Item/Task
6 x 6 x 1/4 Column
12 x 12 x 1/2 Column
Galvanizing for Columns
Grab Bar 36" Long
Grab Bar 42" Long
Faucet
Laundry Faucet
Water Closet
Sump Pump
Water Cooler
Water Heater
Soap Dispenser (Surface Mount)
Mirror
Vent Pipe
Oil Interceptor
Floor Drain
Gas Meter
Steel Stud Wall
150k bmh infrared heater
175k bmh infrared heater
Vent Stack
Anchor Bolts for Columns
Welding Plates 1/4" fillet
Welding Plates 5/16" Fillet
Plate Steel 3/4"
Plate Steel 3/8"
Plate Steel 5/16"
1 1/2" 20 ga Wide Rib Painted Steel Deck
3" 20 ga Wide Galvanized Steel Deck
3/4" Rod

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

5-Nov-13

Total $
$757.50
$1.38
$0.25
$54.65
$55.15
$86.00
$247.50
$591.00
$294.50
$1,087.00
$1,516.00
$59.65
$120.00
$21.00
$12,895.00
$49.35
$400.00
$1.30
$2,174.00
$2,636.33
$203.00
$30.38
$11.26
$14.84
$38.50
$19.15
$25.50
$1.64
$3.29
$1.00

Ext $
$2,272.50
$104.98
$247.02
$54.65
$55.15
$86.00
$247.50
$591.00
$294.50
$1,087.00
$1,516.00
$59.65
$120.00
$2,520.00
$12,895.00
$5,941.74
$400.00
$583.92
$2,174.00
$5,272.66
$609.00
$243.00
$10,122.74
$237.44
$229.92
$95.75
$42.33
$10,276.13
$5,722.96
$413.66
$64,516.19

Contracting

RS Means
05 12 23.17 4555
05 12 23.17 3600
05 12 23.17 1100
10 28 13.13 1100
10 28 13.13 1105
22 41 39.10 2000
22 41 39.10 2290
22 42 13.40 3350
22 14 29.16 7160
22 47 16.10 0160
22 34 30.13 2100
10 28 13.13 4600
10 28 13.13 3100
22 11 13.74 4470
22 13 23.10 4220
22 14 26.19 6700
09 22 16.13 2500
23 82 27.10 0250
23 82 27.10 0260
23 82 27.10 0245
05 05 23.05 0145
05 05 21.90 1500
05 05 21.90 1610
05 12 23.65 0450
05 12 23.65 0300
05 12 23.65 0400
05 31 23.50 2200
05 31 23.50 3300
05 12 23.66 0010

Qty
3
76.07
988.07
1
1
1
1
1
1
1
1
1
1
120
1
120.4
1
449.1666
1
2
3
8
899
16
5.972
5
1.66
6275.5
1739.5
413.66

Unit
Ea
Lb.
Lb.
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ea
L.F.
Ea
L.F.
Ea.
S.F.
Ea
Ea
Ea
Sets
L.F.
L.F.
SF
SF
SF
SF
SF
Lbs.

Mat $
$680.00
$1.25
$0.25
$37.00
$37.50
$49.50
$182.00
$455.00
$207.00
$890.00
$1,225.00
$42.00
$96.50
$6.15
$12,500.00
$42.50
$400.00
$0.55
$1,674.00
$2,053.00
$153.00
$12.73
$0.63
$0.84
$38.50
$19.15
$25.50
$1.29
$2.78
$1.00
$39,973.96

Lab $
$50.00
$0.08
$0.00
$17.65
$17.65
$36.50
$65.50
$136.00
$87.50
$197.00
$291.00
$17.65
$23.50
$14.85
$395.00
$6.85
$0.00
$0.75
$500.00
$583.33
$50.00
$17.65
$8.20
$10.80
$0.00
$0.00
$0.00
$0.33
$0.47
$0.00
$15,958.03

Equip $
$27.50
$0.05
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.43
$3.20
$0.00
$0.00
$0.00
$0.02
$0.04
$0.00
$2,447.58

Total
Percent Increase=

$262,864.67
24.54%

BS
CL
JS
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
Temp Fence
Temp Roads 20' x 100'
Office and Storage Device Space 32' x 8'
Office Equipment Rental
Scaffolding
Scaffolding Plank
Office Equipment Rental Telephone
Crain 30 Day
Mobilization
Office Equipment Rental Lights and HVAC
Toilet, Portable Chemical

High Chairs
#5 Rebar
Concrete Footing 3000 PSI
Foundation Concrete Placement
Precast Walls Grey Fabcon
Forming for Pit
Concrete Floor 4000 PSI
Placing Concrete
Sawcut Control Joints
Airblast Joint to blow out debris
Galvanizing
Concrete for Duct Bank 4000 PSI
Placing Concrete Shallow Direct Chute

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

5-Nov-13

Contracting

RS Means
01 56 26.50 0250
01 55 23.50 0100
01 52 13.20 0300
01 52 13.40 0100
01 54 23.70 0090
01 54 23.70 1800
01 52 13.40 0140
01 54 19.50 0500
01 54 36.50 0020
01 52 13.40 0160
01 54 33.40 6410

Qty
1124
2000
12
12
6.4
200
12
30
1
12
12

Unit
L.F.
SY
Ea
Ea
CSF
Ea
Ea
Day
Ea
Ea
Ea

03 21 05.10 1200 1.62
C
03 21 10.60 0500 0.3698 Ton
03 31 05.35 0150 33.25
C.Y.
03 31 05.70 2100 33.25
C.Y.
6487.9
S.F.
03 11 13.85 4200 235.2 SF Ca.
03 31 05.35 0300
170
C.Y.
03 31 05.70 4300
170
C.Y.
03 35 29.35 0140
490
L.F.
03 35 29.35 0200
490
L.F.
03 21 13.10 0150 2.35196 Ton
03 31 05.35 0300 25.77
CY
03 31 05.70 1950 25.77
CY

