SlideShare a Scribd company logo
1 of 50
Energy Efficient Mortgages 203K & Streamline 203K
Energy Efficient Mortgages 203K & Streamline 203K TOPICS of DISCUSSION Energy Efficient Mortgage (EEM) 203k Standard 203k Streamline 203k Underwriting
Energy Efficient Mortgage (EEM)  Energy Efficient Mortgage Benefits ,[object Object]
 lower utility bills,
conserve energy and, thus,
make more income available for the mortgage payment. ,[object Object]
Contact a HERS rating official to obtain a rating report,[object Object]
Delays in providing an energy audit on a residential property  - urban & suburban areas.  Rural areas will take longer due to a lack of raters in the area.
Training of certified raters & certified retrofit contractors  (approximately $1200 for a one day course),[object Object]
Energy Efficient Mortgage (EEM)
Energy Efficient Mortgage (EEM) Underwriting  ,[object Object], 3.5 percent down payment  (max 96.5% loan-to-value for a refinance)  Closing costs are not included in the 3.5% down payment  Financeable upfront mortgage insurance premium 1-4 unit, existing and new construction properties are eligible 
Energy Efficient Mortgage (EEM) Maximum Loan Amount ,[object Object],The value of the property, or  115% of the median area price of a single family dwelling, or  150% of the conforming Freddie Mac limit
Energy Efficient Mortgage (EEM) Example $380,000 (value) x 5% = 19,000 488,750 (max loan limit for Stockton county for 1-unit) x 5% =24,437 417,000 (Freddie Mac cap) x150% = 625,500 x 5% = 31,275
Energy Efficient Mortgage (EEM) ,[object Object]
Maximum loan limit for a 1-unit property in Stockton, CA is $488,750,[object Object]
203(k) – Rehabilitation Loan Program What is a 203k?  One loan to finance both acquisition & rehabilitation of a property (or refinance and rehabilitation)
203(k) – Rehabilitation Loan Program Purpose of the 203k Restore and preserve the nation’s housing stock Expand homeownership opportunities Help community revitalization
203(k) – Rehabilitation Loan Program Loan Amount The loan amount is  based on projected value after the work is completed
203(k) – Rehabilitation Loan Program FHA has two types of rehabilitation loans  Standard 203k Rehabiliation – includes  more complex repairs (i.e.structural) and requires a minimum of $5,000 in repairs Streamline 203k Rehabilitation – covers uncomplicated repairs up to $35,000 with no minimum dollar threshold– no structural repairs allowed
203(k) – Standard Rehabilitation Loan Program ,[object Object]
Property must be at least one year old
1-4 units
Condos (interior only)
Manufactured Homes
New construction on part of the original foundation,[object Object]
203(k) – Standard Rehabilitation Loan Program Improvements Minimum $5,000 rehab costs Must increase the marketability and value of the property (“must have” repairs not “wish list” repairs) Repairs & Improvements must comply with HUD HB 4910.1  Meet local building & zoning codes Corrections of code violations Energy improvements
203(k) – Standard Rehabilitation Loan Program Continued… ,[object Object]
modernization and improvements to the home's function
elimination of health and safety hazards
changes that improve appearance and eliminate obsolescence,[object Object]
adding or replacing roofing, gutters, and downspouts
adding or replacing floors and/or floor treatments
major landscape work and site improvements
enhancing accessibility for a disabled person
making energy conservation improvements ,[object Object]
203(k) – Standard Rehabilitation Loan Program Preliminary Feasibility Analysis Purpose  Prevent wasted time & finances $100 financeable fee Optional
203(k) – Standard Rehabilitation Loan Program Participants & Responsibilities Borrower Lender 203k Consultant Contractor ,[object Object],Best practice:  borrower, consultant & appraiser all meet at the property to discuss repairs
203(k) – Standard Rehabilitation Loan Program 203k Consultant HUD Approved  3 years experience as general contractor, remodeling contractor, or home inspector State licensed architect or engineer On FHA 203k Consultant Roster Selected by lender (ML 00-25)
203(k) – Standard Rehabilitation Loan Program Consultant Responsibilities Complete a home inspection Obtain & review Architectural Exhibits Prepare Write Up & Cost Estimate Provide line item unit-cost breakdown Duties listed in ML 95-40
203(k) – Standard Rehabilitation Loan Program Consultant Can’t be the contractor or appraiser, but can be the energy rater Work write up clearly indicate the required items vs. “wish list” items  If using EEM, the work write-up must include Energy Package
203(k) – Standard Rehabilitation Loan Program Work Write Up Specifications of Repairs Form 35 categories (HUD HB 4240.4 Rev-2, Appendix 1)  Detail work to be completed Break down labor & materials All health & safety issues must be addressed first (and part of the first $5,000 minimum threshold)  Consultant & Buyer agreement signed by both parties  (ML 95-40)
203(k) – Standard Rehabilitation Loan Program Forms & Exhibits  Property report (existing) Termite/Well/Septic Report(s) EEM Rating or Analysis Proposed Plot Plan (new additions) Proposed Floor Plan (wall changes)  Other reports as necessary Work write up – description of work  Cost estimates - detailed
203(k) – Standard Rehabilitation Loan Program Contractor Selection Lender must ensure  acceptable contractor is hired Contractor credentials,  work experience,  licensing information/bonding or insuring,  type of work performed and client references execution of Homeowner/Contractor Agreement ML 00-25, 98-11, 94-11
203(k) – Standard Rehabilitation Loan Program Who Does the Work?  Experienced general or specialized contractor No self-help
203(k) – Standard Rehabilitation Loan Program Appraiser Responsibilities Appraisal made “subject to completion per plans & specifications” Appraisal must contain copy of plans, specs, work write up and other conditions upon which value is based  4150.2 & HOC Reference Guide
203(k) – Standard Rehabilitation Loan Program 203k mortgage must be based on the lowest sales price in the last year ML 00-25
203(k) – Standard Rehabilitation Loan Program Release of Funds  Consultant performs inspection on behalf of lender  Maximum 4 draws plus final draw  10% holdback on every intermediate draw Funds cannot be released for incomplete work
203(k) – Streamline Loan Program
203(k) – Streamline Loan ProgramAcquisition and up to $35,000  ,[object Object]
 The Streamlined (k) program includes the discretionary improvements and/or repairs shown below:  ,[object Object]

