, tendering, engineering, accounting, and management teams. MAP EXIT
  • 11. WORKSHOP 1: AREA: 7 200m2AREA: 7,200m2. DESCRIPTION: Consisting of three bays each 20m x 120m. EQUIPMENT: 4 x gantry cranes SWL 7.5 tonnes, 6 x gantry cranes SWL 5 tonnesgantry cranes SWL 5 tonnes, 20 x gantry cranes SWL, 1 tonne, 1 x profile pipe cutter, and 70 x welding machines. MAP EXIT
  • 12. WORKSHOP 2: AREA: 7 200m2AREA: 7,200m2. DESCRIPTION: Consisting of three bays each 20m x 120m. EQUIPMENT: 2 x gantry cranes SWL 10 tonnes, 4 x gantry cranes SWL 7 5gantry cranes SWL 7.5 tonnes, and 70 x welding machines. MAP EXIT
  • 13. WORKSHOP 3: AREA: 4 535m2AREA: 4,535m2. DESCRIPTION: Consisting of three bays with a current configuration of one bay being used for an automatic cutting line, one bay being used for a built-up beam line and one baybuilt up beam line, and one bay being used for pro-arc cutting and fabrication. EQUIPMENT: 12 x gantry cranes SWL 5 tonnes, 2 x high- speed band saws, 1 x CNC punch machine 1 x CNCpunch machine, 1 x CNC drilling machine, 1 x robot coupling cutting machine, 1 x CNC plate pro-arc cutting hi 1 imachine, 1 x gas cutting machine, and 30 x welding machines. MAP EXIT
  • 14. WORKSHOP 4: AREA: 1 500m2AREA: 1,500m2. DESCRIPTION: This workshop is used for the fabrication of small components. EQUIPMENT: 2 x gantry cranes SWL 5 tonnes and 4 xcranes SWL 5 tonnes and 4 x gantry cranes SWL 3 tonnes. MAP EXIT
  • 15. LAYDOWN AREA 1: AREA: 3 850m2AREA: 3,850m2. EQUIPMENT: 1 x gantry crane SWL 10 tonnes and 1 x gantry crane SWL 5 tonnes. MAP EXIT
  • 16. LAYDOWN AREA 2: AREA: 1 500m2AREA: 1,500m2. MAP EXIT
  • 17. LAYDOWN AREA 3: AREA: 7 973m2AREA: 7,973m2. MAP EXIT
  • 18. LAYDOWN AREA 4 / PAINTING AREA: AREA: 14,136m2. DESCRIPTION: A dedicated painting area with a permanent paint shop together with 5 x movable paint sheds and a laydown area for paintedlaydown area for painted products. MAP EXIT
  • 19. LAYDOWN AREA 5: AREA: 12 160 m2AREA: 12,160 m2 DESCRIPTION: A general purpose laydown area that can be used as an extension to the painting yard, for storage of raw materials, or as a pre- assembly areaassembly area. MAP EXIT
  • 20. BLASTING CHAMBER AREA: AREA: 1 200m2AREA: 1,200m2. EQUIPMENT: 2 x gantry cranes SWL 5 tonnes. MAP EXIT
  • 21. BEAM LINE BLASTING AREA: AREA: 1,200m2. EQUIPMENT: 2 x gantry cranes SWL 5 tonnes. MAP EXIT
  • 22. WELDER QUALIFICATION TEST AREA: AREA: 500m2. DESCRIPTION: A dedicated area where our welders are tested and qualified for each project. EQUIPMENT: 1 x gantry crane SWL 2.5 tonnes. MAP EXIT
  • 23. PRODUCTION OFFICE: AREA: 720m2AREA: 720m2. OCCUPANTS: The production, Human Resources, Safety, Logistics, and Quality Control teams. MAP EXIT
  • 24. CANTEEN BUILDING & CLIENT OFFICES: AREA: 960m2. OCCUPANTS: Canteen facilities and spare offices for client use. MAP EXIT
  • 25. WAREHOUSE: AREA: 1 536m2AREA: 1,536m2. EQUIPMENT: 2 x gantry cranes SWL 2.5 tonnes. MAP EXIT
  • 26. Our ServicesOur Services The Range of Services Available
  • 27. ServicesPipingServicesPiping Hiap Seng - Thailand has a large and experienced labour force qualified to undertake all kinds oflabour force qualified to undertake all kinds of welding to carbon steel, stainless steel, and alloy pipe systems. We employ all available management tools including QR di t l titiQR coding to process large quantities of components. We have produced up to 90,000 weld diameter inches per month in previous projectsweld diameter inches per month in previous projects including export packing into 40’ sea containers for shipping from the nearby Laem Chabang International Port.
