SlideShare a Scribd company logo
1 of 25
AUDIT DOCUMENTATION SOURCE:  AS-3 ISSUED BY PCAOB (EFFECTIVE: NOVEMBER 15, 2004)
OUTLINE WHAT IS AUDIT DOCUMENTATION? WHO REVIEWS AUDIT DOCUMENTATION? AUDIT DOCUMENTATION REQUIREMENT DOCUMENTATION OF SPECIFIC MATTERS RETENTION OF AND SUBSEQUENT CHANGES TO AUDIT DOCUMENTATION SUMMARY OF KEY POINTS
WHAT IS AUDIT DOCUMENTATION? Audit documentation is the written record of the basis for the auditor‘s conclusions that provides the support for the auditor's representations, whether those representations are contained in the auditor's report or otherwise. It includes records of the planning and performance of the work, the procedures performed, evidence obtained, and conclusions reached by the auditor.
WHAT IS AUDIT DOCUMENTATION? Audit documentation also may be referred to as work papers or working papers.
WHO REVIEWS AUDIT DOCUMENTATION? Reviewers might include, for example: Auditors who are new to an engagement and review the prior year‘s documentation to understand the work performed as an aid in planning and performing the current engagement. Supervisory personnel who review documentation prepared by assistants on the engagement.
WHO REVIEWS AUDIT DOCUMENTATION? Engagement supervisors and engagement quality reviewers who review documentation to understand how the engagement team reached significant conclusions and whether there is adequate evidential support for those Conclusions.
WHO REVIEWS AUDIT DOCUMENTATION? A successor auditor who reviews a predecessor auditor's audit documentation. Internal and external inspection teams that review documentation to assess audit quality and compliance with auditing and related professional practice standards; applicable laws, rules, and regulations; and the auditor's own quality control policies.
AUDIT DOCUMENTATION REQUIREMENT   The auditor must prepare audit documentation in connection with each engagement conducted pursuant to the standards of the PCAOB     Examples of audit documentation include memoranda, confirmations, correspondence, schedules, audit programs, and letters of representation.
AUDIT DOCUMENTATION REQUIREMENT Audit documentation may be in the form of    paper, electronic files, or other media. How it helps? It supports the basis for the auditor's   conclusions concerning every relevant financial statement assertion, and  Audit documentation demonstrates that the work was in fact performed
AUDIT DOCUMENTATION REQUIREMENT One significant feature of audit documentation (work paper): Audit documentation must contain sufficient information to enable an experienced auditor, having no previous connection with the engagement: a. To understand the nature, timing, extent, and results of the procedures performed, evidence obtained, and conclusions reached, and b. To determine who performed the work and the date such work was completed as well as the person who reviewed the work and the date of such review.
AUDIT DOCUMENTATION REQUIREMENT What else it should include?     Audit documentation must include information the auditor has identified relating to significant findings or issues that is inconsistent with or contradicts the auditor's final conclusions. But don’t forget to retain records and how you resolve the issues through consultation and professional judgment among engagement team members.
AUDIT DOCUMENTATION REQUIREMENT What happens if after the audit documentation completion date auditor finds, due to lack of documentation, that the procedures may not have been performed, evidence may not have been obtained, appropriate conclusions may not have been reached?
AUDIT DOCUMENTATION REQUIREMENT   The auditor must determine that  sufficient procedures were performed  sufficient evidence was obtained, and  appropriate conclusions were reached with respect to the relevant financial statement assertions     To accomplish this, the auditor must have persuasive other evidence. Oral explanation alone does not constitute persuasive other evidence, but it may be used to clarify other written evidence.
AUDIT DOCUMENTATION REQUIREMENT (1)If the auditor determines and demonstrates that sufficient procedures were performed, sufficient evidence was obtained, and appropriate conclusions were reached, but that documentation thereof is not adequate, then the auditor should consider what additional documentation is needed.     Q. Can we add additional documentation after the audit is done?
AUDIT DOCUMENTATION REQUIREMENT A. Circumstances may require additions to audit documentation after the report release date. Audit documentation must not be deleted or discarded after the documentation completion date, however, information may be added. Any    documentation added must indicate the date the information was added, the name of the person who prepared the additional documentation, and the reason for adding it.
AUDIT DOCUMENTATION REQUIREMENT (2)If the auditor cannot determine or demonstrate that sufficient procedures were performed, sufficient evidence was obtained, or appropriate conclusions were reached, the auditor should comply with the provisions of AU sec. 390, Consideration of Omitted Procedures After the Report Date.