More Related Content

What's hot

2012 Critical Issues Summit Energy Panel, Part I
2012 Critical Issues Summit Energy Panel, Part I2012 Critical Issues Summit Energy Panel, Part I
2012 Critical Issues Summit Energy Panel, Part I
SFMI
 
Bescom market strategy
Bescom market strategyBescom market strategy
Bescom market strategy
Pankaj Soni
 
next generation home energy management systems - a mass deployment impact 200...
next generation home energy management systems - a mass deployment impact 200...next generation home energy management systems - a mass deployment impact 200...
next generation home energy management systems - a mass deployment impact 200...
Alan Lai
 

What's hot (14)

090820 Regional Forum Ppt English Haesco
090820 Regional Forum Ppt English   Haesco090820 Regional Forum Ppt English   Haesco
090820 Regional Forum Ppt English Haesco
 
How to access EECBG funding
How to access EECBG fundingHow to access EECBG funding
How to access EECBG funding
 
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
 
The Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeThe Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building Code
 
2012 Critical Issues Summit Energy Panel, Part I
2012 Critical Issues Summit Energy Panel, Part I2012 Critical Issues Summit Energy Panel, Part I
2012 Critical Issues Summit Energy Panel, Part I
 
Demand Response Electricity Markets Dallon Kay Diamond Energy Group 20111101
Demand Response Electricity Markets Dallon Kay Diamond Energy Group 20111101Demand Response Electricity Markets Dallon Kay Diamond Energy Group 20111101
Demand Response Electricity Markets Dallon Kay Diamond Energy Group 20111101
 
Electricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiencyElectricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiency
 
Panel 1: DOER Presentation
Panel 1: DOER PresentationPanel 1: DOER Presentation
Panel 1: DOER Presentation
 
Siemens
SiemensSiemens
Siemens
 
Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023
 
Switch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergySwitch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergy
 
Bescom market strategy
Bescom market strategyBescom market strategy
Bescom market strategy
 
next generation home energy management systems - a mass deployment impact 200...
next generation home energy management systems - a mass deployment impact 200...next generation home energy management systems - a mass deployment impact 200...
next generation home energy management systems - a mass deployment impact 200...
 
