SlideShare ist ein Scribd-Unternehmen logo
1 von 15
MTB opportunities in 
Whitireia Park 
Management Plan 
November, 2014
Introduction 
• Mana Cycle Group is a charitable club which develops MTB facilities and 
advocates for improved cycling of all kinds. 
• We have 390 Facebook followers. 
• Many of our members are already regular riders in Whitireia Park. 
• Our objective at this stage is to ensure Whitireia Park’s new Management Plan 
allows for the fantastic potential for high quality sustainable MTB tracks in a 
manner that supports all other park stakeholder needs. 
• By working with landowners and stakeholders to build approved MTB tracks, 
MCG can reduce the incidence of informal tracks being dug without consent. 
This is an issue in Porirua/Tawa because this part of the region has been 
devoid of approved tracks. 
• MCG is currently focused on developing a Mountainbike park at Rangituhi 
Colonial Knob. We are not seeking to dilute that effort. However, we are 
aware there are many MTBers who live close to Whitireia Park who would be 
keen to help build tracks there if a track project was approved and consented.
How MTB tracks will be positive for 
the park 
• Attract a new group of park users. The existing tracks are not regionally 
significant and therefore do not in themselves attract people from very far. 
• Increase the Family friendly singletracks in the region. 
• Engage new local community members in work and care for the park. 
• Create a new recreational and event venue resource for local schools. 
• Improve the quality of the Porirua Grand Traverse and GW’s annual 
community cycling event in the park. 
• Attract more charitable funding to park projects. 
• Improve access for volunteer pest control activity. 
• Improve access for fire response. 
• There are 24,000 Mountain Bikers in Wellington region
35,000 internationals had MTB’d in NZ YE 
June 2013, +52% on 2009.
How MTB tracks will be positive for 
the park 
• High usage due to close proximity to urban population, unlike Stratton 
Street, Battle Hill and Akatarawas. 
• Facilitate lower income populations getting into biking. Most of the 
region’s MTB tracks require a car trip or are close to higher income 
populations (Karori, Mt Vic, Brooklyn, Miramar) 
• Most tracks would be multi-use for walkers, runners. 
• Sustainable MTB Track building is becoming a globally demanded skill that 
can be taught through volunteer parties, engaging youth in positive 
activity and creating career opportunities. 
• Economic development – create demand for expanded cycle retail, rental 
and tours near the park, grow business for all retail in the area. 
• One of the few areas in Wellington that MTBers could take their dogs.
Whitireia Park MTB Track Attributes 
• It would provide the best proximity to the sea 
of all Wellington region singletrack. (QE2 
coastal route has many nasty pinch-climbs 
putting off kids and the less fit). 
• Can connect to Rangituhi Colonial Knob MTB 
Park and Te Ara Roa Walkway. 
• Very easy terrain/geology for track 
construction
Current Issues for Biking in the Park 
• The Coastal track could be made easier to ride for beginners with 
some re-surfacing and options to avoid having to lift bikes over 
gates. 
• The inland route section descending to Onehunga Beach is very 
steep resulting in tyre skidding and it’s very difficult to ride up. This 
will mean ongoing damage and maintenance. 
• To get from Onehunga Beach to Titahi Bay by bike means going up 
the very steep narrow road with high risk of car conflict.
MTB Track Objectives 
• Avoid impacts to Pa’s other cultural sites such as the garden terraces. 
• Plot tracks as soon as possible before the gorse makes most areas 
impassable and to avoid planting where a track will be. 
• Ensure the trails compliment the golf course and other park users, 
walkers, runners, horse-riders, model aircraft, kitesurfers, rock-climbers, 
beach users etc. 
• Design trails that take advantage of the sensation of flying over the sea. 
• Create tracks that are more fun, especially for kids and families having 
their first singletrack MTB experiences. This means easier slopes but 
rather than boring constant gradients, provide frequent grade reversals to 
give a gentle rollercoaster effect. 
• Create a safe easy alternative up from Onehunga Beach to get bikes off the 
road and away from vehicle danger. 
• Build tracks with sustainable design, that shed water and therefore do not 
erode or get muddy. Proactive planting to shield any areas of visual 
impact. 
• Consult closely with Whitireia Restoration Group to try to plot tracks that 
also support volunteer access for planting, pest and weed control.
Track options (Intro) 
• Following we present a series of possible tracks shown on 3 
separate maps. 
• These are based on our knowledge riding and walking the park. 
• We look forward to feedback through the management plan 
process from Iwi, the board, managing rangers and other park 
users to refine these concepts. 
• The lines are just rough hand-drawn routes on the map. Exact 
routes would require accurate piloting with inclinometers to 
ensure ideal gradient and avoidance of sensitive sites. 
• The expectation is that this list may be cut if there are conflicts; 
and implemented in trialled stages over a long-term period.
Track options (see next map) 
• Coastal Traverse - an easy uphill/dual direction from the 
sea-level road up to Mt Cooper, traversing above the cliffs. 
This gets bikes off the road which is too steep to be fun, 
and dangerous with vehicles). 
• Plateau – an easy gradient alternative to the steep, eroding 
inland trail up from the Onehunga Beach Carpark, heading 
for the summit and south along the plateau, dropping 
down the ridgeline but avoiding the Te Onepoto Pa site). 
• Gloaming Traverse - below Gloaming hill houses traversing 
through the scrub towards the line of pines beside the golf 
course and joining the inland track and Golf Traverse. This 
would create easier access for volunteer pest/weed control 
and planting)
Coastal Traverse 
Gloaming Traverse 
Plateau
Track options (Continued) 
• Inland/Golf Traverse - from the big concrete 
carpark at the top dropping south and traversing 
the hillside towards the eastern mast, skirting the 
golf course and meeting the existing inland trail 
and the Gloaming Traverse. 
• Te Kahikatoa View – From Plateau an easy 
descent out skirting the lower plateau by Te 
Kahikatoa Pa site. This takes you back to look 
down on the sea, and it opens a bait-line through 
the gorse which is taking over this area.
Golf Traverse 
Te Kahikatoa View
Track options (Continued) 
• MTB Baitline – from Plateau’s high-point cutting 
along the south-western side of the ridge high 
above the existing inland route. This provides a 
new baitline for volunteers. It circles a knob and 
then cuts back in to drop down a u-shaped valley 
to Onepoto bay to join the bottom of Plateau and 
he coastal track. 
• Marina Downs – intermediate to advanced 
descents from the mid point of Plateau, down the 
spurs to the coastal track.
MTB Baitline 
Marina 
Downs

