What do we Want on our project?
• Lower Costs
• Better Schedules
• Better Quality
• Improved Project Team Environment
Why do we need a different Approach?
• The construction industry has
fallen behind other industries
for productivity improvement.
• Lean target the Removal of
behaviors and activities that
contribute to Waste and loss of
productivity.
• Lean construction brings the
needed methodologies and
culture for improvement.
What is lean Construction?
• Definition of lean:
• A production approach that preserve value and less waste
• “ To produce right product at the right time in the right quality for
the costumer and to produce exactly what you need and nothing
more”
• Taiichi Ohno, creator of Toyota Production System.
• Lean Construction:
• A design and execution methodology to minimize Waste of
material and effort in order to generate the maximum value.
Value is defined by the Costumer
Seven types of waste
-Defects/Rework; scrap and fixing errors
-Overproduction; making more than just in case
-Over-Processing; Beyond what costumer need
-Inventory/Queue; Excessive work in process inventory
-Motion; unnecessary and awkward movement
-Waiting; Delay for upstream activity to complete
-Transport; unnecessary material movement
Lean Attacks Waste on 3 Angles
Project
Delivery
Organization
Integrated Project Delivery
Practical application of Lean Construction towards integrated project delivery
Information is often missed in the handoffs
Typical information flow
Integrated project
Lean Terms are different
Benefits
• less waste can greatly reduce all around costs
• Construction time can greatly be reduced by increased planning and
strategic vision.
• Fewer accidents and a higher rate of safety through increased worker
focus and understanding.
• Increased schedule reliability and predictability.
• Improved overall results due to increased communication and fewer
workers.
• Decreased stress for workers and management due to fewer workers.
• Increased productivity all around due to a higher rate of planning.
• Increased profits and turnovers, with increased customer satisfaction.
• Increased worker accountability.
• Increased job satisfaction resulting in more performance commitment
Drawbacks
• All areas of management, along with the workers, have to be in
accordance with the plan. If there is a break in the chain, the lean
methodology cannot work.
• Getting everyone onboard with a new production method isn’t easy, and
some people may be ambivalent about change.
• In order for successful implementation, management officials must be
able to guide employees directly and efficiently. In essence, the lean
method of operation is derived by how well a management official can
work with his employees more so than with the standard procedure, and
personality clashes, as well as other issues may arise.
• Training and educating employees in the lean method takes time and
dedication, and as expressed earlier, some workers may not like or deal
well with change.
Drawback Continue
• Staying on course with a new system of operation can be difficult for some
managers, and some may grow frustrated.
• Cohesive teamwork is essential for lean production. Each worker has to be
well versed in his position or a breakdown will occur as all workers rely on
one another.
• Training employees with a new system can take some time, and this could
decrease the overall time on a project or design.
• Management has to be astute to all production issues as a breakdown in
the system can easily occur. Staying alert to the change in operations can
be hard for all employees.
• Suppliers and distributors have to be notified of the change in production,
and this could cause problems.
• A temporary decrease in employee morale might be noticed due to the
change in policy.
References
• http://www.buildingsguide.com/blog/introduction-lean-construction
• https://www.academia.edu/8852339/Advantages_and_disadvantages_of_
traditional_and_lean_method
• https://www.youtube.com/watch?v=x0-9nlg-FDY
• https://en.wikipedia.org/wiki/Lean_construction
• www.leanconstruction.org
Whatsapp
16/05/2016
1) Difficulties being faced by site engineers in communicating and integrating the vendors and
stakeholders of the project
2) identifying the key vendors and have continuous group discussion with them
3) Groups
1) Stakeholders
2) Vendors
1) Railing
2) Waterproofing
3) Fire doors
4) Paintings
1) Tower R
2) Tower M
3) Tower N
5) UPVC
6) MEP team
7) False ceiling
8) Granite and stair case material
Why lean/topic????
Why project is delayed?
Types of delays?
Types of issues
Clarity in data
lack of details
Engaging small contractor for large quantum of work
Making meetings with people whose mindset is small
SOLUTION
These are the some of the types of waste which will inquired during the project.
In every project integrated project delivery is there then also we inquired above
wastes so to eliminate that lean approach is used.
What to do…..
hhshh

