- 2. Production Required
Lap Former
147.74 Bags/day with a waste %age of 0.25
Comber
121.14 Bags/day with a waste %age of 18%
- 5. Comparison
Reiter Trutzschler Toyoda Marzoli
Cost (Euros) 105916 100308 99297 95292
Power 8Kw 10.5 KW 9.6 KW 10 KW
Production 306 Kg/hr 280.5 Kg/hr 255 Kg/hr 280.5 Kg/hr
Drafting System 3/3 2/3 3/2 2/3
Doubling 28 24-32 Up to 36 28
- 6. Points for Cost
Cost Chart
20
20 19
19.5 18.5
19
18.5
17
18
17.5
17
16.5
16
15.5
Reiter Trutzschler Toyoda Marzoli
- 7. Points for Power
15 Power
15
14.5 13.5
14
13
13.5 12.5
13
12.5
12
11.5
11
Reiter Trutzschler Toyoda Marzoli
- 8. Points for Production
30 Production
30 28 28
29
28
27
25
26
25
24
23
22
Reiter Trutzschler Toyoda Marzoli
- 9. Points for Quality
30 Production
30 28
29
27
28
27 25
26
25
24
23
22
Reiter Trutzschler Toyoda Marzoli
- 10. Points for Repute
5 Production
4.5 4.5
5 4
4
3
2
1
0
Reiter Trutzschler Toyoda Marzoli
- 11. Total Points 97
88.5 89 93
100
90
80
70
Repute
60 Quality
50 Production
40 Power
Cost
30
20
10
0
Trutzschler Marzoli Toyoda Reiter
- 13. Comparison
Reiter Trutzschler Marzoli Toyoda
Cost (Euros) 107543 102540 99463 100489
Power 7.3 KW 9.5 KW 9.0 KW 8.1 KW
Production 48.9 Kg/hr 47 Kg/hr 45.68 Kg/hr 39.9 Kg/hr
Drafting 3/3 4/4 ¾ 5/4
System
Nips per min 375 350 325 300
(actual)
- 14. Points for Cost
Cost Chart
20
19.7
20 19.4
19.5
18.5
19
18.5
18
17.5
Reiter Trutzschler Toyoda Marzoli
- 15. Points for Power
Power
15
16 12.7 12.2
11.5
14
12
10
8
6
4
2
0
Reiter Trutzschler Toyoda Marzoli
- 16. Points for Production
30 Production
28.8 28
30 24.5
25
20
15
10
5
0
Reiter Trutzschler Toyoda Marzoli
- 17. Points for Quality
30 Production
30 28
29
27
28
27 25
26
25
24
23
22
Reiter Trutzschler Toyoda Marzoli
- 18. Points for Repute
5 Production
4.5 4.5
5 4
4
3
2
1
0
Reiter Trutzschler Toyoda Marzoli
- 19. Total Points 98.5
89.2 91.2 89.4
100
90
80
70
Repute
60 Quality
50 Production
40 Power
Cost
30
20
10
0
Trutzschler Marzoli Toyoda Reiter
- 21. Required Setup
Unilap
Production = 161.86 bags/day/frame
Required Bags = 147.74 bags/day
Machines = 0.91 ~ 1 Unilap
Combers
Production = 25.86 bags/day/frame
Required Bags = 121.14 Bags/day
Machines = 4.68 ~ 5 Combers