IMPORTANT CODE REQUIREMENT AND
PRACTICES RELATED TO WELDING
2. Checkthe seamnumberon the job.
( A ) BEFORE STARTING WELDING
1. Forspecific seam:
Refershop weld plan, WPS and test plan.
2
( A ) BEFORE STARTING WELDING
6. Checkcable connections and earthing.
IMPORTANT CODE REQUIREMENT AND
PRACTICES RELATED TO WELDING
8. Provide run - in, run - out plates forL - seams.
25 mm 25 mm
25 mm25 mm
7. Clean WEP+25 mmon eitherside. Remove rust , paint, oil etc.
3
11. Use SS wire brush /wire wheel forSS, Inconels , Monels and
Cupro-nickels. Do not use grinding wheels used on CS.
9. Get temperature sticks for preheat & interpass.
Temperature > Preheat
< Interpass
25 mm 25 mm
BURNER
10. Checkpreheat at least 25 mm
away fromWEPon both sides.
IMPORTANT CODE REQUIREMENT AND
PRACTICES RELATED TO WELDING
4
IMPORTANT CODE REQUIREMENT AND
PRACTICES RELATED TO WELDING
2. Weaving < 3 x Electrode diameter.
( B) WHILE WELDING
1. Tacks and temporary cleats
- Use specified electrodes and preheats
- Qualified Welder
- No hammering
4. SMAWElectrode left overafter4 hrs - return to stores.
3. No stray arcing on job.
7
โ€ข WELD JOINT NOT CLEAN
โ€ข LOWER PREHEAT TEMPERATURE
WELDING DEFECTS
POROSITIES:
โ€ข STRONG WIND FLOW ON ARC
8
- GTAW / GMAW / FCAW :
โ€ข RUSTED FILLER WIRE
โ€ข DAMAGED TORCH- CLOGGED TUBE, GAS PASSAGE
โ€ข TURBULENT GAS FLOW - USE GAS LENS
โ€ข INADEQUATE GAS FLOW - FAULTY FLOW METER
โ€ข FCAW GAS PREHEATER NOT WORKING
โ€ข GAS PURITY CHECK
WELDING DEFECTS
POROSITIES:
9
โ€ข IMPROPER INTERPASS CLEANING
โ€ข POOR BEAD FINISH- ROUGH, LUMPY BEADS NOT
DRESSED BEFORE WELDING
โ€ข FAULTY RESTART - LUMP AT STARING POINT - TO BE
GROUND
โ€ข WELDING PARAMETERS (I,V, T.S) NOT AS PER WPS
โ€ข WRONG BEAD PLACEMENT
SLAG INCLUSIONS:
WELDING DEFECTS
10
โ€ข LOWER CURRENT
WELDING DEFECTS
LACK OF FUSION / PENETRATION
LF
LP
โ€ข POOR WEP / SET-UP - LOW ROOT GAP,
HIGH ROOT FACE, LOWER INCLUDED ANGLE
โ€ข RUST / PAINT ON WEP
11
โ€ข UNBAKED ELECTRODES / FLUXES
โ€ข LOW PREHEAT
โ€ข INSUFFICIENT POST HEATING
โ€ข UNCLEAN WELD JOINTS
WELDING DEFECTS
CRACKS
12
โ€ข HEAVY RESTRAINT- WELD TACKS WITH HIGHER
CROSS SECTION
โ€ข EXCESSIVE LOCAL HEATING - USE OF RING BURNERS
( NOZZLE# SHELL/ D.END JOINTS )
โ€ข USE OF WRONG ELECTRODE / FLUX
โ€ข FAULTY CONS. QUALITY / SELECTION
WELDING DEFECTS
CRACKS