Weitere ähnliche Inhalte

Andere mochten auch

Micro i 2. microscopy for students of B.Pharm. by amit z chaudhari
Micro i 2. microscopy for students of B.Pharm. by amit z chaudhariMicro i 2. microscopy for students of B.Pharm. by amit z chaudhari
Micro i 2. microscopy for students of B.Pharm. by amit z chaudhariAZCPh
 
(Nearly) Instant Recommendations
(Nearly) Instant Recommendations(Nearly) Instant Recommendations
(Nearly) Instant RecommendationsColin Zima
 
результаты опроса производственных компаний. кризис в головах или в реальности
результаты опроса производственных компаний. кризис в головах или в реальностирезультаты опроса производственных компаний. кризис в головах или в реальности
результаты опроса производственных компаний. кризис в головах или в реальностиVizavi_Consalt
 
Ventajas y desventajas
Ventajas y desventajasVentajas y desventajas
Ventajas y desventajasE Holguin
 
Inorganic salts By lobachemie
Inorganic salts By lobachemieInorganic salts By lobachemie
Inorganic salts By lobachemieLobachemie
 
Horner william 4.4
Horner william 4.4Horner william 4.4
Horner william 4.4willo5812
 
Lobachemie Offers Complexometric Indicators
Lobachemie Offers Complexometric IndicatorsLobachemie Offers Complexometric Indicators
Lobachemie Offers Complexometric IndicatorsLobachemie
 
