Raj Sachdeva
PMP & Oracle Certified Master
Section Manager Pace Suburban Bus
Rajinder.sachdeva@pacebus.com

1/9/2014

1
1/9/2014

4


To provide a single Enterprise Asset Management solution that would integrate
with the current Oracle e-Business Suite (EBS) implementation



eAM solution had to meet the business needs of these six business units while
causing minimal business process changes – Create work order in 30 seconds!!!!!



FIFO Costing & warranty tracking



Work order Billing for Third Party Contractor



Item Rebuild Work Order



Pace’s upper management required full business intelligence visibility.



Asset transfer and Asset Tracking



Data conversion and migration



Performance management



Training to mechanics and foremen

1/9/2014

5
Work Order in 30Seconds

1/9/2014

6
1. Enter the Asset (Bus) Number

2. Enter Object Code

3. Click Save
1. Scroll down to Operation Requirements
2. Enter Mechanic Employee Number or Last Name
1. Click Save

Click Print Work Order










Solid team work
Business involved in every phase of
implementation cycle and decision making
Acceptance to business changes
Thorough project plan and activities
Well constructed “TO Be” processes
One final CRP and Go Live
Integration considerations for Exadata and
OBIEE
1/9/2014

10
1/9/2014

11
1/9/2014

12










Key points is “TO BE “Processes which includes gather
requirements, Configuration and Build Phase.
Minimum number of instances
Data Conversion in Flashback mode of database
Pilot testing in medium busy and the busiest repair
workshop.
Testing of existing modules Upgrade in parallel of
implementation in-house
Migration of Oracle e-Business database to Exadata with
Oracle Active Data Guard.
Upgrade testing of existing modules with eAM and
Inventory enabled
Oracle Navigation Training and then role based training
and finally hand holding UPK training during go-live.

1/9/2014

13






Migration Oracle E-Business database to
Exadata RAC with active data guard.
Cache the major inventory and eAM table
related to WIP
All reports point to Active data guard standby
server

1/9/2014

14




OBIEE BI-Publisher Reporting tools with
organization security and Single Sign On
Implementation of OBIA eAM and Supply
Chain Management to create the ad hoc
reports and dash board for eAM and
Inventory

1/9/2014

15
1/9/2014

16
1/9/2014

17

Weitere ähnliche Inhalte

Was ist angesagt?

Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelAras
 
Introduction to kovair ALM and Integration Products
Introduction to kovair ALM and Integration ProductsIntroduction to kovair ALM and Integration Products
Introduction to kovair ALM and Integration ProductsKovair
 
HP Case study performancetestingusinghp-loadrunner
HP Case study performancetestingusinghp-loadrunnerHP Case study performancetestingusinghp-loadrunner
HP Case study performancetestingusinghp-loadrunnerSatya Harish
 
How to Manage Your Requirements Efficiently - by Kovair Software
How to Manage Your Requirements Efficiently - by Kovair SoftwareHow to Manage Your Requirements Efficiently - by Kovair Software
How to Manage Your Requirements Efficiently - by Kovair SoftwareKovair
 
Kovair Omnibus Integration with Multi Vendor Tools
Kovair Omnibus Integration with Multi Vendor ToolsKovair Omnibus Integration with Multi Vendor Tools
Kovair Omnibus Integration with Multi Vendor ToolsKovair
 
Enhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsEnhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsaminab
 
DevOps for SAP CPI presentation
DevOps for SAP CPI presentationDevOps for SAP CPI presentation
DevOps for SAP CPI presentationDaniel Graversen
 
Benefits of Real time KPIs & Metrics in an Integrated Environment
Benefits of Real time KPIs & Metrics in an Integrated EnvironmentBenefits of Real time KPIs & Metrics in an Integrated Environment
Benefits of Real time KPIs & Metrics in an Integrated EnvironmentKovair
 
ALM Revisited
ALM RevisitedALM Revisited
ALM RevisitedKovair
 
Kovair Migration Solution for ALM Tools
Kovair Migration Solution for ALM ToolsKovair Migration Solution for ALM Tools
Kovair Migration Solution for ALM ToolsKovair
 