Mat $
Lab $
Equip $
Total $
Ext $
$3.29
$1.87
$0.00
$5.16
$5,799.84
$8.30
$2.89
$0.54
$11.73
$23,460.00
$185.00
$0.00
$0.00
$185.00
$2,220.00
$200.00
$0.00
$0.00
$200.00
$2,400.00
$0.00
$132.00
$0.00
$132.00
$844.80
$24.50
$0.00
$0.00
$24.50
$4,900.00
$81.00
$0.00
$0.00
$81.00
$972.00
$2,275.00 $2,985.00 $89,550.00
$0.00
$710.00
$0.00
$70.50
$126.00
$196.50
$196.50
$152.00
$0.00
$0.00
$152.00
$1,824.00
$540.00
$0.00
$0.00
$540.00
$6,480.00
$39,093.96 $30,097.18 $69,456.00
$138,647.14
Percent of Total
34.53%
$40.00
$930.00
$102.00
$0.00
$11.00
$2.17
$103.00
$0.00
$0.05
$0.00
$450.00
$103.00
$0.00
$96,924.69

$0.00
$750.00
$0.00
$12.55
$0.00
$9.15
$0.00
$16.00
$0.38
$0.17
$0.00
$0.00
$16.10
$6,251.11

$0.00
$40.00
$64.80
$0.00
$1,680.00
$621.26
$0.00
$102.00
$3,391.50
$0.39
$12.94
$430.26
$0.00
$11.00
$71,366.90
$0.00
$11.32
$2,662.46
$0.00
$103.00 $17,510.00
$0.50
$16.50
$2,805.00
$0.08
$0.51
$249.90
$0.01
$0.18
$88.20
$0.00
$450.00
$1,058.38
$0.00
$103.00
$2,654.31
$5.15
$21.25
$547.61
$274.78
$103,450.59
Percent of Total
25.76%

BS
CL
JS
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
20k3
22k6
22k11
w8x15
w12x26
w21x44
w18x46
w18x35 Galvanized
w12x26 Galvanized
w12x16 Galvanized
w21x44 Galvanized
Galvanizing
L6x6x5/16
L4x4x1/4
6 x 6 x 1/4 Column
12 x 12 x 1/2 Column
Galvanizing for Columns
Anchor Bolts for Columns
Welding Plates 1/4" fillet
Welding Plates 5/16" Fillet
Plate Steel 3/4"
Plate Steel 3/8"
Plate Steel 5/16"
1 1/2" 20 ga Wide Rib Painted Steel Deck
3" 20 ga Wide Galvanized Steel Deck
3/4" Rod
L 6 x 4 x 7/16
Metal Grating

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

5-Nov-13

Contracting

RS Means
05 21 19.10 0440
05 21 19.10 0440
05 21 19.10 0440
05 12 23.75 0320
05 12 23.75 1500
05 12 23.75 4100
05 12 23.75 3520
05 12 23.75 3300
05 12 23.75 1500
05 12 23.75 1100
05 12 23.75 4100
03 21 13.10 0150
05 12 23.40 0400
05 12 23.40 0400
05 12 23.17 4555
05 12 23.17 3600
05 12 23.17 1100
05 05 23.05 0145
05 05 21.90 1500
05 05 21.90 1610
05 12 23.65 0450
05 12 23.65 0300
05 12 23.65 0400
05 31 23.50 2200
05 31 23.50 3300
05 12 23.66 0010
05 12 23.40 0400
05 53 13.10 0136

Qty
1.08875
1.5793
0.4738
300
91.66
34.3
28.583
51.416
18.33
128.33
18.33
2.35196
8924.5
1122
3
76.07
988.07
8
899
16
5.972
5
1.66
6275.5
1739.5
413.66
616.09
276.7

Unit
Ton
Ton
Ton
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
Ton
Lb
Lb
Ea
Lb.
Lb.
Sets
L.F.
L.F.
SF
SF
SF
SF
SF
Lbs.
Lb
SF

Mat $
$1,500.00
$1,500.00
$1,500.00
$20.50
$36.00
$60.50
$63.50
$48.00
$36.00
$22.00
$60.50
$450.00
$0.73
$0.73
$680.00
$1.25
$0.25
$12.73
$0.63
$0.84
$38.50
$19.15
$25.50
$1.29
$2.78
$1.00
$0.73
$50.00
$64,550.74

Lab $
$230.00
$230.00
$230.00
$4.50
$3.07
$3.67
$4.07
$4.07
$3.07
$3.07
$3.67
$0.00
$2.73
$2.73
$50.00
$0.08
$0.00
$17.65
$8.20
$10.80
$0.00
$0.00
$0.00
$0.33
$0.47
$0.00
$2.73
$3.19
$44,044.93

Equip $
Total $
Ext $
$102.00
$1,832.00 $1,994.59
$102.00
$1,832.00 $2,893.28
$102.00
$1,832.00
$868.00
$2.49
$27.49
$8,247.00
$1.70
$40.77
$3,736.98
$1.52
$65.69
$2,253.17
$1.69
$69.26
$1,979.66
$1.69
$53.76
$2,764.12
$1.70
$40.77
$747.31
$1.70
$26.77
$3,435.39
$1.52
$65.69
$1,204.10
$0.00
$450.00
$1,058.38
$0.28
$3.74
$33,377.63
$0.28
$3.74
$4,196.28
$27.50
$757.50
$2,272.50
$0.05
$1.38
$104.98
$0.00
$0.25
$247.02
$0.00
$30.38
$243.00
$2.43
$11.26
$10,122.74
$3.20
$14.84
$237.44
$0.00
$38.50
$229.92
$0.00
$19.15
$95.75
$0.00
$25.50
$42.33
$0.02
$1.64
$10,276.13
$0.04
$3.29
$5,722.96
$0.00
$1.00
$413.66
$0.28
$3.74
$2,304.18
$0.24
$53.43
$14,784.08
$7,256.91
$115,852.57
Percent of Total
28.85%

BS
CL
JS
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
60 Mil. Pvc roof membrane
Polyethylene Vapor Barrier .006" Thick
4 Ply #15 Tarred Felt Mopped

3' x 7' Door
3' x 7' Door with Half Glass
12' x 16' Garage Door
8' x 12' Garage Door
Hinges
Lockset
Passage Lock
Door Closer
Door Bumper
Privacy Set
Kickplate
Threshold
Casement Window 4'-2" x 4'2"
Casement Window 4'-2" x 5"-0"

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

Contracting

RS Means
Qty Unit
07 54 19.10 8880 62.66 SQ
07 26 10.10 0900 32
Sq.
07 51 13.20 4600 62.66 SQ

Mat $
$97.50
$4.54
$186.00
$11,800.04

Lab $
$39.00
$9.55
$93.00
$6,132.98

08 13 13.13 0100
08 13 13.13 0400
08 36 13.10 2750
08 36 13.10 2625
08 71 20.90 0012
08 71 20.40 0400
08 71 20.40 0020
08 71 20.31 0015
08 71 20.50 1300
08 71 20.40 0100
08 71 20.95 0015
08 71 20.65 0100
08 52 10.40 0260
08 52 10.40 0265

