GenCvsV&a1502

Varndell & Assocs.
GenCvsV&a1502.docx 19/02/15 Page 1 of 5 .
CURRICULUM VITAE
JEFF VARNDELL Director
Qualifications Pr.Eng., C.Eng., B.Sc (Civ. Eng) U.C.T.
NQF5, MSAICE, FWISA, MICE
EXPERIENCE:
1. WATER :
Construction supervision of regional water supply scheme at Eston - Umgeni Water,
2012-2014.
1.1 Project management of :-
Replacement of AC secondary water mains (all field activities in the central region from
site investigation to construction monitoring) – Ethekwini Metropolitan Municipality,
2007-2010
Upgrade of bulk water supply to Ibisi – Alfred Nzo District Municipality, 1998 - 2003.
Upgrade of water reticulation - Richmond TLC, 1997-1999.
Repair of breached dam, safety review, and upgrading of spillway for Hippo Dam at
Sabie River Sun - Hotels, Inns and Resorts, 1996-1999.
Upgrade of water reticulation - Maluti TLC, 1996.
Upgrade of bulk water supply - Nompumalanga and Vukuzenzele Schools, 1996.
Repair of major infrastructure flood damage at Sabie River Bungalows - Hotels, Inns
and Resorts, 1996.
Upgrade of water reticulation - Umzimkulu TLC, 1995-1996.
Upgrade of bulk water supply - Richmond TLC, 1995-1996.
Upgrade of bulk water supply for Umzimkulu - Eastern Cape Government,
1995-1996.
Rural water supply scheme for 4 500 units at Zwelibomvu - Umgeni Water,
1994-1995.
Major repairs to the outlet works at 23m high Mvunyane dam - KwaZulu Government,
1992-1994.
Drought relief works to informal areas of KwaZulu and RSA Trust in Zululand (1,9M
capita spread over 39 000 km2
) - National Consultative Forum on Drought Relief, 1992-
1993.
Varndell & Assocs.
GenCvsV&a1502.docx 19/02/15 Page 2 of 5 .
Upgrading to water supply scheme for 700 unit township at Louwsburg/Mzamo –
Development and Services Board, 1992.
Water supply scheme for 500 unit township at Nkongolwana – Natal Provincial
Administration, 1991-1992.
Cathodic protection of raw water pipeline at eMondlo - KwaZulu Government, 1991-
1992.
Multi purpose pump house for irrigation and sewage at San Lameer –Sanlam
Properties, 1991.
Water treatment plant for Itala Game Reserve - Natal Parks Board, 1991.
Upgrading to bulk water supply for 40 000 capita township at eMondlo –KwaZulu
Government, 1989-1990.
1.2 Review consultant for water supply problems to new housing development at Assagay
– Vernon Smith & Assocs., 2002.
Formulation of Water Services Development Plan - Eshowe TLC, 1998-2000
Assessment of Umgeni River flood lines for Kraanskloof Farm housing project, Durban
Inner West Council, 1998.
Preliminary design of bulk water supply to Mbaswana - 1998
Preliminary design of bulk water supply – Mala Mala Ranches, 1998
Investigation of water reticulation losses - Eshowe TLC, 1995-1998.
First dam safety inspection for Eshlazi Dam - Eshowe TLC, 1997.
Investigation and design for upgrade of bulk water supply - Maluti TLC, 1996.
Formulation of design standards and operating philosophy - Umgeni Water,
1994-1995.
1.3 Construction of betterment’s, maintenance and repairs to structures, civil works and
large bore pipelines on a direct labour basis. (Including major repairs after the
September 1987 floods) - Emergency and Construction Services, Umgeni Water,
1985-1989.
1.4 Construction Supervision of Wiggins Water Treatment Plant Stage I of 350 Ml/day
water and sludge treatment plant - New Works Division Umgeni Water, 1982-1985.
1.5 Regional Management, on a direct labour basis, of planning, investigation, design,
construction, operation, maintenance and supervision of dams, irrigation schemes and
water supply schemes ranging from primary to major works – Mashonaland Province,
Zimbabwe Ministry of Water Development, 1980-1982.
1.6 Regional planning, investigation, design, construction, operation and maintenance of
dams, irrigation schemes and water supplies (including post-war reconstruction). –
Mashonaland Province, Zimbabwe Ministry of Water Resources, 1976-1980.
Varndell & Assocs.
GenCvsV&a1502.docx 19/02/15 Page 3 of 5 .
1.7 Construction supervision of Darwendale Dam - 1,3km long and 28m high earth rock fill
dam with concrete lined spillway - Designs Branch, Zimbabwe Ministry of Water
Resources, 1972-1976.
1.8 Hydrological research, analysis and estimation for peak floods, dam yields and
catchments planning. - Hydrological Branch, Zimbabwe Ministry of Water Resources,
1971-1972.
2. WASTE WATER :
2.1 Construction Supervision of Madiba Valley sewer reticulation– eThekwini Water
Services, 2005-date.
Construction Supervision of Queensburgh sewer reticulation extensions (Mosely) –
eThekwini Water Services, 2004-2005.
Construction Supervision of Umbilo trunk sewer extension from Currie Crescent to
