John C. Shaw_LinkedIn

J
John C. Shaw
Utility Inspector / Survey Party Chief at Golden Field Services, Inc.
gohomejohn1@msn.com
Summary
I am a well-organized team player who is committed to completing complex inspection and survey projects in a
timely manner. I have the proven ability in building trust, confidence, and team cooperation to complete tasks to
deadlines. I have a reputation as a self-directed leader and professional with excellent surveying and inspection
skills. I am equipped with an excellent work ethic, a strong sense of responsibility, and a commendable track
record of dependability.
I communicate with project teams to engage the workforce, providing vision, leadership, and direction to
skillfully manage complex projects and with organizations spanning multiple disciplines. I am noted by
management for know-how with a focus on completing projects on time and under budget. I am recognized as
troubleshooter and problem solver adept at conceptualizing and implementing solutions to accomplish goals
efficiently with attention to continuous improvement.. I am highly skilled in building rapport with individuals
from diverse cultures with the proven ability to bring energy, enthusiasm, and leadership to motivate other
stakeholders to achieve project goals. I am self-motivated with excellent leadership and supervisory skills as
well as significant experience in directing projects and optimizing capabilities.
I have experience in promoting confidence and the maintaining of long-term relationships while successfully
interfacing with people of diverse backgrounds. I place an emphasis on professionalism, analytical skills,
flexibility, and consistency in all phases of decision-making. My organizational skills are accustomed to
working in fast-paced environments while maintaining a clear focus on achieving bottom-line results. I have
successfully demonstrated my ability to manage change for improved performance and greater team efficiency.
Experience
Utility Inspector / Survey Party Chief at Golden Field Services, Inc.
April 2011 - Present (4 years 7 months)
Pacific Gas and Electric (PG&E) - Natural Gas
• Serve as Utility Inspector for location of existing natural gas pipeline network anomalies and right of way
encroachments from Oraville, CA to Eureka, CA for 300 miles.
Gillette Wyoming -16" Gas Line
• Worked initial 16" gas line route layout and preliminary survey. Led construction stake and as-built survey
from Tally (mainline books to final tie-in), utilizing GPS and Total Station.
Blue Knight - Knight Warrior Pipeline Project
• Participated in initial layout of 136 mile route and preliminary survey of route, utilizing Trimble R8 GPS
equipment with TDC 2s and 3s with Total Station.
ONEOK Rockies Midstream, LLC - North Dakota and Montana
• Bear Paw Gathering System - Natural gas poly line well connects - layout and centerline survey from well
pads to tie-in existing lines. Located existing lines and conduct above ground as-built on numerous previously
constructed lines.
• Garden Creek 10" Mainline - Layout and centerline survey route from construction. Supervised and surveyed
as-built from right of way to final clean up and testing.
Bear Tracker Energy LLC - North Dakota
• Completed ground-up poly natural gas gathering system. Performed layout and centerline survey mainlines,
laterals, and all well connects for complete system.
• Located existing lines and conduct above ground as-built on previously constructed lines.
• Set up control network, including recovery of survey records and section monuments.
Banner Transportation Co, LLC - North Dakota
• Market Center Gathering System - Completed ground up for both crude oil and steel line.