$360.00
$615.00
$2,016.00
$1,008.00
$27.50
$92.50
$57.50
$172.00
$10.95
$62.00
$30.00
$41.50
$875.00
$1,056.58
$22,099.08

$41.50
$41.50
$748.80
$374.40
$0.00
$35.50
$29.50
$54.50
$11.05
$29.50
$23.50
$29.50
$32.00
$32.00
$6,490.70

9
1
6
1
15
8
1
9
10
1
1
6
1
1

Ea
Ea
Ea
Ea
PR
Ea
Ea
Ea
Ea
Ea
Ea
Ea
EA
EA

Equip $
Total $
$5.10
$141.60
$0.00
$14.09
$21.50
$300.50
$1,347.19
Percent of Total

5-Nov-13 BS
CL
JS
Ext $
$8,872.66
$450.88
$18,829.33
$28,152.87
7.01%

$0.00
$401.50 $3,613.50
$0.00
$656.50
$656.50
$0.00
$2,764.80 $16,588.80
$0.00
$1,382.40 $1,382.40
$0.00
$27.50
$412.50
$0.00
$128.00 $1,024.00
$0.00
$87.00
$87.00
$0.00
$226.50 $2,038.50
$0.00
$22.00
$220.00
$0.00
$91.50
$91.50
$0.00
$53.50
$53.50
$0.00
$71.00
$426.00
$0.00
$907.00
$907.00
$0.00
$1,088.58 $1,088.58
$0.00
$28,589.78
Percent of Total
7.12%
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
Steel Stud Wall
12" x 12" Ceramic Tile Floor
6" x 6" Ceramic Tile Floor
6" x 6" Ceramic Tile Wall Base
Acoustical Tile Ceiling Eggcrate
Paint CMU latex Spray (First Coat)
Paint CMU latex Spray (Second Coat)
Interior Paint
Gypsum Board 5/8" Thick (Level 5 Finish)

Port. fire extinguisher, 5lb.
Grab Bar 36" Long
Grab Bar 42" Long
Soap Dispenser (Surface Mount)
Mirror

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

Contracting

RS Means
Qty
Unit
09 22 16.13 2500 449.1666 S.F.
09 30 13.10 3270
64
SF
09 30 13.10 9310 37.99
SF
09 30 13.10 5800
256
SF
09 51 23.10 1900 218.5
SF
09 91 13.90 0450
5067
SF
09 91 13.90 0460
5067
SF
09 91 23.72 0200
660
SF
09 29 10.30 2090 658.5
SF

10 44 16.13 1060
10 28 13.13 1100
10 28 13.13 1105
10 28 13.13 4600
10 28 13.13 3100

8
1
1
1
1

EA
Ea
Ea
Ea
Ea

CSM 3450 5-Nov-13 BS
CL
JS

Mat $
Lab $
Equip $ Total $
$0.55
$0.75
$0.00
$1.30
$5.90
$2.01
$0.00
$7.91
$3.33
$0.00
$24.33
$21.00
$2.55
$3.33
$0.00
$5.88
$1.82
$0.71
$0.00
$2.53
$0.06
$0.16
$0.00
$0.22
$0.05
$0.12
$0.00
$0.17
$0.27
$0.00
$0.33
$0.06
$0.34
$0.91
$0.00
$1.25
$3,293.76 $3,795.83 $0.00
Percent of Total
$47.00
$37.00
$37.50
$42.00
$96.50
$213.00

$0.00
$17.65
$17.65
$17.65
$23.50
$76.45

$0.00
$47.00
$0.00
$54.65
$0.00
$55.15
$0.00
$59.65
$0.00
$120.00
$0.00
Percent of Total

Ext $
$583.92
$506.24
$924.30
$1,505.28
$552.81
$1,114.74
$861.39
$217.80
$823.13
$7,089.59
1.77%
$376.00
$54.65
$55.15
$59.65
$120.00
$665.45
0.17%
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
Sanitary 2"
Sanitary 3"
Sanitary 4"
Water 1"
Water 3/4"
Water 1/2"
Gas 2"
Gas 1-1/2"
Gas 1-1/4"
Gas 1"
Gas 3/4"
Compressed Air 2"
Compressed Air 1-1/4"
Compressed Air 1"
Compressed Air 3/4"
Compressed Air 1/2"
Faucet
Laundry Faucet
Water Closet
Sump Pump
Water Cooler
Water Heater
Vent Pipe
Gas Meter
Oil Interceptor
Floor Drain

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

Contracting

RS Means
22 13 16.20 2120
22 13 16.20 2140
22 13 16.20 2160
22 11 13.23 2200
22 11 13.23 2180
22 11 13.23 2140
22 11 13.44 0610
22 11 34.44 0600
22 11 34.44 0590
22 11 34.44 0580
22 11 34.44 0570
22 11 13.23 2260
22 11 13.23 2220
22 11 13.23 2200
22 11 13.23 2180
22 11 13.23 2140
22 41 39.10 2000
22 41 39.10 2290
22 42 13.40 3350
22 14 29.16 7160
22 47 16.10 0160
22 34 30.13 2100
22 11 13.74 4470
22 13 23.10 4220
22 14 26.19 6700

Qty
42.108
29.645
157.663
25.52
174.24
12.43
14.74
70.07
29.48
15.73
56.98
23.76
49.5
17.05
109.45
21.24
1
1
1
1
1
1
120
1
1
120.4

Unit
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
L.F.
Ea
Ea
Ea
Ea
Ea
Ea
L.F.
Ea.
Ea
L.F.