AUDIT DOCUMENTATION REQUIREMENT AU sec. 390, Consideration of Omitted Procedures After the Report Date After the date of the audit report, an auditor who determines that an audit procedure was omitted should assess the importance of the omitted procedure in terms of the auditor’s present ability to support an opinion already expressed and decide whether alternative procedures performed compensated for the omitted procedure. If the omission impairs the auditor’s ability to support the original opinion and the auditor believes that there are or may be parties currently relying, or likely to rely, on the report, the auditor should promptly arrange to apply the omitted procedures or satisfactory alternatives. If after application of those procedures the auditor becomes aware of facts that would have affected the report, the auditor should advise the client to  	1. Disclose the facts to actual or potential statement users, 	2. Issue revised statements, to be accompanied by a revised auditor’s report, 	3. Make suitable disclosure in new financial statements if they are about to be issued, and 	4. Notify users or potential users if the effects on financial statements will take a long time to determine and advise them that revised statements will follow later. If the client refuses to make appropriate disclosures, the auditor must notify the client that the auditor’s report no longer holds and undertake to notify all other actual users, potential users, and regulatory bodies.  If the auditor cannot perform the omitted procedures or suitable alternatives, the auditor should consult with an attorney to determine an appropriate course of action and the auditor’s responsibilities to the client, regulatory authorities, and other persons likely to rely on the report.
Documentation of Specific Matter     Significant matters include but not limited to the following: Significant matters involving the selection, application, and consistency of accounting principles, including related disclosures. Significant matters include, but are not limited to, accounting for complex or unusual transactions, accounting estimates, and uncertainties as well as related management assumptions.
Documentation of Specific Matter Results of auditing procedures that indicate a need for significant modification of planned auditing procedures, the existence of material    misstatements, omissions in the financial statements, the existence of significant deficiencies, or material weaknesses in internal control over financial reporting.
Documentation of Specific Matter Audit adjustments. For purposes of this standard, an audit adjustment is a correction of a misstatement of the financial statements that was or should have been proposed by the auditor, whether or not recorded by management, that could, either individually or when aggregated with other misstatements, have a material effect on the company's financial     statements.
Documentation of Specific Matter Disagreements among members of the engagement team or with others consulted on the engagement about final conclusions reached on significant accounting or auditing matters. Circumstances that cause significant difficulty in applying auditing procedures. Significant changes in the assessed level of audit risk for particular audit areas and the auditor's response to those changes.
Documentation of Specific Matter Any matters that could result in modification of the auditor's report. Engagement Completion Document      The auditor must identify all significant findings or issues in an engagement completion document. This document may include either all information necessary to understand the significant findings, issues or cross-references, as appropriate, to other available supporting audit documentation. This document, along with any documents cross-referenced, should collectively be as specific as necessary in the circumstances for a reviewer to gain a thorough understanding of the significant findings or issues.
Retention of and Subsequent Changes to Audit Documentation  The auditor must retain audit documentation for seven years from the date the auditor grants permission to use the auditor's report in connection with the issuance of the company's financial statements (report release date), unless a longer period of time is required by law. If a report is not issued in connection with an engagement, then the audit documentation must be retained for seven years from the date that fieldwork was substantially completed. If the auditor was unable to complete the engagement, then the audit documentation must be retained for seven years from the date the engagement ceased.
Retention of and Subsequent Changes to Audit Documentation  Prior to the report release date, the auditor must have completed all necessary auditing procedures and obtained sufficient evidence to support the representations in the auditor's report. A complete and final set of audit documentation should be assembled for retention as of a date not more than 45 days after the report release date (documentation completion date). If a report is not issued in connection with an engagement, then the documentation completion date should not be more than 45 days from the date that fieldwork was substantially completed. If the auditor was unable to complete the engagement, then the documentation completion date should not be more than 45 days from the date the engagement ceased.
Summary of Key Points Audit documentation also may be referred to as work papers or working papers  The auditor must prepare audit documentation in connection with each engagement conducted pursuant to the standards of the PCAOB Audit documentation demonstrates that the work was in fact performed The auditor must retain audit documentation for seven years from the date the auditor grants permission to use the auditor's report in connection with the issuance of the company's financial statements (report release date), unless a longer period of time is required by law.

