BILLET YARD LIGHTING STUDY
(4) MH1000 FLOODS @ 35’ BY HOMOGENIZER 1 TO 6
(2)MH1000FLOODS@35’
ABOVEHOMOGENIZERS7AND8
(2)MH1000FLOODS@35’
BYDROSSBLDG
(2)MH400FLOODS@15’
ONDROSSBLDG
60,000 SQUARE FOOT BILLET
AND LOG STORAGE YARD:
THIS AREA IS ACCESSED BY
HEAVY FORK LIFTS 24/7 AND,
FOR SAFETY REASONS, NEEDS
HIGHER LIGHTING LEVELS
THAN A STANDARD STORAGE
YARD WHERE SECURITY
WOULD BE THE PRIMARY
CONCERN. IT IS CURRENTLY
LIT BY (8) MH1000 FLOODS
MOUNTED AT 35’ AND (2)
MH400 FLOODS MOUNTED
AT 15’. MEASURED LIGHT
LEVELS RANGE FROM 5FC
ALONG FRONT OF TANDEM
BLDG TO 1.5 TO 2FC IN
MIDDLE OF YARD.
HEAVY FORKLIFT TRAFFIC IN STORAGE YARD, NIGHT AND DAY HOMOGENIZER 1 TO 6 OVERHANG
BILLET YARD LIGHTING STUDY
(8) LITHONIA 295W HLF 1 P3 WITH MFL
OPTICS
(2) LITHONIA 166W HLF 1 P1 WITH MFL
OPTICS
SIMULATION RUNS WITH LOWER
WATTAGE FIXTURES RESULT LIGHT LEVELS
LOWER THAN EXISTING LEVELS. FIXTURES
WITH HIGHER WATTAGES STILL DON’T FILL
IN THE SOUTHEAST CORNER, BUT DO
OVER-LIGHT THE AREAS CLOSEST TO THE
FIXTURES.
SIMULATION ONLY SHOWS OUTPUT FROM
FIXTURES DIRECTED AT THE STORAGE
YARD. FIXTURES LIGHTING THE AREAS
AROUND THE HOMOGENIZER OVENS
WERE NOT SIMULATED.
DROSS STORAGE BLDG HOMGENIZER 7 AND 8 STRUCTURE
BILLET YARD LIGHTING STUDY

More Related Content

Viewers also liked

Liu_George LLE 2010 summer report
Liu_George LLE 2010 summer reportLiu_George LLE 2010 summer report
Liu_George LLE 2010 summer report
George Liu
 
CPC Catalog (Revised)
CPC Catalog (Revised)CPC Catalog (Revised)
CPC Catalog (Revised)
Tony Gambell
 
Правила рекламной игры "Славная осень"
Правила рекламной игры "Славная осень"Правила рекламной игры "Славная осень"
Правила рекламной игры "Славная осень"
tanya19801980
 

Viewers also liked (8)

My m.sc seminar presentation
My m.sc seminar presentationMy m.sc seminar presentation
My m.sc seminar presentation
 
Rtktthn6
Rtktthn6Rtktthn6
Rtktthn6
 
Projecte MOLL
Projecte MOLLProjecte MOLL
Projecte MOLL
 
Liu_George LLE 2010 summer report
Liu_George LLE 2010 summer reportLiu_George LLE 2010 summer report
Liu_George LLE 2010 summer report
 
CPC Catalog (Revised)
CPC Catalog (Revised)CPC Catalog (Revised)
CPC Catalog (Revised)
 
Ashish_Kumar_CV
Ashish_Kumar_CVAshish_Kumar_CV
Ashish_Kumar_CV
 
Правила рекламной игры "Славная осень"
Правила рекламной игры "Славная осень"Правила рекламной игры "Славная осень"
Правила рекламной игры "Славная осень"
 
20150905 01:基礎課程 @H.K.
20150905 01:基礎課程 @H.K.20150905 01:基礎課程 @H.K.
20150905 01:基礎課程 @H.K.
 

BILLET AND LOG STORAGE YARD-LIGHTING STUDY

  • 1. BILLET YARD LIGHTING STUDY (4) MH1000 FLOODS @ 35’ BY HOMOGENIZER 1 TO 6 (2)MH1000FLOODS@35’ ABOVEHOMOGENIZERS7AND8 (2)MH1000FLOODS@35’ BYDROSSBLDG (2)MH400FLOODS@15’ ONDROSSBLDG 60,000 SQUARE FOOT BILLET AND LOG STORAGE YARD: THIS AREA IS ACCESSED BY HEAVY FORK LIFTS 24/7 AND, FOR SAFETY REASONS, NEEDS HIGHER LIGHTING LEVELS THAN A STANDARD STORAGE YARD WHERE SECURITY WOULD BE THE PRIMARY CONCERN. IT IS CURRENTLY LIT BY (8) MH1000 FLOODS MOUNTED AT 35’ AND (2) MH400 FLOODS MOUNTED AT 15’. MEASURED LIGHT LEVELS RANGE FROM 5FC ALONG FRONT OF TANDEM BLDG TO 1.5 TO 2FC IN MIDDLE OF YARD. HEAVY FORKLIFT TRAFFIC IN STORAGE YARD, NIGHT AND DAY HOMOGENIZER 1 TO 6 OVERHANG
  • 2. BILLET YARD LIGHTING STUDY (8) LITHONIA 295W HLF 1 P3 WITH MFL OPTICS (2) LITHONIA 166W HLF 1 P1 WITH MFL OPTICS SIMULATION RUNS WITH LOWER WATTAGE FIXTURES RESULT LIGHT LEVELS LOWER THAN EXISTING LEVELS. FIXTURES WITH HIGHER WATTAGES STILL DON’T FILL IN THE SOUTHEAST CORNER, BUT DO OVER-LIGHT THE AREAS CLOSEST TO THE FIXTURES. SIMULATION ONLY SHOWS OUTPUT FROM FIXTURES DIRECTED AT THE STORAGE YARD. FIXTURES LIGHTING THE AREAS AROUND THE HOMOGENIZER OVENS WERE NOT SIMULATED. DROSS STORAGE BLDG HOMGENIZER 7 AND 8 STRUCTURE