Mat $
Lab $
$8.50
$12.50
$11.95
$13.10
$15.45
$14.30
$9.85
$6.40
$6.60
$5.75
$4.30
$5.40
$14.90
$12.30
$11.15
$9.85
$9.50
$8.85
$7.55
$8.25
$5.15
$7.15
$27.00
$10.40
$13.45
$7.55
$6.40
$9.85
$6.60
$5.75
$4.30
$5.40
$49.50
$36.50
$182.00
$65.50
$455.00
$136.00
$207.00
$87.50
$890.00
$197.00
$1,225.00
$291.00
$6.15
$14.85
$400.00
$0.00
$12,500.00 $395.00
$42.50
$6.85
$30,348.49 $11,360.40

Equip $
Total $
$0.00
$21.00
$0.00
$25.05
$0.00
$29.75
$0.00
$16.25
$0.00
$12.35
$0.00
$9.70
$0.00
$27.20
$0.00
$21.00
$0.00
$18.35
$0.00
$15.80
$0.00
$12.30
$0.00
$37.40
$0.00
$21.00
$0.00
$16.25
$0.00
$12.35
$0.00
$9.70
$0.00
$86.00
$0.00
$247.50
$0.00
$591.00
$0.00
$294.50
$0.00
$1,087.00
$0.00
$1,516.00
$0.00
$21.00
$0.00
$400.00
$0.00
$12,895.00
$0.00
$49.35
$0.00
Percent of Total

5-Nov-13 BS
CL
JS
Ext $
$884.27
$742.61
$4,690.47
$414.70
$2,151.86
$120.57
$400.93
$1,471.47
$540.96
$248.53
$700.85
$888.62
$1,039.50
$277.06
$1,351.71
$206.03
$86.00
$247.50
$591.00
$294.50
$1,087.00
$1,516.00
$2,520.00
$400.00
$12,895.00
$5,941.74
$41,708.89
10.39%
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
150k bmh infrared heater
175k bmh infrared heater
Vent Stack

Single Pole Switch
Surface Mounted 3 Phase 200 Amp 42 Spaces
Conduit in Trench 4" Doubled
600 Volt, Copper Type #4 Wire
Lithonia Light Fixtures

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

T. T. C .

Contracting

RS Means
Qty Unit
Mat $
Lab $
Equip $ Total $
23 82 27.10 0250 1
Ea $1,674.00 $500.00
$0.00 $2,174.00
23 82 27.10 0260 2
Ea $2,053.00 $583.33
$0.00 $2,636.33
23 82 27.10 0245 3
Ea
$153.00
$50.00
$0.00
$203.00
$6,239.00 $1,816.66 $0.00
Percent of Total
26 05 90.10 2110
26 24 16.30 1000
26 05 39.40 1000
26 05 19.90 1400
26 51 13.50 0001

25 Ea
3
Ea
348 L.F.
3.5 CLF
23 EA

$13.95
$24.00
$1,375.00 $1,225.00
$28.00
$8.25
$90.00
$78.00
$258.84
$72.50
$20,484.27 $9,084.94

5-Nov-13 BS
CL
JS
Ext $
$2,174.00
$5,272.66
$609.00
$8,055.66
2.01%

$0.00
$37.95
$948.75
$0.00 $2,600.00 $7,800.00
$0.00
$36.25 $12,615.00
$0.00
$168.00
$584.64
$0.00
$331.34 $7,620.82
$0.00
$29,569.21
Percent of Total
7.36%
12:40:00 PM
Bradley Smith
Corbin Ledley
Josh Shoemaker
Item/Task
Topsoil Stripping and stockpiling 400 H.P. Dozer
Silt Fence
ODOT Gravel 4" Thick
Excavating Trench For Conduit

Item/Task
Asphaltic Concrete Paving

T. T. C .

Maintenance Building Estimate
Project #SSMB2012-3450

CSM 3450

5-Nov-13

Contracting

RS Means
Qty
31 14 13.23 0400 2924.33
31 25 14.16 1000
1124
31 23 23.17 0500
3155
31 23 16.13 0060 25.77

Unit
C.Y.
L.F.
S.F.
BCY

Mat $
Lab $
Equip $
Total $
$0.00
$0.13
$0.58
$0.71
$0.25
$0.35
$0.00
$0.60
$0.43
$0.18
$1.24
$1.85
$0.00
$3.27
$1.82
$5.09
$1,637.65 $1,425.73 $5,655.21
Percent of Total

RS Means
32 12 16.14 1180

Unit
SF

Mat $
Lab $
$2.52
$0.89
$3,225.60 $1,139.20

Qty
1280

Ext $
$2,076.27
$674.40
$5,836.75
$131.17
$8,718.59
2.17%

Equip $
Total $
Ext $
$0.11
$3.52
$ 4,505.60
$0.28
$ 4,505.60
Percent of Total
0.87%

BS
CL
JS
Division #
Division 1
Division 2
Division 3
Division 4
Division 5
Division 6
Division 7
Division 8
Division 9
Division 10
Division 11
Division 12
Division 13
Division 14
Division 15
Division 16
Division 17
Division 18
Division 19
Division 20
Division 21
Division 22
Division 23
Division 24
Division 25
Division 26
Division 27
Division 28
Division 29
Division 30
Division 31
Division 32

Total
$ 138,647.14
$ 103,450.59

Structural
Mechanical
Plumbing

$ 115,852.57
$ 28,152.87
$ 28,589.78
$ 7,089.59
$
665.45

$ 41,708.89
$ 8,055.66

$ 29,569.21

$ 8,718.59
$ 4,505.60
Total
Overhead
Profit
$ 515,005.95 $
50,290.33 $ 51,500.59

Grand Total
$ 616,796.87

$ 247,892.94
$ 8,055.66
$ 41,708.89

Weitere ähnliche Inhalte

Ähnlich wie Construction Estimating Final Project

Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance BuildingTylerShisler
 
Final project Estimating
Final project EstimatingFinal project Estimating
Final project EstimatingRonald Rhodes
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileZiad Salem
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)eisa chegini
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV - AC Surge Arresters ...
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV -  AC Surge Arresters ...ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV -  AC Surge Arresters ...
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV - AC Surge Arresters ...Thorne & Derrick International
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueArnoud Sulkers
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CataloguePieter Blom
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueRobert van Dijk
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete PresentationJosue Campos
 
Enrollment 06 07
Enrollment 06 07Enrollment 06 07
Enrollment 06 07Mardy McGaw
 
Enrollmentsixseven
EnrollmentsixsevenEnrollmentsixseven
EnrollmentsixsevenMardy McGaw
 
Presentation1
Presentation1Presentation1
Presentation1Akma Ija
 
Pricelist Innova sparepart
Pricelist Innova sparepartPricelist Innova sparepart
Pricelist Innova sparepartConanisti Kudo
 
08.2010 fsae hybrid 3rd presentation gen-3 geared bldc motors, planetary tr...
08.2010 fsae hybrid 3rd presentation   gen-3 geared bldc motors, planetary tr...08.2010 fsae hybrid 3rd presentation   gen-3 geared bldc motors, planetary tr...
08.2010 fsae hybrid 3rd presentation gen-3 geared bldc motors, planetary tr...Tobias Overdiek
 
