SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
Keith Marchand 1 of 3
Keith W. Marchand (BSME)
Objective Management or process/solution design position in an innovative organization implementing or
maintaining a leading product lifecycle management (PLM) or customer relationship management
(CRM) solution.
Profile
Experience
 More than 20 years in solution design and program management in the areas of product data
Management (PDM), product lifecycle management (PLM), and customer relationship management
(CRM).
 Proven ability to develop comprehensive process and software solutions to resolve complex business
problems and improve operational performance.
 Versatile, enthusiastic professional with a track record of successfully managing large projects with
cross functional teams.
Startup March 2015 – Present
 Supporting the startup of my wife’s business.
Bose Corporation, Framingham, MA
PLM Business Analyst and Administration Consultant April 2011 – March 2015
 Project scope was to completely redesign Bose product development processes and systems affecting more
than 3000 employees and suppliers globally. The solution was implemented in Windchill PDMLink and
ProjectLink 10.2 integrated with Cadence ECAD, and NX MCAD Workgroup Managers, as well as SAP.
 Very successful single phase rollout that succeeded in meeting strategic objective of satisfying all critical
business requirements with virtually no customization resulting in a highly scalable and upgradable solution.
 Led several cross functional teams responsible for various aspects of the solution including system wide
security design, core elements (container templates, lifecycles, links, revision and numbering schemes),
visualization, reporting, business administration processes to support the entire solution, as well as post go-
live stabilization.
 Played an active role in other areas such as ECN processes, design outsourcing, BOM and document
management.
 Developed complex mapping logic to transform the database to the new data model resulting in a very
successful migration.
 Wrote detailed test plans and led a team of testers through manual and automated testing (using Selenium)
of more than 250K tests yielding near perfect results the first time we deployed to a QA server.
 Agile/Scrum methodologies executed via Jira. HPQC used for test planning and execution.
International Travel September 2009 – March 2011
NVIDIA Corporation, Santa Clara, CA
Senior Operations Program Manager November 2007 – September 2009
 Project Manager for Product Lifecycle Management (PLM) implementation affecting more than 1400
Engineers, Operations, Sales, Support, and Supply users worldwide (multiple sites in NA, EU, and Asia).
 Project scope was to convert corporate PLM solution from Agile to Windchill 9 including integrations with
SAP, Cadence ECAD, and Pro/ENGINEER MCAD data management.
 Managed cross functional team of 20 employees and up to 30 PTC contractors engaged in all aspects of the
project (solution design, process mapping, development, testing, BCM, cutover, and stabilization).
 I was brought in mid project to effectively save it from cancellation as a result of being severely off
schedule and budget. With a new team structure, timeline, and execution plan the project went live on time
with a very successful single phase roll out.
Other Projects
 Project Manager for a very high profile quality issue. Assembled cross functional team, developed metric
Mobile: (408) 568-1192
Email: keithmarchand@yahoo.com
176 Whitman Road
Groton, MA 01450
Keith Marchand 2 of 3
dashboard which tracked the scope of the problem, drove appropriate root cause analyses, corrective actions,
and supported financial decisions.
 Project Manager for initiative to improve cycle time and internal/customer communication for product and
operations quality issues. Solution required process re-engineering and a custom software solution to
collaborate, track, resolve, and report on all customer quality issues.
Asyst Technologies, Inc., Fremont, CA
Senior Manager, Corporate Quality
December 2004 – November 2007
 Created and re-engineered processes in all business areas for improved company performance.
 Measured progress through creation of corporate quality metric dashboard, reviewed quarterly with
executive management. This position required influencing all levels of management to resource and fund
large quality projects which significantly improved company performance and customer satisfaction.
 Managed scoping and creation of web applications to support customer relationship management (CRM)
processes such as technical support, field service, manufacturing quality, and escalations.
 Maintained ISO certification and managed customer quality audits.
Senior Manager, Corporate CAD and PLM Systems November 2000 – December 2004
 Project Manager of very successful PLM project to implement Windchill PDMLink 6.2.6. The solution
included integrations with Pro/INTRALINK and ERP and had a custom developed AVL application.
 Responsible for data management and integrity of all product documentation. Enabled real time design
collaboration and data synchronization between 6 US sites, Japan, Taiwan and our supplier in Singapore.
 Lead design and development of a customized Pro/INTRALINK Gateway for PDMLink providing fully
automated (1 click to release) bi-directional data synchronization between Pro/INTRALINK and PDMLink.
 Managed a very successful migration of Asyst’s Pro/ENGINEER CAD database from Pro/PDM to
Pro/INTRALINK using only my team’s resources saving the company $250K in consulting dollars.
Optimal Impact Consulting (OIC), Mountain View CA
Account Manager November 1998 – November 2000
 Account Manager for OIC’s customer KLA-Tencor, grew the account to OIC’s largest customer.
Manufacturing Process Development Consultant September 1999 – November 2000
 Worked with KLA-Tencor’s manufacturing organization in the capacity of a support and process
development consultant supporting all CAD (Pro/E) and PDM activities.
 Implemented and administered PDM database for manufacturing data.
 Developed procedures for manufacturing to leverage CAD data to create assembly method sheets.
 Implemented paperless manufacturing from CAD deigns to touch screens on the manufacturing floor.
CAD Administration Consultant November 1998 – September 1999
 Activities included project management, custom configuration, testing, training, and mentoring.
LAM Research Corporation, Fremont, CA
CAD Administrator November 1997 – November 1998
 Had sole responsibility for design and administration of CAD and PDM environment for 70 Engineers.
 Formed ECN and related PLM processes for Lam’s CMP division.
 Configured and deployed Pro/PDM database for CAD Data Management.
Parametric Technology Corporation (PTC), Boston, MA and San Jose, CA
Application/Sales Engineer December 1996 – November 1997
 Designed product demonstrations for PTC software and presented at sales engagements and seminars.
 Software implementations including installation, configuration, standards development, and user training.
 Supported the entire Pro/ENGINEER product line as a pre and post sales consultant.
Mechanical CAD Trainer July 1995 – December 1996
 Specialties included Data Management, Advanced Solid Modeling, Large Assembly Management, Drawing
Detailing, Sheetmetal Design, Advanced Surfacing, Pro/INTRALINK, and Pro/Process.
Keith Marchand 3 of 3
Additional
Skills
Education
Very proficient with MS office products (Word, Excel, PowerPoint, Project, etc)
Familiar with Agile/Scrum Methodologies, Jira and HPQC systems
Bachelor of Science in Mechanical Engineering
Technical University of Nova Scotia Halifax, NS Canada
Residency
Status
US Citizen