More Related Content

What's hot

Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
Sunil Manjeri
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
ijtsrd
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
Allan Berry
 

What's hot (20)

Last planner system
Last planner systemLast planner system
Last planner system
 
Lean construction
Lean constructionLean construction
Lean construction
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introduction
 
Lean construction
Lean constructionLean construction
Lean construction
 
Om lean
Om leanOm lean
Om lean
 
Lean Construction: From Theory to Implementation
Lean Construction: From Theory to ImplementationLean Construction: From Theory to Implementation
Lean Construction: From Theory to Implementation
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in Construction
 
Green building design for sustainable urban habitats
Green building design for sustainable urban habitatsGreen building design for sustainable urban habitats
Green building design for sustainable urban habitats
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
 
Quality in Construction
Quality in ConstructionQuality in Construction
Quality in Construction
 
Risk & Risk Management in Construction.ppt
Risk & Risk Management in Construction.pptRisk & Risk Management in Construction.ppt
Risk & Risk Management in Construction.ppt
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Epc overview
Epc  overviewEpc  overview
Epc overview
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

Viewers also liked

Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
Bharat Parmar
 

Viewers also liked (6)

LEAN Construction
LEAN ConstructionLEAN Construction
LEAN Construction
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
Agile and Lean for Construction
Agile and Lean for ConstructionAgile and Lean for Construction
Agile and Lean for Construction
 
Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
 
QUALITY FUCTION DEPLOYMENT
QUALITY FUCTION DEPLOYMENTQUALITY FUCTION DEPLOYMENT
QUALITY FUCTION DEPLOYMENT
 
Quality Function Deployment (QFD) Seminar Presentation
Quality Function Deployment (QFD) Seminar PresentationQuality Function Deployment (QFD) Seminar Presentation
Quality Function Deployment (QFD) Seminar Presentation
 

Similar to lean construction and integrated project delivery

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
Terry Bunio
 

Similar to lean construction and integrated project delivery (20)

Lean construction
Lean constructionLean construction
Lean construction
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Recognize dimensions of change
Recognize dimensions of changeRecognize dimensions of change
Recognize dimensions of change
 
Bringing Discipline To Project Management
Bringing Discipline To Project ManagementBringing Discipline To Project Management
Bringing Discipline To Project Management
 
Group 2 six myths of product development final
Group 2 six myths of product development finalGroup 2 six myths of product development final
Group 2 six myths of product development final
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Value Management
Value Management Value Management
Value Management
 
Agile for process improvement
Agile for process improvementAgile for process improvement
Agile for process improvement
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Goldratt
GoldrattGoldratt
Goldratt
 
Olena Grygorchuk - Refactor your understandings about Agile development
Olena Grygorchuk - Refactor your understandings about Agile developmentOlena Grygorchuk - Refactor your understandings about Agile development
Olena Grygorchuk - Refactor your understandings about Agile development
 
Tqm
TqmTqm
Tqm
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 
Different approaches for different scopes: How to tackle a medium-sized Dr...
Different approaches for different scopes: How to tackle a medium-sized Dr...Different approaches for different scopes: How to tackle a medium-sized Dr...
Different approaches for different scopes: How to tackle a medium-sized Dr...
 
Agile 101
Agile 101Agile 101
Agile 101
 
Seminar report on lean
Seminar report on leanSeminar report on lean
Seminar report on lean
 