01_Plantas de Distribucion_Cuadro de Vanos.pdf
01_Plantas de Distribucion_Cuadro de Vanos.pdf01_Plantas de Distribucion_Cuadro de Vanos.pdf
01_Plantas de Distribucion_Cuadro de Vanos.pdfSirPendragon
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimationimaduddin91
 

Ähnlich wie Construction Estimating Final Project (20)

Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance Building
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
 
Final project Estimating
Final project EstimatingFinal project Estimating
Final project Estimating
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV - AC Surge Arresters ...
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV -  AC Surge Arresters ...ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV -  AC Surge Arresters ...
ABB POLIM-D High Voltage Surge Arresters AC 4kV - 36kV - AC Surge Arresters ...
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
Enrollment 06 07
Enrollment 06 07Enrollment 06 07
Enrollment 06 07
 
Enrollmentsixseven
EnrollmentsixsevenEnrollmentsixseven
Enrollmentsixseven
 
Presentation1
Presentation1Presentation1
Presentation1
 
Plate Estimation
Plate EstimationPlate Estimation
Plate Estimation
 
Pricelist Innova sparepart
Pricelist Innova sparepartPricelist Innova sparepart
Pricelist Innova sparepart
 
08.2010 fsae hybrid 3rd presentation gen-3 geared bldc motors, planetary tr...
08.2010 fsae hybrid 3rd presentation   gen-3 geared bldc motors, planetary tr...08.2010 fsae hybrid 3rd presentation   gen-3 geared bldc motors, planetary tr...
08.2010 fsae hybrid 3rd presentation gen-3 geared bldc motors, planetary tr...
 
01_Plantas de Distribucion_Cuadro de Vanos.pdf
01_Plantas de Distribucion_Cuadro de Vanos.pdf01_Plantas de Distribucion_Cuadro de Vanos.pdf
01_Plantas de Distribucion_Cuadro de Vanos.pdf
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 

Kürzlich hochgeladen

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Kürzlich hochgeladen (20)