Horner William PPP
Horner William PPPHorner William PPP
Horner William PPPwillo5812
 
Patti McCarthy Resume 2014 Nov
Patti McCarthy Resume 2014 NovPatti McCarthy Resume 2014 Nov
Patti McCarthy Resume 2014 NovPatti McCarthy
 
Week 6 assignment shakespeare blogging
Week 6 assignment   shakespeare blogging Week 6 assignment   shakespeare blogging
Week 6 assignment shakespeare blogging Amy Conger
 
HR-функция в отделе продаж
HR-функция в отделе продажHR-функция в отделе продаж
HR-функция в отделе продажVizavi_Consalt
 
INSTITUCION EDUCATIVA LA PAMBA
INSTITUCION EDUCATIVA LA PAMBAINSTITUCION EDUCATIVA LA PAMBA
INSTITUCION EDUCATIVA LA PAMBAE Holguin
 
Hplc, spectroscopy grade solvents
Hplc, spectroscopy grade solventsHplc, spectroscopy grade solvents
Hplc, spectroscopy grade solventsLobachemie
 

Andere mochten auch (20)

Micro i 2. microscopy for students of B.Pharm. by amit z chaudhari
Micro i 2. microscopy for students of B.Pharm. by amit z chaudhariMicro i 2. microscopy for students of B.Pharm. by amit z chaudhari
Micro i 2. microscopy for students of B.Pharm. by amit z chaudhari
 
Filtration
FiltrationFiltration
Filtration
 
Hydrazides
HydrazidesHydrazides
Hydrazides
 
(Nearly) Instant Recommendations
(Nearly) Instant Recommendations(Nearly) Instant Recommendations
(Nearly) Instant Recommendations
 
212 Syllabus Spring 2014
212 Syllabus Spring 2014212 Syllabus Spring 2014
212 Syllabus Spring 2014
 
результаты опроса производственных компаний. кризис в головах или в реальности
результаты опроса производственных компаний. кризис в головах или в реальностирезультаты опроса производственных компаний. кризис в головах или в реальности
результаты опроса производственных компаний. кризис в головах или в реальности
 
Acid halides
Acid halidesAcid halides
Acid halides
 
Ventajas y desventajas
Ventajas y desventajasVentajas y desventajas
Ventajas y desventajas
 
Inorganic salts By lobachemie
Inorganic salts By lobachemieInorganic salts By lobachemie
Inorganic salts By lobachemie
 
Horner william 4.4
Horner william 4.4Horner william 4.4
Horner william 4.4
 
Elon musk
Elon muskElon musk
Elon musk
 
Lobachemie Offers Complexometric Indicators
Lobachemie Offers Complexometric IndicatorsLobachemie Offers Complexometric Indicators
Lobachemie Offers Complexometric Indicators
 
Horner William PPP
Horner William PPPHorner William PPP
Horner William PPP
 
Patti McCarthy Resume 2014 Nov
Patti McCarthy Resume 2014 NovPatti McCarthy Resume 2014 Nov
Patti McCarthy Resume 2014 Nov
 
Week 6 assignment shakespeare blogging
Week 6 assignment   shakespeare blogging Week 6 assignment   shakespeare blogging
Week 6 assignment shakespeare blogging
 
HR-функция в отделе продаж
HR-функция в отделе продажHR-функция в отделе продаж
HR-функция в отделе продаж
 
Essays to tariq's articles
Essays to tariq's articlesEssays to tariq's articles
Essays to tariq's articles
 
INSTITUCION EDUCATIVA LA PAMBA
INSTITUCION EDUCATIVA LA PAMBAINSTITUCION EDUCATIVA LA PAMBA
INSTITUCION EDUCATIVA LA PAMBA
 
Dance
DanceDance
Dance
 
Hplc, spectroscopy grade solvents
Hplc, spectroscopy grade solventsHplc, spectroscopy grade solvents
Hplc, spectroscopy grade solvents
 

Ähnlich wie Mcg suggestions on whitireia park management plan, nov 2014

Mtc ppt final
Mtc   ppt finalMtc   ppt final
Mtc ppt finalJenGehrt
 
East-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsEast-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsAdams Carroll
 
