PROJECT COST
MANAGEMENT
KNOWLEDGE AREA
COST MANAGEMENT
KNOWLEDGE AREA
OVERVIEW
7.1 Plan Cost management
7.2 Estimate costs
7.3 determine budget
7.4 control costs
COST MANAGEMENT KNOWLEDGE
AREA OVERVIEW
All the processes needed to work
through a project within the confines of
the budget. The cost baseline is created
within this knowledge area’s processes.
7.1 PLAN COST
MANAGEMENT
-PART OF THE PLANNING PROCESS GROUP
This Photo by Unknown Author is licensed under CC BY-SA
PLAN COST MANAGEMENT PROCESS
The process of planning how
managing costs associated with the
project will be planned and
controlled
7.1 PLAN COST
MANAGEMENT
 Part of the Planning Process
Group
 Establishes policies and
procedures for planning,
managing, and controlling
project costs
 OUTPUT:
 Cost Management Plan
COST MANAGEMENT PLAN
GUIDES THE ESTIMATION OF COSTS
AND BUDGET CONSTRUCTION
GUIDES THE PROPER USE OF
SPENDING WITHIN THE PROJECT
INCLUDED IN THE PROJECT
MANAGEMENT PLAN
LIFECYCLE COSTING
The cost of a product’s entire life
expectancy
Life expectancy value of resources
purchased for a project that can be
used in later projects or organizational
activities
VALUE ENGINEERING / ANALYSIS
Lower cost ways to do the same
amount of work
Can be brought on by process
improvements or better resource
purchasing conditions
7.2 ESTIMATE COSTS
-PART OF THE PLANNING PROCESS GROUP
This Photo by Unknown Author is licensed under CC BY-SA
ESTIMATE COST PROCESS
The development of estimates related
to the anticipated costs of project
activities
7.2 ESTIMATE COSTS
 Part of the Planning Process
Group
 Each activity’s cost must be
estimated
 Entire project cost is
estimated
 Products purchased,
wages/labor, contingency
reserves for delay
ESTIMATING COSTS – PROJECT INPUTS
The Scope Baseline
The Cost
Management Plan
Quality
Management Plan
The Project Schedule
Resource
Requirements
Project Risk / Risk
Register
Lessons Learned
Register
Organizational
Process Assets
Enterprise
Environmental
Factors
ESTIMATING COSTS
USING THE WBS
CREATED IN THE
PROJECT SCOPE
MANAGEMENT
KNOWLEDGE
AREA CAN
IMPROVE
ESTIMATIONS
ACTIVITY
ESTIMATIONS
SHOULD INCLUDE
INPUT FROM THE
PERSON DOING
THE WORK
PROJECT
HISTORICAL
INFORMATION /
ORGANIZATIONS
PAST PROJECTS
SHOULD BE USED
FACTORS
IMPACTING
COSTS
High quality / low quality impacts costs
Increased risk factors
Project complexity
General project costs
Training
Project manager costs
Required resources
Other tangible resources
COST TYPES
• Costs that can change with the amount of work output
produced
Variable
Cost
• Costs that do not change as the work output is
increased
Fixed
Costs
• Costs associated with producing project deliverables
Direct
Costs
• Overhead costs that can be accrued by multiple
projects (Program Costs, Organizational Operations)
Indirect
Costs
ESTIMATING COSTS
One-Point Estimation Each estimator submits a cost estimate for the activity
Parametric Estimation
Using historical records to collect average costs for activities
and using that as a basis to estimate current activities
Analogous Estimation
Similar activities are examined for their actual costs and used
to estimate for the current activity
Bottom-up Estimating
Estimations done for each activity or work package,
estimations are combined or rolled up to “Control Accounts” or
group of work packages. Total project costs are found by
combining “Control Accounts”
PERT ANALYSIS
 Three cost estimates are provided for each activity
 Optimistic Estimate (O) – Best case scenario for
activity completion times
 Most Likely Estimate (M) - The most likely
completion time of the activity
 Pessimistic Estimate (P) – Worst case scenario for
activity completion duration
 Using the average of the estimates to estimate the
activity
 Triangular Distribution
 Beta Distribution
 Used for time and cost estimates
ESTIMATION ACCURACY
Rough Order of
magnitude (ROM)
Range of estimates
between -25% and +
75% from actual costs
Budge Estimates
Fall in the Range of -
10% to + 25% from
actual costs
Definitive
Estimates
Range of estimates
between -10% to +10%
from actual costs
7.3 DETERMINE BUDGET
-PART OF THE PLANNING PROCESS GROUP
This Photo by Unknown Author is licensed under CC BY-SA
THE DETERMINE BUDGET PROCESS
