by Julian Kalac, P.Eng
Lean Six Sigma Master Black Belt
 “Lean” is a Japanese methodology that focuses on
producing high quality products faster, better and at
lowest cost.
 Lean is about eliminating waste (scrap, rework) and
doing things right the 1st time.
 Lean is NOT ELIMINATING JOBS, it’s about creating jobs
by becoming more productive!
 It’s NOT about work harder, but rather smarter”
Single Piece Flow Just-In-Time Eliminate Waste
•Process parts one-at-a-
time or in small lots
instead of in large
batches or economies of
scale
•Quick changeovers
•Balanced and
continuous flows instead
of stop and start
processing
•Have just the right
amount of inventory you
need, when you need it,
where you need it
•Optimize the amount
of inventory required
•Ensure that your
resources are ready to
support the flow
•Never knowingly pass
on a defect
•Improve the capability
of your processes
•Fix failure modes
when they occur
•Determine and resolve
the deeper root causes
= =
The Toyota Production System
“Classic Lean”
Strength
“Supply Chain
Management” Strength
“Classic Six
Sigma” Strength
| | 4
 Customers demand shorter lead times,
improved quality & reduced prices
 Increase through-put and quality and reduce
time wasted and frustration by working on non-
value add activities.
 Gain new business
| | 5
INSANITY “Doing the
same thing over and
over again and expecting
different results”
Albert Einstein
| | 6 6
How people feel
Keep momentum
moving
MOST CRITICAL
TIME IN CHANGES
After results from
changes are seen
 The systematic elimination of waste and re-alignment of resources to
deliver value to the customer faster, better, & more consistently
 Lean also is:
◦ Pursuit of excellence
◦ Continuous Improvement of performance and quality
◦ .
◦ Increasing inventory “turns” and throughput
◦ Simplifying and redefining processes
◦ Measuring & monitoring processes
◦ Empowering the workforce (80%)
Leading to Leading to
Eliminate
Waste
Reduced Cycle
Times
Increased
Capacity
Focus: Eliminate waste, non-value add steps, process
constraints and bottle necks that cause problems in work
| | 8
1. Define Customer requirement—TAKT TIME (demand/time)
2. Map out the Current process (Value Stream Map) and identify
Value-Add vs Non-Value-Add activity
3. Get the stream to “flow” by Reducing/Eliminating the 7+1 Sins
Waste, i.e. material handling, setup time, downtime, walking
4. Line balance the Cycle Times & implement internal customer
“PULL” system, (continuous flow)
5. Manage the Bottleneck process by implementing Flexible Work
Cells with Cross Functionally trained operators who help do
each others job and to keep the “flow going”
 Takt Time
◦ Drum beat of production
◦ Based on actual internal or external
demand
Available production time
customer demand
Takt Time =
| | 10
1. Producing Defects (SCRAP)
2. Reworking parts due to process problems
3. OVER-TIME to make up lost time (In-efficiencies)
4. Time Waiting i.e. Set-Up/Change-Over time, delivery
of supplier materials
5. Wasting time walking around and looking for tools,
material, people,
6. Moving parts from one area to another & staging
them into (WIP)
7. Carrying excess Inventories of parts more than
needed ($$ tied up)
| | 11
Not utilizing operators to their full potential
Over relying on a select few while others are
Inadequately trained
 Operators are unable to rotate and help each
other out to balanance the work-load
High overtime increasing pressure and stress
 Elements of Lead Time
◦ Lead Time = total process time from
initiation to design to build to ship to
payment
◦ Batch & Queue – Accumulate orders, then
wait to be processed
◦ Setup time – prepare to process next job
◦ Run time – processing time per unit
 Often less than 1% of cycle time
 Only value added step of Lead time
Mistake proofing
◦ Eliminate/minimize chance for human error
◦ Poka yoke =
 to avoid (yokeru) inadvertent errors (poka)
◦ Detection Poka yoke
 Notifies of imminent process failure but requires
operator interaction to avoid mistakes
◦ Prevention Poka Yoke
 Stops the process before failures occur
 Does not allow defects to pass through the process
Pull Systems
Production scheduling method used to link downstream
activities to upstream activities
Work begins based upon a demand signal (kanban) from a