Weitere ähnliche Inhalte

Was ist angesagt?

Lean and Agile SAP
Lean and Agile SAPLean and Agile SAP
Lean and Agile SAPJason Fair
 
EDM/PDM Implementation
EDM/PDM ImplementationEDM/PDM Implementation
EDM/PDM ImplementationGlen Alleman
 
Staab_Michael_2016 (refresh)
Staab_Michael_2016 (refresh)Staab_Michael_2016 (refresh)
Staab_Michael_2016 (refresh)mstaab
 
Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)Glen Alleman
 
Scrum Book Of Knowledge - Reading Notes, Part#1
Scrum Book Of Knowledge - Reading Notes, Part#1Scrum Book Of Knowledge - Reading Notes, Part#1
Scrum Book Of Knowledge - Reading Notes, Part#1COMPETENSIS
 
InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268Carmen DeArdo
 
3. Project Management A Case Study Of A Successful Erp Implementation
3. Project Management A Case Study Of A Successful Erp Implementation3. Project Management A Case Study Of A Successful Erp Implementation
3. Project Management A Case Study Of A Successful Erp ImplementationDonovan Mulder
 
Faster New Product Introduction Using Oracle Project Portfolio Management
Faster New Product Introduction Using Oracle Project Portfolio ManagementFaster New Product Introduction Using Oracle Project Portfolio Management
Faster New Product Introduction Using Oracle Project Portfolio ManagementMohan Dutt
 
Re-Architecting with Agile Delivery featuring Forrester's Randy Heffner
Re-Architecting with Agile Delivery featuring Forrester's Randy HeffnerRe-Architecting with Agile Delivery featuring Forrester's Randy Heffner
Re-Architecting with Agile Delivery featuring Forrester's Randy HeffnerHeadspring
 
Product development kaizen (pdk)
Product  development kaizen (pdk)Product  development kaizen (pdk)
Product development kaizen (pdk)Glen Alleman
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani Shekhar
 

Was ist angesagt? (20)

Ervin Patrick Loresco - CV
Ervin Patrick Loresco - CVErvin Patrick Loresco - CV
Ervin Patrick Loresco - CV
 
Lean and Agile SAP
Lean and Agile SAPLean and Agile SAP
Lean and Agile SAP
 
EDM/PDM Implementation
EDM/PDM ImplementationEDM/PDM Implementation
EDM/PDM Implementation
 
