1. Curriculum Vitae
Personal Details
Full Name : Pareman Plato Tarigan. M.Eng
Sex : Male
Date of Birth : 8 July 1976
Nationality : Indonesia
Marial Status : Married
Health : Perfect
Language : Indonesian & English
Mobile : +6281290283562
E-mail : fery_anesta@yahoo.com
Education Background
1982-1992 : Junior Technical High School, Berastagi
1992-1995 : Senior Technical High School, Berastagi
1995-2000 : Mechanical Engineering of Medan Technology Institute, Medan-Indonesia
2014-2016 : Magister Petroleum of Trisakti University, Jakarta-Indonesia
Qualification
Mechanical Engineering Degree and Magister of Petroleum Engineering
Course attended
Attended International Safety Training for 3 days by Rio Tinto Company in Abu Dhabi
UEA in the following areas:
a. Site EHS Induction by SNC Lavalin International company
b. Business Resilience and Recovery Program by Rio Tinto
c. HSEQ MS general awarness by Rio Tinto
d. Incident Management by Rio Tinto
e. Risk Analysis Process by ECL TM
f. Rigging Safety Awarness Course by ECL TM
g. Job Safety Analysis by ECL TM
QA/QC Mechanical Engineering Induction program for QA/QC Awareness Training on
September 15,2007 by Foster Wheeler&Almogil group company at Damam Saudi-Arabia,
in the following areas:
a. Company Quality Policy
b. Quality system Awareness
c. Quality Organitation
d. Project Quality Plans
e. Dicipline Inspection Requirements
f. Reports and Records
Mechanical Inspector Training on 12th September, 2007 at Saudi-Arabia
Attended the field Safety Induction program for Safety awareness Training on October,
2007 by Foster Wheeler company at Sharq 3rd expansion U/O Project Jubail Saudi-
Arabia
2. Working Experience
1. University of Trisakti
Period : January 2014-March 2016
2. ECL – RIO TINTO
Period : January 2013 – November 2013
Position : International Mechanical engineering & Supervisor
Location : EMAL Aluminium smelter, Al Taweelah , ABU DHABI, UAE
Job description
To do inspection for all mechanical and structure according to the drawing and
specification.
Todo Pre-commisioning before doing commissioning together wit client.
Toprepare all documents for commissioning and testing together with client.
Toprepare all document and reports before hand over the project to client.
3. ECL - RIO TINTO
Period : January 2012 – December 2012
Position : International Mechanical Supervisor.
Location : Mahan Aluminium Project Aditya Birla Group Hindalco
Bargawan Singrauli UP ( Uttar Pradesh ) India.
Job description.
To help site Manager making report after completion project before sending to Head
office in France.
Toprepare all document for commissioning before handover to the client.
Torectify some drawing if when it is not accordance with actual on site
Supervision, monitoring and inspection of the contractor activities
Planning and scheduling the work.
Attending progress meetings to evaluate the work progress and making daily reports.
Designing of Quality Control Plans and ensuring the procedures are properly executed.
Doing the final inspection on the equipment
4. MPH
Period : July 2010 – December 2011
Position : Senior Mechanical Supervisor on ECL Site (Vedanta Aluminium Limited,
India)
Location : Jharsunguda Orissa - India
Job description
Supervision on erection and commissioning of ECL Transfer Equipment and Pot Tending
Machines (PTM)
Planning and scheduling the work.
Attending progress meetings to evaluate the work progress and making reports
Equipment inspection with the client for handover.
5. LAFARGE Company Uganda East-Africa
Period: September 2009 – Jun 2010
3. Position : International Mechanical Supervisor & Inspector
Location : Hima Town, Kasese, Fort Portland Road Kasese Uganda, East-Africa
Job Description.
Supervision, monitoring and inspection of the contractor activities
Planning and scheduling the work.
Attending progress meetings to evaluate the work progress and making daily reports.
Designing of Quality Control Plans and ensuring the procedures are properly executed.
Doing the final inspection on the equipment.
6. PT. INWHA Engineering Indonesia
Period: Juny 2009 – September2009
Position : Mechanical Supervisor for Rotating&Static Equipment
Location : PERTAMINA UP II Dumai ( Indonesia oil&Gas company )
Job description
Supervision, monitoring and inspection of the contractor activities
Planning and scheduling the work.
Attending progress meetings to evaluate the work progress and making daily reports.
Designing of Quality Control Plans and ensuring the procedures are properly executed.
Doing the final inspection on the equipment
7. MUHAMAD AL-MOGIL GROUP (MMG) COMPANY
Period: September 2007 - November 2008
Position : QA/QC. Mechanical Static&Rotating Eguipment on Foster Wheeler
Energy (Sharq Chemical Industry)
Location : Dammam Saudi-Arabia
Job description
Inspect field installation of Rotating Equipment
Inspection of equipment prior delivery to siteInspection of mounting positions including
foundation, baseplate,sanblock for levelling,centering and elevation before doing
installation of equipments
Inspection for checking elevation,centering,leveling including Pre-alignment for rotating
equipment such as: Pums,Compressors etc.
Inspection of static equipment for checking elevation, plubness for Vessel, Exchanger,
reboiler, oil separator, air fin cooler etc.
Inspection for Final Alignment for rotating equipment after pipe installation.
Final installation inspection of the equipment.
Preparation and submitting Quality pack to the manager to evaluate during internal and
external meeting
8. TAKADA ENGINEERING INDONESIA
Period : January 2007 – September2007
Position : Piping Engineer
4. Location : Asahimas Petrochemical Indonesia
Job description
Drawing preparation
Modify the drawing as per site requirement
Document control
Material and equipment inspection prior delivery tosite
Planning and scheduling the work
Attending progress meetings.
Prepare Test-package prior to leak test for the piping
9. PT.MITSUBISHI CHEMICAL ENGINEERING INDONESIA
Period : July 2004-December 2006
Position : MECHANICAL ENGINEER
Location : Merak- Banten Indonesia
Job description
Toprepare drawing before submitting to the contractor
Inspection of all material at the workshop and making sure that it is according to
specification before delivery tosite.
Scheduling for work as per the shutdown periods
Inspect field installation of Rotating equipment: gas Compressor, gas Generator solar
centaur gas turbineGenerator and solar taurus Gas Turbine Compressor, including
Pumps,Frost draft fan etc.
Inspect mounting positions for all equipment Rotating and Static prior to install
Inspection of installation for static equipments for checking elevation,plubness for the
vessel, exchanger, oil separator, air fin cooler, reboiler etc
Final inspection
10. PT.ANCOL TERANG METAL PRINTING
Period : June 2002-May 2005
Position : Mechanical Supervisor
Location : Jakarta - Indonesia
Job description
Prepare daily schedule and activities report
Create weekly and monthly schedule based on production of equipment
Prepare periodically maintenance schedule of printing equipment to be submitted to
maintenance supervisor
Cordinate and supervise maintenance for heavy duty equipment, coal conveyor
preparation, reclaming and coalterminal conveyor.
11.HYUNDAY-MBRC-JINRO-JOINT OPERATION
5. Period : Oct 1999 – Dec2001
Position : Mechanical Supervisor ( Hydroelectric power project )
Location : Lake Toba , North Sumatra – Indonesia
Job description
Monitoring all activities and installation by sub contractors under Hyundai - Jinro
Indonesia
Prepare weekly reports tobe submitted to project Manager
Attended weekly meeting with project Manager for the evaluation of projects in progress
Coordinate the process of setting orientation and elevation all equipments
Prepare inspection reports for all equipment