More Related Content

What's hot

10 flanges gaskets &amp; fasteners
10 flanges gaskets &amp; fasteners10 flanges gaskets &amp; fasteners
10 flanges gaskets &amp; fastenerscahngawi1981
ย 
Welding visual inspection
Welding visual inspectionWelding visual inspection
Welding visual inspectionbusinespartner
ย 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginnersMOHAMMAD ATIF ALI
ย 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
ย 
Latest cswip 3.1 book
Latest cswip 3.1 bookLatest cswip 3.1 book
Latest cswip 3.1 bookRehan khan
ย 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswipguest831c1e
ย 
Wis5 welding symbols 05
Wis5 welding symbols 05Wis5 welding symbols 05
Wis5 welding symbols 05Thang Do Minh
ย 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...Blastline Institute
ย 
cswip-3-1-new-book
 cswip-3-1-new-book cswip-3-1-new-book
cswip-3-1-new-bookRohit Jaiswal
ย 
Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Lennard Charles
ย 
16 wis5 consumable
16 wis5 consumable16 wis5 consumable
16 wis5 consumableTori Tom
ย 
Welding Defects
Welding DefectsWelding Defects
Welding Defectsdjhelliweld
ย 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009Jithu John
ย 
Cswip 3.1 course note 2016 with question & answers
Cswip 3.1 course note 2016 with question & answersCswip 3.1 course note 2016 with question & answers
Cswip 3.1 course note 2016 with question & answersSK PK
ย 
Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15Thang Do Minh
ย 

What's hot (16)

10 flanges gaskets &amp; fasteners
10 flanges gaskets &amp; fasteners10 flanges gaskets &amp; fasteners
10 flanges gaskets &amp; fasteners
ย 
Welding visual inspection
Welding visual inspectionWelding visual inspection
Welding visual inspection
ย 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
ย 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
ย 
Latest cswip 3.1 book
Latest cswip 3.1 bookLatest cswip 3.1 book
Latest cswip 3.1 book
ย 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswip
ย 
Kobelco welding handbook 2008ok
Kobelco welding handbook 2008okKobelco welding handbook 2008ok
Kobelco welding handbook 2008ok
ย 
Wis5 welding symbols 05
Wis5 welding symbols 05Wis5 welding symbols 05
Wis5 welding symbols 05
ย 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
ย 
cswip-3-1-new-book
 cswip-3-1-new-book cswip-3-1-new-book
cswip-3-1-new-book
ย 
Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)Sampleq practice-exam-d11-2002 (1)
Sampleq practice-exam-d11-2002 (1)
ย 
16 wis5 consumable
16 wis5 consumable16 wis5 consumable
16 wis5 consumable
ย 
Welding Defects
Welding DefectsWelding Defects
Welding Defects
ย 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009
ย 
Cswip 3.1 course note 2016 with question & answers
Cswip 3.1 course note 2016 with question & answersCswip 3.1 course note 2016 with question & answers
Cswip 3.1 course note 2016 with question & answers
ย 
Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15
ย 

Viewers also liked

weldability and defects in weldments
weldability and defects in weldmentsweldability and defects in weldments
weldability and defects in weldmentsBahri Fetahi
ย 
Welding lectures 14 16
Welding lectures 14 16Welding lectures 14 16
Welding lectures 14 16Suraj Aggarwal
ย 
9488085 welding-defects
9488085 welding-defects9488085 welding-defects
9488085 welding-defectsRony Simeon
ย 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare pptMandy Suzanne
ย 
Inspecรงรฃo Visual Soldadura
Inspecรงรฃo Visual SoldaduraInspecรงรฃo Visual Soldadura
Inspecรงรฃo Visual SoldaduraTรœV Rheinland AG
ย 
Weld symbolsproof
Weld symbolsproofWeld symbolsproof
Weld symbolsproofchander_sek
ย 
Nityanand gopalika digital detectors for industrial applications
Nityanand gopalika   digital detectors for industrial applicationsNityanand gopalika   digital detectors for industrial applications
Nityanand gopalika digital detectors for industrial applicationsNityanand Gopalika
ย 
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...David Scaduto
ย 
AWS Welding Symbols Certificate
AWS Welding Symbols CertificateAWS Welding Symbols Certificate
AWS Welding Symbols CertificateBeau Bonin
ย 
Nityanand gopalika digital radiography performance study
Nityanand gopalika   digital radiography performance studyNityanand gopalika   digital radiography performance study
Nityanand gopalika digital radiography performance studyNityanand Gopalika
ย 
Weld defects and discontinuities
Weld defects and discontinuitiesWeld defects and discontinuities
Weld defects and discontinuitiesNima Tajallipour
ย 
Weldmaster - Assignment 1st year
Weldmaster - Assignment 1st yearWeldmaster - Assignment 1st year
Weldmaster - Assignment 1st yearMohinder Pal Ahuja
ย 
Welding defects causes & correction
Welding defects causes & correctionWelding defects causes & correction
Welding defects causes & correctionRavi Teja
ย 
Welding defects
Welding defectsWelding defects
Welding defectsGulfam Hussain
ย 
Defects in welding
Defects  in  weldingDefects  in  welding
Defects in weldingPRABIR DATTA
ย 
Introduction to Phased Array Using the OmniScan MX2 - Part One
Introduction to Phased Array Using the OmniScan MX2 - Part OneIntroduction to Phased Array Using the OmniScan MX2 - Part One
Introduction to Phased Array Using the OmniScan MX2 - Part OneOlympus IMS
ย 
Advances in Phased Array Weld Inspection Scan Plan Designs
Advances in Phased Array Weld Inspection Scan Plan DesignsAdvances in Phased Array Weld Inspection Scan Plan Designs
Advances in Phased Array Weld Inspection Scan Plan DesignsOlympus IMS
ย 
Weld Defects and Material Properties - Presentation
Weld Defects and Material Properties - PresentationWeld Defects and Material Properties - Presentation
Weld Defects and Material Properties - PresentationBrett Leary
ย 
Welding defects
Welding defects Welding defects
Welding defects Pankaj Saini
ย 

