1. 1
Formerly known as People’s Power & Light/Mass Energy
Electric Vehicles and Charging Infrastructure
2019 Massachusetts Sustainable Communities & Campuses Conference
March 29, 2019
2. Our Mission:
2
Harness the power of energy consumers to speed the
transition to a low-carbon future
Today’s Speaker:
Anna Vanderspek, Energy Programs Manager
anna@greenenergyconsumers.org
(617) 524-3950 ext. 152
5. 5
Public Health
• No (or less) tailpipe emissions
• Cleaner even if you take
electricity generation into
account
• Climate change itself is a
public health threat
• ALA estimate of $37 billion of
health and climate costs in 10
states studies in 2015
(=$1.55/gallon)
6. 6
Lower Fuel Costs
Our math:
● Average driver will save ~3.4
cents/mile
● Equivalent to $402/year
● (Methodology on our website)
● Compares well to Union of
Concerned Scientists’ estimate
of $770/year
Dept. of Energy’s eGallon, 3.28.19
7. 7
Maintenance Savings
● Battery, motor, and electronics require little maintenance
● Fewer fluids
● Regenerative braking protects brakes
● Far fewer moving parts
“No more stops at the gas station, oil changes, rusted out mufflers and
radiators, etc. Why would anyone choose to drive anything else?”
~Gerard, smart fortwo
8. 8
Range Anxiety: A Thing of the Past!
0
100
200
300
400
500
600
700
Range(Miles) Electric Gas
9. 9
Purchase & Lease Incentives
1. Federal tax credit
• Up to $7,500
• Depends on battery size of vehicle and tax liability
• 200,000 limit: Tesla and GM credit declining
2. State MOR-EV rebate
• $1,500 for all-electric vehicles only
• Sale price under $50,000
• Until June 30, 2019
3. Drive Green discounts
• Vary by car, dealer, and month
• In addition to federal tax credit and state rebate
• See greenenergyconsumers.org/drivegreen
10. 10
So, for example: Chevrolet Bolt
MSRP $37,495
Largest Drive Green dealer discount* - $9,500
Federal tax credit* - $7,500
State MOR-EV rebate - $1,500
Final cost after incentives $18,995
* Change April 1, 2019
12. 12
Charging isn’t hard
Three basic levels
Level I: 110 volts, 2 - 6 miles of range per hour
Level II: 240 volts, 10 - 25 miles of range per hour
DC Fast Charging, 90 miles in 30 minutes on Chevy Bolt
Plug types
Level I and Level II: J1772
DC Fast Charging: SAE Combo vs. CHAdeMO
(Tesla)
13. 13
You can charge on the go
There are currently 595 public Level II and DCFC stations with 1,724 charging outlets in Massachusetts.
Important details:
- Network
- Payment
- Parking
restrictions
16. 16
Eversource
$45 million over 5 years
3,500 Level II and DCFC ports at ~450 sites
To participate:
Visit this link, or
Email evmakeready@eversource.com
National Grid
$25 million over 3 years
1,200 Level II and DCFC ports at ~140 sites
To participate:
Visit this link, or
Email EVNationalGrid@nationalgrid.com
Reminder: Currently 595 public Level II and DCFC stations with 1,724 charging outlets!!!
17. 17
Volkswagen “Dieselgate”
Electrify America installing Level II and DCFC stations in Metro Boston area
Three DCFC sites currently live: Chicopee, Braintree, Plymouth
Several coming soon: Auburn, Burlington
Even more after that!
Massachusetts: Awarded $75 million total, Phase 1 = $23.5 million
$11 million → electric buses in Pioneer Valley and Martha’s Vineyard
$5 million → electric vehicle charging infrastructure (workplaces, multi-unit dwellings, public sites)
$7.5 million → MassDEP open solicitation (deadline passed)
Stay tuned for Phase 2!
18. 18
Charging Funding Opportunities
MassEVIP Workplace Charging
Program
MassEVIP Multi-Unit Dwelling
Charging Program
Open enrollment. To provide 60% of
cost of hardware of Level I or Level II
charging station to eligible
employees with 15 or more
employees in non-residential place
of business.
Open enrollment. To provide 60% of
cost of hardware of Level I or Level II
charging station to eligible property
owners with 10 or more residential
units at the location
20. 20
Mass EVIP Fleets Incentive
Open enrollment grant that will provide public entities $750 to
$7,500 per electric vehicle, depending on the type of vehicle, and up
to $7,500 for associated charging infrastructure.
22. 22
Buses!
● MBTA: 2.8 million gallons of diesel, 28,000 tons CO2
● BPS: 1.4 million gallons diesel, 14,000 tons CO2
Cambridge, MA
Photo credit: Gina Coplon-Newfield
Martha’s Vineyard
Photo credit: Vineyard Transit
23. 23
Join us!
If you don’t yet have an EV, sign up to test drive today:
www.greenenergyconsumers.org/drivegreen
If you do have an EV, sign up to be an EV ambassador:
info.greenenergyconsumers.org/evambassador