  • 29. ServicesPlateServicesPlate Hiap Seng - Thailand’s versatility means that our plate work products range from bodies for tipperplate work products range from bodies for tipper trucks to pressure rated process and utility equipment.q p
  • 31. ServicesStructureServicesStructure Hiap Seng - Thailand’s large workshops and laydown areas together with our extensive array oflaydown areas together with our extensive array of automatic profile cutting and other machines makes us one of the premier structural steel fabrications inp the region.
  • 33. ServicesPaintingServicesPainting Hiap Seng - Thailand has extensive blasting and painting facilities Our auto-blasting chamber canpainting facilities. Our auto-blasting chamber can accommodate sizes up to 30m x 7m and many of our painting sheds are rail mounted to providep g p optimum versatility.
  • 35. Case StudiesCase Studies Four Major Case Studies Revealed
  • 36. ProjectCase Studies Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Steel Structure Fabrication and Modularisation for CUEL Limited Steel Structure Fabrication of Access Jetty &Wharf for John Holland Power Diverter Fabrication for NEM Power-Systems
  • 37. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 38. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 39. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 40. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 41. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 42. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 43. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 44. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 45. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 46. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 47. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 48. Case Study 1 Steel Structure Fabricationand Modularisationfor CUEL LimitedSteel Structure Fabricationand Modularisationfor CUEL Limited ProjectDetailsProjectDetails Scope: Fabrication of Steel Structures Pre-Assembly of Modules Output:Output: 1,000 Tonnes per month EXIT
  • 49. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 50. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 51. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 52. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 53. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 54. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 55. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 56. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 57. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 58. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 59. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 60. Case Study 2 Tokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn BhdTokuyama Malaysia PipingFabricationfor Chiyoda SarawakSdn. Bhd. ProjectDetailsProjectDetails Feature 1: Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax Feature 2: The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools. Scope: Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping. Output: 60,000 weld diameter inches per month. EXIT
  • 61. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 62. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 63. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 64. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 65. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 66. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 67. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 68. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 69. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 70. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 71. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 72. Case Study 3 Steel StructureFabricationof Access Jetty & Wharf for John HollandSteel StructureFabricationof Access Jetty & Wharf for John Holland ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Steel Structures •Pre-Assembly of Structures •Blasting and PaintingBlasting and Painting •Export Packing Output: •1,800 Tonnes per month EXIT
  • 73. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 74. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 75. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 76. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 77. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 78. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 79. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 80. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 81. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 82. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 83. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 84. Case Study 4 Power Diverter Fabricationfor NEM Power SystemsPower Diverter Fabricationfor NEM Power-Systems ProjectDetailsProjectDetails Scope: •Material Supply •Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate •Assembly of Diverters •Blasting and Painting •Functional Testing •Export Packing and Shipping Output: •One Diverter Every 6 weeks •400 Tonnes per month EXIT
  • 85. Our RevenueOur Revenue Substantial and Continual Growth
  • 88. Sales Distribution 25% Average overseas sales for the past 5 years25% 85% Overseas sales Increase since 201285% Overseas sales Increase since 2012
  • 89. Our WorkforceOur Workforce The Cornerstone to our Success
  • 90. Overall Workforce DirectWorkforce 1000+ Office Staff 100+ 250+ Indirect Supervision 1 76 Office1 200+ Welders2 35 QC2 480+ Other Trade 3 20 Safety3 90% 10%
  • 92. Machinery That Deliversresults 1 Daito CNC Coping Robot1 2 p g Automatic H-Beam Drilling Machine2 Automatic H-Beam Drilling Machine H B B d S P i Li3 H-Beam Band Saw Processing Line 4 Built Up Beam Fabrication Line 5 Plasma Plate Cutting Machine 6 Pipe Coaster Profile Cutting Machine
  • 93. Our ClientsOur Clients Delivering Beyond Expectations
  • 94. Our Clients Client Name Theiss John Holland Country Australia Australia Nature of Work ModuleStructure / Piping Falseworks - CapeLambertJohn Holland United Group Nems PowerSystems Chiyoda Australia Germany Japan Falseworks CapeLambert Piping Diverter/ Damper/ PlateWork PipingChiyoda JGC Corporation Samsung Engineering GS Engineering & Construction Japan Japan Korea Korea Piping Diverter/ Damper/ PlateWork Structure StructureGS Engineering & Construction CTCI CUEL UOP LLC Korea Taiwan Thailand USA Structure Structure/ Piping Structure/ Piping ModuleStructure / Piping Experienceworkingwith globaland regionalclients UOP LLC USA ModuleStructure / Piping
  • 96. Past 5 years accumulated Man hours 8.1m LTI 0LTI = 0
  • 98. Our Certificates The company achieved ISO 9001 Registered certification in 2008. The company holds Thailand Board of Investment Certification and is registered with the Department of Foreign Trade.
  • 99. Our LocationOur Location Only 15km from Laem Chabang International Port
  • 100. Our LocationOur Location We are located 15km from Laem Chabang International Port allowing easy export of fabricated metals