More Related Content

What's hot

Audit programme
Audit programmeAudit programme
Audit programmeKumandan
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediEr. Manish Dwivedi
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing PresentationVernon Benjamin
 
Internal audit report writing
Internal audit report writingInternal audit report writing
Internal audit report writingNeha Kothari
 
Internal Auditing In Research
Internal Auditing In ResearchInternal Auditing In Research
Internal Auditing In ResearchHeather Kemp
 
Verita audit report writing training v1
Verita audit report writing training v1Verita audit report writing training v1
Verita audit report writing training v1veritama
 
Presentation 3 - Audit Program & Procedure
Presentation 3 - Audit Program & ProcedurePresentation 3 - Audit Program & Procedure
Presentation 3 - Audit Program & ProcedureMarzanur Rahman
 
3. planning feb 2014
3. planning feb 20143. planning feb 2014
3. planning feb 2014Syed Osama Rizvi
 
Two series audit documentation-
Two series audit documentation-Two series audit documentation-
Two series audit documentation-Amalina1234
 
Audit Report
Audit ReportAudit Report
Audit Reportstudent
 
summary_of_sa_CA_My_AIM_Dubey
summary_of_sa_CA_My_AIM_Dubeysummary_of_sa_CA_My_AIM_Dubey
summary_of_sa_CA_My_AIM_DubeyHanumant Dubey
 
Followup Audit Findings
Followup Audit FindingsFollowup Audit Findings
Followup Audit Findingsprashanth
 
I audit report warborough final 2013-14
I audit report   warborough final 2013-14I audit report   warborough final 2013-14
I audit report warborough final 2013-14John Bradshaw
 

What's hot (19)

Audit working-papers
Audit working-papersAudit working-papers
Audit working-papers
 
Audit programme
Audit programmeAudit programme
Audit programme
 
7. programme
7. programme7. programme
7. programme
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish Dwivedi
 
Basic Internal Auditing Presentation
Basic Internal Auditing PresentationBasic Internal Auditing Presentation
Basic Internal Auditing Presentation
 
Audit
AuditAudit
Audit
 
Internal audit report writing
Internal audit report writingInternal audit report writing
Internal audit report writing
 
Internal Auditing In Research
Internal Auditing In ResearchInternal Auditing In Research
Internal Auditing In Research
 
Verita audit report writing training v1
Verita audit report writing training v1Verita audit report writing training v1
Verita audit report writing training v1
 
Audit planning
Audit planningAudit planning
Audit planning
 
Presentation 3 - Audit Program & Procedure
Presentation 3 - Audit Program & ProcedurePresentation 3 - Audit Program & Procedure
Presentation 3 - Audit Program & Procedure
 
3. planning feb 2014
3. planning feb 20143. planning feb 2014
3. planning feb 2014
 
Two series audit documentation-
Two series audit documentation-Two series audit documentation-
Two series audit documentation-
 
Acpet planning and conducting internal audit
Acpet planning and conducting internal auditAcpet planning and conducting internal audit
Acpet planning and conducting internal audit
 
Audit Report
Audit ReportAudit Report
Audit Report
 
summary_of_sa_CA_My_AIM_Dubey
summary_of_sa_CA_My_AIM_Dubeysummary_of_sa_CA_My_AIM_Dubey
summary_of_sa_CA_My_AIM_Dubey
 
Followup Audit Findings
Followup Audit FindingsFollowup Audit Findings
Followup Audit Findings
 
How to Navigate the Audit Process
How to Navigate the Audit ProcessHow to Navigate the Audit Process
How to Navigate the Audit Process
 
I audit report warborough final 2013-14
I audit report   warborough final 2013-14I audit report   warborough final 2013-14
I audit report warborough final 2013-14
 

Viewers also liked

Modernism
ModernismModernism
Modernismtsasser
 
HELPING MINORITIES HACK THE FASHION INDUSTRY
HELPING MINORITIES HACK THE FASHION INDUSTRYHELPING MINORITIES HACK THE FASHION INDUSTRY
HELPING MINORITIES HACK THE FASHION INDUSTRYRashaun Stovall
 