Wirtz Road – eThekwini Water Services, 2003-2004.
Construction Supervision of Queensburgh sewer reticulation extensions (Northdene) –
Durban Wastewater Management, 2000-2001.
Construction Supervision of Umbilo trunk sewer extension to Currie Crescent – Durban
Wastewater Management, 1999-2000.
2.2 Investigation and design of sewage pump station and rising main for 500 erven housing
development – Gwanza Umzimkulu Trust, 2000.
Investigation and design for upgrading of bulk sewerage and disposal -Lusikisiki TLC,
1997.
Investigation and design for upgrading of sewerage systems - Maluti TLC, 1996.
Investigation and design for upgrading of sewerage systems - Umzimkulu TLC, 1996.
2.3 Detailed design of gravity sewer main for Teacher Training College at Umzimkulu -
Eastern Cape Government, 1995-1996.
2.4 Project Management of :
Sewage for 500 unit township at Nkongalwana - Natal Provincial Administration, 1991-
1992.
Gravity and rising sewer mains and pump house at San Lameer - Sanlam Properties,
1991.
2.5 Investigation and design for relocation of sewer main at Clairwood Quarries – Ready
Mix Materials, 1991.
Concept design and costing of water-borne sewage options for 23 000 unit township
at Inwabi - KwaZulu Government, 1990-1991.
Cost comparison (capital and running) of low cost and water-borne sewage systems
for 55 000 unit townships at Umlazi and Inwabi - KwaZulu Government, 1990-1991.
Varndell & Assocs.
GenCvsV&a1502.docx 19/02/15 Page 4 of 5 .
3. ROADS and STORM WATER :
3.1 Project Management of :
Upgrading of storm water drainage at Ibisi – Alfred Nzo District Municipality, 2000-
2001.
Upgrade of roads and storm water at Maluti - Eastern Cape Government, 1999-2000.
Upgrade of bus route - Umzimkulu TLC, 1998-2000.
Upgrade of storm water drainage - Richmond TLC, 1997-1999.
Upgrading of roads and storm water at Ibisi – Eastern Cape Government, 1998-2000.
Upgrading of roads and storm water at Maluti - Wild Coast District Council, 1997-1998.
Bus and LDV rank at Umzimkulu - Wild Coast District Council, 1997.
Upgrading of roads and storm water - Maluti TLC, 1996-1997.
3.2 Project proposals for upgrading of rural roads for Maluti and Mt. Ayliff regions – Transkei
Rural Development Co-ordinating Forum, 1997
Investigation and design for upgrading of roads and storm water - Umzimkulu TLC,
1995.
3.3 Construction management of upgrading to storm water drainage schemes in Durban
Central Business District - City Engineer, 1989-1991.
4. COASTAL :
Project management of :
Erosion protection at Umzinto river mouth - Pennington Town Board, 1992-1993.
Extensions to Wilson’s Wharf - Wilson Marinas, 1992.
5. ENGINEERING INFRASTRUCTURE / TOWNSHIP SERVICES :
5.1 Project Management of Civil Engineering Infrastructure for :
Provision of services for 54 unit Princeton Place town housing development - Stocks
Housing, 1998.
Provision of services for 400 unit Ext. 1 housing project - Maluti TLC, 1997-1998
5.2 Detailed design of services for 500 unit housing project - Lusikisiki TLC, 1997-1998.
Detailed design of services for Mthumbane and Greens Farm housing projects – Port
St. Johns TLC, 1997.
Varndell & Assocs.
GenCvsV&a1502.docx 19/02/15 Page 5 of 5 .
5.3 Preliminary design of services for 50 unit industrial and commercial unit extension to
central business district - Umzimkulu TLC, 1997
Preliminary design of services for 84 unit Golf course and 315 unit Morningwiew
housing projects - Ixopo TLC, 1997.
Preliminary design to upgrade existing services for 163 unit Ext. 5 housing project –
Umzimkulu TLC, 1997.
Preliminary design of services for 216 unit Ext. 6, 326 unit Ext. 7 and 208 unit Ext. 8
housing projects - Umzimkulu TLC, 1996-1997.
5.4 Infrastructure assessment for Magwa/Mkambati Spatial Development Plan – Wild
Coast District Council, 1998.
Infrastructure assessment for Integrated Development Plan – Wild Coast District
Council, 1998.
Infrastructure assessment for Lusikisiki, Maluti and Umzimkulu Integrated
Development Plans - Wild Coast District Council, 1998.
Bulk and internal infrastructure assessment for Structure Plan - Umzimkulu TLC, 1996-
1997.
6. GENERAL CIVIL :
6.1 Project management of :
Upgrading to community street lighting at Ibisi – Wild Coast District Council, 1998-2001
Upgrading of sports field - Umzimkulu TLC, 1996-1997.
Project management of upgrading to community sports fields in Durban South
Functional Region - KwaZulu Government, 1990-1995.
6.2 Investigation and preliminary design of commercial shopping centre and small traders
centre - Umzimkulu TLC, 1997-2001.
6.3 Specification of maintenance plant and equipment for golf course at San Lameer –
Sanlam Properties, 1991.