downstream customer, either internal or external
Avoids overproduction, work backlog, and disconnects within a
process
Nothing is produced until the downstream customer signals a
need
 Cycle Time is the actual production rate – It is the time
between two successive finished items coming out of your
production cell.
 Cycle Time is dictated by the slowest (longest) operation
in the cell.
40
min
20
min
25
min
15
min
30
min
1
54
3
2
•What operation controls the
cycle?
•What is the Critical Path?
•How can you relieve or shift the
bottleneck?
| | 16
 High-Level Process Map
 Suppliers, Departments,
Customers
 Mid-Level Process Map
 Specific Area ex Production
 Detail-Level Process Map
 Specific process/operation
 (most commonly used)
Stop
Start
Stop
Start
Start
Stop
Stop
Customer
Batch
WIP 1
Test
failures
Batch
WIP 2
Production
Defects
detected
Customer
Defects
Late
Orders
QC
I
Rework
Test
Rejects
QC
I2REWORK1
Sub-Assy
Riveting
Shipping
Supplier
Sub-Assy2
WIP2
Final-Assy
Test 2
Hurry Need
To ship!!!
NVA = 38%
Cost = 32%
DLV+Scrap
VA= 62%
| | 18
15 coils/shift 8 20 26 39 31 10 20
4
13
19
20 8 40 20 20 20
20 20 20 20
Start Loop coils
180 deg
twist & prep
Skin Electric
Press
Coil form
Model
check
M/C tapePre-tape
Final Tape
Apply
Mylar
Micalast
Load
Micalastic
Impregnation
Final
Press &
Cure
Remove
Mylar
Final
gauge
ECP
Tape
ECP
oven
cure
Strand &
Final testPack &
Ship
Stop
Rotation schedule:
Based on the cycle times above every 2Hrs, Rotate Final Taping operators
with operators from “Skinning”, Electric Pressing. Coil forming & Model-
checking.
This will increase productivity from 28 Coils/Day to 40 Coils/Day and
ensure max exposure to F/T not more then 2hrs/day.
Needed: Cross-functional training and ~ 1 week
learning curve to achieve 85% operator efficiency
 Increased Coil Productivity by 30% from 28 to 40
Coils/day = $420K/Year
 Increased direct labour utilization by 26%
=$240K/Year
 Reduced in-process scrap from 20% to under 4%
 OEE improvement of 24% (from 62% to 84%)
 Flexible work Cells & cross functionally trained
workers able to help manage bottleneck efficiently
 MOL order on Final Tape exposure complied with
 Total Operational Savings = $ 800K
 Workers can do each others work, help out when
someone is sick, on holidays, quit
 Workers help improve bottleneck operations by
helping out each other
 Variety in work making it more full-filling
 Training new workers
| | 20
10
15
20
25
30
35
40
45
1 2 3 4 5 6 7 8 9 10 11 12
AvgCoils/Day
Week
Coil Productivity by week Avg Coils/Day
Baseline
Target
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12
Direct Labour Utilization
DLV Baseline Target
Week
%Utilization
| | 23
 Setup Time
◦ Starts when last piece of previous job is complete; ends when
first good piece of next job is complete
 Internal set-up: While machine is shut-down
◦ Strive to minimize this as process is not producing parts
 External set-up: While machine is working
◦ Prepare for set-up, get all tools/parts needed ready and
beside the press before starting set-up
 Level 1 (Workstation Achievements)
◦ Data and reports (hard & soft) are sorted into piles,
sections, drawers and multiple file locations: Cluttered
 Level 2 (Workstation Achievements)
◦ Data & reports are sorted into files, binders and single
locations
◦ Metrics, basic labelling, some visual controls
◦ Appearance is cleaner and more organized
 Level 3 (Workstation Achievements)
◦ All files, data and reports are organize and labelled
◦ Metrics, information and 5S maps are available and
posted
◦ Maintenance of 5S activities, audits of 5S performance
 Level 4 (Work Group Achievements)
◦ Common standards for metrics, filing, labelling, file
naming
◦ Simple, clear and effective Visual Controls & Driver
Measure Boards
◦ Maintenance of Work Group 5S activities, audits of 5S
performance
 Level 5 (Site and Business Unit (BU) Achievements)
◦ Common standards for metrics, filing, labelling, file
naming
◦ Simple, clear and effective Visual Controls
◦ Maintenance of 5S activities, 5S audits
Can usually find
things
Can find things in
a reasonable
amount of time
Can find any file
or doc. In 30
seconds
Close colleagues
can find any file
or doc. In 30
seconds
Any colleague
can find any file
or doc. In 30
seconds
| | 25