Aggregating costs of
activities or work
packages together to
create the project cost
baseline
7.3 DETERMINE BUDGET
Part of the Planning
Process Group
Creates the cost baseline
Activity risks need to be
considered and cost
reserves need to be placed
into the estimates
COST RESERVES
Contingency Reserve
Reserve for handling known risks and is used
as part of the risk management strategy
Management
Cost reserved for unexpected risks or
changes
COST BASELINE
The base estimated costs
of the funds authorized for
spending on the project
Includes all estimated costs
and contingency reserves
but does not include
management reserves
PROJECT
BUDGET
The project cost budget includes
the cost baseline plus the
management reserve
7.4 CONTROL COSTS
-PART OF THE MONITORING & CONTROLLING PROCESS
GROUP
This Photo by Unknown Author is licensed under CC BY-SA
THE CONTROL COSTS PROCESS
The monitoring of the project
expenditures throughout the project
and handling changes to the cost
baseline
7.4 CONTROL COSTS
 Part of the Monitoring &
Controlling Process Group
 Calculating the actual costs spend
and measuring it against the cost
baseline
 Work to prevent changes or
handle changes to the cost if they
do occur
EARNED VALUE
MANAGEMENT
(EVM)
EARNED VALUE MANAGEMENT
Can be used to measure the
performance of the project against the
baselines for scope, schedule, and
costs
This Photo by Unknown Author is licensed under CC BY-NC
EARNED VALUE MANAGEMENT
Planned Value
The planned or estimated value
for planned work
Earned Value (EV)
The value of the work
completed based on the
estimated value
Actual Cost (AC)
The actual cost for the
completed work
CALCULATING PV, EV, AC
PV = % Planned
Complete * Estimated
Total Budget
EV = % Actually
Complete * Estimated
Total Budget
AC = Actual Cost of
the Completed Work
VARIANCES
Schedule Variance (SV) Measures the performance of the schedule
Less than 0 indicates a project behind schedule
Greater than 0 indicates a project ahead of schedule
Cost Variance (CV) Measures the performance of the budget
Less than 0 indicates a project is over budget
Greater than 0 indicates a project that is under budget
Schedule Performance
Index (SPI)
Measure of the efficiency of the project schedule
Greater than 1 indicates a project is ahead of schedule
Less than 1 indicates a project is behind schedule
Cost Performance
Index (CPI)
Measure of the efficiency of the project costs
Greater than 1 indicates a project that is under budget
Less than 1 indicates a project that is over budget
CALCULATING VARIANCE
• SV = EV – PVSchedule Variance (SV)
• CV = EV – ACCost Variance (CV)
• SPI = EV/PVSchedule Performance Index (SPI)
• CPI = EV/ACCost Performance Index (CPI)
EARNED VALUE - FORECASTS
Total budget for all work items in the project to bring them to completion
Budget at
Completion (BAC)
Total estimated costs for completing all project work
Estimate at
Completion (EAC)
Estimate to complete the project from this point forward
Estimate to
Complete (ETC)
The forecasted completion costs of the project
If VAC < 0 Project will be completed over budget
If VAC > 0, Project will be completed under budget
Variance at
Completion (VAC)
Gives an indicator of what efficiency is needed to complete the project in order to make up for past negative
variances with the budget
If TCPI < 0 Project will more easily complete within budget
If TCPI > 0, Project will not be very easy to complete within budget
To Complete
Performance Index
(TCPI)
EARNED VALUE - FORECASTS
Estimate to Complete (ETC)
• ETC is equal to the estimates of the
remaining work items
• OR
• ETC = EAC - AC
Estimate at Completion (EAC)
• EAC = AC + ETC
• If all ETC work will remain within the
budgeted rate:
• EAC = AC + (BAC – EV)
• If the cost performance index is
expected to remain persistent:
• EAC = BAC/CPI
EARNED VALUE - FORECASTS
Variance at Completion (VAC)
• VAC = BAC – EAC
To Complete Performance Index
(TCPI)
• Original budget completion
requirement:
• TCPI = (BAC – EV) / (BAC – AC)
• Accommodating for past variances
• TCPI = (BAC – EV) / (EAC – AC)
SOURCES
A Guide to the Project
Management Body of
Knowledge – PMBOK 6th
Edition
https://www.pmi.org/
Joshua Render
https://agile-mercurial.com

