Kenneth probst resume 2016

K

Resume

Kenneth W. Probst
10182 Green Moss Cove
Cordova, TN 38018
Mobile: 901-361-7077 Home: 901-379-8618 Email: ken_harley98@yahoo.com
Six-Sigma certified Quality Engineering Manager experienced in managing teams in the United States,
Malaysia, China, Singapore, Thailand, Europe, & Mexico.
Responsibilities include the repair & test operations for consumer products. Communicate directly with
various departments including engineering, production, IT, quality, and materials. Duties include resolving
complex technical issues and working efficiently under pressure in a fast-paced, “reverse logistics” business
model. Communicate in conversational Spanish for work projects when in Mexico. Manage NPI engineers in
Singapore, China & Malaysia.
FEATURED EXPERIENCE
Quality Engineer/Process Engineer, Assignment: iQor New Business Park
•
• Developed initial test setup for the new product repair lines including time studies and detailed work
instructions.Kaizen techniques used resulting in process flow enhancements,higher yields, & reduced cycle
times.
• Data analysis completed for tracking yields, fail trends, top hitters Pareto, with corrective actions presented to
customer.
• Provided written and verbal product performance reports to customers on a weekly and monthly basis.
• Worked directly with management from Sonos,Vivint, NCR, and Philips corporations to meet customer
requirements.
• Trained and certified all test operators on the line with the process work instructions.
• Implemented total QMS systemwith control plans for customers including Gage R&R reports and statistical
control methods using Minitab tools. Developed customer based OBA reporting system.
• Responsible for ISO9001 corporate compliance team providing efficient preparations for upcoming audits.
PROFESSIONAL EXPERIENCE
iQor Aftermarket Services 2015 - Present
• Senior Quality Engineer supporting DirecTV, Sonos & NPI customers. Implemented QMS system
including OBA trigger mechanisms. Developed new processes for reduction in VMI failures based on OBA
findings with root cause analysis and corrective actions. Direct weekly conference calls with customers
regarding quality initiatives.
Flextronics Global Services March 2012 - 2015
• Quality Engineering Supervisor for Apple product repair service operations, providing technical training &
documentation for analyzing & repairing technical issues related to Apple laptops. Managed the incoming
quality (IQC) of materials including managing PCBA inspectors according to IPC 610-D standards to
ensure parts acceptance in the test process.Resolving technical issues with circuit board suppliers in China
by identifying known issues with CLCA. Provided “Design for Manufacturing” FMEA reports directly to
Apple engineering and management teams.
• Managed 2 engineering technicians and 2 PCBA inspectors for incoming parts quality issues.Conducted
materials purges and implemented corrective actions to the suppliers for resolution. Communicated weekly
via conference calls with supplier in China to ensure real time solutions.Provide defect analysis with
pictures of issues and proposed actions for resolution. Developed and provided special tooling for line techs
to perform laptop repairs.
• Directed special projects for Apple Quality improvement initiative that includes Design of Experiments
(DOE), quality control plans, process enhancements,time studies,capacity models, and new product
introductions (NPI).
• Implemented process changes to reduce workmanship issues by providing “foolproof” solutions such as IT
dropdown menus; PCBA overlay templates, defective component isolation flow charts thus eliminating a
“shotgun” approach to troubleshooting by the deployment of Poka Yoke techniques.
• Prepared product and process reports by collecting, analyzing, and summarizing information and trends
using Mini-Tab, Excel spreadsheets,flowcharts, Keynote, and PowerPoint slide decks. Provided FMEA’s,
DOE, & DFM documentation & review results with suppliers and management. Knowledge of ISO 9001
standards.
Teleplan International July 2009 – March 2012
• Senior Product Engineer for television converterbox repair and refurbishing in Mexico. Includes creating