Building Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesBuilding Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United States
 

Viewers also liked (6)

myEnergyLoan Presentation
myEnergyLoan Presentation myEnergyLoan Presentation
myEnergyLoan Presentation
 
Trust-based recommender systems
Trust-based recommender systemsTrust-based recommender systems
Trust-based recommender systems
 
The Near Future of CSS
The Near Future of CSSThe Near Future of CSS
The Near Future of CSS
 
Classroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and AdolescentsClassroom Management Tips for Kids and Adolescents
Classroom Management Tips for Kids and Adolescents
 
The Presentation Come-Back Kid
The Presentation Come-Back KidThe Presentation Come-Back Kid
The Presentation Come-Back Kid
 
The Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris LemaThe Buyer's Journey - by Chris Lema
The Buyer's Journey - by Chris Lema
 

Similar to Eem 203 K Hq

Distressed Conversion Eco Efficient
Distressed Conversion Eco EfficientDistressed Conversion Eco Efficient
Distressed Conversion Eco Efficient
Rickrew
 
Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010
Go2Training
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab Loans
NatlMortgagePro
 
Funding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives KimFunding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives Kim
kimcollins01
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentation
prdrueke
 

Similar to Eem 203 K Hq (20)

Distressed Conversion Eco Efficient
Distressed Conversion Eco EfficientDistressed Conversion Eco Efficient
Distressed Conversion Eco Efficient
 
Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab Loans
 
PowerSaver webinar #1 final
PowerSaver webinar #1 finalPowerSaver webinar #1 final
PowerSaver webinar #1 final
 
FHA203k Financing
FHA203k FinancingFHA203k Financing
FHA203k Financing
 
Energy Incentives Presentation
Energy Incentives PresentationEnergy Incentives Presentation
Energy Incentives Presentation
 
Multifamily Energy Efficiency Webinar
Multifamily Energy Efficiency WebinarMultifamily Energy Efficiency Webinar
Multifamily Energy Efficiency Webinar
 
Streamline 203k
Streamline 203kStreamline 203k
Streamline 203k
 
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
 
Funding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives KimFunding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives Kim
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
FHA 203k
FHA 203kFHA 203k
FHA 203k
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentation
 
Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...Specialized Tax Strategies - Using engineering, design and costing to seize t...
Specialized Tax Strategies - Using engineering, design and costing to seize t...
 
NZC - Ben Taube
NZC - Ben TaubeNZC - Ben Taube
NZC - Ben Taube
 
Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Program
 
Fha streamline 203k powerpoint
Fha streamline 203k powerpointFha streamline 203k powerpoint
Fha streamline 203k powerpoint
 
The Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansThe Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action Plans
 
RCTC - Framework For A Journey, Solar Program
RCTC - Framework For A Journey, Solar ProgramRCTC - Framework For A Journey, Solar Program
RCTC - Framework For A Journey, Solar Program
 
Phoenix Energy Performance Contracting Presentation
Phoenix   Energy Performance Contracting PresentationPhoenix   Energy Performance Contracting Presentation
Phoenix Energy Performance Contracting Presentation
 