• Led layout and centerline survey mainlines, laterals, and complete well connects from complete systems.
Located existing foreign pipelines for parallel alignments alignment.
Equipment
• Above surveys were conducted utilizing Trimble GPS equipment and data collection systems. Utilized
Metrotech and RD-8000 locators to determine existing pipeline locations.
Survey Part Chief/Supervisor at W.B. Wells and Association, Inc.
October 1995 - March 2011 (15 years 6 months)
• Experienced in Trimble/Geodometer robotics with 1 man total stations.
• Utilized Geotronics Software - Topcon GTS GPS RTK and Static - all aspects.
• Completed all aspects of boundary - right of way - topographic and construction surveying.
• Provided expertise in underground storm and sewer inspections.
• Served as Equipment Coordinator.
Survey Supervisor: (Northwest Pipeline Expansion) at Gibbs Ellison
February 1995 - October 1995 (9 months)
• Supervised a three segment of pipeline expansion project with 10 crews on final survey.
Survey Supervisor: (Panola Pipeline, Houston, TX) at Gibbs Ellison
October 1994 - February 1995 (5 months)
• Managed 5 survey crews - preliminary surveys and conventional as-built survey in plant route layouts.
Survey Party Chief: (Lakehead Pipeline, Thief River Falls, MN) at Gibbs Ellison
April 1994 - October 1994 (7 months)
• Provided leadership and supervision for all aspects of survey coordination of six crews.
• Handled GPS static control and RTK roving units for total GPS alignment as-built.
Survey Supervisor: (Gasco Pipeline) at National Pipeline Services
January 1994 - April 1994 (4 months)
• Completed preliminary route layout - conventional survey.
Party Chief Survey Crew/Utilities Inspector at Canjon Pipeline Project
November 1993 - January 1994 (3 months)
• Participated in Total Station downtown Los Angeles and Los Angeles River survey and data collection
system.
• Located, marked, and supervised pot hole excavation to determine size, type, and location of utility
crossings.
Party Chief Four-man Crew/Data Collection Coordinator (SW Washington) at Northwest Pipeline
1994 - 1994 (less than a year)
• Led preliminary alignment and survey five spreads Northwest Pipeline Expansion II projects, river crossing
Cowlits Rover wetland delineation, archeological sites, Lietz Set 4, Topcon 303, Lietz SDR 2, SDR 22.
Party Chief Two-Man Crew at Porter Robertson Engineering and Surveying
December 1990 - June 1993 (2 years 7 months)
• Led all areas construction surveying from topography to finish subdivision, land, and right-of-way surveys.
• Completed Destec Pipeline from Mojave Line lateral to five-cogeneration plants route layout, horizontal
control, vertical control, and as-built shuttle lifting facility Rockwell International - HP-48 with TDS data
collections system as well as Lietz Set 2A and Set 2B total Stations.
Party Chief: (Solar Field Electric Generation) at Luz Construction
June 1990 - December 1990 (7 months)
• Was responsible for all phases of solar field mirror placement surveys and power block layout.
Party Chief Four-Man Crew at WYCAL Pipeline
April 1990 - May 1990 (2 months)
• Led routed layout, preliminary survey and equipment curator.
Instrument Man/Party Chief at Alta Engineering - Hughes Surveying
January 1989 - April 1990 (1 year 4 months)
• Completed topography, land, and construction surveys, gaining Set 2 and SDR 2 experience.
Surveyor/Inspector (Pipelines) at Southern Pacific Group
August 1988 - January 1989 (6 months)
• Led preliminary work and layout on a 20" pipeline. Completed restake and as-built finish notes.
Certifications
Structural Pipe/Welding
Robeson Technical College
Radar/Navigation, Fire Control, Communications Training
United States Navy
Education
University of North Carolina
1979

