Diese Präsentation wurde erfolgreich gemeldet.
Wir verwenden Ihre LinkedIn Profilangaben und Informationen zu Ihren Aktivitäten, um Anzeigen zu personalisieren und Ihnen relevantere Inhalte anzuzeigen. Sie können Ihre Anzeigeneinstellungen jederzeit ändern.
M K NARAYANA
Address: Shashi, Vidyanagar, Kulai Post, Mangalore - 575 019
Telephone: +91 9879200130 | Email: narayanamk66@...
Advance planning of the resources (men, material, tools etc) for execution of works and arranging availability of
sufficie...
including the
Peripheral
Facilities.
Pre-feasibility
Report
Preparation
(In progress)
Setting up of 20MTPA Coal terminal a...
REFERENCE
Available on request.
Preparation of Pre-TFR for the 300MTPA
Iron Ore and Coal Greenfield Port at
North of Savan...
Nächste SlideShare
Wird geladen in …5
×

CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering

154 Aufrufe

Veröffentlicht am

Seaport Port Terminal Planning ■ Front End Engineering Design (FEED) ■ Pre-bid Engineering Services ■ Technical Feasibility Report ■ Tender Document/EPC Documents ■ Technical Specifications/Data Sheet Development) ■ Detail Engineering Assistance & Project Management Services for Seaport Terminal Facilities viz. Navigational Channel, Dredging, Breakwater, Wharf/Jetty Structures and Back up Facilities

Veröffentlicht in: Ingenieurwesen
  • Als Erste(r) kommentieren

  • Gehören Sie zu den Ersten, denen das gefällt!

CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering

  1. 1. M K NARAYANA Address: Shashi, Vidyanagar, Kulai Post, Mangalore - 575 019 Telephone: +91 9879200130 | Email: narayanamk66@yahoo.co.in | Date of Birth: 10th March 1966 Senior Level | Sea port Terminal Engineering | Process Excellence & Cost Innovation Specialization: Sea Port/Off Shore Engineering, Terminal Facility Planning, Project Implementation & Commissioning of Seaport Terminal Facilities PROFESSIONAL PROFILE A dedicated and hard working professional with over 2 decades of experience in project engineering, execution, contract management, and team/people management. B E in Civil Engineering; presently associated with Essar Bulk Terminal Ltd. as General Manager- Project Engineering. Proficiency in handling Terminal Facilities planning, Marine Project FEED, EPC Tender Preparation, Engineering executing etc., & spearheading Seaport Terminal projects involving engineering, contract administration and resource planning along with all related internal/external project responsibilities. Ability to successfully manage multiple priorities and assignments to provide total leadership to value engineering. Expertise in developing & implementing strategies for the organisation & align it to the business objectives. Adept in swiftly ramping up projects within deadlines, budgets and quality parameters, thereby generating savings and improvement in volumes for the organisation. Ability of managing large teams including up to 20 members of Team of Engineers towards meeting the project and company objectives from Concept to Completion stage Excellent management of operations & achieving delivery & service norms within deadlines. Familiar with quality standards, quality assurance and control norms. Effective communicator with exceptional relationship management skills & ability to relate to people at all level. COMPETENCIES Leadership & team building Decision making Entrepreneurial orientation Civil engineering Construction management Material management Procurement planning Negotiations Erection & commissioning Managing operations Utilization of resources Value engineering Analytical & problem solving Cost & quality control Safety & health EXPERIENCE Seaport Port Terminal Planning ■ Front End Engineering Design (FEED) ■ Pre-bid Engineering Services ■ Technical Feasibility Report ■ Tender Document/EPC Documents ■ Technical Specifications/Data Sheet Development) ■ Detail Engineering Assistance & Project Management Services for Seaport Terminal Facilities viz. Navigational Channel, Dredging, Breakwater, Wharf/Jetty Structures and Back up Facilities CAREER PATH Essar Bulk Terminal Ltd. Nov 2014 - Till date General Manager – Project Engineering Essar Engineering Services Division (Aegis Ltd.) Mar 2006 – Oct 2014 Associate Vice President Afcons Infrastructure Ltd Apr 1995 - Mar 2006 Senior Engineer SSN Construction Co Jun 1991 - Apr 1995 Site Engineer G K Shetty Builders Pvt. Ltd Nov 1990 - Jun 1991 Quality Assurance and Control KEY PERFORMANCE AREAS Operations Management Planning of Sea Port Terminal Facilities, preparing detailed Project Report/Technical Feasibility Report. Preparing Tender Document/ EPC documents and Contract Document for Sea Port Terminal Facilities Including Capital Dredging and Designing of Water front Structures and Other Maine Infrastructures like Approach Channel, Turning Circle (Capital & Maintenance Dredging), Breakwaters, etc. Project Management & consulting services and Pre-bid engineering (FEED) Services for Port Projects. Project Management Handle project management activities for all civil, building, structural engineering and land activities; encompassing planning, design, estimation, scope definition, finalisation of techno-commercial aspects and laying down of quality standards. Manage the material from requisition to procurement & ensure availability to match project schedule.
  2. 2. Advance planning of the resources (men, material, tools etc) for execution of works and arranging availability of sufficient resources by contractors. Keep track of work progress in terms of cost, resource deployment, quality compliance and time over runs. Prepare budget & mange cash flow/billing and interact with other departments for commercials. Oversee operations including contracts finalisation, planning, directing & coordinating and supervising all activities of the project execution. Ensure all construction activities are completed within the time frame and meet the requirements of business and corporate goals. Deliver services that are in line with industry standards from a cost and quality standpoint. Maintain controls the Project budgets handled. Monitor individual project progress, create analytical reports to understand the site requirements and provide necessary support to eliminate delays. Site Management Deal with various implementation activities at site including various erections and commissioning activities, post- award implementation of various contracts, internal coordination between various groups and head quarters. Oversee development of all Infrastructural facilities at site including site levelling, approach roads, drains, fencing. Manage the finalization at site for execution & monitoring of works of various packages at site, with contractors and monitor their progress. Process & Compliance Management Arrange availability of sufficient work fronts & facilities before required time and availability of owner’s issued items and inputs. Review meetings at site and ensure effective feedback & monitoring parameters. Ensure compliance of all statutory requirements, safety standards and environment regulations. Arrange erection & commissioning of project as per schedule, prescribed specifications and specified quality. Ensure compliance of field quality plans at site. Resolve all bottlenecks in smooth project execution and follow up & expedite various activities. Oversee monitoring of dispatches from various contractors & suppliers, including the deployment of construction machinery, tools and manpower on time & within schedule. Stakeholder Management Advice and present the information and Progress Reports related the Project implementation to the senior management. Coordinate with site consultants and Head Office team regarding all issues for project i.e. drawings, work orders, dealing with Government Body, CSR and Health & Safety. Fix budgets for projects and monitoring on monthly basis and sending variance report to HO. Leadership & Team Management Lead the Engineering & project team of executives for project implementation. Implement ongoing processes and productivity improvements through staff activity. Monitor activities of the line managers and provide feedback regularly on team resources and performance. Guide, train and advice team members on performance, ensuring team members are adequately skilled to meet team objectives. EDUCATION 1990 B E - Civil Engineering - Bangalore University LIST OF MAJOR PROJECTS ASSOCIATED WITH Project Estimated Capital Cost Client Name Organization Name Responsibility and (Date of Completion of Assignment) Preparation of Hazira Deep Water Terminal Master Plan – Vision 2020 INR 6400 Cr (USD 984 Million) Essar Bulk Terminal Ltd. Essar Bulk Terminal Ltd. Preparation of Master plan over the reclaimed land of 350 Ha comprising Container Terminal, Dry Bulk Terminals, Break Bulk Terminals, Bunkering/Liq uid Terminal, Dry Docks etc
  3. 3. including the Peripheral Facilities. Pre-feasibility Report Preparation (In progress) Setting up of 20MTPA Coal terminal at Beira, Mozambique 450 Million USD New Coal Terminal- Beira SA Essar Bulk Terminal Ltd. (a subsidiary of Essar Ports Limited) EPC Tender Document Preparation Completed. Detailed Design for Berthing Structure Completed. (Acting as the Client’s Engineer In charge) Detailed Engineering services of 14 MTPA Coal Berth at Paradip Port on BOT Basis, Orissa INR 773 crores (USD 119 Million) Essar Bulk Terminal (Paradip) Ltd. Essar Eng. Services Div Detailed Engineering for Marine Structure Completed Jun 2012. Engineering for Back up Facilities in progress Project Management for 550m Deep Water Berth at Hazira Capital & Maintenance dredging INR 875.5 crore. (USD 134 Million) Essar Bulk Terminal Ltd Essar Eng. Services Div Jun 2010 Tender Document Preparation and Contract Document Preparation & Detailed Engineering and Project Management for Capital dredging for Forming of Turning circle and Approach Channel INR 285 crores. (USD 44 Million) Essar Bulk Terminal Ltd Essar Eng. Services Div Jun 2010 Detailed Engineering Services for modification of Existing Berth for Mechanization of CQ-3 berth at Paradeep under BOT. INR 416 crores (USD 64 Million) Essar Bulk Terminal (Paradip) Ltd Essar Eng. Services Div Jan 2013 Technical Scrutiny Services for the Marine and Material Handling facility at Salaya INR 864 crores. (USD 133Million) Essar Bulk Terminal (Salaya) Ltd Essar Eng. Services Div Jul 2013 Detailed Engineering Services for Extension of 1100 m Deep Water Berth on southern side of Existing 700 M Deep Water Berth at Hazira for 20 MTPA break bulk and General cargo and Containers. INR 1400 crores (USD 215 Million) Essar Bulk Terminal Ltd Essar Eng. Services Div In Progress Preparation of TEFR, EPC tender documents and Detailed Project report for Coal & Iron Ore Terminal at Beira port- Mozambique. Preparation of Preliminary Tech. Feasibility report for Development of Green-field Iron Ore Pellet Terminal at twin port Wisconsin - USA USD 875 Million USD 110.5 Million Essar (Africa) Holding Ltd. Essar Ports Limited Essar Eng. Services Div. Essar Eng. Services Div Feb 2012 Jun 2013
  4. 4. REFERENCE Available on request. Preparation of Pre-TFR for the 300MTPA Iron Ore and Coal Greenfield Port at North of Savane - Mozambique USD 4200 Million Essar (Africa) Holding Ltd. Essar Eng. Services Div Feb 2013 Planning & Detailed Engg. services for developing Port jetty & IWT jetty at Sittwe and IWT jetty at Paletwa INR 180 crores. (USD 28 Million) Essar Project (India) Ltd. (EPC Contractor) and IWTA - India (Client) Essar Eng. Services Div Apr 2014 Detailed Engineering Services for Transition Jetty Between existing Shallow Water berth & Deep Water Berth INR 32 crores (USD 5 Million) Essar Steel Ltd. Essar Eng. Services Div Dec 2009 Detailed Engg. Services for Rehabilitation of Permanent jetty and Wharf wall at Hazira INR 16 crores (USD 2.5 Million) Essar Steel Ltd. Essar Eng. Services Div Sep 2008 Construction of Cofferdam for Pump House No 1 & 3 for cooling Sea Water at Ras-Laffan - Qatar USD 22 million Qatar Petroleum Afcons Infra Ltd Nov 2005 Project Management Services for Refurbishment of existing quay wall & installation of floating jetty at Aden USD 10 million Yemen Coast Guard – Aden, Yemen Afcons Infra Ltd Dec 2004 Construction Management for Major bridges between Ernakulum and Vypeen INR 45 crores. (USD 6.9 Million) Cochin Port Trust Afcons Infra Ltd Apr 2004 Construction Management for Tanker jetty no.3, no.4 and wharf wall for Liquid cargo berth at NMPT-Mangalore INR 60 crores. (USD 9.2 Million) Mangalore Port trust Afcons Infra Ltd Dec 2001 Construction Management for Coal un- Loading Berth at Navalakhi- Gujarat INR 20 crores (USD 3 Million) USL – Mumbai Afcons Infra Ltd Nov 2000 Construction/Execution Management RO jetty, Intake facilities, Filtration packages, Reservoirs, Sea water outfall and Auxiliary facilities INR 100 crores (USD 15 Million) Reliance Petroleum Ltd. Jamnagar, Gujarat Afcons Infra Ltd Jan 2000 Construction/Execution Management general Cargo berth at INR 30 crores (USD 4.6 Million) Pipavav Port Ltd. Afcons Infra Ltd May 1997 Tunnel No.1 between Chainage 135/900 and 139/880 including other ancillary items of works INR 10 crores Konkan Railway Corporation Ltd. SNC CO. 1995 Earth work in cutting and embankment between Chainage 85/500 and 92/750 including minor bridges. INR 20 crores Konkan Railway Corporation Ltd. SNC CO. 1993

×