  1. Value Stream Mapping
  2. Six Steps to Lean
  3. Value Stream Mapping Icons OPS460 > Course Documents > Visio Tutorials > Value Stream Mapping Icons
  4. Furniture Value Steam Furniture Manufacturing Current State Map
  5. Material and Information flows
  6. Acme Current State Map
  7. EMC Supply Assignment
  8. Exercise-Flextronics Solution
  9. Value Stream Mapping Process Product Family Current State Drawing Work Plan & Implementation Future State Drawing Understand how the value currently flows Design a Lean flow Plan how to get there and execute the plan Define the Value Stream
  10. Crane Aerospace Value Stream Map
  11. Crane Aerospace Value Stream Map Detailed
  12. OEE Elements
  13. OEE Example
  14. Value Stream Mapping Process Product Family Current State Drawing Work Plan & Implementation Future State Drawing Understand how the value currently flows Design a LEAN flow Plan how to get there and execute the plan Define the Value Stream
  15. Future State Icons
  16. Takt Time
  17. Acme Takt Time 60 seconds 27,600 sec 460 pieces
  18. Build to Shipping or Supermarket 20 Kanban based on customer packaging 20-bracket tray 20
  19. Continuous Flow Processing Batch-and-Queue Processing Process time/product = 1 min Original Batch = 10 parts Revised Batch = 1 part
  20. Alternative Work Combinations Split the Work
  21. Staffing for Increased Demand Combination Split the Work and Circuit
  22. Supermarket
  23. Number of Kanban Card Sets k = Expected demand during lead time + Safety Stock Size of container k = D  L ( 1 + S ) C k = Number of kanban card sets (a set is a card) D = Average number of units demanded over some time period L = Lead time to replenish an order (same units of time as demand) S = Safety stock expressed as a percentage of demand during lead time C = Container size
  24. Kanban Calculations k = Expected demand during lead time + Safety Stock Size of container k = D  L ( 1 + S ) = 5 (2) (1.10) = 2.75 or 3 C 4
  25. Acme Supermarkets Coils Supermarket Finished Goods Supermarket Stamped Parts Supermarket Milk Run
  26. First In, First Out (FIFO) Lane An Example of a “First In, First Out (FIFO) Lane”
  27. Scheduling Schedule Schedule
  28. Mixed Production Pacemaker Process! 50B 70A 80C 50B 70A 80C
  29. Leveling the Volume = Takt Time • Pack Size
  30. Implementation Process Value Stream Manager Point Kaizen
  31. Acme Future-State Map
  32. Acme Future State Performance
  33. House of Lean-5S
  34. Six Steps to Lean
  35. Meaning of the 5S’s Sort Simplify Sweep Standardize Self-Discipline
  36. Example of a Red Tag RED TAG
  37. Red Tag and Signboard Strategies
  38. Dilbert – 5S Program
  39. Types of Simplifying Type Identification Markers Location Markers Quantity Markers Standard Methods Tags Andon Kanban Performance Display Defect Display Personnel Board Examples Signboards, name labels, photos, or shapes of items. Tape strips, color coding, numbering. Signs indicating number (min/max), standard files, number of spaces for items indicators of normal operating values. Charts of cycle time and work sequence, standard procedures, flowcharts, photos of operation or process flows. Errors, excess or extremes (red flag), “broken” items or process Visual (lights, flags) and audio (bells, buzzers, tones) signals to draw immediate attention for help. Card, empty container or blank information space signaling that activity or Process schedule and quantities, quality, costs, safety, or improvement activities. Tables or boards or other forum / venue showing defective processes, information, or paperwork. Availability (in/out), assignment and location of department personnel, cross-training status vs. plan. movement is authorized.
  40. Inventory Signboards
  41. Boeing-Point of Use Standard Responsibility, Authority, Accountability (RAA) Placard Color Code Flag
  42. Crane 4-819 RHGS Incoming Material Before 5S After 5S Inventory Signboards
  43. Shadow Boards and Identification Shadow board
  44. Crane Aerospace Shadow Board Lazy Susan for hand tools
  45. Boeing-Shadow Boxes Tool Pallet Kit Examples
  46. Crane Simplify, Arrange, Identify Arrange and Identify for ease of use “ Anyone should be able to easily understand proper arrangement and sub-optimal arrangement.”
  47. Crane Level 3 Office “ The Goal”
  48. Visible Workplace “ With the 5S’s implemented, we have an easy to observe gemba (workplace), and the andon clearly shows where and when we have problems” Andon Jidoka Gemba 5S’s
  49. Crane 5S Level of Factory Excellence