Weitere ähnliche Inhalte

Was ist angesagt?

7.4 Earned Value Analysis
7.4 Earned Value Analysis7.4 Earned Value Analysis
7.4 Earned Value AnalysisDavidMcLachlan1
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best PracticesPMILebanonChapter
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation ChecklistAnand Subramaniam
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementNandi Sudheer
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project PlanningZilicus
 
009. project communication management
009. project communication management009. project communication management
009. project communication managementBoobalan G
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk ManagementDavidMcLachlan1
 

Was ist angesagt? (20)

7.4 Earned Value Analysis
7.4 Earned Value Analysis7.4 Earned Value Analysis
7.4 Earned Value Analysis
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best Practices
 
Cost Management PMBOK
Cost Management PMBOKCost Management PMBOK
Cost Management PMBOK
 
Project Management
Project ManagementProject Management
Project Management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Risk Management in Project Management
Risk Management in Project ManagementRisk Management in Project Management
Risk Management in Project Management
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project Planning
 
009. project communication management
009. project communication management009. project communication management
009. project communication management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project managment ppt
Project managment pptProject managment ppt
Project managment ppt
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 

Ähnlich wie Project Management: Cost Management Knowledge Area

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdfAmrishTyagi8
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Day 7 Project Cost Management .pdf
Day 7 Project Cost Management .pdfDay 7 Project Cost Management .pdf
Day 7 Project Cost Management .pdfMadhusha15
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagementDhamo daran
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...IRJET Journal
 
Project Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseProject Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseVladimir Vujovic
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)Nita Cristian
 
Project cost & control
Project cost & controlProject cost & control
Project cost & controlAMARAYYA
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimationssuser9d62d6
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdfzohir khellouf
 

Ähnlich wie Project Management: Cost Management Knowledge Area (20)

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
COST MANAGEMENT REPORT
COST MANAGEMENT REPORT COST MANAGEMENT REPORT
COST MANAGEMENT REPORT
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdf
 
Project cost control
Project cost controlProject cost control
Project cost control
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Day 7 Project Cost Management .pdf
Day 7 Project Cost Management .pdfDay 7 Project Cost Management .pdf
Day 7 Project Cost Management .pdf
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...Application of Earned Value Method and Delay Analysis on Construction Project...
Application of Earned Value Method and Delay Analysis on Construction Project...
 