Recomendados

Substantial Completion: Lorton Road Project von
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
2.4K views17 Folien
Infra Presentation as of Sep 28, 2014 von
Infra Presentation as of Sep 28, 2014Infra Presentation as of Sep 28, 2014
Infra Presentation as of Sep 28, 2014Zaldy Santillan
1.9K views90 Folien
CV William 2016 von
CV William 2016CV William 2016
CV William 2016William Tarume
310 views7 Folien
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road von
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadFairfax County
193 views15 Folien
VMC Career Portfolio Aug 15 von
VMC Career Portfolio Aug 15VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15Victor Couto
230 views7 Folien
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp von
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampFairfax County
120 views14 Folien

Más contenido relacionado

Was ist angesagt?

Pohick Creek Restoration Project - Phase 1 von
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Fairfax County
350 views9 Folien
Virtual Open House: Eastern Works von
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern WorksCrosstown TO
361 views45 Folien
Dead Run Force Main Rehabilitation Project von
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectFairfax County
325 views8 Folien
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road von
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
2.3K views39 Folien
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016 von
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016VDOT Northern Virginia
19.6K views24 Folien
South Lakes Drive Sidewalk von
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk Fairfax County
137 views18 Folien

Was ist angesagt?(20)

Pohick Creek Restoration Project - Phase 1 von Fairfax County
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1
Fairfax County350 views
Virtual Open House: Eastern Works von Crosstown TO
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern Works
Crosstown TO361 views
Dead Run Force Main Rehabilitation Project von Fairfax County
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
Fairfax County325 views
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road von Fairfax County
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Fairfax County2.3K views
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016 von VDOT Northern Virginia
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Silverbrook Road at Monacan Road Walkway Project von Fairfax County
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
Fairfax County297 views
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr... von Maureen Kenney
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Bridge Construction, Pedestrian Safety Upgrades, Tree-Plantings and Road Impr...
Maureen Kenney161 views
Stringfellow Park and Ride Expansion von Fairfax County
Stringfellow Park and Ride ExpansionStringfellow Park and Ride Expansion
Stringfellow Park and Ride Expansion
Fairfax County387 views
Brookfield Park Wet Pond Construction von Fairfax County
Brookfield Park Wet Pond ConstructionBrookfield Park Wet Pond Construction
Brookfield Park Wet Pond Construction
Fairfax County119 views
North Shore Sidewalk Improvements von Fairfax County
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
Fairfax County101 views
Alafaya presentation 3 3-11 von JennThomp
Alafaya presentation 3 3-11Alafaya presentation 3 3-11
Alafaya presentation 3 3-11
JennThomp446 views
Pohick Creek Tributary Stream Restoration Project von Fairfax County
Pohick Creek Tributary Stream Restoration ProjectPohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration Project
Fairfax County1.2K views
Oak Marr Pump Station Rehabilitation – Construction Project von Fairfax County
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County471 views
3870 a4 8pp brochure no bleed von pennyschultz
3870  a4 8pp brochure no bleed3870  a4 8pp brochure no bleed
3870 a4 8pp brochure no bleed
pennyschultz234 views
Pohick Road - South Run Road Walkway Pedestrian Improvements von Fairfax County
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian Improvements
Fairfax County154 views
Summerton Way Pond Retrofit von Fairfax County
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
Fairfax County2.2K views
Pohick Creek Restoration Project Phase I June 2016 von Fairfax County
Pohick Creek Restoration Project Phase I June 2016Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016
Fairfax County416 views