Notre Dame Television Spring 2010 Ratings Report
Notre Dame Television Spring 2010 Ratings ReportNotre Dame Television Spring 2010 Ratings Report
Notre Dame Television Spring 2010 Ratings Reportkevinlig
 
A U D I T D O C U M E N T A T I O N P R E S E N T A T I O N
A U D I T  D O C U M E N T A T I O N  P R E S E N T A T I O NA U D I T  D O C U M E N T A T I O N  P R E S E N T A T I O N
A U D I T D O C U M E N T A T I O N P R E S E N T A T I O NKarim70
 
meshDETECT, Control Contraband Cell Phones Without Investment
meshDETECT, Control Contraband Cell Phones Without InvestmentmeshDETECT, Control Contraband Cell Phones Without Investment
meshDETECT, Control Contraband Cell Phones Without Investmentbrianfbyrne
 
Open data day open data and govt
Open data day   open data and govtOpen data day   open data and govt
Open data day open data and govtLori Bush
 
Drogy nie! 5
Drogy nie! 5Drogy nie! 5
Drogy nie! 5irenkolcak
 
Collins Research Based Extension
Collins Research Based ExtensionCollins Research Based Extension
Collins Research Based ExtensionJane Fancher
 
Drogy nie
Drogy nie Drogy nie
Drogy nie irenkolcak
 
Southern gothic
Southern gothicSouthern gothic
Southern gothictsasser
 
Native american renaissance
Native american renaissanceNative american renaissance
Native american renaissancetsasser
 
The metamorphosis
The metamorphosisThe metamorphosis
The metamorphosistsasser
 

Viewers also liked (15)

Modernism
ModernismModernism
Modernism
 
HELPING MINORITIES HACK THE FASHION INDUSTRY
HELPING MINORITIES HACK THE FASHION INDUSTRYHELPING MINORITIES HACK THE FASHION INDUSTRY
HELPING MINORITIES HACK THE FASHION INDUSTRY
 
Notre Dame Television Spring 2010 Ratings Report
Notre Dame Television Spring 2010 Ratings ReportNotre Dame Television Spring 2010 Ratings Report
Notre Dame Television Spring 2010 Ratings Report
 
Pack the Park
Pack the ParkPack the Park
Pack the Park
 
Racing club
Racing clubRacing club
Racing club
 
A U D I T D O C U M E N T A T I O N P R E S E N T A T I O N
A U D I T  D O C U M E N T A T I O N  P R E S E N T A T I O NA U D I T  D O C U M E N T A T I O N  P R E S E N T A T I O N
A U D I T D O C U M E N T A T I O N P R E S E N T A T I O N
 
meshDETECT, Control Contraband Cell Phones Without Investment
meshDETECT, Control Contraband Cell Phones Without InvestmentmeshDETECT, Control Contraband Cell Phones Without Investment
meshDETECT, Control Contraband Cell Phones Without Investment
 
Open data day open data and govt
Open data day   open data and govtOpen data day   open data and govt
Open data day open data and govt
 
Drogy nie! 5
Drogy nie! 5Drogy nie! 5
Drogy nie! 5
 
Collins Research Based Extension
Collins Research Based ExtensionCollins Research Based Extension
Collins Research Based Extension
 
Drogy nie
Drogy nie Drogy nie
Drogy nie
 
Drogy 3
Drogy 3Drogy 3
Drogy 3
 
Southern gothic
Southern gothicSouthern gothic
Southern gothic
 
Native american renaissance
Native american renaissanceNative american renaissance
Native american renaissance
 
The metamorphosis
The metamorphosisThe metamorphosis
The metamorphosis
 

Similar to Audit Documentation Presentation

Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfPractical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfAbhishekPareek64
 
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPT
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPTAUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPT
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPTHeldaMaryA
 
Psre 2400
Psre 2400Psre 2400
Psre 2400RS NAVARRO
 
SA 230- Audit Documentation.pdf
SA 230- Audit Documentation.pdfSA 230- Audit Documentation.pdf
SA 230- Audit Documentation.pdftaxguruedu
 
Psrs 4400-previously-psa-920
Psrs 4400-previously-psa-920Psrs 4400-previously-psa-920
Psrs 4400-previously-psa-920RS NAVARRO
 
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptx
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptxAUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptx
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptxHeldaMaryA
 
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdfviji4laxmi
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxSohailSheikh62
 