Project Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseProject Cost Management - PMP preparation course
Project Cost Management - PMP preparation course
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)
 
Project cost & control
Project cost & controlProject cost & control
Project cost & control
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
PMP COST FORMULAE
PMP COST FORMULAEPMP COST FORMULAE
PMP COST FORMULAE
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
 
Project cost management
Project cost managementProject cost management
Project cost management
 

Mehr von Joshua Render

Setting SMART Goals - What are SMART Goals?
Setting SMART Goals - What are SMART Goals?Setting SMART Goals - What are SMART Goals?
Setting SMART Goals - What are SMART Goals?Joshua Render
 
Alderfer's ERG theory of motivation
Alderfer's ERG theory of motivationAlderfer's ERG theory of motivation
Alderfer's ERG theory of motivationJoshua Render
 
MacGregor’s XY Theory and Ouchi’s Theory Z
MacGregor’s XY Theory and Ouchi’s Theory ZMacGregor’s XY Theory and Ouchi’s Theory Z
MacGregor’s XY Theory and Ouchi’s Theory ZJoshua Render
 
Big Five Personality Traits: The Five Factor Model
Big Five Personality Traits: The Five Factor ModelBig Five Personality Traits: The Five Factor Model
Big Five Personality Traits: The Five Factor ModelJoshua Render
 
Drexler-Sibbet Team Performance Model
Drexler-Sibbet Team Performance ModelDrexler-Sibbet Team Performance Model
Drexler-Sibbet Team Performance ModelJoshua Render
 
7 Core Concepts of Lean
7 Core Concepts of Lean7 Core Concepts of Lean
7 Core Concepts of LeanJoshua Render
 
Guide to User Story Creation
Guide to User Story CreationGuide to User Story Creation
Guide to User Story CreationJoshua Render
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
Stakeholder Management Knowledge Area
Stakeholder Management Knowledge AreaStakeholder Management Knowledge Area
Stakeholder Management Knowledge AreaJoshua Render
 
Risk Management Knowledge Area
Risk Management Knowledge AreaRisk Management Knowledge Area
Risk Management Knowledge AreaJoshua Render
 
Communication Management Knowledge Area
Communication Management Knowledge AreaCommunication Management Knowledge Area
Communication Management Knowledge AreaJoshua Render
 
Resource Management Knowledge Area
Resource Management Knowledge AreaResource Management Knowledge Area
Resource Management Knowledge AreaJoshua Render
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge AreaJoshua Render
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaJoshua Render
 
What is Osmotic Communication?
What is Osmotic Communication?What is Osmotic Communication?
What is Osmotic Communication?Joshua Render
 
Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge AreaJoshua Render
 
PMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and MindsetPMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and MindsetJoshua Render
 

Mehr von Joshua Render (20)

Setting SMART Goals - What are SMART Goals?
Setting SMART Goals - What are SMART Goals?Setting SMART Goals - What are SMART Goals?
Setting SMART Goals - What are SMART Goals?
 
Alderfer's ERG theory of motivation
Alderfer's ERG theory of motivationAlderfer's ERG theory of motivation
Alderfer's ERG theory of motivation
 
MacGregor’s XY Theory and Ouchi’s Theory Z
MacGregor’s XY Theory and Ouchi’s Theory ZMacGregor’s XY Theory and Ouchi’s Theory Z
MacGregor’s XY Theory and Ouchi’s Theory Z
 
Big Five Personality Traits: The Five Factor Model
Big Five Personality Traits: The Five Factor ModelBig Five Personality Traits: The Five Factor Model
Big Five Personality Traits: The Five Factor Model
 
Drexler-Sibbet Team Performance Model
Drexler-Sibbet Team Performance ModelDrexler-Sibbet Team Performance Model
Drexler-Sibbet Team Performance Model
 
What is Kanban?
What is Kanban?What is Kanban?
What is Kanban?
 
7 Core Concepts of Lean
7 Core Concepts of Lean7 Core Concepts of Lean
7 Core Concepts of Lean
 
Guide to User Story Creation
Guide to User Story CreationGuide to User Story Creation
Guide to User Story Creation
 
Tuckman's Model
Tuckman's ModelTuckman's Model
Tuckman's Model
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Stakeholder Management Knowledge Area
Stakeholder Management Knowledge AreaStakeholder Management Knowledge Area
Stakeholder Management Knowledge Area
 
Risk Management Knowledge Area
Risk Management Knowledge AreaRisk Management Knowledge Area
Risk Management Knowledge Area
 
Communication Management Knowledge Area
Communication Management Knowledge AreaCommunication Management Knowledge Area
Communication Management Knowledge Area
 
Resource Management Knowledge Area
Resource Management Knowledge AreaResource Management Knowledge Area
Resource Management Knowledge Area
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge Area
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge Area
 
What is Osmotic Communication?
What is Osmotic Communication?What is Osmotic Communication?
What is Osmotic Communication?
 
Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge Area
 
PMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and MindsetPMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and Mindset
 
DSDM certifications
DSDM certificationsDSDM certifications
DSDM certifications
 

Kürzlich hochgeladen

Pistachio Caviar and raisins from Iran.pdf
Pistachio Caviar and raisins from Iran.pdfPistachio Caviar and raisins from Iran.pdf
Pistachio Caviar and raisins from Iran.pdfRezaSeif2
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Lviv Startup Club
 
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCEirhcs
 
DIPLOMA IN PURCHASING AND SUPPLIES MANAG
DIPLOMA IN PURCHASING AND SUPPLIES MANAGDIPLOMA IN PURCHASING AND SUPPLIES MANAG
DIPLOMA IN PURCHASING AND SUPPLIES MANAGChrisWachira
 
decentralized Launchpad providing a safe and transparent fundraising
decentralized Launchpad providing a safe and transparent fundraisingdecentralized Launchpad providing a safe and transparent fundraising
decentralized Launchpad providing a safe and transparent fundraisingrectinajh
 
Leadership and Collaborative Qualities | Hejir Rashidzadeh
Leadership and Collaborative Qualities | Hejir RashidzadehLeadership and Collaborative Qualities | Hejir Rashidzadeh
Leadership and Collaborative Qualities | Hejir RashidzadehHejir Rashidzadeh
 
Trian White Paper on Creating Value at Disney April 2024
Trian White Paper on Creating Value at Disney April 2024Trian White Paper on Creating Value at Disney April 2024
Trian White Paper on Creating Value at Disney April 2024Neil Kimberley
 
Harnessing LinkedIn's Data Goldmine: A Strategic Guide
Harnessing LinkedIn's Data Goldmine: A Strategic GuideHarnessing LinkedIn's Data Goldmine: A Strategic Guide
Harnessing LinkedIn's Data Goldmine: A Strategic GuideScrapIn
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
Saffron and Dates opportunities from Iran .pdf
Saffron and Dates opportunities from Iran .pdfSaffron and Dates opportunities from Iran .pdf
Saffron and Dates opportunities from Iran .pdfRezaSeif2
 
How the Insurance Industry is Scaling with AI
How the Insurance Industry is  Scaling with AIHow the Insurance Industry is  Scaling with AI
How the Insurance Industry is Scaling with AIPeter Ward
 
BoSEU24 | Imogen Wethered | How to Sell a Business in a Decade
BoSEU24 | Imogen Wethered | How to Sell a Business in a DecadeBoSEU24 | Imogen Wethered | How to Sell a Business in a Decade
BoSEU24 | Imogen Wethered | How to Sell a Business in a DecadeBusiness of Software Conference
 
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003Levi Shapiro
 
AI automation startup Nanonets' $29 Million pitch deck
AI automation startup Nanonets' $29 Million pitch deckAI automation startup Nanonets' $29 Million pitch deck
AI automation startup Nanonets' $29 Million pitch deckqilerongrong
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution""Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"vicky222yadav11
 
BoSEU24 | Claire Suellentrop | How to Operationalise JTBD
BoSEU24 | Claire Suellentrop | How to Operationalise JTBDBoSEU24 | Claire Suellentrop | How to Operationalise JTBD
BoSEU24 | Claire Suellentrop | How to Operationalise JTBDBusiness of Software Conference
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 

Kürzlich hochgeladen (20)

