Latest Information Railway Signaling & Telecom, Power Supply Traction Power/OHE/Building Power Supply/Smart Building and Infra Faciilities/OEM Equipments Railway /Railway EPC Contractors/ Electrical Contractors/Consultants MEP/Metro Rail/DFCC/ High Speed Train
2. G
M
Generation Transmission Distribution Load
Generation Transmission Distribution Consumption
Electric Power Systems for Indian Railway(Moving Transport Systems)
10. An Arcing Fault is the flow of current through
the air between phase conductors or phase
conductors and neutral or ground.
Concentrated radiant energy is released at the
point of arcing an a small amount of time
resulting in Extremely High Temperature.
25. ESE Installation Guidence
ESE AT with radius protection form 32 mtr to 107 mtr.
DMC Insulator .
GI/FRP Mast .
Down Conductor Copper / Copper Cadmium
Cable 70 sq. mm
Copper Bonded Ground Earthing
34. Most Efficient Joint Process/Fail Proof as per IEEE 837
It is efficient and superior to all existing
surface –to-surface
mechanical retention connectors.
35. Want to meet Expert in India for Lightning
Protection Instalation in your Facilities