Viewers also liked (20)

weldability and defects in weldments
weldability and defects in weldmentsweldability and defects in weldments
weldability and defects in weldments
ย 
Welding lectures 14 16
Welding lectures 14 16Welding lectures 14 16
Welding lectures 14 16
ย 
9488085 welding-defects
9488085 welding-defects9488085 welding-defects
9488085 welding-defects
ย 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
ย 
Inspecรงรฃo Visual Soldadura
Inspecรงรฃo Visual SoldaduraInspecรงรฃo Visual Soldadura
Inspecรงรฃo Visual Soldadura
ย 
Weld symbolsproof
Weld symbolsproofWeld symbolsproof
Weld symbolsproof
ย 
Nityanand gopalika digital detectors for industrial applications
Nityanand gopalika   digital detectors for industrial applicationsNityanand gopalika   digital detectors for industrial applications
Nityanand gopalika digital detectors for industrial applications
ย 
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...
Increasing Amorphous Selenium Thickness in Direct Conversion Flat-Panel Image...
ย 
AWS Welding Symbols Certificate
AWS Welding Symbols CertificateAWS Welding Symbols Certificate
AWS Welding Symbols Certificate
ย 
Nityanand gopalika digital radiography performance study
Nityanand gopalika   digital radiography performance studyNityanand gopalika   digital radiography performance study
Nityanand gopalika digital radiography performance study
ย 
Weld defects and discontinuities
Weld defects and discontinuitiesWeld defects and discontinuities
Weld defects and discontinuities
ย 
Weldmaster - Assignment 1st year
Weldmaster - Assignment 1st yearWeldmaster - Assignment 1st year
Weldmaster - Assignment 1st year
ย 
Welding defects causes & correction
Welding defects causes & correctionWelding defects causes & correction
Welding defects causes & correction
ย 
Welding defects
Welding defectsWelding defects
Welding defects
ย 
Defects in welding
Defects  in  weldingDefects  in  welding
Defects in welding
ย 
Introduction to Phased Array Using the OmniScan MX2 - Part One
Introduction to Phased Array Using the OmniScan MX2 - Part OneIntroduction to Phased Array Using the OmniScan MX2 - Part One
Introduction to Phased Array Using the OmniScan MX2 - Part One
ย 
Advances in Phased Array Weld Inspection Scan Plan Designs
Advances in Phased Array Weld Inspection Scan Plan DesignsAdvances in Phased Array Weld Inspection Scan Plan Designs
Advances in Phased Array Weld Inspection Scan Plan Designs
ย 
NDT TESTING
NDT  TESTINGNDT  TESTING
NDT TESTING
ย 
Weld Defects and Material Properties - Presentation
Weld Defects and Material Properties - PresentationWeld Defects and Material Properties - Presentation
Weld Defects and Material Properties - Presentation
ย 
Welding defects
Welding defects Welding defects
Welding defects
ย 