Pistachio Caviar and raisins from Iran.pdf
Pistachio Caviar and raisins from Iran.pdfPistachio Caviar and raisins from Iran.pdf
Pistachio Caviar and raisins from Iran.pdf
 
Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)Roman Kyslyi: Використання та побудова LLM агентів (UA)
Roman Kyslyi: Використання та побудова LLM агентів (UA)
 
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE
2023_EN. HYUNDAI CAPITAL SERVICES 2023 PERFORMANCE
 
DIPLOMA IN PURCHASING AND SUPPLIES MANAG
DIPLOMA IN PURCHASING AND SUPPLIES MANAGDIPLOMA IN PURCHASING AND SUPPLIES MANAG
DIPLOMA IN PURCHASING AND SUPPLIES MANAG
 
decentralized Launchpad providing a safe and transparent fundraising
decentralized Launchpad providing a safe and transparent fundraisingdecentralized Launchpad providing a safe and transparent fundraising
decentralized Launchpad providing a safe and transparent fundraising
 
Leadership and Collaborative Qualities | Hejir Rashidzadeh
Leadership and Collaborative Qualities | Hejir RashidzadehLeadership and Collaborative Qualities | Hejir Rashidzadeh
Leadership and Collaborative Qualities | Hejir Rashidzadeh
 
Trian White Paper on Creating Value at Disney April 2024
Trian White Paper on Creating Value at Disney April 2024Trian White Paper on Creating Value at Disney April 2024
Trian White Paper on Creating Value at Disney April 2024
 
Harnessing LinkedIn's Data Goldmine: A Strategic Guide
Harnessing LinkedIn's Data Goldmine: A Strategic GuideHarnessing LinkedIn's Data Goldmine: A Strategic Guide
Harnessing LinkedIn's Data Goldmine: A Strategic Guide
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
Saffron and Dates opportunities from Iran .pdf
Saffron and Dates opportunities from Iran .pdfSaffron and Dates opportunities from Iran .pdf
Saffron and Dates opportunities from Iran .pdf
 
How the Insurance Industry is Scaling with AI
How the Insurance Industry is  Scaling with AIHow the Insurance Industry is  Scaling with AI
How the Insurance Industry is Scaling with AI
 
BoSEU24 | Imogen Wethered | How to Sell a Business in a Decade
BoSEU24 | Imogen Wethered | How to Sell a Business in a DecadeBoSEU24 | Imogen Wethered | How to Sell a Business in a Decade
BoSEU24 | Imogen Wethered | How to Sell a Business in a Decade
 
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003
Version Bravo- The Springboard for Navy SEAL entrepreneurship, cohort 003
 
AI automation startup Nanonets' $29 Million pitch deck
AI automation startup Nanonets' $29 Million pitch deckAI automation startup Nanonets' $29 Million pitch deck
AI automation startup Nanonets' $29 Million pitch deck
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution""Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"
"Ecommerce Tomorrow: Trends, Innovations, and Consumer Revolution"
 
BoSEU24 | Claire Suellentrop | How to Operationalise JTBD
BoSEU24 | Claire Suellentrop | How to Operationalise JTBDBoSEU24 | Claire Suellentrop | How to Operationalise JTBD
BoSEU24 | Claire Suellentrop | How to Operationalise JTBD
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 