Staab_Michael_2016 (refresh)
Staab_Michael_2016 (refresh)Staab_Michael_2016 (refresh)
Staab_Michael_2016 (refresh)
 
Arindam Resume
Arindam ResumeArindam Resume
Arindam Resume
 
Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)
 
CMMI and Agile
CMMI and AgileCMMI and Agile
CMMI and Agile
 
Andrew Chard
Andrew ChardAndrew Chard
Andrew Chard
 
SAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.comSAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.com
 
Scrum Book Of Knowledge - Reading Notes, Part#1
Scrum Book Of Knowledge - Reading Notes, Part#1Scrum Book Of Knowledge - Reading Notes, Part#1
Scrum Book Of Knowledge - Reading Notes, Part#1
 
InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268InterConnect 2016 Continuous Visibility DTA-3268
InterConnect 2016 Continuous Visibility DTA-3268
 
David Wells CV
David Wells CVDavid Wells CV
David Wells CV
 
Resume
ResumeResume
Resume
 
3. Project Management A Case Study Of A Successful Erp Implementation
3. Project Management A Case Study Of A Successful Erp Implementation3. Project Management A Case Study Of A Successful Erp Implementation
3. Project Management A Case Study Of A Successful Erp Implementation
 
Faster New Product Introduction Using Oracle Project Portfolio Management
Faster New Product Introduction Using Oracle Project Portfolio ManagementFaster New Product Introduction Using Oracle Project Portfolio Management
Faster New Product Introduction Using Oracle Project Portfolio Management
 
Re-Architecting with Agile Delivery featuring Forrester's Randy Heffner
Re-Architecting with Agile Delivery featuring Forrester's Randy HeffnerRe-Architecting with Agile Delivery featuring Forrester's Randy Heffner
Re-Architecting with Agile Delivery featuring Forrester's Randy Heffner
 
Product development kaizen (pdk)
Product  development kaizen (pdk)Product  development kaizen (pdk)
Product development kaizen (pdk)
 
Understand SAP ASAP 8.0
Understand SAP ASAP 8.0Understand SAP ASAP 8.0
Understand SAP ASAP 8.0
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_Consultant
 
Agile And Cmmi
Agile And CmmiAgile And Cmmi
Agile And Cmmi
 

Ähnlich wie Keith Marchand PLM and CRM Profile

Burge, Stephen Agile Pm Revised
Burge, Stephen Agile Pm RevisedBurge, Stephen Agile Pm Revised
Burge, Stephen Agile Pm RevisedStephen Burge
 
Thomas R Graham bio
Thomas R Graham bioThomas R Graham bio
Thomas R Graham bioTom Graham
 
Read Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitte
Read Curriculum vitae of Shwetabh Kumar as Project Manager at DeloitteRead Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitte
Read Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitteshwetabhkumar
 
Resume for Mark Spohn
Resume for Mark SpohnResume for Mark Spohn
Resume for Mark SpohnMark Spohn
 
Resume of Shwetabh Kumar, Project Manager at Deloitte
Resume of Shwetabh Kumar, Project Manager at DeloitteResume of Shwetabh Kumar, Project Manager at Deloitte
Resume of Shwetabh Kumar, Project Manager at Deloitteshwetabhkumar
 
Chris Forehand-2insurance
Chris Forehand-2insuranceChris Forehand-2insurance
Chris Forehand-2insuranceChris Forehand
 
Resume - Kedar Deo (Oct 2016)
Resume - Kedar Deo (Oct 2016)Resume - Kedar Deo (Oct 2016)
Resume - Kedar Deo (Oct 2016)Kedar Deo
 
Resume 2015 - Copy
Resume 2015 - CopyResume 2015 - Copy
Resume 2015 - CopyEben Weinman
 
Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Todd Groshong
 
C Ward Resume - Principal TPM, TDM
C Ward Resume -  Principal TPM, TDMC Ward Resume -  Principal TPM, TDM
C Ward Resume - Principal TPM, TDMCasey Ward
 
Toby Smith CV v4
Toby Smith CV v4Toby Smith CV v4
Toby Smith CV v4Toby Smith
 

Ähnlich wie Keith Marchand PLM and CRM Profile (20)

joseph j resume
joseph j resumejoseph j resume
joseph j resume
 
Workforce Management Solution
Workforce Management SolutionWorkforce Management Solution
Workforce Management Solution
 