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINES
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINESAT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINES
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINESRenee Lewis
 
auditing.pptx
auditing.pptxauditing.pptx
auditing.pptxDevarajuBn
 
Presentation 1 - Different Stages of Audit
Presentation 1 - Different Stages of AuditPresentation 1 - Different Stages of Audit
Presentation 1 - Different Stages of AuditMarzanur Rahman
 
Practical approach to auditing v2
Practical approach to auditing v2Practical approach to auditing v2
Practical approach to auditing v2Edu Umechukwu
 
STANDARDS ON AUDIT
STANDARDS  ON AUDITSTANDARDS  ON AUDIT
STANDARDS ON AUDITKinjal Gada
 
01 Auditing CH 1.ppt
01 Auditing CH 1.ppt01 Auditing CH 1.ppt
01 Auditing CH 1.pptShimelisTamene2
 
Audit Reports and Relevant Standards on Auditing (2019)
Audit Reports and Relevant Standards on Auditing (2019)Audit Reports and Relevant Standards on Auditing (2019)
Audit Reports and Relevant Standards on Auditing (2019)Rohan Tauro
 
SA-230 by Atul Mehra.pptx
SA-230 by Atul Mehra.pptxSA-230 by Atul Mehra.pptx
SA-230 by Atul Mehra.pptxAtulMehra19
 

Similar to Audit Documentation Presentation (20)

Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdfPractical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
Practical_aspects_of_Statutory_Audit_Doc_to_reporting_by_CA._Amit_Doshi.pdf
 
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPT
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPTAUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPT
AUDIT WORKING PAPERS -OWNERSHIP AND CUSTODY-PPT
 
Psre 2400
Psre 2400Psre 2400
Psre 2400
 
SA 230- Audit Documentation.pdf
SA 230- Audit Documentation.pdfSA 230- Audit Documentation.pdf
SA 230- Audit Documentation.pdf
 
Psrs 4400-previously-psa-920
Psrs 4400-previously-psa-920Psrs 4400-previously-psa-920
Psrs 4400-previously-psa-920
 
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptx
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptxAUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptx
AUDIT WORKING PAPERS-CUSTODY OF OWNERSHIP.pptx
 
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf
1. Major failure of BK&D CPAs are as follows-a. Portions of the r.pdf
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptx
 
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINES
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINESAT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINES
AT-5908 CPA REVIEW SCHOOL OF THE PHILIPPINES
 
auditing.pptx
auditing.pptxauditing.pptx
auditing.pptx
 
Documentation
Documentation Documentation
Documentation
 
Lecture 11, Chapter 18, Completing the audit
Lecture 11, Chapter 18, Completing the auditLecture 11, Chapter 18, Completing the audit
Lecture 11, Chapter 18, Completing the audit
 
Audit process
Audit processAudit process
Audit process
 
Audit & Assurance
Audit & AssuranceAudit & Assurance
Audit & Assurance
 
Presentation 1 - Different Stages of Audit
Presentation 1 - Different Stages of AuditPresentation 1 - Different Stages of Audit
Presentation 1 - Different Stages of Audit
 
Practical approach to auditing v2
Practical approach to auditing v2Practical approach to auditing v2
Practical approach to auditing v2
 
STANDARDS ON AUDIT
STANDARDS  ON AUDITSTANDARDS  ON AUDIT
STANDARDS ON AUDIT
 
01 Auditing CH 1.ppt
01 Auditing CH 1.ppt01 Auditing CH 1.ppt
01 Auditing CH 1.ppt
 
Audit Reports and Relevant Standards on Auditing (2019)
Audit Reports and Relevant Standards on Auditing (2019)Audit Reports and Relevant Standards on Auditing (2019)
Audit Reports and Relevant Standards on Auditing (2019)
 
SA-230 by Atul Mehra.pptx
SA-230 by Atul Mehra.pptxSA-230 by Atul Mehra.pptx
SA-230 by Atul Mehra.pptx
 

Recently uploaded

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Recently uploaded (20)