Similar to Weld defects

PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)jaspreet singh
ย 
Spot weldings
Spot weldingsSpot weldings
Spot weldingsJitesh Gaurav
ย 
01) workshop design consideration for bolted and welded connections -apr '20
01) workshop   design consideration for bolted and welded connections -apr '2001) workshop   design consideration for bolted and welded connections -apr '20
01) workshop design consideration for bolted and welded connections -apr '20sameer sawant
ย 
Handboek Aristorod Lasdraden
Handboek Aristorod LasdradenHandboek Aristorod Lasdraden
Handboek Aristorod LasdradenJorg Eichhorn
ย 
10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdfKetanBhore
ย 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1Elsayed Amer
ย 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Ramez Abdalla, M.Sc
ย 
2005 CVX Hot Bolting Procedures.ppt
2005 CVX Hot Bolting Procedures.ppt2005 CVX Hot Bolting Procedures.ppt
2005 CVX Hot Bolting Procedures.pptDebbie Collett
ย 
The Impact of Temperature-on-Common Sealer Defects
The Impact of Temperature-on-Common Sealer DefectsThe Impact of Temperature-on-Common Sealer Defects
The Impact of Temperature-on-Common Sealer DefectsRob Gladstone
ย 
The Impact of Temperature On Common Sealer Defects
The Impact of Temperature On Common Sealer DefectsThe Impact of Temperature On Common Sealer Defects
The Impact of Temperature On Common Sealer DefectsAllison Spooner
ย 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trialNagesh H
ย 
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdfGirgis A. Rezqallah
ย 
Steam blowing procedure
Steam blowing procedure Steam blowing procedure
Steam blowing procedure Vaibhav Paydelwar
ย 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESGaurav Dalal
ย 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSMohan Doshi
ย 
Sn100c Bar Solder
Sn100c Bar SolderSn100c Bar Solder
Sn100c Bar SolderFCT Solder
ย 
Gas disaster in steel industries
Gas disaster in steel industriesGas disaster in steel industries
Gas disaster in steel industriesEr. EHS & Fire Syed Ali
ย 
PPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham BurahPPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham BurahTuan Afaham Burah
ย 

Similar to Weld defects (20)

Improving PCBA wave soldering Quality
Improving PCBA wave soldering QualityImproving PCBA wave soldering Quality
Improving PCBA wave soldering Quality
ย 
PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)
ย 
Spot weldings
Spot weldingsSpot weldings
Spot weldings
ย 
01) workshop design consideration for bolted and welded connections -apr '20
01) workshop   design consideration for bolted and welded connections -apr '2001) workshop   design consideration for bolted and welded connections -apr '20
01) workshop design consideration for bolted and welded connections -apr '20
ย 
Handboek Aristorod Lasdraden
Handboek Aristorod LasdradenHandboek Aristorod Lasdraden
Handboek Aristorod Lasdraden
ย 
10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf10 Ways to murder your pump.pdf
10 Ways to murder your pump.pdf
ย 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
ย 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
ย 
2005 CVX Hot Bolting Procedures.ppt
2005 CVX Hot Bolting Procedures.ppt2005 CVX Hot Bolting Procedures.ppt
2005 CVX Hot Bolting Procedures.ppt
ย 
The Impact of Temperature-on-Common Sealer Defects
The Impact of Temperature-on-Common Sealer DefectsThe Impact of Temperature-on-Common Sealer Defects
The Impact of Temperature-on-Common Sealer Defects
ย 
The Impact of Temperature On Common Sealer Defects
The Impact of Temperature On Common Sealer DefectsThe Impact of Temperature On Common Sealer Defects
The Impact of Temperature On Common Sealer Defects
ย 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
ย 
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf
140416_14_54_NAMAT_UPVC_DRAINAGE (4).pdf
ย 
Steam blowing procedure
Steam blowing procedure Steam blowing procedure
Steam blowing procedure
ย 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVES
ย 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICS
ย 
Sn100c Bar Solder
Sn100c Bar SolderSn100c Bar Solder
Sn100c Bar Solder
ย 
PRESNTAION
PRESNTAIONPRESNTAION
PRESNTAION
ย 
Gas disaster in steel industries
Gas disaster in steel industriesGas disaster in steel industries
Gas disaster in steel industries
ย 
PPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham BurahPPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham Burah
ย 

More from Jithu John

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptxJithu John
ย 
my ppt.pptx
my ppt.pptxmy ppt.pptx
my ppt.pptxJithu John
ย 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairsJithu John
ย 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cuiJithu John
ย 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processesJithu John
ย 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
ย 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
ย 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
ย 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
ย 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
ย 
Alignment
AlignmentAlignment
AlignmentJithu John
ย 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gudJithu John
ย 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsJithu John
ย 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
ย 