Protected Bike Lanes Presentation
Protected Bike Lanes PresentationProtected Bike Lanes Presentation
Protected Bike Lanes PresentationJon Chavers
 
Balboa Station Plan Alternatives
Balboa Station Plan AlternativesBalboa Station Plan Alternatives
Balboa Station Plan AlternativesCirculateSD
 
The New Urbanism: Design Principles for Vibrant Communities
The New Urbanism: Design Principles for Vibrant CommunitiesThe New Urbanism: Design Principles for Vibrant Communities
The New Urbanism: Design Principles for Vibrant CommunitiesVierbicher
 
Horse SA Public Consultations relating to trails May 2015
Horse SA Public Consultations relating to trails May 2015Horse SA Public Consultations relating to trails May 2015
Horse SA Public Consultations relating to trails May 2015Julie Fiedler
 
Final power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rlFinal power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rlcityofevanston
 
2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main PresentationFitzgerald's Bicycles
 
Session 6 - Bike Boxes in San Francisco
Session 6 - Bike Boxes in San FranciscoSession 6 - Bike Boxes in San Francisco
Session 6 - Bike Boxes in San FranciscoSharon Roerty
 
Chicago - Bicycle Facilities Guide
Chicago - Bicycle Facilities GuideChicago - Bicycle Facilities Guide
Chicago - Bicycle Facilities GuideDivvyBikes
 
Planning & Urban Design Principles for Non-Planners
Planning & Urban Design Principles for Non-PlannersPlanning & Urban Design Principles for Non-Planners
Planning & Urban Design Principles for Non-PlannersVierbicher
 
Revolutionise roundabout design
Revolutionise roundabout designRevolutionise roundabout design
Revolutionise roundabout designJumpingJaq
 
Bikeway Design for Complete Streets
Bikeway Design for Complete StreetsBikeway Design for Complete Streets
Bikeway Design for Complete StreetsTrailnet
 
Proposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentationProposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentationknelischer
 
Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path PresentationAmy Hooker
 

Ähnlich wie Mcg suggestions on whitireia park management plan, nov 2014 (20)

Mtc ppt final
Mtc   ppt finalMtc   ppt final
Mtc ppt final
 
East-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsEast-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking Recommendations
 
Protected Bike Lanes Presentation
Protected Bike Lanes PresentationProtected Bike Lanes Presentation
Protected Bike Lanes Presentation
 
Balboa Station Plan Alternatives
Balboa Station Plan AlternativesBalboa Station Plan Alternatives
Balboa Station Plan Alternatives
 
The New Urbanism: Design Principles for Vibrant Communities
The New Urbanism: Design Principles for Vibrant CommunitiesThe New Urbanism: Design Principles for Vibrant Communities
The New Urbanism: Design Principles for Vibrant Communities
 
Horse SA Public Consultations relating to trails May 2015
Horse SA Public Consultations relating to trails May 2015Horse SA Public Consultations relating to trails May 2015
Horse SA Public Consultations relating to trails May 2015
 
Bike Friendly Summit presentation package with video.
Bike Friendly Summit presentation package with video.Bike Friendly Summit presentation package with video.
Bike Friendly Summit presentation package with video.
 
Final power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rlFinal power point pedestrian safety presentation se rl
Final power point pedestrian safety presentation se rl
 
2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation
 
State of Fat Bike Access
State of Fat Bike AccessState of Fat Bike Access
State of Fat Bike Access
 
Session 6 - Bike Boxes in San Francisco
Session 6 - Bike Boxes in San FranciscoSession 6 - Bike Boxes in San Francisco
Session 6 - Bike Boxes in San Francisco
 
Chicago - Bicycle Facilities Guide
Chicago - Bicycle Facilities GuideChicago - Bicycle Facilities Guide
Chicago - Bicycle Facilities Guide
 
Cabot Head Trail - Project Overview
Cabot Head Trail - Project OverviewCabot Head Trail - Project Overview
Cabot Head Trail - Project Overview
 