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

Audit Documentation Presentation

  • 1. AUDIT DOCUMENTATION SOURCE: AS-3 ISSUED BY PCAOB (EFFECTIVE: NOVEMBER 15, 2004)
  • 2. OUTLINE WHAT IS AUDIT DOCUMENTATION? WHO REVIEWS AUDIT DOCUMENTATION? AUDIT DOCUMENTATION REQUIREMENT DOCUMENTATION OF SPECIFIC MATTERS RETENTION OF AND SUBSEQUENT CHANGES TO AUDIT DOCUMENTATION SUMMARY OF KEY POINTS
  • 3. WHAT IS AUDIT DOCUMENTATION? Audit documentation is the written record of the basis for the auditor‘s conclusions that provides the support for the auditor's representations, whether those representations are contained in the auditor's report or otherwise. It includes records of the planning and performance of the work, the procedures performed, evidence obtained, and conclusions reached by the auditor.
  • 4. WHAT IS AUDIT DOCUMENTATION? Audit documentation also may be referred to as work papers or working papers.
  • 5. WHO REVIEWS AUDIT DOCUMENTATION? Reviewers might include, for example: Auditors who are new to an engagement and review the prior year‘s documentation to understand the work performed as an aid in planning and performing the current engagement. Supervisory personnel who review documentation prepared by assistants on the engagement.
  • 6. WHO REVIEWS AUDIT DOCUMENTATION? Engagement supervisors and engagement quality reviewers who review documentation to understand how the engagement team reached significant conclusions and whether there is adequate evidential support for those Conclusions.
  • 7. WHO REVIEWS AUDIT DOCUMENTATION? A successor auditor who reviews a predecessor auditor's audit documentation. Internal and external inspection teams that review documentation to assess audit quality and compliance with auditing and related professional practice standards; applicable laws, rules, and regulations; and the auditor's own quality control policies.
  • 8. AUDIT DOCUMENTATION REQUIREMENT The auditor must prepare audit documentation in connection with each engagement conducted pursuant to the standards of the PCAOB Examples of audit documentation include memoranda, confirmations, correspondence, schedules, audit programs, and letters of representation.
  • 9. AUDIT DOCUMENTATION REQUIREMENT Audit documentation may be in the form of paper, electronic files, or other media. How it helps? It supports the basis for the auditor's conclusions concerning every relevant financial statement assertion, and Audit documentation demonstrates that the work was in fact performed
  • 10. AUDIT DOCUMENTATION REQUIREMENT One significant feature of audit documentation (work paper): Audit documentation must contain sufficient information to enable an experienced auditor, having no previous connection with the engagement: a. To understand the nature, timing, extent, and results of the procedures performed, evidence obtained, and conclusions reached, and b. To determine who performed the work and the date such work was completed as well as the person who reviewed the work and the date of such review.
  • 11. AUDIT DOCUMENTATION REQUIREMENT What else it should include? Audit documentation must include information the auditor has identified relating to significant findings or issues that is inconsistent with or contradicts the auditor's final conclusions. But don’t forget to retain records and how you resolve the issues through consultation and professional judgment among engagement team members.
  • 12. AUDIT DOCUMENTATION REQUIREMENT What happens if after the audit documentation completion date auditor finds, due to lack of documentation, that the procedures may not have been performed, evidence may not have been obtained, appropriate conclusions may not have been reached?
  • 13. AUDIT DOCUMENTATION REQUIREMENT The auditor must determine that sufficient procedures were performed sufficient evidence was obtained, and appropriate conclusions were reached with respect to the relevant financial statement assertions To accomplish this, the auditor must have persuasive other evidence. Oral explanation alone does not constitute persuasive other evidence, but it may be used to clarify other written evidence.
  • 14. AUDIT DOCUMENTATION REQUIREMENT (1)If the auditor determines and demonstrates that sufficient procedures were performed, sufficient evidence was obtained, and appropriate conclusions were reached, but that documentation thereof is not adequate, then the auditor should consider what additional documentation is needed. Q. Can we add additional documentation after the audit is done?
  • 15. AUDIT DOCUMENTATION REQUIREMENT A. Circumstances may require additions to audit documentation after the report release date. Audit documentation must not be deleted or discarded after the documentation completion date, however, information may be added. Any documentation added must indicate the date the information was added, the name of the person who prepared the additional documentation, and the reason for adding it.
  • 16. AUDIT DOCUMENTATION REQUIREMENT (2)If the auditor cannot determine or demonstrate that sufficient procedures were performed, sufficient evidence was obtained, or appropriate conclusions were reached, the auditor should comply with the provisions of AU sec. 390, Consideration of Omitted Procedures After the Report Date.