Project Management: Cost Management Knowledge Area

  • 2. COST MANAGEMENT KNOWLEDGE AREA OVERVIEW 7.1 Plan Cost management 7.2 Estimate costs 7.3 determine budget 7.4 control costs
  • 3. COST MANAGEMENT KNOWLEDGE AREA OVERVIEW All the processes needed to work through a project within the confines of the budget. The cost baseline is created within this knowledge area’s processes.
  • 4. 7.1 PLAN COST MANAGEMENT -PART OF THE PLANNING PROCESS GROUP This Photo by Unknown Author is licensed under CC BY-SA
  • 5. PLAN COST MANAGEMENT PROCESS The process of planning how managing costs associated with the project will be planned and controlled
  • 6. 7.1 PLAN COST MANAGEMENT  Part of the Planning Process Group  Establishes policies and procedures for planning, managing, and controlling project costs  OUTPUT:  Cost Management Plan
  • 7. COST MANAGEMENT PLAN GUIDES THE ESTIMATION OF COSTS AND BUDGET CONSTRUCTION GUIDES THE PROPER USE OF SPENDING WITHIN THE PROJECT INCLUDED IN THE PROJECT MANAGEMENT PLAN
  • 8. LIFECYCLE COSTING The cost of a product’s entire life expectancy Life expectancy value of resources purchased for a project that can be used in later projects or organizational activities
  • 9. VALUE ENGINEERING / ANALYSIS Lower cost ways to do the same amount of work Can be brought on by process improvements or better resource purchasing conditions
  • 10. 7.2 ESTIMATE COSTS -PART OF THE PLANNING PROCESS GROUP This Photo by Unknown Author is licensed under CC BY-SA
  • 11. ESTIMATE COST PROCESS The development of estimates related to the anticipated costs of project activities
  • 12. 7.2 ESTIMATE COSTS  Part of the Planning Process Group  Each activity’s cost must be estimated  Entire project cost is estimated  Products purchased, wages/labor, contingency reserves for delay
  • 13. ESTIMATING COSTS – PROJECT INPUTS The Scope Baseline The Cost Management Plan Quality Management Plan The Project Schedule Resource Requirements Project Risk / Risk Register Lessons Learned Register Organizational Process Assets Enterprise Environmental Factors
  • 14. ESTIMATING COSTS USING THE WBS CREATED IN THE PROJECT SCOPE MANAGEMENT KNOWLEDGE AREA CAN IMPROVE ESTIMATIONS ACTIVITY ESTIMATIONS SHOULD INCLUDE INPUT FROM THE PERSON DOING THE WORK PROJECT HISTORICAL INFORMATION / ORGANIZATIONS PAST PROJECTS SHOULD BE USED
  • 15. FACTORS IMPACTING COSTS High quality / low quality impacts costs Increased risk factors Project complexity General project costs Training Project manager costs Required resources Other tangible resources
  • 16. COST TYPES • Costs that can change with the amount of work output produced Variable Cost • Costs that do not change as the work output is increased Fixed Costs • Costs associated with producing project deliverables Direct Costs • Overhead costs that can be accrued by multiple projects (Program Costs, Organizational Operations) Indirect Costs
  • 17. ESTIMATING COSTS One-Point Estimation Each estimator submits a cost estimate for the activity Parametric Estimation Using historical records to collect average costs for activities and using that as a basis to estimate current activities Analogous Estimation Similar activities are examined for their actual costs and used to estimate for the current activity Bottom-up Estimating Estimations done for each activity or work package, estimations are combined or rolled up to “Control Accounts” or group of work packages. Total project costs are found by combining “Control Accounts”
  • 18. PERT ANALYSIS  Three cost estimates are provided for each activity  Optimistic Estimate (O) – Best case scenario for activity completion times  Most Likely Estimate (M) - The most likely completion time of the activity  Pessimistic Estimate (P) – Worst case scenario for activity completion duration  Using the average of the estimates to estimate the activity  Triangular Distribution  Beta Distribution  Used for time and cost estimates
  • 19. ESTIMATION ACCURACY Rough Order of magnitude (ROM) Range of estimates between -25% and + 75% from actual costs Budge Estimates Fall in the Range of - 10% to + 25% from actual costs Definitive Estimates Range of estimates between -10% to +10% from actual costs
  • 20. 7.3 DETERMINE BUDGET -PART OF THE PLANNING PROCESS GROUP This Photo by Unknown Author is licensed under CC BY-SA