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 

Construction Estimating Final Project

  • 1. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task 6 x 6 x 1/4 Column 12 x 12 x 1/2 Column Galvanizing for Columns Grab Bar 36" Long Grab Bar 42" Long Faucet Laundry Faucet Water Closet Sump Pump Water Cooler Water Heater Soap Dispenser (Surface Mount) Mirror Vent Pipe Oil Interceptor Floor Drain Gas Meter Steel Stud Wall 150k bmh infrared heater 175k bmh infrared heater Vent Stack Anchor Bolts for Columns Welding Plates 1/4" fillet Welding Plates 5/16" Fillet Plate Steel 3/4" Plate Steel 3/8" Plate Steel 5/16" 1 1/2" 20 ga Wide Rib Painted Steel Deck 3" 20 ga Wide Galvanized Steel Deck 3/4" Rod T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 5-Nov-13 Total $ $757.50 $1.38 $0.25 $54.65 $55.15 $86.00 $247.50 $591.00 $294.50 $1,087.00 $1,516.00 $59.65 $120.00 $21.00 $12,895.00 $49.35 $400.00 $1.30 $2,174.00 $2,636.33 $203.00 $30.38 $11.26 $14.84 $38.50 $19.15 $25.50 $1.64 $3.29 $1.00 Ext $ $2,272.50 $104.98 $247.02 $54.65 $55.15 $86.00 $247.50 $591.00 $294.50 $1,087.00 $1,516.00 $59.65 $120.00 $2,520.00 $12,895.00 $5,941.74 $400.00 $583.92 $2,174.00 $5,272.66 $609.00 $243.00 $10,122.74 $237.44 $229.92 $95.75 $42.33 $10,276.13 $5,722.96 $413.66 $64,516.19 Contracting RS Means 05 12 23.17 4555 05 12 23.17 3600 05 12 23.17 1100 10 28 13.13 1100 10 28 13.13 1105 22 41 39.10 2000 22 41 39.10 2290 22 42 13.40 3350 22 14 29.16 7160 22 47 16.10 0160 22 34 30.13 2100 10 28 13.13 4600 10 28 13.13 3100 22 11 13.74 4470 22 13 23.10 4220 22 14 26.19 6700 09 22 16.13 2500 23 82 27.10 0250 23 82 27.10 0260 23 82 27.10 0245 05 05 23.05 0145 05 05 21.90 1500 05 05 21.90 1610 05 12 23.65 0450 05 12 23.65 0300 05 12 23.65 0400 05 31 23.50 2200 05 31 23.50 3300 05 12 23.66 0010 Qty 3 76.07 988.07 1 1 1 1 1 1 1 1 1 1 120 1 120.4 1 449.1666 1 2 3 8 899 16 5.972 5 1.66 6275.5 1739.5 413.66 Unit Ea Lb. Lb. Ea Ea Ea Ea Ea Ea Ea Ea Ea Ea L.F. Ea L.F. Ea. S.F. Ea Ea Ea Sets L.F. L.F. SF SF SF SF SF Lbs. Mat $ $680.00 $1.25 $0.25 $37.00 $37.50 $49.50 $182.00 $455.00 $207.00 $890.00 $1,225.00 $42.00 $96.50 $6.15 $12,500.00 $42.50 $400.00 $0.55 $1,674.00 $2,053.00 $153.00 $12.73 $0.63 $0.84 $38.50 $19.15 $25.50 $1.29 $2.78 $1.00 $39,973.96 Lab $ $50.00 $0.08 $0.00 $17.65 $17.65 $36.50 $65.50 $136.00 $87.50 $197.00 $291.00 $17.65 $23.50 $14.85 $395.00 $6.85 $0.00 $0.75 $500.00 $583.33 $50.00 $17.65 $8.20 $10.80 $0.00 $0.00 $0.00 $0.33 $0.47 $0.00 $15,958.03 Equip $ $27.50 $0.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.43 $3.20 $0.00 $0.00 $0.00 $0.02 $0.04 $0.00 $2,447.58 Total Percent Increase= $262,864.67 24.54% BS CL JS
  • 2. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task Temp Fence Temp Roads 20' x 100' Office and Storage Device Space 32' x 8' Office Equipment Rental Scaffolding Scaffolding Plank Office Equipment Rental Telephone Crain 30 Day Mobilization Office Equipment Rental Lights and HVAC Toilet, Portable Chemical High Chairs #5 Rebar Concrete Footing 3000 PSI Foundation Concrete Placement Precast Walls Grey Fabcon Forming for Pit Concrete Floor 4000 PSI Placing Concrete Sawcut Control Joints Airblast Joint to blow out debris Galvanizing Concrete for Duct Bank 4000 PSI Placing Concrete Shallow Direct Chute T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 5-Nov-13 Contracting RS Means 01 56 26.50 0250 01 55 23.50 0100 01 52 13.20 0300 01 52 13.40 0100 01 54 23.70 0090 01 54 23.70 1800 01 52 13.40 0140 01 54 19.50 0500 01 54 36.50 0020 01 52 13.40 0160 01 54 33.40 6410 Qty 1124 2000 12 12 6.4 200 12 30 1 12 12 Unit L.F. SY Ea Ea CSF Ea Ea Day Ea Ea Ea 03 21 05.10 1200 1.62 C 03 21 10.60 0500 0.3698 Ton 03 31 05.35 0150 33.25 C.Y. 03 31 05.70 2100 33.25 C.Y. 6487.9 S.F. 03 11 13.85 4200 235.2 SF Ca. 03 31 05.35 0300 170 C.Y. 03 31 05.70 4300 170 C.Y. 03 35 29.35 0140 490 L.F. 03 35 29.35 0200 490 L.F. 03 21 13.10 0150 2.35196 Ton 03 31 05.35 0300 25.77 CY 03 31 05.70 1950 25.77 CY Mat $ Lab $ Equip $ Total $ Ext $ $3.29 $1.87 $0.00 $5.16 $5,799.84 $8.30 $2.89 $0.54 $11.73 $23,460.00 $185.00 $0.00 $0.00 $185.00 $2,220.00 $200.00 $0.00 $0.00 $200.00 $2,400.00 $0.00 $132.00 $0.00 $132.00 $844.80 $24.50 $0.00 $0.00 $24.50 $4,900.00 $81.00 $0.00 $0.00 $81.00 $972.00 $2,275.00 $2,985.00 $89,550.00 $0.00 $710.00 $0.00 $70.50 $126.00 $196.50 $196.50 $152.00 $0.00 $0.00 $152.00 $1,824.00 $540.00 $0.00 $0.00 $540.00 $6,480.00 $39,093.96 $30,097.18 $69,456.00 $138,647.14 Percent of Total 34.53% $40.00 $930.00 $102.00 $0.00 $11.00 $2.17 $103.00 $0.00 $0.05 $0.00 $450.00 $103.00 $0.00 $96,924.69 $0.00 $750.00 $0.00 $12.55 $0.00 $9.15 $0.00 $16.00 $0.38 $0.17 $0.00 $0.00 $16.10 $6,251.11 $0.00 $40.00 $64.80 $0.00 $1,680.00 $621.26 $0.00 $102.00 $3,391.50 $0.39 $12.94 $430.26 $0.00 $11.00 $71,366.90 $0.00 $11.32 $2,662.46 $0.00 $103.00 $17,510.00 $0.50 $16.50 $2,805.00 $0.08 $0.51 $249.90 $0.01 $0.18 $88.20 $0.00 $450.00 $1,058.38 $0.00 $103.00 $2,654.31 $5.15 $21.25 $547.61 $274.78 $103,450.59 Percent of Total 25.76% BS CL JS
  • 3.