  • 17. AUDIT DOCUMENTATION REQUIREMENT AU sec. 390, Consideration of Omitted Procedures After the Report Date After the date of the audit report, an auditor who determines that an audit procedure was omitted should assess the importance of the omitted procedure in terms of the auditor’s present ability to support an opinion already expressed and decide whether alternative procedures performed compensated for the omitted procedure. If the omission impairs the auditor’s ability to support the original opinion and the auditor believes that there are or may be parties currently relying, or likely to rely, on the report, the auditor should promptly arrange to apply the omitted procedures or satisfactory alternatives. If after application of those procedures the auditor becomes aware of facts that would have affected the report, the auditor should advise the client to 1. Disclose the facts to actual or potential statement users, 2. Issue revised statements, to be accompanied by a revised auditor’s report, 3. Make suitable disclosure in new financial statements if they are about to be issued, and 4. Notify users or potential users if the effects on financial statements will take a long time to determine and advise them that revised statements will follow later. If the client refuses to make appropriate disclosures, the auditor must notify the client that the auditor’s report no longer holds and undertake to notify all other actual users, potential users, and regulatory bodies. If the auditor cannot perform the omitted procedures or suitable alternatives, the auditor should consult with an attorney to determine an appropriate course of action and the auditor’s responsibilities to the client, regulatory authorities, and other persons likely to rely on the report.
  • 18. Documentation of Specific Matter Significant matters include but not limited to the following: Significant matters involving the selection, application, and consistency of accounting principles, including related disclosures. Significant matters include, but are not limited to, accounting for complex or unusual transactions, accounting estimates, and uncertainties as well as related management assumptions.
  • 19. Documentation of Specific Matter Results of auditing procedures that indicate a need for significant modification of planned auditing procedures, the existence of material misstatements, omissions in the financial statements, the existence of significant deficiencies, or material weaknesses in internal control over financial reporting.
  • 20. Documentation of Specific Matter Audit adjustments. For purposes of this standard, an audit adjustment is a correction of a misstatement of the financial statements that was or should have been proposed by the auditor, whether or not recorded by management, that could, either individually or when aggregated with other misstatements, have a material effect on the company's financial statements.
  • 21. Documentation of Specific Matter Disagreements among members of the engagement team or with others consulted on the engagement about final conclusions reached on significant accounting or auditing matters. Circumstances that cause significant difficulty in applying auditing procedures. Significant changes in the assessed level of audit risk for particular audit areas and the auditor's response to those changes.
  • 22. Documentation of Specific Matter Any matters that could result in modification of the auditor's report. Engagement Completion Document The auditor must identify all significant findings or issues in an engagement completion document. This document may include either all information necessary to understand the significant findings, issues or cross-references, as appropriate, to other available supporting audit documentation. This document, along with any documents cross-referenced, should collectively be as specific as necessary in the circumstances for a reviewer to gain a thorough understanding of the significant findings or issues.
  • 23. Retention of and Subsequent Changes to Audit Documentation The auditor must retain audit documentation for seven years from the date the auditor grants permission to use the auditor's report in connection with the issuance of the company's financial statements (report release date), unless a longer period of time is required by law. If a report is not issued in connection with an engagement, then the audit documentation must be retained for seven years from the date that fieldwork was substantially completed. If the auditor was unable to complete the engagement, then the audit documentation must be retained for seven years from the date the engagement ceased.
  • 24. Retention of and Subsequent Changes to Audit Documentation Prior to the report release date, the auditor must have completed all necessary auditing procedures and obtained sufficient evidence to support the representations in the auditor's report. A complete and final set of audit documentation should be assembled for retention as of a date not more than 45 days after the report release date (documentation completion date). If a report is not issued in connection with an engagement, then the documentation completion date should not be more than 45 days from the date that fieldwork was substantially completed. If the auditor was unable to complete the engagement, then the documentation completion date should not be more than 45 days from the date the engagement ceased.
  • 25. Summary of Key Points Audit documentation also may be referred to as work papers or working papers The auditor must prepare audit documentation in connection with each engagement conducted pursuant to the standards of the PCAOB Audit documentation demonstrates that the work was in fact performed The auditor must retain audit documentation for seven years from the date the auditor grants permission to use the auditor's report in connection with the issuance of the company's financial statements (report release date), unless a longer period of time is required by law.