failure analysis debug procedures, work instructions,SOP’s, and supporting NPI product ramp to high
volume production.
• Lead Engineer for process engineering team performing repairs to component level including BGA’s.
• Experienced in RF signal technology including SMT. Analyzed technical issues to component level for
various manufactures & cable providers including Pace, Comcast, Motorola, AT&T, Cox, Cable One, &
Time Warner.
• Developed scrap reduction project resulting in 11% decrease in scrap rates resulting in over $30K
savings/month.
• Provided detailed slides to define and measure quarterly metrics and presented in weekly & quarterly
reviews.
• Hired as contract consultant engineer to reduce scrap of set top boxes & promoted to full time within 1
month.
• Reduced overall scrap rate from 16% to 6% in a 30 day time frame and hired as a full time engineer.
• Integrated a state of the art disk drive test process resulting in $560K savings/yearwithout any capital
investment.
Hewlett Packard 2007 – 2009
• HDD (hard disk drive) Principal Hardware/Firmware Test Engineer for Raid Array qualification laboratory.
• Principal Fiber channel HDD qualification engineer. Critical position for maintaining FC and SAS HDD
qualification schedule for current and future enterprise large storage business.Led project teams by
delivering and documenting new products.
• Expert in evaluation of hardware performance to investigate, integrate, develop, define and validate FC
HDD hardware and firmware prior to release to manufacturing. Part of this role included working with
and managing HDD vendors,including managing HP specifications, reviewing/approving vendor reports,
design reviews, firmware change management and othervendor supplied information. Job also requires
trouble shooting possible disk drive issues seen in HP enterprise storage systems.
• Managed HDD & SSD vendors such as Seagate Technology, STEC, and Hitachi to manage 8D’s and
problem resolution associated with the test qualification process.This included directing weekly technical
meetings with high level managers and proposing solutions to critical technical issues.
•
Seagate Technology 1995 – 2007
Senior Program Manager, 2003 - 2007 Global Customer Service Organization, McAllen, Texas - Managed the
repair and refurbishment of disk drives (20,000/week) by employees in Mexico for all worldwide customer returns.
This included yield improvement activities, process improvement and NPI (new product introduction) on customer
warranty returns and refurbished drives at Jabil Corporation (service provider) in a Reynosa Mexico Maquiladora.
• Facilitated $5 million increase in revenues from additional customer shipments by improving test process core
yields by 15% in 6 months.
• Saved over $50K in material cost during three-month time frame by developing and managing a Six-Sigma
project.
• Managed and developed projects working with Engineering VPs and Business Unit Managers in a Mexico
Maquiladora factory, increasing product yields and reducing production costs.
•
• Senior Firmware Manager, 2000 - 2003 Firmware Integration Group, Longmont, Colorado
• Managed 4 Firmware Engineers for the release of disk drive code for the drive self-test in the Asian factories.
• Managed customer coding needs including consumer electronic (CE) customers for desktop and portable drives.
Served Dell, HP, Sony, Compact and other major OEM customer needs,meeting critical timelines in fast-paced
environment.
•
Manufacturing Engineering Manager, 1996 - 2000 Product Sustaining Engineering, Longmont, Colorado
Electrical/Firmware Manager for 9 engineers and 1 technician providing detailed failure analysis of disk drives to
component level on early engineering models through the end of product life. Team also conducted failure analysis
of customer returns,initiating corrective action implementation and providing design solutions. Responsibilities
included salary planning, capital budgets,expense budgets,employee performance appraisals, staffing and project
planning.
EDUCATION / CERTIFICATIONS
BSEE, Electrical Engineering Colorado Technical College, Colorado Springs, CO
BA, Psychology, Minor Management, Texas Tech University, Lubbock, TX