  • 4. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task 20k3 22k6 22k11 w8x15 w12x26 w21x44 w18x46 w18x35 Galvanized w12x26 Galvanized w12x16 Galvanized w21x44 Galvanized Galvanizing L6x6x5/16 L4x4x1/4 6 x 6 x 1/4 Column 12 x 12 x 1/2 Column Galvanizing for Columns Anchor Bolts for Columns Welding Plates 1/4" fillet Welding Plates 5/16" Fillet Plate Steel 3/4" Plate Steel 3/8" Plate Steel 5/16" 1 1/2" 20 ga Wide Rib Painted Steel Deck 3" 20 ga Wide Galvanized Steel Deck 3/4" Rod L 6 x 4 x 7/16 Metal Grating T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 5-Nov-13 Contracting RS Means 05 21 19.10 0440 05 21 19.10 0440 05 21 19.10 0440 05 12 23.75 0320 05 12 23.75 1500 05 12 23.75 4100 05 12 23.75 3520 05 12 23.75 3300 05 12 23.75 1500 05 12 23.75 1100 05 12 23.75 4100 03 21 13.10 0150 05 12 23.40 0400 05 12 23.40 0400 05 12 23.17 4555 05 12 23.17 3600 05 12 23.17 1100 05 05 23.05 0145 05 05 21.90 1500 05 05 21.90 1610 05 12 23.65 0450 05 12 23.65 0300 05 12 23.65 0400 05 31 23.50 2200 05 31 23.50 3300 05 12 23.66 0010 05 12 23.40 0400 05 53 13.10 0136 Qty 1.08875 1.5793 0.4738 300 91.66 34.3 28.583 51.416 18.33 128.33 18.33 2.35196 8924.5 1122 3 76.07 988.07 8 899 16 5.972 5 1.66 6275.5 1739.5 413.66 616.09 276.7 Unit Ton Ton Ton L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. Ton Lb Lb Ea Lb. Lb. Sets L.F. L.F. SF SF SF SF SF Lbs. Lb SF Mat $ $1,500.00 $1,500.00 $1,500.00 $20.50 $36.00 $60.50 $63.50 $48.00 $36.00 $22.00 $60.50 $450.00 $0.73 $0.73 $680.00 $1.25 $0.25 $12.73 $0.63 $0.84 $38.50 $19.15 $25.50 $1.29 $2.78 $1.00 $0.73 $50.00 $64,550.74 Lab $ $230.00 $230.00 $230.00 $4.50 $3.07 $3.67 $4.07 $4.07 $3.07 $3.07 $3.67 $0.00 $2.73 $2.73 $50.00 $0.08 $0.00 $17.65 $8.20 $10.80 $0.00 $0.00 $0.00 $0.33 $0.47 $0.00 $2.73 $3.19 $44,044.93 Equip $ Total $ Ext $ $102.00 $1,832.00 $1,994.59 $102.00 $1,832.00 $2,893.28 $102.00 $1,832.00 $868.00 $2.49 $27.49 $8,247.00 $1.70 $40.77 $3,736.98 $1.52 $65.69 $2,253.17 $1.69 $69.26 $1,979.66 $1.69 $53.76 $2,764.12 $1.70 $40.77 $747.31 $1.70 $26.77 $3,435.39 $1.52 $65.69 $1,204.10 $0.00 $450.00 $1,058.38 $0.28 $3.74 $33,377.63 $0.28 $3.74 $4,196.28 $27.50 $757.50 $2,272.50 $0.05 $1.38 $104.98 $0.00 $0.25 $247.02 $0.00 $30.38 $243.00 $2.43 $11.26 $10,122.74 $3.20 $14.84 $237.44 $0.00 $38.50 $229.92 $0.00 $19.15 $95.75 $0.00 $25.50 $42.33 $0.02 $1.64 $10,276.13 $0.04 $3.29 $5,722.96 $0.00 $1.00 $413.66 $0.28 $3.74 $2,304.18 $0.24 $53.43 $14,784.08 $7,256.91 $115,852.57 Percent of Total 28.85% BS CL JS
  • 5. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task 60 Mil. Pvc roof membrane Polyethylene Vapor Barrier .006" Thick 4 Ply #15 Tarred Felt Mopped 3' x 7' Door 3' x 7' Door with Half Glass 12' x 16' Garage Door 8' x 12' Garage Door Hinges Lockset Passage Lock Door Closer Door Bumper Privacy Set Kickplate Threshold Casement Window 4'-2" x 4'2" Casement Window 4'-2" x 5"-0" T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 Contracting RS Means Qty Unit 07 54 19.10 8880 62.66 SQ 07 26 10.10 0900 32 Sq. 07 51 13.20 4600 62.66 SQ Mat $ $97.50 $4.54 $186.00 $11,800.04 Lab $ $39.00 $9.55 $93.00 $6,132.98 08 13 13.13 0100 08 13 13.13 0400 08 36 13.10 2750 08 36 13.10 2625 08 71 20.90 0012 08 71 20.40 0400 08 71 20.40 0020 08 71 20.31 0015 08 71 20.50 1300 08 71 20.40 0100 08 71 20.95 0015 08 71 20.65 0100 08 52 10.40 0260 08 52 10.40 0265 $360.00 $615.00 $2,016.00 $1,008.00 $27.50 $92.50 $57.50 $172.00 $10.95 $62.00 $30.00 $41.50 $875.00 $1,056.58 $22,099.08 $41.50 $41.50 $748.80 $374.40 $0.00 $35.50 $29.50 $54.50 $11.05 $29.50 $23.50 $29.50 $32.00 $32.00 $6,490.70 9 1 6 1 15 8 1 9 10 1 1 6 1 1 Ea Ea Ea Ea PR Ea Ea Ea Ea Ea Ea Ea EA EA Equip $ Total $ $5.10 $141.60 $0.00 $14.09 $21.50 $300.50 $1,347.19 Percent of Total 5-Nov-13 BS CL JS Ext $ $8,872.66 $450.88 $18,829.33 $28,152.87 7.01% $0.00 $401.50 $3,613.50 $0.00 $656.50 $656.50 $0.00 $2,764.80 $16,588.80 $0.00 $1,382.40 $1,382.40 $0.00 $27.50 $412.50 $0.00 $128.00 $1,024.00 $0.00 $87.00 $87.00 $0.00 $226.50 $2,038.50 $0.00 $22.00 $220.00 $0.00 $91.50 $91.50 $0.00 $53.50 $53.50 $0.00 $71.00 $426.00 $0.00 $907.00 $907.00 $0.00 $1,088.58 $1,088.58 $0.00 $28,589.78 Percent of Total 7.12%
  • 6. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task Steel Stud Wall 12" x 12" Ceramic Tile Floor 6" x 6" Ceramic Tile Floor 6" x 6" Ceramic Tile Wall Base Acoustical Tile Ceiling Eggcrate Paint CMU latex Spray (First Coat) Paint CMU latex Spray (Second Coat) Interior Paint Gypsum Board 5/8" Thick (Level 5 Finish) Port. fire extinguisher, 5lb. Grab Bar 36" Long Grab Bar 42" Long Soap Dispenser (Surface Mount) Mirror T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 Contracting RS Means Qty Unit 09 22 16.13 2500 449.1666 S.F. 09 30 13.10 3270 64 SF 09 30 13.10 9310 37.99 SF 09 30 13.10 5800 256 SF 09 51 23.10 1900 218.5 SF 09 91 13.90 0450 5067 SF 09 91 13.90 0460 5067 SF 09 91 23.72 0200 660 SF 09 29 10.30 2090 658.5 SF 10 44 16.13 1060 10 28 13.13 1100 10 28 13.13 1105 10 28 13.13 4600 10 28 13.13 3100 8 1 1 1 1 EA Ea Ea Ea Ea CSM 3450 5-Nov-13 BS CL JS Mat $ Lab $ Equip $ Total $ $0.55 $0.75 $0.00 $1.30 $5.90 $2.01 $0.00 $7.91 $3.33 $0.00 $24.33 $21.00 $2.55 $3.33 $0.00 $5.88 $1.82 $0.71 $0.00 $2.53 $0.06 $0.16 $0.00 $0.22 $0.05 $0.12 $0.00 $0.17 $0.27 $0.00 $0.33 $0.06 $0.34 $0.91 $0.00 $1.25 $3,293.76 $3,795.83 $0.00 Percent of Total $47.00 $37.00 $37.50 $42.00 $96.50 $213.00 $0.00 $17.65 $17.65 $17.65 $23.50 $76.45 $0.00 $47.00 $0.00 $54.65 $0.00 $55.15 $0.00 $59.65 $0.00 $120.00 $0.00 Percent of Total Ext $ $583.92 $506.24 $924.30 $1,505.28 $552.81 $1,114.74 $861.39 $217.80 $823.13 $7,089.59 1.77% $376.00 $54.65 $55.15 $59.65 $120.00 $665.45 0.17%