Recomendados

HailmyRizuan_CV von
HailmyRizuan_CVHailmyRizuan_CV
HailmyRizuan_CVHailmy Rizuan
176 views2 Folien
Ken Eaton Res 2016-P2 von
Ken Eaton Res 2016-P2Ken Eaton Res 2016-P2
Ken Eaton Res 2016-P2Kenneth Eaton, PLS (MT-UT-CO)
259 views3 Folien
Ken Eaton Res 2015-P2 von
Ken Eaton Res 2015-P2Ken Eaton Res 2015-P2
Ken Eaton Res 2015-P2Kenneth Eaton, PLS (MT-UT-CO)
298 views3 Folien
Resume von
ResumeResume
ResumeLaura Blair Woodward
173 views1 Folie
E J Piekenbrock Resume 5-2014 Revised von
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 RevisedEugene Piekenbrock
232 views2 Folien
Yates,Jimmy resume von
Yates,Jimmy resume Yates,Jimmy resume
Yates,Jimmy resume Jimmy Yates
439 views3 Folien

Más contenido relacionado

Was ist angesagt?

Resume Dwyer 9-16 von
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16Don Dwyer
213 views5 Folien
2016 resume von
2016 resume2016 resume
2016 resumeTony Becker
230 views3 Folien
Joshua's Resume von
Joshua's ResumeJoshua's Resume
Joshua's ResumeJoshua Phillips, PLS
23 views1 Folie
LCZ GPS Guidelines March 2016 von
LCZ GPS Guidelines March 2016LCZ GPS Guidelines March 2016
LCZ GPS Guidelines March 2016Ricardo Mark Johnson
396 views42 Folien
MDE_Projects_history_2016 von
MDE_Projects_history_2016MDE_Projects_history_2016
MDE_Projects_history_2016Mercedes D. Erdey
116 views4 Folien
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek... von
News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...Lakeland Resources Inc. (TSXv: LK)
418 views6 Folien

Was ist angesagt?(20)

Resume Dwyer 9-16 von Don Dwyer
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16
Don Dwyer213 views
CV mona-rev 2 von Mona Gouda
CV mona-rev 2CV mona-rev 2
CV mona-rev 2
Mona Gouda1.3K views
JKULL_RESUME_AUG2016 von Josh Kull
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016
Josh Kull119 views
Mapping guilford, rev von pggunn
Mapping guilford, revMapping guilford, rev
Mapping guilford, rev
pggunn522 views
John C Jones Jr - Resume von John Jones
John C Jones Jr - ResumeJohn C Jones Jr - Resume
John C Jones Jr - Resume
John Jones233 views
Headings - 2014 issue 1 von Headings
Headings - 2014 issue 1Headings - 2014 issue 1
Headings - 2014 issue 1
Headings201 views
Orion Park Housing Area VOC Plume Assessment von Steve Williams
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
Steve Williams1.5K views

Destacado

KristinHuestis von
KristinHuestisKristinHuestis
KristinHuestisKristin Huestis
218 views3 Folien
Question 6 draft von
Question 6 draftQuestion 6 draft
Question 6 draftCLEKmedia
335 views5 Folien
Lasik post-surgery care von
Lasik post-surgery careLasik post-surgery care
Lasik post-surgery careJenniferJays
218 views8 Folien
презентация Microsoft office power point von
презентация Microsoft office power pointпрезентация Microsoft office power point
презентация Microsoft office power pointOLGA300908
189 views21 Folien
Media task 2 von
Media task 2Media task 2
Media task 2ryanpike16
173 views9 Folien
Presentacion von
PresentacionPresentacion
PresentacionCaah1967
67 views14 Folien

Destacado(10)

Question 6 draft von CLEKmedia
Question 6 draftQuestion 6 draft
Question 6 draft
CLEKmedia335 views
Lasik post-surgery care von JenniferJays
Lasik post-surgery careLasik post-surgery care
Lasik post-surgery care
JenniferJays218 views
презентация Microsoft office power point von OLGA300908
презентация Microsoft office power pointпрезентация Microsoft office power point
презентация Microsoft office power point
OLGA300908189 views
Presentacion von Caah1967
PresentacionPresentacion
Presentacion
Caah196767 views
List of Publications in National and International Journals 100 von aravi kumar
List of Publications in National and International Journals 100List of Publications in National and International Journals 100
List of Publications in National and International Journals 100
aravi kumar194 views
SRAVYA von pvpsit
SRAVYASRAVYA
SRAVYA
pvpsit725 views
new product development vs brand extension von Swarnjeet Kaur
new product development vs brand extensionnew product development vs brand extension
new product development vs brand extension
Swarnjeet Kaur628 views

Similar a John C. Shaw_LinkedIn

Zade Couch - resume von
Zade Couch - resumeZade Couch - resume
Zade Couch - resumeZade Couch
313 views2 Folien
Curriculum Vitae von
Curriculum VitaeCurriculum Vitae
Curriculum VitaeWINFRED ATCHICO
440 views4 Folien
RMP CV Feb 2015 von
RMP CV Feb 2015RMP CV Feb 2015
RMP CV Feb 2015Roxana Platon
437 views3 Folien
Lewis, L-CONDENSED RESUME von
Lewis, L-CONDENSED RESUMELewis, L-CONDENSED RESUME
Lewis, L-CONDENSED RESUMELisa Lewis, PG
177 views4 Folien
Mark C Icenhower Landman Resume 2015_ von
Mark C  Icenhower Landman Resume 2015_Mark C  Icenhower Landman Resume 2015_
Mark C Icenhower Landman Resume 2015_Mark Icenhower
900 views6 Folien
Resume + Abstract-update 4-15-16 von
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Kristy Plummer
410 views7 Folien