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...Cedar Consulting
 
Leveraging Worksoft Beyond Test Automation at Mosaic
Leveraging Worksoft Beyond Test Automation at MosaicLeveraging Worksoft Beyond Test Automation at Mosaic
Leveraging Worksoft Beyond Test Automation at MosaicWorksoft
 
Kovair ALM Studio Overview
Kovair ALM Studio OverviewKovair ALM Studio Overview
Kovair ALM Studio OverviewKovair
 
GraciaVijayan_Resume (1)
GraciaVijayan_Resume (1)GraciaVijayan_Resume (1)
GraciaVijayan_Resume (1)Gracia Vijayan
 
Sap Upgrade Project Brief
Sap Upgrade Project BriefSap Upgrade Project Brief
Sap Upgrade Project Briefvpallapothu
 
Testing SAP PI/PO systems Full version
Testing SAP PI/PO systems Full versionTesting SAP PI/PO systems Full version
Testing SAP PI/PO systems Full versionDaniel Graversen
 
Continuous delivery for digital transformation renu rajani v0 1
Continuous delivery for digital  transformation renu rajani v0 1Continuous delivery for digital  transformation renu rajani v0 1
Continuous delivery for digital transformation renu rajani v0 1Innovation Roots
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...InSync Conference
 

Was ist angesagt? (20)

Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Introduction to kovair ALM and Integration Products
Introduction to kovair ALM and Integration ProductsIntroduction to kovair ALM and Integration Products
Introduction to kovair ALM and Integration Products
 
HP Case study performancetestingusinghp-loadrunner
HP Case study performancetestingusinghp-loadrunnerHP Case study performancetestingusinghp-loadrunner
HP Case study performancetestingusinghp-loadrunner
 
How to Manage Your Requirements Efficiently - by Kovair Software
How to Manage Your Requirements Efficiently - by Kovair SoftwareHow to Manage Your Requirements Efficiently - by Kovair Software
How to Manage Your Requirements Efficiently - by Kovair Software
 
Kovair Omnibus Integration with Multi Vendor Tools
Kovair Omnibus Integration with Multi Vendor ToolsKovair Omnibus Integration with Multi Vendor Tools
Kovair Omnibus Integration with Multi Vendor Tools
 
Enhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operationsEnhancement packages for sap erp what's new in logistics and operations
Enhancement packages for sap erp what's new in logistics and operations
 
DevOps for SAP CPI presentation
DevOps for SAP CPI presentationDevOps for SAP CPI presentation
DevOps for SAP CPI presentation
 
Benefits of Real time KPIs & Metrics in an Integrated Environment
Benefits of Real time KPIs & Metrics in an Integrated EnvironmentBenefits of Real time KPIs & Metrics in an Integrated Environment
Benefits of Real time KPIs & Metrics in an Integrated Environment
 
ALM Revisited
ALM RevisitedALM Revisited
ALM Revisited
 
Kovair Migration Solution for ALM Tools
Kovair Migration Solution for ALM ToolsKovair Migration Solution for ALM Tools
Kovair Migration Solution for ALM Tools
 
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
Allen & Overy: Delivering Business Value from Our PeopleSoft HCM 9.2 Investme...
 
Leveraging Worksoft Beyond Test Automation at Mosaic
Leveraging Worksoft Beyond Test Automation at MosaicLeveraging Worksoft Beyond Test Automation at Mosaic
Leveraging Worksoft Beyond Test Automation at Mosaic
 
Kovair ALM Studio Overview
Kovair ALM Studio OverviewKovair ALM Studio Overview
Kovair ALM Studio Overview
 
Dilip_K_Sharma_CV
Dilip_K_Sharma_CVDilip_K_Sharma_CV
Dilip_K_Sharma_CV
 
GraciaVijayan_Resume (1)
GraciaVijayan_Resume (1)GraciaVijayan_Resume (1)
GraciaVijayan_Resume (1)
 
Sap Upgrade Project Brief
Sap Upgrade Project BriefSap Upgrade Project Brief
Sap Upgrade Project Brief
 
107 day implementation of oracle ebs
107 day implementation of oracle ebs107 day implementation of oracle ebs
107 day implementation of oracle ebs
 
Testing SAP PI/PO systems Full version
Testing SAP PI/PO systems Full versionTesting SAP PI/PO systems Full version
Testing SAP PI/PO systems Full version
 
Continuous delivery for digital transformation renu rajani v0 1
Continuous delivery for digital  transformation renu rajani v0 1Continuous delivery for digital  transformation renu rajani v0 1
Continuous delivery for digital transformation renu rajani v0 1
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...
 