More from Jithu John (14)

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx
ย 
my ppt.pptx
my ppt.pptxmy ppt.pptx
my ppt.pptx
ย 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs
ย 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cui
ย 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
ย 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
ย 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
ย 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
ย 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
ย 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
ย 
Alignment
AlignmentAlignment
Alignment
ย 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud
ย 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steels
ย 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
ย 

Recently uploaded

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
ย 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
ย 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
ย 

Recently uploaded (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
ย 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 

Weld defects

  • 1. 1 IMPORTANT CODE REQUIREMENT AND PRACTICES RELATED TO WELDING 2. Checkthe seamnumberon the job. ( A ) BEFORE STARTING WELDING 1. Forspecific seam: Refershop weld plan, WPS and test plan.
  • 2. 2 ( A ) BEFORE STARTING WELDING 6. Checkcable connections and earthing. IMPORTANT CODE REQUIREMENT AND PRACTICES RELATED TO WELDING 8. Provide run - in, run - out plates forL - seams. 25 mm 25 mm 25 mm25 mm 7. Clean WEP+25 mmon eitherside. Remove rust , paint, oil etc.
  • 3. 3 11. Use SS wire brush /wire wheel forSS, Inconels , Monels and Cupro-nickels. Do not use grinding wheels used on CS. 9. Get temperature sticks for preheat & interpass. Temperature > Preheat < Interpass 25 mm 25 mm BURNER 10. Checkpreheat at least 25 mm away fromWEPon both sides. IMPORTANT CODE REQUIREMENT AND PRACTICES RELATED TO WELDING
  • 4. 4 IMPORTANT CODE REQUIREMENT AND PRACTICES RELATED TO WELDING 2. Weaving < 3 x Electrode diameter. ( B) WHILE WELDING 1. Tacks and temporary cleats - Use specified electrodes and preheats - Qualified Welder - No hammering 4. SMAWElectrode left overafter4 hrs - return to stores. 3. No stray arcing on job.
  • 5. 7 โ€ข WELD JOINT NOT CLEAN โ€ข LOWER PREHEAT TEMPERATURE WELDING DEFECTS POROSITIES: โ€ข STRONG WIND FLOW ON ARC
  • 6. 8 - GTAW / GMAW / FCAW : โ€ข RUSTED FILLER WIRE โ€ข DAMAGED TORCH- CLOGGED TUBE, GAS PASSAGE โ€ข TURBULENT GAS FLOW - USE GAS LENS โ€ข INADEQUATE GAS FLOW - FAULTY FLOW METER โ€ข FCAW GAS PREHEATER NOT WORKING โ€ข GAS PURITY CHECK WELDING DEFECTS POROSITIES:
  • 7. 9 โ€ข IMPROPER INTERPASS CLEANING โ€ข POOR BEAD FINISH- ROUGH, LUMPY BEADS NOT DRESSED BEFORE WELDING โ€ข FAULTY RESTART - LUMP AT STARING POINT - TO BE GROUND โ€ข WELDING PARAMETERS (I,V, T.S) NOT AS PER WPS โ€ข WRONG BEAD PLACEMENT SLAG INCLUSIONS: WELDING DEFECTS
  • 8. 10 โ€ข LOWER CURRENT WELDING DEFECTS LACK OF FUSION / PENETRATION LF LP โ€ข POOR WEP / SET-UP - LOW ROOT GAP, HIGH ROOT FACE, LOWER INCLUDED ANGLE โ€ข RUST / PAINT ON WEP
  • 9. 11 โ€ข UNBAKED ELECTRODES / FLUXES โ€ข LOW PREHEAT โ€ข INSUFFICIENT POST HEATING โ€ข UNCLEAN WELD JOINTS WELDING DEFECTS CRACKS
  • 10. 12 โ€ข HEAVY RESTRAINT- WELD TACKS WITH HIGHER CROSS SECTION โ€ข EXCESSIVE LOCAL HEATING - USE OF RING BURNERS ( NOZZLE# SHELL/ D.END JOINTS ) โ€ข USE OF WRONG ELECTRODE / FLUX โ€ข FAULTY CONS. QUALITY / SELECTION WELDING DEFECTS CRACKS