Similar a John C. Shaw_LinkedIn(20)

Zade Couch - resume von Zade Couch
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
Zade Couch313 views
Mark C Icenhower Landman Resume 2015_ von Mark Icenhower
Mark C  Icenhower Landman Resume 2015_Mark C  Icenhower Landman Resume 2015_
Mark C Icenhower Landman Resume 2015_
Mark Icenhower900 views
Resume + Abstract-update 4-15-16 von Kristy Plummer
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16
Kristy Plummer410 views
ATEF CV Updated in June 2015 von Atef Farouk
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015
Atef Farouk228 views
Kiper,_Malcolm_Resume_Current 6 1 2015 von Malcolm Kiper
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
Malcolm Kiper183 views
CIRRICULUM VITAE - PelisP von Peter Pelis
CIRRICULUM VITAE - PelisPCIRRICULUM VITAE - PelisP
CIRRICULUM VITAE - PelisP
Peter Pelis585 views
Fritz Ansel resume word(12-14) von Fritz Ansel
Fritz Ansel resume word(12-14)Fritz Ansel resume word(12-14)
Fritz Ansel resume word(12-14)
Fritz Ansel208 views
Pete day resume 8 2010 von Pete Day
Pete day resume 8 2010Pete day resume 8 2010
Pete day resume 8 2010
Pete Day661 views