Kate Resume-7Page
Kate Resume-7PageKate Resume-7Page
Kate Resume-7Page
 
Resume - Sr. Business Analyst
Resume - Sr. Business AnalystResume - Sr. Business Analyst
Resume - Sr. Business Analyst
 
Burge, Stephen Agile Pm Revised
Burge, Stephen Agile Pm RevisedBurge, Stephen Agile Pm Revised
Burge, Stephen Agile Pm Revised
 
Thomas R Graham bio
Thomas R Graham bioThomas R Graham bio
Thomas R Graham bio
 
Read Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitte
Read Curriculum vitae of Shwetabh Kumar as Project Manager at DeloitteRead Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitte
Read Curriculum vitae of Shwetabh Kumar as Project Manager at Deloitte
 
Resume for Mark Spohn
Resume for Mark SpohnResume for Mark Spohn
Resume for Mark Spohn
 
RJRothen_Resume_0816
RJRothen_Resume_0816RJRothen_Resume_0816
RJRothen_Resume_0816
 
Resume of Shwetabh Kumar, Project Manager at Deloitte
Resume of Shwetabh Kumar, Project Manager at DeloitteResume of Shwetabh Kumar, Project Manager at Deloitte
Resume of Shwetabh Kumar, Project Manager at Deloitte
 
Adi CV Tech Manager
Adi CV Tech ManagerAdi CV Tech Manager
Adi CV Tech Manager
 
Resume Complete 112416
Resume Complete 112416Resume Complete 112416
Resume Complete 112416
 
Chris Forehand-2insurance
Chris Forehand-2insuranceChris Forehand-2insurance
Chris Forehand-2insurance
 
Resume - Kedar Deo (Oct 2016)
Resume - Kedar Deo (Oct 2016)Resume - Kedar Deo (Oct 2016)
Resume - Kedar Deo (Oct 2016)
 
FNK Resume 2017
FNK Resume 2017FNK Resume 2017
FNK Resume 2017
 
SV Resume
SV ResumeSV Resume
SV Resume
 
Resume 2015 - Copy
Resume 2015 - CopyResume 2015 - Copy
Resume 2015 - Copy
 
Groshong_Resume 11-18-16
Groshong_Resume 11-18-16Groshong_Resume 11-18-16
Groshong_Resume 11-18-16
 
C Ward Resume - Principal TPM, TDM
C Ward Resume -  Principal TPM, TDMC Ward Resume -  Principal TPM, TDM
C Ward Resume - Principal TPM, TDM
 