More Related Content

What's hot

Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overviewbroper
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Yadhu Gopinath
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
Lean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgdLean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgdSanjeev Deshmukh
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)Mohamed Effat
 

What's hot (20)

Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Visual Management
Visual Management Visual Management
Visual Management
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kaizen
Kaizen Kaizen
Kaizen
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Lean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgdLean manufacturing system (lms) 19-march-sgd
Lean manufacturing system (lms) 19-march-sgd
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Learning to see (VSM)
Learning to see (VSM)Learning to see (VSM)
Learning to see (VSM)
 

Viewers also liked

Five Phase Lean Approach
Five Phase Lean ApproachFive Phase Lean Approach
Five Phase Lean Approachahmad bassiouny
 
Journey of a letter
Journey of a letterJourney of a letter
Journey of a lettertanjeevbhs
 
Lean & Meaningful Workflow Redesign
Lean & Meaningful Workflow RedesignLean & Meaningful Workflow Redesign
Lean & Meaningful Workflow RedesignPat Scherer
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessLeanleaders.org
 
Tendai Charasika - 2012 Lean Startup Conference
Tendai Charasika - 2012 Lean Startup ConferenceTendai Charasika - 2012 Lean Startup Conference
Tendai Charasika - 2012 Lean Startup ConferenceEric Ries
 
Eric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries
 
The Lean Startup - Visual Summary
The Lean Startup - Visual SummaryThe Lean Startup - Visual Summary
The Lean Startup - Visual SummaryBrett Suddreth
 
Process Mapping For Systems Improvement
Process Mapping For Systems ImprovementProcess Mapping For Systems Improvement
Process Mapping For Systems ImprovementMitchell Manning Sr.
 

Viewers also liked (9)

Five Phase Lean Approach
Five Phase Lean ApproachFive Phase Lean Approach
Five Phase Lean Approach
 
Journey of a letter
Journey of a letterJourney of a letter
Journey of a letter
 
Lean & Meaningful Workflow Redesign
Lean & Meaningful Workflow RedesignLean & Meaningful Workflow Redesign
Lean & Meaningful Workflow Redesign
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the Process
 
Tendai Charasika - 2012 Lean Startup Conference
Tendai Charasika - 2012 Lean Startup ConferenceTendai Charasika - 2012 Lean Startup Conference
Tendai Charasika - 2012 Lean Startup Conference
 
Eric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech Talk
 
The Lean Startup - Visual Summary
The Lean Startup - Visual SummaryThe Lean Startup - Visual Summary
The Lean Startup - Visual Summary
 
Process Mapping For Systems Improvement
Process Mapping For Systems ImprovementProcess Mapping For Systems Improvement
Process Mapping For Systems Improvement
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 

Similar to 5 Steps to implementing Lean

Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACJulian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Designing the Enterprise for Manufacturing
Designing the Enterprise for ManufacturingDesigning the Enterprise for Manufacturing
Designing the Enterprise for Manufacturingsc0ttruss
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Rolland Keying Center RIE Presentation
Rolland Keying Center RIE PresentationRolland Keying Center RIE Presentation
Rolland Keying Center RIE PresentationBrandon W. Douglas
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Total Quality Management - Chapter 6 Management of Process Quality
Total Quality Management - Chapter 6 Management of Process QualityTotal Quality Management - Chapter 6 Management of Process Quality
Total Quality Management - Chapter 6 Management of Process QualityYasir Afzal Rajput
 
Advanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptAdvanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptThinL389917
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systemsvideoaakash15
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingssuser72b8e8
 
Lean Bski Essentials
Lean Bski EssentialsLean Bski Essentials
Lean Bski Essentialsbstawski
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 

Similar to 5 Steps to implementing Lean (20)

Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Designing the Enterprise for Manufacturing
Designing the Enterprise for ManufacturingDesigning the Enterprise for Manufacturing
Designing the Enterprise for Manufacturing
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Rolland Keying Center RIE Presentation
Rolland Keying Center RIE PresentationRolland Keying Center RIE Presentation
Rolland Keying Center RIE Presentation
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Total Quality Management - Chapter 6 Management of Process Quality
Total Quality Management - Chapter 6 Management of Process QualityTotal Quality Management - Chapter 6 Management of Process Quality
Total Quality Management - Chapter 6 Management of Process Quality
 
Advanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.pptAdvanced Lean Training Manual Toolkit.ppt
Advanced Lean Training Manual Toolkit.ppt
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
Kaizen
KaizenKaizen
Kaizen
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturingLEAN - What Does Kaizen Mean.ppt based on lean manufacturing
LEAN - What Does Kaizen Mean.ppt based on lean manufacturing
 
Lean Bski Essentials
Lean Bski EssentialsLean Bski Essentials
Lean Bski Essentials
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 

More from Julian Kalac P.Eng

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverJulian Kalac P.Eng
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACJulian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

Recently uploaded

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 

Recently uploaded (20)

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 

5 Steps to implementing Lean

  • 1. | | 1 by Julian Kalac, P.Eng Lean Six Sigma Master Black Belt
  • 2.  “Lean” is a Japanese methodology that focuses on producing high quality products faster, better and at lowest cost.  Lean is about eliminating waste (scrap, rework) and doing things right the 1st time.  Lean is NOT ELIMINATING JOBS, it’s about creating jobs by becoming more productive!  It’s NOT about work harder, but rather smarter”
  • 3. Single Piece Flow Just-In-Time Eliminate Waste •Process parts one-at-a- time or in small lots instead of in large batches or economies of scale •Quick changeovers •Balanced and continuous flows instead of stop and start processing •Have just the right amount of inventory you need, when you need it, where you need it •Optimize the amount of inventory required •Ensure that your resources are ready to support the flow •Never knowingly pass on a defect •Improve the capability of your processes •Fix failure modes when they occur •Determine and resolve the deeper root causes = = The Toyota Production System “Classic Lean” Strength “Supply Chain Management” Strength “Classic Six Sigma” Strength
  • 4. | | 4  Customers demand shorter lead times, improved quality & reduced prices  Increase through-put and quality and reduce time wasted and frustration by working on non- value add activities.  Gain new business
  • 5. | | 5 INSANITY “Doing the same thing over and over again and expecting different results” Albert Einstein
  • 6. | | 6 6 How people feel Keep momentum moving MOST CRITICAL TIME IN CHANGES After results from changes are seen
  • 7.  The systematic elimination of waste and re-alignment of resources to deliver value to the customer faster, better, & more consistently  Lean also is: ◦ Pursuit of excellence ◦ Continuous Improvement of performance and quality ◦ . ◦ Increasing inventory “turns” and throughput ◦ Simplifying and redefining processes ◦ Measuring & monitoring processes ◦ Empowering the workforce (80%) Leading to Leading to Eliminate Waste Reduced Cycle Times Increased Capacity Focus: Eliminate waste, non-value add steps, process constraints and bottle necks that cause problems in work
  • 8. | | 8 1. Define Customer requirement—TAKT TIME (demand/time) 2. Map out the Current process (Value Stream Map) and identify Value-Add vs Non-Value-Add activity 3. Get the stream to “flow” by Reducing/Eliminating the 7+1 Sins Waste, i.e. material handling, setup time, downtime, walking 4. Line balance the Cycle Times & implement internal customer “PULL” system, (continuous flow) 5. Manage the Bottleneck process by implementing Flexible Work Cells with Cross Functionally trained operators who help do each others job and to keep the “flow going”
  • 9.  Takt Time ◦ Drum beat of production ◦ Based on actual internal or external demand Available production time customer demand Takt Time =
  • 10. | | 10 1. Producing Defects (SCRAP) 2. Reworking parts due to process problems 3. OVER-TIME to make up lost time (In-efficiencies) 4. Time Waiting i.e. Set-Up/Change-Over time, delivery of supplier materials 5. Wasting time walking around and looking for tools, material, people, 6. Moving parts from one area to another & staging them into (WIP) 7. Carrying excess Inventories of parts more than needed ($$ tied up)
  • 11. | | 11 Not utilizing operators to their full potential Over relying on a select few while others are Inadequately trained  Operators are unable to rotate and help each other out to balanance the work-load High overtime increasing pressure and stress
  • 12.  Elements of Lead Time ◦ Lead Time = total process time from initiation to design to build to ship to payment ◦ Batch & Queue – Accumulate orders, then wait to be processed ◦ Setup time – prepare to process next job ◦ Run time – processing time per unit  Often less than 1% of cycle time  Only value added step of Lead time