Similar a GenCvsV&a1502

E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx von
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxRuiMendes93783
4 views23 Folien
CV of F Verschueren - 11-04-2016 von
CV of F Verschueren - 11-04-2016CV of F Verschueren - 11-04-2016
CV of F Verschueren - 11-04-2016Francois Verschueren
441 views9 Folien
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx von
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxRuiMendes93783
3 views23 Folien
Cv marinda le roux sept 2015 von
Cv marinda le roux sept 2015Cv marinda le roux sept 2015
Cv marinda le roux sept 2015Marinda Le Roux
433 views5 Folien
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx von
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxRuiMendes93783
5 views23 Folien
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍 von
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍dreamsion
1.4K views36 Folien

Similar a GenCvsV&a1502(20)

E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx von RuiMendes93783
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
RuiMendes937834 views
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx von RuiMendes93783
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
RuiMendes937833 views
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx von RuiMendes93783
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
RuiMendes937835 views
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍 von dreamsion
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
dreamsion1.4K views
Singapore Managing Stormwater For Water Resource And Flood Control von Victor Zapanta Manlapaz
Singapore   Managing Stormwater For Water Resource And Flood ControlSingapore   Managing Stormwater For Water Resource And Flood Control
Singapore Managing Stormwater For Water Resource And Flood Control
TUUL SELBE RIVER IMPROVEMENT von Else Bayarma
TUUL SELBE RIVER IMPROVEMENT TUUL SELBE RIVER IMPROVEMENT
TUUL SELBE RIVER IMPROVEMENT
Else Bayarma692 views
Vol.9 appendices to environmental impact assessment and resettlement aspects von zubeditufail
Vol.9  appendices to environmental impact assessment and resettlement aspectsVol.9  appendices to environmental impact assessment and resettlement aspects
Vol.9 appendices to environmental impact assessment and resettlement aspects
zubeditufail637 views
Intro infrastructure project 2015.02.26 von Uyanga Nyamkhuu
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26
Uyanga Nyamkhuu613 views
Status of roads in nairobi by ps mo r 2nd august 2012 von Functional Eco
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
Functional Eco12.3K views