Planning & Urban Design Principles for Non-Planners
Planning & Urban Design Principles for Non-PlannersPlanning & Urban Design Principles for Non-Planners
Planning & Urban Design Principles for Non-Planners
 
Revolutionise roundabout design
Revolutionise roundabout designRevolutionise roundabout design
Revolutionise roundabout design
 
Des Moines Bike Planning Overview
Des Moines Bike Planning OverviewDes Moines Bike Planning Overview
Des Moines Bike Planning Overview
 
Bikeway Design for Complete Streets
Bikeway Design for Complete StreetsBikeway Design for Complete Streets
Bikeway Design for Complete Streets
 
Cabot Head Trail - Project Overview
Cabot Head Trail - Project OverviewCabot Head Trail - Project Overview
Cabot Head Trail - Project Overview
 
Proposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentationProposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentation
 
Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path Presentation
 

Kürzlich hochgeladen

Clash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfClash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfMuhammad Hashim
 
PPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports RivalryPPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports Rivalryanirbannath184
 
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxJORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxArturo Pacheco Alvarez
 
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfJORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfArturo Pacheco Alvarez
 
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...World Wide Tickets And Hospitality
 
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 GACOR
 
Project & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEProject & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEDeShawn Ellis
 
Benifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxBenifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxsherrymieg19
 
Introduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationIntroduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationJuliusMacaballug
 
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxItaly Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxWorld Wide Tickets And Hospitality
 

Kürzlich hochgeladen (11)

Clash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfClash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdf
 
PPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports RivalryPPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports Rivalry
 
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxJORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
 
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfJORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
 
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
 
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
 
Project & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEProject & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWE
 
Benifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxBenifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptx
 
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
 
Introduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationIntroduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint Presentation
 
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxItaly Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
 

