In the date of 17th April 2017, we had received an invitation to tender a single
storey show house project in Mukim Petaling Jaya, Selangor.
CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123,
MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN.
1. Obtain quotation from supplier
● All Hardware Trading
● Majuhin Timber Sdn Bhd
● Sp Sinaran Perkasa Enterprise
● Fortune Tiling Sdn. Bhd.
● SKB shutters
● ATKC Warehouse
● Kok Ming Enterprise
● Saujana Putra Hardware
● Linpros Construction Sdn Bhd
● Pembinaan YSH Sdn Bhd
● Ag Promo Industries
● Seng Pang Enterprise
● D’Lock Boutique Sdn Bhd
● Chuan Li Steel Sdn Bhd
● Henlico Industrial Supplier Sdn. Bhd
● Berjaya Hardware (B'worth) Sdn. Bhd
● Y Soon Construction
● CSM Engineering Hardware Sdn Bhd
● City Amoeba Sdn Bhd
● Abad Hebat Hardware
● Who Sang Hardware & Timber Trading
Sdn Bhd
● Prima Solutions Enterprise
● PMH Timber Industries Sdn Bhd
● Best design construction and trading
● Seng Kong Shutter Industries Sdn Bhd
● Syarikat Perniagaan Cheng Huat
Estimating Planning and Coordination
1. Obtain quotation from supplier (email)
Estimating Planning and Coordination
http://myn3c.cidb.gov.my/cidb_n3c/output/n3clist.php
1. Obtain quotation from supplier (website)
Estimating Planning and Coordination
http://www.quantitysurveyoronline.
com.my/materials-prices.html
http://nasmuning.com/pricelist.htm
1. Obtain quotation from supplier (website)
Estimating Planning and Coordination
2. List out the lowest quotation
Estimating Planning and Coordination
No. Element Name
1. Work Below Lowest Floor Level Le Jia Nian
2. Frame Sylvester Tang Kiok Heng
3. Roof Construction and Finishes Yeo Kai Wen
4. External Wall Mathilde Nicolas
5. Internal Wall Loh Jiun Shen
6. Doors & Ironmongeries Bryan Teh Qing Da
7. Internal Wall Finishes Sam Wei Yin
8. Internal Floor Finishes Constance
9. Internal Ceiling Finishes Tan Hwee Min
10. External Finishes Terence Tan Peng Ong
3. Calculation
Estimating Planning and Coordination
Estimating Planning and Coordination
4. Final Summary
● Submission of tender: 8th of June 2017
● Disqualified due to late submission
● Tender amount is the second highest among all the tenderers
Summary of the Company Tender Positions
Position of Opening Tenderer Tender Amount (RM)
1. BINASONG BHD 170,331.79
2. LUMICON COMPANY 195,913.22
3. UB COMPANY 209,167.16
4. ABC CONSTRUCTION SDN BHD 219,088.37
5. QUANTITATIVE SDN BHD 233,241.59
6. ALPHALETE 267,011.74
7. AETRIO SDN BHD 249,901.41
1. Recommended Nominated Sub-contractor
Strengths of the Company Tender
1. Recommended Nominated Sub-contractor
Strengths of the Company Tender
1. Recommended Nominated Sub-contractor
Strengths of the Company Tender
2. Reputable source of company
Strengths of the Company Tender
3. Propose same quality material with lower price
Strengths of the Company Tender
4. Good workmanship
● Painting change from “Dulux” brand to “Nippon” brand
● Price are 10% to 15% lower
● All labour are well trained and skilled
● Can produce high quality work
1. High material price
Weakness of the Company Tender
● Unable to get a lower material price
● Price of door leaf is too high
● Should find more supplier to get a lower price
1. Calculation error
Errors in the Tender
● External Wall
1. Calculation error
Errors in the Tender
● Internal Wall
Tender Amount Total Less: RM 2,303.61
1. Tender amount is higher than other tenderer
2. Late submission
3. Does not have good time management
4. Less experience in preparing tender document
Reasons of Failure
1. Good time management
2. Be punctual
3. Communication
4. Improve negotiation skill with the supplier
5. Developing a good relationship with supplier
6. Find more price for a material to get the lowest price
7. Minimize errors
8. Fill in all the form in tender document
Conclusion and Recommendations
Thank You !