Day 4 part 3
Day  4 part 3Day  4 part 3
Day 4 part 3
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 

lean construction and integrated project delivery

  • 1.
  • 2. Content • Introduction • Types of Activities • Seven types of wastes • Waste of 3 Angle of Project delivery • Integrated project • Advantages • Limitation • References
  • 3. What do we Want on our project? • Lower Costs • Better Schedules • Better Quality • Improved Project Team Environment
  • 4. Why do we need a different Approach? • The construction industry has fallen behind other industries for productivity improvement. • Lean target the Removal of behaviors and activities that contribute to Waste and loss of productivity. • Lean construction brings the needed methodologies and culture for improvement.
  • 5. What is lean Construction? • Definition of lean: • A production approach that preserve value and less waste • “ To produce right product at the right time in the right quality for the costumer and to produce exactly what you need and nothing more” • Taiichi Ohno, creator of Toyota Production System. • Lean Construction: • A design and execution methodology to minimize Waste of material and effort in order to generate the maximum value.
  • 6. Value is defined by the Costumer
  • 7. Seven types of waste -Defects/Rework; scrap and fixing errors -Overproduction; making more than just in case -Over-Processing; Beyond what costumer need -Inventory/Queue; Excessive work in process inventory -Motion; unnecessary and awkward movement -Waiting; Delay for upstream activity to complete -Transport; unnecessary material movement
  • 8.
  • 9. Lean Attacks Waste on 3 Angles Project Delivery Organization Integrated Project Delivery Practical application of Lean Construction towards integrated project delivery
  • 10. Information is often missed in the handoffs
  • 13.
  • 14. Lean Terms are different
  • 15. Benefits • less waste can greatly reduce all around costs • Construction time can greatly be reduced by increased planning and strategic vision. • Fewer accidents and a higher rate of safety through increased worker focus and understanding. • Increased schedule reliability and predictability. • Improved overall results due to increased communication and fewer workers. • Decreased stress for workers and management due to fewer workers. • Increased productivity all around due to a higher rate of planning. • Increased profits and turnovers, with increased customer satisfaction. • Increased worker accountability. • Increased job satisfaction resulting in more performance commitment
  • 16. Drawbacks • All areas of management, along with the workers, have to be in accordance with the plan. If there is a break in the chain, the lean methodology cannot work. • Getting everyone onboard with a new production method isn’t easy, and some people may be ambivalent about change. • In order for successful implementation, management officials must be able to guide employees directly and efficiently. In essence, the lean method of operation is derived by how well a management official can work with his employees more so than with the standard procedure, and personality clashes, as well as other issues may arise. • Training and educating employees in the lean method takes time and dedication, and as expressed earlier, some workers may not like or deal well with change.
  • 17. Drawback Continue • Staying on course with a new system of operation can be difficult for some managers, and some may grow frustrated. • Cohesive teamwork is essential for lean production. Each worker has to be well versed in his position or a breakdown will occur as all workers rely on one another. • Training employees with a new system can take some time, and this could decrease the overall time on a project or design. • Management has to be astute to all production issues as a breakdown in the system can easily occur. Staying alert to the change in operations can be hard for all employees. • Suppliers and distributors have to be notified of the change in production, and this could cause problems. • A temporary decrease in employee morale might be noticed due to the change in policy.
  • 18.
  • 19. References • http://www.buildingsguide.com/blog/introduction-lean-construction • https://www.academia.edu/8852339/Advantages_and_disadvantages_of_ traditional_and_lean_method • https://www.youtube.com/watch?v=x0-9nlg-FDY • https://en.wikipedia.org/wiki/Lean_construction • www.leanconstruction.org
  • 20.
  • 21. Whatsapp 16/05/2016 1) Difficulties being faced by site engineers in communicating and integrating the vendors and stakeholders of the project 2) identifying the key vendors and have continuous group discussion with them 3) Groups 1) Stakeholders 2) Vendors 1) Railing 2) Waterproofing 3) Fire doors 4) Paintings 1) Tower R 2) Tower M 3) Tower N 5) UPVC 6) MEP team 7) False ceiling 8) Granite and stair case material
  • 22. Why lean/topic???? Why project is delayed? Types of delays? Types of issues Clarity in data lack of details Engaging small contractor for large quantum of work Making meetings with people whose mindset is small SOLUTION These are the some of the types of waste which will inquired during the project. In every project integrated project delivery is there then also we inquired above wastes so to eliminate that lean approach is used.