GenCvsV&a1502

  • 1. Varndell & Assocs. GenCvsV&a1502.docx 19/02/15 Page 1 of 5 . CURRICULUM VITAE JEFF VARNDELL Director Qualifications Pr.Eng., C.Eng., B.Sc (Civ. Eng) U.C.T. NQF5, MSAICE, FWISA, MICE EXPERIENCE: 1. WATER : Construction supervision of regional water supply scheme at Eston - Umgeni Water, 2012-2014. 1.1 Project management of :- Replacement of AC secondary water mains (all field activities in the central region from site investigation to construction monitoring) – Ethekwini Metropolitan Municipality, 2007-2010 Upgrade of bulk water supply to Ibisi – Alfred Nzo District Municipality, 1998 - 2003. Upgrade of water reticulation - Richmond TLC, 1997-1999. Repair of breached dam, safety review, and upgrading of spillway for Hippo Dam at Sabie River Sun - Hotels, Inns and Resorts, 1996-1999. Upgrade of water reticulation - Maluti TLC, 1996. Upgrade of bulk water supply - Nompumalanga and Vukuzenzele Schools, 1996. Repair of major infrastructure flood damage at Sabie River Bungalows - Hotels, Inns and Resorts, 1996. Upgrade of water reticulation - Umzimkulu TLC, 1995-1996. Upgrade of bulk water supply - Richmond TLC, 1995-1996. Upgrade of bulk water supply for Umzimkulu - Eastern Cape Government, 1995-1996. Rural water supply scheme for 4 500 units at Zwelibomvu - Umgeni Water, 1994-1995. Major repairs to the outlet works at 23m high Mvunyane dam - KwaZulu Government, 1992-1994. Drought relief works to informal areas of KwaZulu and RSA Trust in Zululand (1,9M capita spread over 39 000 km2 ) - National Consultative Forum on Drought Relief, 1992- 1993.
  • 2. Varndell & Assocs. GenCvsV&a1502.docx 19/02/15 Page 2 of 5 . Upgrading to water supply scheme for 700 unit township at Louwsburg/Mzamo – Development and Services Board, 1992. Water supply scheme for 500 unit township at Nkongolwana – Natal Provincial Administration, 1991-1992. Cathodic protection of raw water pipeline at eMondlo - KwaZulu Government, 1991- 1992. Multi purpose pump house for irrigation and sewage at San Lameer –Sanlam Properties, 1991. Water treatment plant for Itala Game Reserve - Natal Parks Board, 1991. Upgrading to bulk water supply for 40 000 capita township at eMondlo –KwaZulu Government, 1989-1990. 1.2 Review consultant for water supply problems to new housing development at Assagay – Vernon Smith & Assocs., 2002. Formulation of Water Services Development Plan - Eshowe TLC, 1998-2000 Assessment of Umgeni River flood lines for Kraanskloof Farm housing project, Durban Inner West Council, 1998. Preliminary design of bulk water supply to Mbaswana - 1998 Preliminary design of bulk water supply – Mala Mala Ranches, 1998 Investigation of water reticulation losses - Eshowe TLC, 1995-1998. First dam safety inspection for Eshlazi Dam - Eshowe TLC, 1997. Investigation and design for upgrade of bulk water supply - Maluti TLC, 1996. Formulation of design standards and operating philosophy - Umgeni Water, 1994-1995. 1.3 Construction of betterment’s, maintenance and repairs to structures, civil works and large bore pipelines on a direct labour basis. (Including major repairs after the September 1987 floods) - Emergency and Construction Services, Umgeni Water, 1985-1989. 1.4 Construction Supervision of Wiggins Water Treatment Plant Stage I of 350 Ml/day water and sludge treatment plant - New Works Division Umgeni Water, 1982-1985. 1.5 Regional Management, on a direct labour basis, of planning, investigation, design, construction, operation, maintenance and supervision of dams, irrigation schemes and water supply schemes ranging from primary to major works – Mashonaland Province, Zimbabwe Ministry of Water Development, 1980-1982. 1.6 Regional planning, investigation, design, construction, operation and maintenance of dams, irrigation schemes and water supplies (including post-war reconstruction). – Mashonaland Province, Zimbabwe Ministry of Water Resources, 1976-1980.
  • 3. Varndell & Assocs. GenCvsV&a1502.docx 19/02/15 Page 3 of 5 . 1.7 Construction supervision of Darwendale Dam - 1,3km long and 28m high earth rock fill dam with concrete lined spillway - Designs Branch, Zimbabwe Ministry of Water Resources, 1972-1976. 1.8 Hydrological research, analysis and estimation for peak floods, dam yields and catchments planning. - Hydrological Branch, Zimbabwe Ministry of Water Resources, 1971-1972. 2. WASTE WATER : 2.1 Construction Supervision of Madiba Valley sewer reticulation– eThekwini Water Services, 2005-date. Construction Supervision of Queensburgh sewer reticulation extensions (Mosely) – eThekwini Water Services, 2004-2005. Construction Supervision of Umbilo trunk sewer extension from Currie Crescent to Wirtz Road – eThekwini Water Services, 2003-2004. Construction Supervision of Queensburgh sewer reticulation extensions (Northdene) – Durban Wastewater Management, 2000-2001. Construction Supervision of Umbilo trunk sewer extension to Currie Crescent – Durban Wastewater Management, 1999-2000. 