Recomendados

Rogeliodevenencia von
RogeliodevenenciaRogeliodevenencia
RogeliodevenenciaRogelio de Venencia
210 views4 Folien
resume von
resumeresume
resumeDanish Noor
242 views3 Folien
Bhattacharyya_Keya-Elec.Eng von
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngKeya Bhattacharyya
177 views4 Folien
RESUME98[1]. (1) von
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)Denise Yu-Szeto
188 views3 Folien
Resume_LI von
Resume_LIResume_LI
Resume_LIBilly Elliott
232 views3 Folien
MSQ_Resume_19092016 von
MSQ_Resume_19092016MSQ_Resume_19092016
MSQ_Resume_19092016Shafi Quraishi
122 views4 Folien

Más contenido relacionado

Was ist angesagt?

Resume for Lee Hanson von
Resume for Lee HansonResume for Lee Hanson
Resume for Lee HansonLee Hanson
107 views2 Folien
Jps16 von
Jps16Jps16
Jps16Joseph Slogar
92 views2 Folien
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer, von
Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj s
220 views4 Folien
Faruk syed ee mba_asq-cssgb von
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk Syed
173 views4 Folien
Resume Rac von
Resume RacResume Rac
Resume Racrcarcieri
782 views3 Folien
Joe Bollig-Resume von
Joe Bollig-ResumeJoe Bollig-Resume
Joe Bollig-ResumeJoseph Bollig
142 views2 Folien

Was ist angesagt?(20)

Resume for Lee Hanson von Lee Hanson
Resume for Lee HansonResume for Lee Hanson
Resume for Lee Hanson
Lee Hanson107 views
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer, von Antonya vijaya raj s
Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
Faruk syed ee mba_asq-cssgb von Faruk Syed
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
Faruk Syed173 views
Resume Rac von rcarcieri
Resume RacResume Rac
Resume Rac
rcarcieri782 views
johndermodyresume-ATS Results von John Dermody
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS Results
John Dermody114 views
Amer malik resume von Amer Malik
Amer malik resumeAmer malik resume
Amer malik resume
Amer Malik207 views

Destacado

Kens Resume von
Kens ResumeKens Resume
Kens ResumeKenneth McAuley
181 views2 Folien
Kens resume 7-19-2016 von
Kens resume 7-19-2016Kens resume 7-19-2016
Kens resume 7-19-2016Ken wilson
127 views4 Folien
Engneer Manaf Mahfouz M von
Engneer Manaf Mahfouz MEngneer Manaf Mahfouz M
Engneer Manaf Mahfouz MM.Manaf Mahfouz
167 views4 Folien
Kaitlynn Henson Resume 2016 von
Kaitlynn Henson Resume 2016Kaitlynn Henson Resume 2016
Kaitlynn Henson Resume 2016Kaitlynn Henson
69 views1 Folie
Parcial von
ParcialParcial
ParcialFrancesco Pisciotti
653 views1 Folie
Trabajo practico n7 von
Trabajo practico n7Trabajo practico n7
Trabajo practico n7Karenabigail
143 views2 Folien

Similar a Kenneth probst resume 2016

Carlos_Aragon_100816 von
Carlos_Aragon_100816Carlos_Aragon_100816
Carlos_Aragon_100816Carlos Aragon
66 views3 Folien
Gary giblock resume 1 31-17 von
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary Giblock
119 views3 Folien
Rob VanBuren resume von
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resumeRob Van Buren
244 views3 Folien
Jason E Stephens’ 2020 Resume/CV von
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVjasonstephens
38 views4 Folien
Process Control & CV history von
Process Control & CV historyProcess Control & CV history
Process Control & CV historyacdnexpat
448 views13 Folien
resume luis lopez von
resume luis lopezresume luis lopez
resume luis lopezluis alfonso lopez castillo
118 views2 Folien

Similar a Kenneth probst resume 2016(20)

Gary giblock resume 1 31-17 von Gary Giblock
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock119 views
Jason E Stephens’ 2020 Resume/CV von jasonstephens
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CV
jasonstephens38 views
Process Control & CV history von acdnexpat
Process Control & CV historyProcess Control & CV history
Process Control & CV history
acdnexpat448 views
Amy Freeman Resume June2009 von guestc9e91c
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
guestc9e91c261 views
Gary giblock resume 2 21-17 von Gary Giblock
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
Gary Giblock41 views
Walid Saliba resume 2015 von walid Saliba
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015
walid Saliba178 views
CV of Kim Chung von Kim Chung
CV of Kim ChungCV of Kim Chung
CV of Kim Chung
Kim Chung213 views
Joel Amzallag von jamzallag
Joel AmzallagJoel Amzallag
Joel Amzallag
jamzallag256 views
Phil Suter Resume April 22 2009 Rev 2 von PhilSuter
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
PhilSuter398 views
Emanis, Dustin Jr. Resume 2015 (1) von Dustin Emanis
Emanis, Dustin Jr.     Resume    2015 (1)Emanis, Dustin Jr.     Resume    2015 (1)
Emanis, Dustin Jr. Resume 2015 (1)
Dustin Emanis161 views