Ähnlich wie PMP Oracle Master Implements Asset Management

Soa12c launch 3 bpm 12c cr
Soa12c launch 3 bpm 12c crSoa12c launch 3 bpm 12c cr
Soa12c launch 3 bpm 12c crVasily Demin
 
Chainsys proposal ki v1-28-feb-2013
Chainsys proposal ki  v1-28-feb-2013Chainsys proposal ki  v1-28-feb-2013
Chainsys proposal ki v1-28-feb-2013Uppiliappan Gopalan
 
SAP on Azure Technical Pitch Deck
SAP on Azure Technical Pitch DeckSAP on Azure Technical Pitch Deck
SAP on Azure Technical Pitch DeckNicholas Vossburg
 
Rajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_ConsultantRajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_ConsultantRAJESH REDDI
 
sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)Prof Dr Mehmed ERDAS
 
10 tips for successful 12.2 upgrade
10 tips for successful 12.2 upgrade10 tips for successful 12.2 upgrade
10 tips for successful 12.2 upgradeRavi Madabhushanam
 
Lanny resume 190804
Lanny resume 190804Lanny resume 190804
Lanny resume 190804LannyIrwan
 
Chainsys Accelerate Presentation
Chainsys Accelerate PresentationChainsys Accelerate Presentation
Chainsys Accelerate Presentationsundu72
 
Robin Hesje - CV - Application Design
Robin Hesje - CV - Application DesignRobin Hesje - CV - Application Design
Robin Hesje - CV - Application DesignRobin Hesje
 
Business_Process_Modeling_Training.ppt
Business_Process_Modeling_Training.pptBusiness_Process_Modeling_Training.ppt
Business_Process_Modeling_Training.pptssuser50762b
 
The Power of Converged HP BAC and Operations Manager
The Power of Converged HP BAC and Operations ManagerThe Power of Converged HP BAC and Operations Manager
The Power of Converged HP BAC and Operations ManagerStefan Bergstein
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld
 
The Road to Simple: Accelerate S/4HANA Adoption with Automation
The Road to Simple: Accelerate S/4HANA Adoption with AutomationThe Road to Simple: Accelerate S/4HANA Adoption with Automation
The Road to Simple: Accelerate S/4HANA Adoption with AutomationWorksoft
 

Ähnlich wie PMP Oracle Master Implements Asset Management (20)

SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracleSOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
SOA_BPM_12c_launch_event_BPM_track_proficiency_features_joost_volker_oracle
 
Soa12c launch 3 bpm 12c cr
Soa12c launch 3 bpm 12c crSoa12c launch 3 bpm 12c cr
Soa12c launch 3 bpm 12c cr
 
RakeshDhanani
RakeshDhananiRakeshDhanani
RakeshDhanani
 
Chainsys proposal ki v1-28-feb-2013
Chainsys proposal ki  v1-28-feb-2013Chainsys proposal ki  v1-28-feb-2013
Chainsys proposal ki v1-28-feb-2013
 
SAP on Azure Technical Pitch Deck
SAP on Azure Technical Pitch DeckSAP on Azure Technical Pitch Deck
SAP on Azure Technical Pitch Deck
 
Rajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_ConsultantRajesh Reddi_9_Years_Demantra_Consultant
Rajesh Reddi_9_Years_Demantra_Consultant
 
sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)sap nw bw7.3 on sap hana ramp up project approach (2)
sap nw bw7.3 on sap hana ramp up project approach (2)
 
10 tips for successful 12.2 upgrade
10 tips for successful 12.2 upgrade10 tips for successful 12.2 upgrade
10 tips for successful 12.2 upgrade
 
Lanny resume 190804
Lanny resume 190804Lanny resume 190804
Lanny resume 190804
 
Omprakash_ABAP_Resume
Omprakash_ABAP_ResumeOmprakash_ABAP_Resume
Omprakash_ABAP_Resume
 