John C. Shaw_LinkedIn

  • 1. John C. Shaw Utility Inspector / Survey Party Chief at Golden Field Services, Inc. gohomejohn1@msn.com Summary I am a well-organized team player who is committed to completing complex inspection and survey projects in a timely manner. I have the proven ability in building trust, confidence, and team cooperation to complete tasks to deadlines. I have a reputation as a self-directed leader and professional with excellent surveying and inspection skills. I am equipped with an excellent work ethic, a strong sense of responsibility, and a commendable track record of dependability. I communicate with project teams to engage the workforce, providing vision, leadership, and direction to skillfully manage complex projects and with organizations spanning multiple disciplines. I am noted by management for know-how with a focus on completing projects on time and under budget. I am recognized as troubleshooter and problem solver adept at conceptualizing and implementing solutions to accomplish goals efficiently with attention to continuous improvement.. I am highly skilled in building rapport with individuals from diverse cultures with the proven ability to bring energy, enthusiasm, and leadership to motivate other stakeholders to achieve project goals. I am self-motivated with excellent leadership and supervisory skills as well as significant experience in directing projects and optimizing capabilities. I have experience in promoting confidence and the maintaining of long-term relationships while successfully interfacing with people of diverse backgrounds. I place an emphasis on professionalism, analytical skills, flexibility, and consistency in all phases of decision-making. My organizational skills are accustomed to working in fast-paced environments while maintaining a clear focus on achieving bottom-line results. I have successfully demonstrated my ability to manage change for improved performance and greater team efficiency. Experience Utility Inspector / Survey Party Chief at Golden Field Services, Inc. April 2011 - Present (4 years 7 months) Pacific Gas and Electric (PG&E) - Natural Gas • Serve as Utility Inspector for location of existing natural gas pipeline network anomalies and right of way encroachments from Oraville, CA to Eureka, CA for 300 miles. Gillette Wyoming -16" Gas Line • Worked initial 16" gas line route layout and preliminary survey. Led construction stake and as-built survey from Tally (mainline books to final tie-in), utilizing GPS and Total Station.
  • 2. Blue Knight - Knight Warrior Pipeline Project • Participated in initial layout of 136 mile route and preliminary survey of route, utilizing Trimble R8 GPS equipment with TDC 2s and 3s with Total Station. ONEOK Rockies Midstream, LLC - North Dakota and Montana • Bear Paw Gathering System - Natural gas poly line well connects - layout and centerline survey from well pads to tie-in existing lines. Located existing lines and conduct above ground as-built on numerous previously constructed lines. • Garden Creek 10" Mainline - Layout and centerline survey route from construction. Supervised and surveyed as-built from right of way to final clean up and testing. Bear Tracker Energy LLC - North Dakota • Completed ground-up poly natural gas gathering system. Performed layout and centerline survey mainlines, laterals, and all well connects for complete system. • Located existing lines and conduct above ground as-built on previously constructed lines. • Set up control network, including recovery of survey records and section monuments. Banner Transportation Co, LLC - North Dakota • Market Center Gathering System - Completed ground up for both crude oil and steel line. • Led layout and centerline survey mainlines, laterals, and complete well connects from complete systems. Located existing foreign pipelines for parallel alignments alignment. Equipment • Above surveys were conducted utilizing Trimble GPS equipment and data collection systems. Utilized Metrotech and RD-8000 locators to determine existing pipeline locations. Survey Part Chief/Supervisor at W.B. Wells and Association, Inc. October 1995 - March 2011 (15 years 6 months) • Experienced in Trimble/Geodometer robotics with 1 man total stations. • Utilized Geotronics Software - Topcon GTS GPS RTK and Static - all aspects. • Completed all aspects of boundary - right of way - topographic and construction surveying. • Provided expertise in underground storm and sewer inspections. • Served as Equipment Coordinator. Survey Supervisor: (Northwest Pipeline Expansion) at Gibbs Ellison February 1995 - October 1995 (9 months) • Supervised a three segment of pipeline expansion project with 10 crews on final survey. Survey Supervisor: (Panola Pipeline, Houston, TX) at Gibbs Ellison October 1994 - February 1995 (5 months) • Managed 5 survey crews - preliminary surveys and conventional as-built survey in plant route layouts.
  • 3. Survey Party Chief: (Lakehead Pipeline, Thief River Falls, MN) at Gibbs Ellison April 1994 - October 1994 (7 months) • Provided leadership and supervision for all aspects of survey coordination of six crews. • Handled GPS static control and RTK roving units for total GPS alignment as-built. Survey Supervisor: (Gasco Pipeline) at National Pipeline Services January 1994 - April 1994 (4 months) • Completed preliminary route layout - conventional survey. Party Chief Survey Crew/Utilities Inspector at Canjon Pipeline Project November 1993 - January 1994 (3 months) • Participated in Total Station downtown Los Angeles and Los Angeles River survey and data collection system. • Located, marked, and supervised pot hole excavation to determine size, type, and location of utility crossings. Party Chief Four-man Crew/Data Collection Coordinator (SW Washington) at Northwest Pipeline 1994 - 1994 (less than a year) • Led preliminary alignment and survey five spreads Northwest Pipeline Expansion II projects, river crossing Cowlits Rover wetland delineation, archeological sites, Lietz Set 4, Topcon 303, Lietz SDR 2, SDR 22. Party Chief Two-Man Crew at Porter Robertson Engineering and Surveying December 1990 - June 1993 (2 years 7 months) • Led all areas construction surveying from topography to finish subdivision, land, and right-of-way surveys. • Completed Destec Pipeline from Mojave Line lateral to five-cogeneration plants route layout, horizontal control, vertical control, and as-built shuttle lifting facility Rockwell International - HP-48 with TDS data collections system as well as Lietz Set 2A and Set 2B total Stations. Party Chief: (Solar Field Electric Generation) at Luz Construction June 1990 - December 1990 (7 months) • Was responsible for all phases of solar field mirror placement surveys and power block layout. Party Chief Four-Man Crew at WYCAL Pipeline April 1990 - May 1990 (2 months) • Led routed layout, preliminary survey and equipment curator. Instrument Man/Party Chief at Alta Engineering - Hughes Surveying January 1989 - April 1990 (1 year 4 months) • Completed topography, land, and construction surveys, gaining Set 2 and SDR 2 experience. Surveyor/Inspector (Pipelines) at Southern Pacific Group August 1988 - January 1989 (6 months) • Led preliminary work and layout on a 20" pipeline. Completed restake and as-built finish notes.
  • 4. Certifications Structural Pipe/Welding Robeson Technical College Radar/Navigation, Fire Control, Communications Training United States Navy Education University of North Carolina 1979