  • 7. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task Sanitary 2" Sanitary 3" Sanitary 4" Water 1" Water 3/4" Water 1/2" Gas 2" Gas 1-1/2" Gas 1-1/4" Gas 1" Gas 3/4" Compressed Air 2" Compressed Air 1-1/4" Compressed Air 1" Compressed Air 3/4" Compressed Air 1/2" Faucet Laundry Faucet Water Closet Sump Pump Water Cooler Water Heater Vent Pipe Gas Meter Oil Interceptor Floor Drain T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 Contracting RS Means 22 13 16.20 2120 22 13 16.20 2140 22 13 16.20 2160 22 11 13.23 2200 22 11 13.23 2180 22 11 13.23 2140 22 11 13.44 0610 22 11 34.44 0600 22 11 34.44 0590 22 11 34.44 0580 22 11 34.44 0570 22 11 13.23 2260 22 11 13.23 2220 22 11 13.23 2200 22 11 13.23 2180 22 11 13.23 2140 22 41 39.10 2000 22 41 39.10 2290 22 42 13.40 3350 22 14 29.16 7160 22 47 16.10 0160 22 34 30.13 2100 22 11 13.74 4470 22 13 23.10 4220 22 14 26.19 6700 Qty 42.108 29.645 157.663 25.52 174.24 12.43 14.74 70.07 29.48 15.73 56.98 23.76 49.5 17.05 109.45 21.24 1 1 1 1 1 1 120 1 1 120.4 Unit L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. Ea Ea Ea Ea Ea Ea L.F. Ea. Ea L.F. Mat $ Lab $ $8.50 $12.50 $11.95 $13.10 $15.45 $14.30 $9.85 $6.40 $6.60 $5.75 $4.30 $5.40 $14.90 $12.30 $11.15 $9.85 $9.50 $8.85 $7.55 $8.25 $5.15 $7.15 $27.00 $10.40 $13.45 $7.55 $6.40 $9.85 $6.60 $5.75 $4.30 $5.40 $49.50 $36.50 $182.00 $65.50 $455.00 $136.00 $207.00 $87.50 $890.00 $197.00 $1,225.00 $291.00 $6.15 $14.85 $400.00 $0.00 $12,500.00 $395.00 $42.50 $6.85 $30,348.49 $11,360.40 Equip $ Total $ $0.00 $21.00 $0.00 $25.05 $0.00 $29.75 $0.00 $16.25 $0.00 $12.35 $0.00 $9.70 $0.00 $27.20 $0.00 $21.00 $0.00 $18.35 $0.00 $15.80 $0.00 $12.30 $0.00 $37.40 $0.00 $21.00 $0.00 $16.25 $0.00 $12.35 $0.00 $9.70 $0.00 $86.00 $0.00 $247.50 $0.00 $591.00 $0.00 $294.50 $0.00 $1,087.00 $0.00 $1,516.00 $0.00 $21.00 $0.00 $400.00 $0.00 $12,895.00 $0.00 $49.35 $0.00 Percent of Total 5-Nov-13 BS CL JS Ext $ $884.27 $742.61 $4,690.47 $414.70 $2,151.86 $120.57 $400.93 $1,471.47 $540.96 $248.53 $700.85 $888.62 $1,039.50 $277.06 $1,351.71 $206.03 $86.00 $247.50 $591.00 $294.50 $1,087.00 $1,516.00 $2,520.00 $400.00 $12,895.00 $5,941.74 $41,708.89 10.39%
  • 8. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task 150k bmh infrared heater 175k bmh infrared heater Vent Stack Single Pole Switch Surface Mounted 3 Phase 200 Amp 42 Spaces Conduit in Trench 4" Doubled 600 Volt, Copper Type #4 Wire Lithonia Light Fixtures Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 T. T. C . Contracting RS Means Qty Unit Mat $ Lab $ Equip $ Total $ 23 82 27.10 0250 1 Ea $1,674.00 $500.00 $0.00 $2,174.00 23 82 27.10 0260 2 Ea $2,053.00 $583.33 $0.00 $2,636.33 23 82 27.10 0245 3 Ea $153.00 $50.00 $0.00 $203.00 $6,239.00 $1,816.66 $0.00 Percent of Total 26 05 90.10 2110 26 24 16.30 1000 26 05 39.40 1000 26 05 19.90 1400 26 51 13.50 0001 25 Ea 3 Ea 348 L.F. 3.5 CLF 23 EA $13.95 $24.00 $1,375.00 $1,225.00 $28.00 $8.25 $90.00 $78.00 $258.84 $72.50 $20,484.27 $9,084.94 5-Nov-13 BS CL JS Ext $ $2,174.00 $5,272.66 $609.00 $8,055.66 2.01% $0.00 $37.95 $948.75 $0.00 $2,600.00 $7,800.00 $0.00 $36.25 $12,615.00 $0.00 $168.00 $584.64 $0.00 $331.34 $7,620.82 $0.00 $29,569.21 Percent of Total 7.36%
  • 9. 12:40:00 PM Bradley Smith Corbin Ledley Josh Shoemaker Item/Task Topsoil Stripping and stockpiling 400 H.P. Dozer Silt Fence ODOT Gravel 4" Thick Excavating Trench For Conduit Item/Task Asphaltic Concrete Paving T. T. C . Maintenance Building Estimate Project #SSMB2012-3450 CSM 3450 5-Nov-13 Contracting RS Means Qty 31 14 13.23 0400 2924.33 31 25 14.16 1000 1124 31 23 23.17 0500 3155 31 23 16.13 0060 25.77 Unit C.Y. L.F. S.F. BCY Mat $ Lab $ Equip $ Total $ $0.00 $0.13 $0.58 $0.71 $0.25 $0.35 $0.00 $0.60 $0.43 $0.18 $1.24 $1.85 $0.00 $3.27 $1.82 $5.09 $1,637.65 $1,425.73 $5,655.21 Percent of Total RS Means 32 12 16.14 1180 Unit SF Mat $ Lab $ $2.52 $0.89 $3,225.60 $1,139.20 Qty 1280 Ext $ $2,076.27 $674.40 $5,836.75 $131.17 $8,718.59 2.17% Equip $ Total $ Ext $ $0.11 $3.52 $ 4,505.60 $0.28 $ 4,505.60 Percent of Total 0.87% BS CL JS
  • 10. Division # Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Division 9 Division 10 Division 11 Division 12 Division 13 Division 14 Division 15 Division 16 Division 17 Division 18 Division 19 Division 20 Division 21 Division 22 Division 23 Division 24 Division 25 Division 26 Division 27 Division 28 Division 29 Division 30 Division 31 Division 32 Total $ 138,647.14 $ 103,450.59 Structural Mechanical Plumbing $ 115,852.57 $ 28,152.87 $ 28,589.78 $ 7,089.59 $ 665.45 $ 41,708.89 $ 8,055.66 $ 29,569.21 $ 8,718.59 $ 4,505.60 Total Overhead Profit $ 515,005.95 $ 50,290.33 $ 51,500.59 Grand Total $ 616,796.87 $ 247,892.94 $ 8,055.66 $ 41,708.89