Mcg suggestions on whitireia park management plan, nov 2014

  • 1. MTB opportunities in Whitireia Park Management Plan November, 2014
  • 2. Introduction • Mana Cycle Group is a charitable club which develops MTB facilities and advocates for improved cycling of all kinds. • We have 390 Facebook followers. • Many of our members are already regular riders in Whitireia Park. • Our objective at this stage is to ensure Whitireia Park’s new Management Plan allows for the fantastic potential for high quality sustainable MTB tracks in a manner that supports all other park stakeholder needs. • By working with landowners and stakeholders to build approved MTB tracks, MCG can reduce the incidence of informal tracks being dug without consent. This is an issue in Porirua/Tawa because this part of the region has been devoid of approved tracks. • MCG is currently focused on developing a Mountainbike park at Rangituhi Colonial Knob. We are not seeking to dilute that effort. However, we are aware there are many MTBers who live close to Whitireia Park who would be keen to help build tracks there if a track project was approved and consented.
  • 3. How MTB tracks will be positive for the park • Attract a new group of park users. The existing tracks are not regionally significant and therefore do not in themselves attract people from very far. • Increase the Family friendly singletracks in the region. • Engage new local community members in work and care for the park. • Create a new recreational and event venue resource for local schools. • Improve the quality of the Porirua Grand Traverse and GW’s annual community cycling event in the park. • Attract more charitable funding to park projects. • Improve access for volunteer pest control activity. • Improve access for fire response. • There are 24,000 Mountain Bikers in Wellington region
  • 4. 35,000 internationals had MTB’d in NZ YE June 2013, +52% on 2009.
  • 5. How MTB tracks will be positive for the park • High usage due to close proximity to urban population, unlike Stratton Street, Battle Hill and Akatarawas. • Facilitate lower income populations getting into biking. Most of the region’s MTB tracks require a car trip or are close to higher income populations (Karori, Mt Vic, Brooklyn, Miramar) • Most tracks would be multi-use for walkers, runners. • Sustainable MTB Track building is becoming a globally demanded skill that can be taught through volunteer parties, engaging youth in positive activity and creating career opportunities. • Economic development – create demand for expanded cycle retail, rental and tours near the park, grow business for all retail in the area. • One of the few areas in Wellington that MTBers could take their dogs.
  • 6. Whitireia Park MTB Track Attributes • It would provide the best proximity to the sea of all Wellington region singletrack. (QE2 coastal route has many nasty pinch-climbs putting off kids and the less fit). • Can connect to Rangituhi Colonial Knob MTB Park and Te Ara Roa Walkway. • Very easy terrain/geology for track construction
  • 7. Current Issues for Biking in the Park • The Coastal track could be made easier to ride for beginners with some re-surfacing and options to avoid having to lift bikes over gates. • The inland route section descending to Onehunga Beach is very steep resulting in tyre skidding and it’s very difficult to ride up. This will mean ongoing damage and maintenance. • To get from Onehunga Beach to Titahi Bay by bike means going up the very steep narrow road with high risk of car conflict.
  • 8. MTB Track Objectives • Avoid impacts to Pa’s other cultural sites such as the garden terraces. • Plot tracks as soon as possible before the gorse makes most areas impassable and to avoid planting where a track will be. • Ensure the trails compliment the golf course and other park users, walkers, runners, horse-riders, model aircraft, kitesurfers, rock-climbers, beach users etc. • Design trails that take advantage of the sensation of flying over the sea. • Create tracks that are more fun, especially for kids and families having their first singletrack MTB experiences. This means easier slopes but rather than boring constant gradients, provide frequent grade reversals to give a gentle rollercoaster effect. • Create a safe easy alternative up from Onehunga Beach to get bikes off the road and away from vehicle danger. • Build tracks with sustainable design, that shed water and therefore do not erode or get muddy. Proactive planting to shield any areas of visual impact. • Consult closely with Whitireia Restoration Group to try to plot tracks that also support volunteer access for planting, pest and weed control.
  • 9. Track options (Intro) • Following we present a series of possible tracks shown on 3 separate maps. • These are based on our knowledge riding and walking the park. • We look forward to feedback through the management plan process from Iwi, the board, managing rangers and other park users to refine these concepts. • The lines are just rough hand-drawn routes on the map. Exact routes would require accurate piloting with inclinometers to ensure ideal gradient and avoidance of sensitive sites. • The expectation is that this list may be cut if there are conflicts; and implemented in trialled stages over a long-term period.
  • 10. Track options (see next map) • Coastal Traverse - an easy uphill/dual direction from the sea-level road up to Mt Cooper, traversing above the cliffs. This gets bikes off the road which is too steep to be fun, and dangerous with vehicles). • Plateau – an easy gradient alternative to the steep, eroding inland trail up from the Onehunga Beach Carpark, heading for the summit and south along the plateau, dropping down the ridgeline but avoiding the Te Onepoto Pa site). • Gloaming Traverse - below Gloaming hill houses traversing through the scrub towards the line of pines beside the golf course and joining the inland track and Golf Traverse. This would create easier access for volunteer pest/weed control and planting)
  • 11. Coastal Traverse Gloaming Traverse Plateau
  • 12. Track options (Continued) • Inland/Golf Traverse - from the big concrete carpark at the top dropping south and traversing the hillside towards the eastern mast, skirting the golf course and meeting the existing inland trail and the Gloaming Traverse. • Te Kahikatoa View – From Plateau an easy descent out skirting the lower plateau by Te Kahikatoa Pa site. This takes you back to look down on the sea, and it opens a bait-line through the gorse which is taking over this area.
  • 13. Golf Traverse Te Kahikatoa View
  • 14. Track options (Continued) • MTB Baitline – from Plateau’s high-point cutting along the south-western side of the ridge high above the existing inland route. This provides a new baitline for volunteers. It circles a knob and then cuts back in to drop down a u-shaped valley to Onepoto bay to join the bottom of Plateau and he coastal track. • Marina Downs – intermediate to advanced descents from the mid point of Plateau, down the spurs to the coastal track.

Hinweis der Redaktion

  1. More than cricket, badminton, rugby, tennis, basketball