More Related Content

What's hot

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
Pembinaan
PembinaanPembinaan
Pembinaananis
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
2.0 agensi terlibat dlm pembangunan projek
2.0 agensi terlibat dlm pembangunan projek2.0 agensi terlibat dlm pembangunan projek
2.0 agensi terlibat dlm pembangunan projekKhalid Mdnoh
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industricik Ena
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Kompetensi 2 lengkap
Kompetensi 2 lengkapKompetensi 2 lengkap
Kompetensi 2 lengkapZul Hilmi
 
Unit 2 concrete material 2.5-2.6
Unit 2 concrete material 2.5-2.6Unit 2 concrete material 2.5-2.6
Unit 2 concrete material 2.5-2.6Mara
 
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPuteri Zaharah
 

What's hot (20)

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Lukisan bangunan
Lukisan bangunanLukisan bangunan
Lukisan bangunan
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
ECA form
ECA formECA form
ECA form
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
2.0 agensi terlibat dlm pembangunan projek
2.0 agensi terlibat dlm pembangunan projek2.0 agensi terlibat dlm pembangunan projek
2.0 agensi terlibat dlm pembangunan projek
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industri
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bab 6
Bab 6Bab 6
Bab 6
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Kompetensi 2 lengkap
Kompetensi 2 lengkapKompetensi 2 lengkap
Kompetensi 2 lengkap
 
Unit 2 concrete material 2.5-2.6
Unit 2 concrete material 2.5-2.6Unit 2 concrete material 2.5-2.6
Unit 2 concrete material 2.5-2.6
 
Spun pile
Spun pileSpun pile
Spun pile
 
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALAPEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
PEMAHAMAN LUKISAN ARKITEK, PELAN SUSUNATUR, DAN SKALA
 

Viewers also liked

Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Kai Yun Pang
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Kai Yun Pang
 
Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Kai Yun Pang
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientPang Khai Shuen
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationHasif Alias
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationkohwenqi
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Lee Pei Gie
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationShze Hwa Lee
 
Assignment - Tender Documentation
Assignment - Tender DocumentationAssignment - Tender Documentation
Assignment - Tender DocumentationKai Yun Pang
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Kai Yun Pang
 
Taylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusTaylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusEst
 
Seminar 2 - Calculation Question (Excavation)
Seminar 2 - Calculation Question (Excavation)Seminar 2 - Calculation Question (Excavation)
Seminar 2 - Calculation Question (Excavation)Kai Yun Pang
 
Seminar 1 - Theory Question
Seminar 1 - Theory QuestionSeminar 1 - Theory Question
Seminar 1 - Theory QuestionKai Yun Pang
 
Seminar 2 - Excavation
Seminar 2 - ExcavationSeminar 2 - Excavation
Seminar 2 - ExcavationKai Yun Pang
 
Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1Kai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyright
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 CopyrightBBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyright
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyrightrickottenhof
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationtfkc1212
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationKailyn Lee
 

Viewers also liked (20)

Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2
 
Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Assignment - Tender Documentation
Assignment - Tender DocumentationAssignment - Tender Documentation
Assignment - Tender Documentation
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
 
Taylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusTaylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectus
 
Seminar 2 - Calculation Question (Excavation)
Seminar 2 - Calculation Question (Excavation)Seminar 2 - Calculation Question (Excavation)
Seminar 2 - Calculation Question (Excavation)
 
Seminar 1 - Theory Question
Seminar 1 - Theory QuestionSeminar 1 - Theory Question
Seminar 1 - Theory Question
 
Seminar 2 - Excavation
Seminar 2 - ExcavationSeminar 2 - Excavation
Seminar 2 - Excavation
 
Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyright
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 CopyrightBBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyright
BBHB Estimating Presentation GOHBA Renovators Council July 21,2010 Copyright
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 

Similar to Assignment - Single Storey Show House (Presentation)

Estimating
Estimating Estimating
Estimating Lin Hui
 
Estimating presentation slides
Estimating presentation slidesEstimating presentation slides
Estimating presentation slideslohwenjun
 
Jm company profile ici
Jm company profile iciJm company profile ici
Jm company profile iciJamesMoy7
 
Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15SOLAI RAMAIAH
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra Parmar
 
Nothern Coalfields Limited
Nothern Coalfields LimitedNothern Coalfields Limited
Nothern Coalfields LimitedAshz Mahajan
 
Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)Hasif Alias
 
MKY CV
MKY CVMKY CV
MKY CVKY Mah
 
professionalResume e
professionalResume eprofessionalResume e
professionalResume epandiyaraj k
 
Estimating letters
Estimating lettersEstimating letters
Estimating lettersZIyeeTan
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineChong Chin Pin
 
resume1 doc-20031a-1 (2)
resume1 doc-20031a-1 (2)resume1 doc-20031a-1 (2)
resume1 doc-20031a-1 (2)nookiah sooria
 
GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016Graham Chaffey
 

Similar to Assignment - Single Storey Show House (Presentation) (20)

Estimating
Estimating Estimating
Estimating
 
Ici
IciIci
Ici
 
Estimating presentation slides
Estimating presentation slidesEstimating presentation slides
Estimating presentation slides
 
Jm company profile ici
Jm company profile iciJm company profile ici
Jm company profile ici
 
Proposal Final Edited
Proposal Final EditedProposal Final Edited
Proposal Final Edited
 
Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
 
Nothern Coalfields Limited
Nothern Coalfields LimitedNothern Coalfields Limited
Nothern Coalfields Limited
 
Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)
 
MKY CV
MKY CVMKY CV
MKY CV
 
MazherCVUpdated (291116)
MazherCVUpdated (291116)MazherCVUpdated (291116)
MazherCVUpdated (291116)
 
Construction company
Construction companyConstruction company
Construction company
 
professionalResume e
professionalResume eprofessionalResume e
professionalResume e
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
Amir Muneer (1)
Amir Muneer (1)Amir Muneer (1)
Amir Muneer (1)
 
resume1 doc-20031a-1 (2)
resume1 doc-20031a-1 (2)resume1 doc-20031a-1 (2)
resume1 doc-20031a-1 (2)
 
GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016GRAHAMS RESUME docx GC 3 19 2016
GRAHAMS RESUME docx GC 3 19 2016
 
pradeesh resume
pradeesh resumepradeesh resume
pradeesh resume
 
M4ppt
M4pptM4ppt
M4ppt
 

More from Kai Yun Pang

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiKai Yun Pang
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - ReportKai Yun Pang
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump StationKai Yun Pang
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial AppraisalKai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal Kai Yun Pang
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012Kai Yun Pang
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Kai Yun Pang
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S HotelKai Yun Pang
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study ReportKai Yun Pang
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - JournalKai Yun Pang
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service Kai Yun Pang
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final AccountKai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - QuestionKai Yun Pang
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK LandKai Yun Pang
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 

More from Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 

Assignment - Single Storey Show House (Presentation)