  • 21. THE DETERMINE BUDGET PROCESS Aggregating costs of activities or work packages together to create the project cost baseline
  • 22. 7.3 DETERMINE BUDGET Part of the Planning Process Group Creates the cost baseline Activity risks need to be considered and cost reserves need to be placed into the estimates
  • 23. COST RESERVES Contingency Reserve Reserve for handling known risks and is used as part of the risk management strategy Management Cost reserved for unexpected risks or changes
  • 24. COST BASELINE The base estimated costs of the funds authorized for spending on the project Includes all estimated costs and contingency reserves but does not include management reserves
  • 25. PROJECT BUDGET The project cost budget includes the cost baseline plus the management reserve
  • 26. 7.4 CONTROL COSTS -PART OF THE MONITORING & CONTROLLING PROCESS GROUP This Photo by Unknown Author is licensed under CC BY-SA
  • 27. THE CONTROL COSTS PROCESS The monitoring of the project expenditures throughout the project and handling changes to the cost baseline
  • 28. 7.4 CONTROL COSTS  Part of the Monitoring & Controlling Process Group  Calculating the actual costs spend and measuring it against the cost baseline  Work to prevent changes or handle changes to the cost if they do occur
  • 30. EARNED VALUE MANAGEMENT Can be used to measure the performance of the project against the baselines for scope, schedule, and costs This Photo by Unknown Author is licensed under CC BY-NC
  • 31. EARNED VALUE MANAGEMENT Planned Value The planned or estimated value for planned work Earned Value (EV) The value of the work completed based on the estimated value Actual Cost (AC) The actual cost for the completed work
  • 32. CALCULATING PV, EV, AC PV = % Planned Complete * Estimated Total Budget EV = % Actually Complete * Estimated Total Budget AC = Actual Cost of the Completed Work
  • 33. VARIANCES Schedule Variance (SV) Measures the performance of the schedule Less than 0 indicates a project behind schedule Greater than 0 indicates a project ahead of schedule Cost Variance (CV) Measures the performance of the budget Less than 0 indicates a project is over budget Greater than 0 indicates a project that is under budget Schedule Performance Index (SPI) Measure of the efficiency of the project schedule Greater than 1 indicates a project is ahead of schedule Less than 1 indicates a project is behind schedule Cost Performance Index (CPI) Measure of the efficiency of the project costs Greater than 1 indicates a project that is under budget Less than 1 indicates a project that is over budget
  • 34. CALCULATING VARIANCE • SV = EV – PVSchedule Variance (SV) • CV = EV – ACCost Variance (CV) • SPI = EV/PVSchedule Performance Index (SPI) • CPI = EV/ACCost Performance Index (CPI)
  • 35. EARNED VALUE - FORECASTS Total budget for all work items in the project to bring them to completion Budget at Completion (BAC) Total estimated costs for completing all project work Estimate at Completion (EAC) Estimate to complete the project from this point forward Estimate to Complete (ETC) The forecasted completion costs of the project If VAC < 0 Project will be completed over budget If VAC > 0, Project will be completed under budget Variance at Completion (VAC) Gives an indicator of what efficiency is needed to complete the project in order to make up for past negative variances with the budget If TCPI < 0 Project will more easily complete within budget If TCPI > 0, Project will not be very easy to complete within budget To Complete Performance Index (TCPI)
  • 36. EARNED VALUE - FORECASTS Estimate to Complete (ETC) • ETC is equal to the estimates of the remaining work items • OR • ETC = EAC - AC Estimate at Completion (EAC) • EAC = AC + ETC • If all ETC work will remain within the budgeted rate: • EAC = AC + (BAC – EV) • If the cost performance index is expected to remain persistent: • EAC = BAC/CPI
  • 37. EARNED VALUE - FORECASTS Variance at Completion (VAC) • VAC = BAC – EAC To Complete Performance Index (TCPI) • Original budget completion requirement: • TCPI = (BAC – EV) / (BAC – AC) • Accommodating for past variances • TCPI = (BAC – EV) / (EAC – AC)
  • 38. SOURCES A Guide to the Project Management Body of Knowledge – PMBOK 6th Edition https://www.pmi.org/ Joshua Render https://agile-mercurial.com