Omprakash_ABAP_Resume
Omprakash_ABAP_ResumeOmprakash_ABAP_Resume
Omprakash_ABAP_Resume
 
Mary Ann Moore Resume
Mary Ann Moore ResumeMary Ann Moore Resume
Mary Ann Moore Resume
 
Chainsys Accelerate Presentation
Chainsys Accelerate PresentationChainsys Accelerate Presentation
Chainsys Accelerate Presentation
 
Robin Hesje - CV - Application Design
Robin Hesje - CV - Application DesignRobin Hesje - CV - Application Design
Robin Hesje - CV - Application Design
 
Business_Process_Modeling_Training.ppt
Business_Process_Modeling_Training.pptBusiness_Process_Modeling_Training.ppt
Business_Process_Modeling_Training.ppt
 
The Power of Converged HP BAC and Operations Manager
The Power of Converged HP BAC and Operations ManagerThe Power of Converged HP BAC and Operations Manager
The Power of Converged HP BAC and Operations Manager
 
Jayachandran_Resume
Jayachandran_ResumeJayachandran_Resume
Jayachandran_Resume
 
Curriculum Vitae - Kenneth
Curriculum Vitae - KennethCurriculum Vitae - Kenneth
Curriculum Vitae - Kenneth
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
 
The Road to Simple: Accelerate S/4HANA Adoption with Automation
The Road to Simple: Accelerate S/4HANA Adoption with AutomationThe Road to Simple: Accelerate S/4HANA Adoption with Automation
The Road to Simple: Accelerate S/4HANA Adoption with Automation
 

Kürzlich hochgeladen

Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalayResources
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Probe Gold
 
Falcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024CollectiveMining1
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd
 

Kürzlich hochgeladen (8)

Korea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment ReportKorea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment Report
 
Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR Presentation
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024
 
Falcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potentialFalcon Invoice Discounting unlock your cash flow potential
Falcon Invoice Discounting unlock your cash flow potential
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
 

PMP Oracle Master Implements Asset Management

  • 1. Raj Sachdeva PMP & Oracle Certified Master Section Manager Pace Suburban Bus Rajinder.sachdeva@pacebus.com 1/9/2014 1
  • 2.
  • 3.
  • 5.  To provide a single Enterprise Asset Management solution that would integrate with the current Oracle e-Business Suite (EBS) implementation  eAM solution had to meet the business needs of these six business units while causing minimal business process changes – Create work order in 30 seconds!!!!!  FIFO Costing & warranty tracking  Work order Billing for Third Party Contractor  Item Rebuild Work Order  Pace’s upper management required full business intelligence visibility.  Asset transfer and Asset Tracking  Data conversion and migration  Performance management  Training to mechanics and foremen 1/9/2014 5
  • 6. Work Order in 30Seconds 1/9/2014 6
  • 7. 1. Enter the Asset (Bus) Number 2. Enter Object Code 3. Click Save
  • 8. 1. Scroll down to Operation Requirements 2. Enter Mechanic Employee Number or Last Name
  • 9. 1. Click Save Click Print Work Order
  • 10.        Solid team work Business involved in every phase of implementation cycle and decision making Acceptance to business changes Thorough project plan and activities Well constructed “TO Be” processes One final CRP and Go Live Integration considerations for Exadata and OBIEE 1/9/2014 10
  • 13.         Key points is “TO BE “Processes which includes gather requirements, Configuration and Build Phase. Minimum number of instances Data Conversion in Flashback mode of database Pilot testing in medium busy and the busiest repair workshop. Testing of existing modules Upgrade in parallel of implementation in-house Migration of Oracle e-Business database to Exadata with Oracle Active Data Guard. Upgrade testing of existing modules with eAM and Inventory enabled Oracle Navigation Training and then role based training and finally hand holding UPK training during go-live. 1/9/2014 13
  • 14.    Migration Oracle E-Business database to Exadata RAC with active data guard. Cache the major inventory and eAM table related to WIP All reports point to Active data guard standby server 1/9/2014 14
  • 15.   OBIEE BI-Publisher Reporting tools with organization security and Single Sign On Implementation of OBIA eAM and Supply Chain Management to create the ad hoc reports and dash board for eAM and Inventory 1/9/2014 15