2.2 Investigation and design of sewage pump station and rising main for 500 erven housing development – Gwanza Umzimkulu Trust, 2000. Investigation and design for upgrading of bulk sewerage and disposal -Lusikisiki TLC, 1997. Investigation and design for upgrading of sewerage systems - Maluti TLC, 1996. Investigation and design for upgrading of sewerage systems - Umzimkulu TLC, 1996. 2.3 Detailed design of gravity sewer main for Teacher Training College at Umzimkulu - Eastern Cape Government, 1995-1996. 2.4 Project Management of : Sewage for 500 unit township at Nkongalwana - Natal Provincial Administration, 1991- 1992. Gravity and rising sewer mains and pump house at San Lameer - Sanlam Properties, 1991. 2.5 Investigation and design for relocation of sewer main at Clairwood Quarries – Ready Mix Materials, 1991. Concept design and costing of water-borne sewage options for 23 000 unit township at Inwabi - KwaZulu Government, 1990-1991. Cost comparison (capital and running) of low cost and water-borne sewage systems for 55 000 unit townships at Umlazi and Inwabi - KwaZulu Government, 1990-1991.
  • 4. Varndell & Assocs. GenCvsV&a1502.docx 19/02/15 Page 4 of 5 . 3. ROADS and STORM WATER : 3.1 Project Management of : Upgrading of storm water drainage at Ibisi – Alfred Nzo District Municipality, 2000- 2001. Upgrade of roads and storm water at Maluti - Eastern Cape Government, 1999-2000. Upgrade of bus route - Umzimkulu TLC, 1998-2000. Upgrade of storm water drainage - Richmond TLC, 1997-1999. Upgrading of roads and storm water at Ibisi – Eastern Cape Government, 1998-2000. Upgrading of roads and storm water at Maluti - Wild Coast District Council, 1997-1998. Bus and LDV rank at Umzimkulu - Wild Coast District Council, 1997. Upgrading of roads and storm water - Maluti TLC, 1996-1997. 3.2 Project proposals for upgrading of rural roads for Maluti and Mt. Ayliff regions – Transkei Rural Development Co-ordinating Forum, 1997 Investigation and design for upgrading of roads and storm water - Umzimkulu TLC, 1995. 3.3 Construction management of upgrading to storm water drainage schemes in Durban Central Business District - City Engineer, 1989-1991. 4. COASTAL : Project management of : Erosion protection at Umzinto river mouth - Pennington Town Board, 1992-1993. Extensions to Wilson’s Wharf - Wilson Marinas, 1992. 5. ENGINEERING INFRASTRUCTURE / TOWNSHIP SERVICES : 5.1 Project Management of Civil Engineering Infrastructure for : Provision of services for 54 unit Princeton Place town housing development - Stocks Housing, 1998. Provision of services for 400 unit Ext. 1 housing project - Maluti TLC, 1997-1998 5.2 Detailed design of services for 500 unit housing project - Lusikisiki TLC, 1997-1998. Detailed design of services for Mthumbane and Greens Farm housing projects – Port St. Johns TLC, 1997.
  • 5. Varndell & Assocs. GenCvsV&a1502.docx 19/02/15 Page 5 of 5 . 5.3 Preliminary design of services for 50 unit industrial and commercial unit extension to central business district - Umzimkulu TLC, 1997 Preliminary design of services for 84 unit Golf course and 315 unit Morningwiew housing projects - Ixopo TLC, 1997. Preliminary design to upgrade existing services for 163 unit Ext. 5 housing project – Umzimkulu TLC, 1997. Preliminary design of services for 216 unit Ext. 6, 326 unit Ext. 7 and 208 unit Ext. 8 housing projects - Umzimkulu TLC, 1996-1997. 5.4 Infrastructure assessment for Magwa/Mkambati Spatial Development Plan – Wild Coast District Council, 1998. Infrastructure assessment for Integrated Development Plan – Wild Coast District Council, 1998. Infrastructure assessment for Lusikisiki, Maluti and Umzimkulu Integrated Development Plans - Wild Coast District Council, 1998. Bulk and internal infrastructure assessment for Structure Plan - Umzimkulu TLC, 1996- 1997. 6. GENERAL CIVIL : 6.1 Project management of : Upgrading to community street lighting at Ibisi – Wild Coast District Council, 1998-2001 Upgrading of sports field - Umzimkulu TLC, 1996-1997. Project management of upgrading to community sports fields in Durban South Functional Region - KwaZulu Government, 1990-1995. 6.2 Investigation and preliminary design of commercial shopping centre and small traders centre - Umzimkulu TLC, 1997-2001. 6.3 Specification of maintenance plant and equipment for golf course at San Lameer – Sanlam Properties, 1991.