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING ESTIMATING (QSB 60504) Lecturer: Ms Azrina Md Yaakob Project Tendering for Single Storey Show House
  • 3. Introduction In the date of 17th April 2017, we had received an invitation to tender a single storey show house project in Mukim Petaling Jaya, Selangor.
  • 4. CADANGAN MEMBINA SATU RUMAH CONTOH DI ATAS LOT 123, MUKIM PETALING JAYA, NEGERI SELANGOR DARUL EHSAN.
  • 5. 1. Obtain quotation from supplier ● All Hardware Trading ● Majuhin Timber Sdn Bhd ● Sp Sinaran Perkasa Enterprise ● Fortune Tiling Sdn. Bhd. ● SKB shutters ● ATKC Warehouse ● Kok Ming Enterprise ● Saujana Putra Hardware ● Linpros Construction Sdn Bhd ● Pembinaan YSH Sdn Bhd ● Ag Promo Industries ● Seng Pang Enterprise ● D’Lock Boutique Sdn Bhd ● Chuan Li Steel Sdn Bhd ● Henlico Industrial Supplier Sdn. Bhd ● Berjaya Hardware (B'worth) Sdn. Bhd ● Y Soon Construction ● CSM Engineering Hardware Sdn Bhd ● City Amoeba Sdn Bhd ● Abad Hebat Hardware ● Who Sang Hardware & Timber Trading Sdn Bhd ● Prima Solutions Enterprise ● PMH Timber Industries Sdn Bhd ● Best design construction and trading ● Seng Kong Shutter Industries Sdn Bhd ● Syarikat Perniagaan Cheng Huat Estimating Planning and Coordination
  • 6. 1. Obtain quotation from supplier (email) Estimating Planning and Coordination
  • 7. http://myn3c.cidb.gov.my/cidb_n3c/output/n3clist.php 1. Obtain quotation from supplier (website) Estimating Planning and Coordination
  • 9. 2. List out the lowest quotation Estimating Planning and Coordination
  • 10. No. Element Name 1. Work Below Lowest Floor Level Le Jia Nian 2. Frame Sylvester Tang Kiok Heng 3. Roof Construction and Finishes Yeo Kai Wen 4. External Wall Mathilde Nicolas 5. Internal Wall Loh Jiun Shen 6. Doors & Ironmongeries Bryan Teh Qing Da 7. Internal Wall Finishes Sam Wei Yin 8. Internal Floor Finishes Constance 9. Internal Ceiling Finishes Tan Hwee Min 10. External Finishes Terence Tan Peng Ong 3. Calculation Estimating Planning and Coordination
  • 11. Estimating Planning and Coordination 4. Final Summary
  • 12. ● Submission of tender: 8th of June 2017 ● Disqualified due to late submission ● Tender amount is the second highest among all the tenderers Summary of the Company Tender Positions Position of Opening Tenderer Tender Amount (RM) 1. BINASONG BHD 170,331.79 2. LUMICON COMPANY 195,913.22 3. UB COMPANY 209,167.16 4. ABC CONSTRUCTION SDN BHD 219,088.37 5. QUANTITATIVE SDN BHD 233,241.59 6. ALPHALETE 267,011.74 7. AETRIO SDN BHD 249,901.41
  • 13. 1. Recommended Nominated Sub-contractor Strengths of the Company Tender
  • 14. 1. Recommended Nominated Sub-contractor Strengths of the Company Tender
  • 15. 1. Recommended Nominated Sub-contractor Strengths of the Company Tender
  • 16. 2. Reputable source of company Strengths of the Company Tender
  • 17. 3. Propose same quality material with lower price Strengths of the Company Tender 4. Good workmanship ● Painting change from “Dulux” brand to “Nippon” brand ● Price are 10% to 15% lower ● All labour are well trained and skilled ● Can produce high quality work
  • 18. 1. High material price Weakness of the Company Tender ● Unable to get a lower material price ● Price of door leaf is too high ● Should find more supplier to get a lower price
  • 19. 1. Calculation error Errors in the Tender ● External Wall
  • 20. 1. Calculation error Errors in the Tender ● Internal Wall Tender Amount Total Less: RM 2,303.61
  • 21. 1. Tender amount is higher than other tenderer 2. Late submission 3. Does not have good time management 4. Less experience in preparing tender document Reasons of Failure
  • 22. 1. Good time management 2. Be punctual 3. Communication 4. Improve negotiation skill with the supplier 5. Developing a good relationship with supplier 6. Find more price for a material to get the lowest price 7. Minimize errors 8. Fill in all the form in tender document Conclusion and Recommendations