Último

Proposal Presentation.pptx von
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptxkeytonallamon
52 views36 Folien
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx von
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptxlwang78
109 views19 Folien
SUMIT SQL PROJECT SUPERSTORE 1.pptx von
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptxSumit Jadhav
18 views26 Folien
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf von
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfAlhamduKure
6 views11 Folien
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) von
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Tsuyoshi Horigome
38 views16 Folien
fakenews_DBDA_Mar23.pptx von
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptxdeepmitra8
16 views34 Folien

Último(20)

2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx von lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78109 views
SUMIT SQL PROJECT SUPERSTORE 1.pptx von Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 18 views
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf von AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure6 views
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) von Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
fakenews_DBDA_Mar23.pptx von deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra816 views
Design_Discover_Develop_Campaign.pptx von ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth637 views
REACTJS.pdf von ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR334 views
_MAKRIADI-FOTEINI_diploma thesis.pptx von fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi8 views
GDSC Mikroskil Members Onboarding 2023.pdf von gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil58 views
Web Dev Session 1.pptx von VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande11 views
Design of machine elements-UNIT 3.pptx von gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy33 views

Kenneth probst resume 2016

  • 1. Kenneth W. Probst 10182 Green Moss Cove Cordova, TN 38018 Mobile: 901-361-7077 Home: 901-379-8618 Email: ken_harley98@yahoo.com Six-Sigma certified Quality Engineering Manager experienced in managing teams in the United States, Malaysia, China, Singapore, Thailand, Europe, & Mexico. Responsibilities include the repair & test operations for consumer products. Communicate directly with various departments including engineering, production, IT, quality, and materials. Duties include resolving complex technical issues and working efficiently under pressure in a fast-paced, “reverse logistics” business model. Communicate in conversational Spanish for work projects when in Mexico. Manage NPI engineers in Singapore, China & Malaysia. FEATURED EXPERIENCE Quality Engineer/Process Engineer, Assignment: iQor New Business Park • • Developed initial test setup for the new product repair lines including time studies and detailed work instructions.Kaizen techniques used resulting in process flow enhancements,higher yields, & reduced cycle times. • Data analysis completed for tracking yields, fail trends, top hitters Pareto, with corrective actions presented to customer. • Provided written and verbal product performance reports to customers on a weekly and monthly basis. • Worked directly with management from Sonos,Vivint, NCR, and Philips corporations to meet customer requirements. • Trained and certified all test operators on the line with the process work instructions. • Implemented total QMS systemwith control plans for customers including Gage R&R reports and statistical control methods using Minitab tools. Developed customer based OBA reporting system. • Responsible for ISO9001 corporate compliance team providing efficient preparations for upcoming audits. PROFESSIONAL EXPERIENCE iQor Aftermarket Services 2015 - Present • Senior Quality Engineer supporting DirecTV, Sonos & NPI customers. Implemented QMS system including OBA trigger mechanisms. Developed new processes for reduction in VMI failures based on OBA findings with root cause analysis and corrective actions. Direct weekly conference calls with customers regarding quality initiatives. Flextronics Global Services March 2012 - 2015 • Quality Engineering Supervisor for Apple product repair service operations, providing technical training & documentation for analyzing & repairing technical issues related to Apple laptops. Managed the incoming quality (IQC) of materials including managing PCBA inspectors according to IPC 610-D standards to ensure parts acceptance in the test process.Resolving technical issues with circuit board suppliers in China by identifying known issues with CLCA. Provided “Design for Manufacturing” FMEA reports directly to Apple engineering and management teams. • Managed 2 engineering technicians and 2 PCBA inspectors for incoming parts quality issues.Conducted materials purges and implemented corrective actions to the suppliers for resolution. Communicated weekly via conference calls with supplier in China to ensure real time solutions.Provide defect analysis with pictures of issues and proposed actions for resolution. Developed and provided special tooling for line techs to perform laptop repairs.