Toby Smith CV v4
Toby Smith CV v4Toby Smith CV v4
Toby Smith CV v4
 

Keith Marchand PLM and CRM Profile

  • 1. Keith Marchand 1 of 3 Keith W. Marchand (BSME) Objective Management or process/solution design position in an innovative organization implementing or maintaining a leading product lifecycle management (PLM) or customer relationship management (CRM) solution. Profile Experience  More than 20 years in solution design and program management in the areas of product data Management (PDM), product lifecycle management (PLM), and customer relationship management (CRM).  Proven ability to develop comprehensive process and software solutions to resolve complex business problems and improve operational performance.  Versatile, enthusiastic professional with a track record of successfully managing large projects with cross functional teams. Startup March 2015 – Present  Supporting the startup of my wife’s business. Bose Corporation, Framingham, MA PLM Business Analyst and Administration Consultant April 2011 – March 2015  Project scope was to completely redesign Bose product development processes and systems affecting more than 3000 employees and suppliers globally. The solution was implemented in Windchill PDMLink and ProjectLink 10.2 integrated with Cadence ECAD, and NX MCAD Workgroup Managers, as well as SAP.  Very successful single phase rollout that succeeded in meeting strategic objective of satisfying all critical business requirements with virtually no customization resulting in a highly scalable and upgradable solution.  Led several cross functional teams responsible for various aspects of the solution including system wide security design, core elements (container templates, lifecycles, links, revision and numbering schemes), visualization, reporting, business administration processes to support the entire solution, as well as post go- live stabilization.  Played an active role in other areas such as ECN processes, design outsourcing, BOM and document management.  Developed complex mapping logic to transform the database to the new data model resulting in a very successful migration.  Wrote detailed test plans and led a team of testers through manual and automated testing (using Selenium) of more than 250K tests yielding near perfect results the first time we deployed to a QA server.  Agile/Scrum methodologies executed via Jira. HPQC used for test planning and execution. International Travel September 2009 – March 2011 NVIDIA Corporation, Santa Clara, CA Senior Operations Program Manager November 2007 – September 2009  Project Manager for Product Lifecycle Management (PLM) implementation affecting more than 1400 Engineers, Operations, Sales, Support, and Supply users worldwide (multiple sites in NA, EU, and Asia).  Project scope was to convert corporate PLM solution from Agile to Windchill 9 including integrations with SAP, Cadence ECAD, and Pro/ENGINEER MCAD data management.  Managed cross functional team of 20 employees and up to 30 PTC contractors engaged in all aspects of the project (solution design, process mapping, development, testing, BCM, cutover, and stabilization).  I was brought in mid project to effectively save it from cancellation as a result of being severely off schedule and budget. With a new team structure, timeline, and execution plan the project went live on time with a very successful single phase roll out. Other Projects  Project Manager for a very high profile quality issue. Assembled cross functional team, developed metric Mobile: (408) 568-1192 Email: keithmarchand@yahoo.com 176 Whitman Road Groton, MA 01450
  • 2. Keith Marchand 2 of 3 dashboard which tracked the scope of the problem, drove appropriate root cause analyses, corrective actions, and supported financial decisions.  Project Manager for initiative to improve cycle time and internal/customer communication for product and operations quality issues. Solution required process re-engineering and a custom software solution to collaborate, track, resolve, and report on all customer quality issues. Asyst Technologies, Inc., Fremont, CA Senior Manager, Corporate Quality December 2004 – November 2007  Created and re-engineered processes in all business areas for improved company performance.  Measured progress through creation of corporate quality metric dashboard, reviewed quarterly with executive management. This position required influencing all levels of management to resource and fund large quality projects which significantly improved company performance and customer satisfaction.  Managed scoping and creation of web applications to support customer relationship management (CRM) processes such as technical support, field service, manufacturing quality, and escalations.  Maintained ISO certification and managed customer quality audits. Senior Manager, Corporate CAD and PLM Systems November 2000 – December 2004  Project Manager of very successful PLM project to implement Windchill PDMLink 6.2.6. The solution included integrations with Pro/INTRALINK and ERP and had a custom developed AVL application.  Responsible for data management and integrity of all product documentation. Enabled real time design collaboration and data synchronization between 6 US sites, Japan, Taiwan and our supplier in Singapore.  Lead design and development of a customized Pro/INTRALINK Gateway for PDMLink providing fully automated (1 click to release) bi-directional data synchronization between Pro/INTRALINK and PDMLink.  Managed a very successful migration of Asyst’s Pro/ENGINEER CAD database from Pro/PDM to Pro/INTRALINK using only my team’s resources saving the company $250K in consulting dollars. Optimal Impact Consulting (OIC), Mountain View CA Account Manager November 1998 – November 2000  Account Manager for OIC’s customer KLA-Tencor, grew the account to OIC’s largest customer. Manufacturing Process Development Consultant September 1999 – November 2000  Worked with KLA-Tencor’s manufacturing organization in the capacity of a support and process development consultant supporting all CAD (Pro/E) and PDM activities.  Implemented and administered PDM database for manufacturing data.  Developed procedures for manufacturing to leverage CAD data to create assembly method sheets.  Implemented paperless manufacturing from CAD deigns to touch screens on the manufacturing floor. CAD Administration Consultant November 1998 – September 1999  Activities included project management, custom configuration, testing, training, and mentoring. LAM Research Corporation, Fremont, CA CAD Administrator November 1997 – November 1998  Had sole responsibility for design and administration of CAD and PDM environment for 70 Engineers.  Formed ECN and related PLM processes for Lam’s CMP division.  Configured and deployed Pro/PDM database for CAD Data Management. Parametric Technology Corporation (PTC), Boston, MA and San Jose, CA Application/Sales Engineer December 1996 – November 1997  Designed product demonstrations for PTC software and presented at sales engagements and seminars.  Software implementations including installation, configuration, standards development, and user training.  Supported the entire Pro/ENGINEER product line as a pre and post sales consultant. Mechanical CAD Trainer July 1995 – December 1996  Specialties included Data Management, Advanced Solid Modeling, Large Assembly Management, Drawing Detailing, Sheetmetal Design, Advanced Surfacing, Pro/INTRALINK, and Pro/Process.
  • 3. Keith Marchand 3 of 3 Additional Skills Education Very proficient with MS office products (Word, Excel, PowerPoint, Project, etc) Familiar with Agile/Scrum Methodologies, Jira and HPQC systems Bachelor of Science in Mechanical Engineering Technical University of Nova Scotia Halifax, NS Canada Residency Status US Citizen