  • 13. Mistake proofing ◦ Eliminate/minimize chance for human error ◦ Poka yoke =  to avoid (yokeru) inadvertent errors (poka) ◦ Detection Poka yoke  Notifies of imminent process failure but requires operator interaction to avoid mistakes ◦ Prevention Poka Yoke  Stops the process before failures occur  Does not allow defects to pass through the process
  • 14. Pull Systems Production scheduling method used to link downstream activities to upstream activities Work begins based upon a demand signal (kanban) from a downstream customer, either internal or external Avoids overproduction, work backlog, and disconnects within a process Nothing is produced until the downstream customer signals a need
  • 15.  Cycle Time is the actual production rate – It is the time between two successive finished items coming out of your production cell.  Cycle Time is dictated by the slowest (longest) operation in the cell. 40 min 20 min 25 min 15 min 30 min 1 54 3 2 •What operation controls the cycle? •What is the Critical Path? •How can you relieve or shift the bottleneck?
  • 16. | | 16  High-Level Process Map  Suppliers, Departments, Customers  Mid-Level Process Map  Specific Area ex Production  Detail-Level Process Map  Specific process/operation  (most commonly used) Stop Start Stop Start Start Stop Stop
  • 18. | | 18 15 coils/shift 8 20 26 39 31 10 20 4 13 19 20 8 40 20 20 20 20 20 20 20 Start Loop coils 180 deg twist & prep Skin Electric Press Coil form Model check M/C tapePre-tape Final Tape Apply Mylar Micalast Load Micalastic Impregnation Final Press & Cure Remove Mylar Final gauge ECP Tape ECP oven cure Strand & Final testPack & Ship Stop Rotation schedule: Based on the cycle times above every 2Hrs, Rotate Final Taping operators with operators from “Skinning”, Electric Pressing. Coil forming & Model- checking. This will increase productivity from 28 Coils/Day to 40 Coils/Day and ensure max exposure to F/T not more then 2hrs/day. Needed: Cross-functional training and ~ 1 week learning curve to achieve 85% operator efficiency
  • 19.  Increased Coil Productivity by 30% from 28 to 40 Coils/day = $420K/Year  Increased direct labour utilization by 26% =$240K/Year  Reduced in-process scrap from 20% to under 4%  OEE improvement of 24% (from 62% to 84%)  Flexible work Cells & cross functionally trained workers able to help manage bottleneck efficiently  MOL order on Final Tape exposure complied with  Total Operational Savings = $ 800K
  • 20.  Workers can do each others work, help out when someone is sick, on holidays, quit  Workers help improve bottleneck operations by helping out each other  Variety in work making it more full-filling  Training new workers | | 20
  • 21. 10 15 20 25 30 35 40 45 1 2 3 4 5 6 7 8 9 10 11 12 AvgCoils/Day Week Coil Productivity by week Avg Coils/Day Baseline Target
  • 22. 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 Direct Labour Utilization DLV Baseline Target Week %Utilization
  • 23. | | 23  Setup Time ◦ Starts when last piece of previous job is complete; ends when first good piece of next job is complete  Internal set-up: While machine is shut-down ◦ Strive to minimize this as process is not producing parts  External set-up: While machine is working ◦ Prepare for set-up, get all tools/parts needed ready and beside the press before starting set-up
  • 24.  Level 1 (Workstation Achievements) ◦ Data and reports (hard & soft) are sorted into piles, sections, drawers and multiple file locations: Cluttered  Level 2 (Workstation Achievements) ◦ Data & reports are sorted into files, binders and single locations ◦ Metrics, basic labelling, some visual controls ◦ Appearance is cleaner and more organized  Level 3 (Workstation Achievements) ◦ All files, data and reports are organize and labelled ◦ Metrics, information and 5S maps are available and posted ◦ Maintenance of 5S activities, audits of 5S performance  Level 4 (Work Group Achievements) ◦ Common standards for metrics, filing, labelling, file naming ◦ Simple, clear and effective Visual Controls & Driver Measure Boards ◦ Maintenance of Work Group 5S activities, audits of 5S performance  Level 5 (Site and Business Unit (BU) Achievements) ◦ Common standards for metrics, filing, labelling, file naming ◦ Simple, clear and effective Visual Controls ◦ Maintenance of 5S activities, 5S audits Can usually find things Can find things in a reasonable amount of time Can find any file or doc. In 30 seconds Close colleagues can find any file or doc. In 30 seconds Any colleague can find any file or doc. In 30 seconds