  • 2. • Directed special projects for Apple Quality improvement initiative that includes Design of Experiments (DOE), quality control plans, process enhancements,time studies,capacity models, and new product introductions (NPI). • Implemented process changes to reduce workmanship issues by providing “foolproof” solutions such as IT dropdown menus; PCBA overlay templates, defective component isolation flow charts thus eliminating a “shotgun” approach to troubleshooting by the deployment of Poka Yoke techniques. • Prepared product and process reports by collecting, analyzing, and summarizing information and trends using Mini-Tab, Excel spreadsheets,flowcharts, Keynote, and PowerPoint slide decks. Provided FMEA’s, DOE, & DFM documentation & review results with suppliers and management. Knowledge of ISO 9001 standards. Teleplan International July 2009 – March 2012 • Senior Product Engineer for television converterbox repair and refurbishing in Mexico. Includes creating failure analysis debug procedures, work instructions,SOP’s, and supporting NPI product ramp to high volume production. • Lead Engineer for process engineering team performing repairs to component level including BGA’s. • Experienced in RF signal technology including SMT. Analyzed technical issues to component level for various manufactures & cable providers including Pace, Comcast, Motorola, AT&T, Cox, Cable One, & Time Warner. • Developed scrap reduction project resulting in 11% decrease in scrap rates resulting in over $30K savings/month. • Provided detailed slides to define and measure quarterly metrics and presented in weekly & quarterly reviews. • Hired as contract consultant engineer to reduce scrap of set top boxes & promoted to full time within 1 month. • Reduced overall scrap rate from 16% to 6% in a 30 day time frame and hired as a full time engineer. • Integrated a state of the art disk drive test process resulting in $560K savings/yearwithout any capital investment. Hewlett Packard 2007 – 2009 • HDD (hard disk drive) Principal Hardware/Firmware Test Engineer for Raid Array qualification laboratory. • Principal Fiber channel HDD qualification engineer. Critical position for maintaining FC and SAS HDD qualification schedule for current and future enterprise large storage business.Led project teams by delivering and documenting new products. • Expert in evaluation of hardware performance to investigate, integrate, develop, define and validate FC HDD hardware and firmware prior to release to manufacturing. Part of this role included working with and managing HDD vendors,including managing HP specifications, reviewing/approving vendor reports, design reviews, firmware change management and othervendor supplied information. Job also requires trouble shooting possible disk drive issues seen in HP enterprise storage systems. • Managed HDD & SSD vendors such as Seagate Technology, STEC, and Hitachi to manage 8D’s and problem resolution associated with the test qualification process.This included directing weekly technical meetings with high level managers and proposing solutions to critical technical issues. • Seagate Technology 1995 – 2007 Senior Program Manager, 2003 - 2007 Global Customer Service Organization, McAllen, Texas - Managed the repair and refurbishment of disk drives (20,000/week) by employees in Mexico for all worldwide customer returns. This included yield improvement activities, process improvement and NPI (new product introduction) on customer warranty returns and refurbished drives at Jabil Corporation (service provider) in a Reynosa Mexico Maquiladora.
  • 3. • Facilitated $5 million increase in revenues from additional customer shipments by improving test process core yields by 15% in 6 months. • Saved over $50K in material cost during three-month time frame by developing and managing a Six-Sigma project. • Managed and developed projects working with Engineering VPs and Business Unit Managers in a Mexico Maquiladora factory, increasing product yields and reducing production costs. • • Senior Firmware Manager, 2000 - 2003 Firmware Integration Group, Longmont, Colorado • Managed 4 Firmware Engineers for the release of disk drive code for the drive self-test in the Asian factories. • Managed customer coding needs including consumer electronic (CE) customers for desktop and portable drives. Served Dell, HP, Sony, Compact and other major OEM customer needs,meeting critical timelines in fast-paced environment. • Manufacturing Engineering Manager, 1996 - 2000 Product Sustaining Engineering, Longmont, Colorado Electrical/Firmware Manager for 9 engineers and 1 technician providing detailed failure analysis of disk drives to component level on early engineering models through the end of product life. Team also conducted failure analysis of customer returns,initiating corrective action implementation and providing design solutions. Responsibilities included salary planning, capital budgets,expense budgets,employee performance appraisals, staffing and project planning. EDUCATION / CERTIFICATIONS BSEE, Electrical Engineering Colorado Technical College, Colorado Springs, CO BA, Psychology, Minor Management, Texas Tech University, Lubbock, TX