Eem 203 K Hq

  • 1. Energy Efficient Mortgages 203K & Streamline 203K
  • 2. Energy Efficient Mortgages 203K & Streamline 203K TOPICS of DISCUSSION Energy Efficient Mortgage (EEM) 203k Standard 203k Streamline 203k Underwriting
  • 3.
  • 6.
  • 7.
  • 8. Delays in providing an energy audit on a residential property - urban & suburban areas. Rural areas will take longer due to a lack of raters in the area.
  • 9.
  • 11.
  • 12.
  • 13. Energy Efficient Mortgage (EEM) Example $380,000 (value) x 5% = 19,000 488,750 (max loan limit for Stockton county for 1-unit) x 5% =24,437 417,000 (Freddie Mac cap) x150% = 625,500 x 5% = 31,275
  • 14.
  • 15.
  • 16. 203(k) – Rehabilitation Loan Program What is a 203k? One loan to finance both acquisition & rehabilitation of a property (or refinance and rehabilitation)
  • 17. 203(k) – Rehabilitation Loan Program Purpose of the 203k Restore and preserve the nation’s housing stock Expand homeownership opportunities Help community revitalization
  • 18. 203(k) – Rehabilitation Loan Program Loan Amount The loan amount is based on projected value after the work is completed
  • 19. 203(k) – Rehabilitation Loan Program FHA has two types of rehabilitation loans Standard 203k Rehabiliation – includes more complex repairs (i.e.structural) and requires a minimum of $5,000 in repairs Streamline 203k Rehabilitation – covers uncomplicated repairs up to $35,000 with no minimum dollar threshold– no structural repairs allowed
  • 20.
  • 21. Property must be at least one year old
  • 25.
  • 26. 203(k) – Standard Rehabilitation Loan Program Improvements Minimum $5,000 rehab costs Must increase the marketability and value of the property (“must have” repairs not “wish list” repairs) Repairs & Improvements must comply with HUD HB 4910.1 Meet local building & zoning codes Corrections of code violations Energy improvements
  • 27.
  • 28. modernization and improvements to the home's function
  • 29. elimination of health and safety hazards
  • 30.
  • 31. adding or replacing roofing, gutters, and downspouts
  • 32. adding or replacing floors and/or floor treatments
  • 33. major landscape work and site improvements
  • 34. enhancing accessibility for a disabled person
  • 35.
  • 36. 203(k) – Standard Rehabilitation Loan Program Preliminary Feasibility Analysis Purpose Prevent wasted time & finances $100 financeable fee Optional
  • 37.
  • 38. 203(k) – Standard Rehabilitation Loan Program 203k Consultant HUD Approved 3 years experience as general contractor, remodeling contractor, or home inspector State licensed architect or engineer On FHA 203k Consultant Roster Selected by lender (ML 00-25)
  • 39. 203(k) – Standard Rehabilitation Loan Program Consultant Responsibilities Complete a home inspection Obtain & review Architectural Exhibits Prepare Write Up & Cost Estimate Provide line item unit-cost breakdown Duties listed in ML 95-40
  • 40. 203(k) – Standard Rehabilitation Loan Program Consultant Can’t be the contractor or appraiser, but can be the energy rater Work write up clearly indicate the required items vs. “wish list” items If using EEM, the work write-up must include Energy Package
  • 41. 203(k) – Standard Rehabilitation Loan Program Work Write Up Specifications of Repairs Form 35 categories (HUD HB 4240.4 Rev-2, Appendix 1) Detail work to be completed Break down labor & materials All health & safety issues must be addressed first (and part of the first $5,000 minimum threshold) Consultant & Buyer agreement signed by both parties (ML 95-40)
  • 42. 203(k) – Standard Rehabilitation Loan Program Forms & Exhibits Property report (existing) Termite/Well/Septic Report(s) EEM Rating or Analysis Proposed Plot Plan (new additions) Proposed Floor Plan (wall changes) Other reports as necessary Work write up – description of work Cost estimates - detailed
  • 43. 203(k) – Standard Rehabilitation Loan Program Contractor Selection Lender must ensure acceptable contractor is hired Contractor credentials, work experience, licensing information/bonding or insuring, type of work performed and client references execution of Homeowner/Contractor Agreement ML 00-25, 98-11, 94-11
  • 44. 203(k) – Standard Rehabilitation Loan Program Who Does the Work? Experienced general or specialized contractor No self-help
  • 45. 203(k) – Standard Rehabilitation Loan Program Appraiser Responsibilities Appraisal made “subject to completion per plans & specifications” Appraisal must contain copy of plans, specs, work write up and other conditions upon which value is based 4150.2 & HOC Reference Guide
  • 46. 203(k) – Standard Rehabilitation Loan Program 203k mortgage must be based on the lowest sales price in the last year ML 00-25
  • 47. 203(k) – Standard Rehabilitation Loan Program Release of Funds Consultant performs inspection on behalf of lender Maximum 4 draws plus final draw 10% holdback on every intermediate draw Funds cannot be released for incomplete work
  • 48. 203(k) – Streamline Loan Program
  • 49.
  • 50.
  • 52. Repair/Replacement/upgrade of plumbing and electrical systems
  • 54.
  • 55. Painting, both exterior and interior
  • 56. Weatherization, including storm windows and doors, insulation, weather stripping, etc.
  • 57. Purchase and installation of appliances, including free-standing ranges, refrigerators, washers/dryers, dishwashers and microwave ovens.
  • 58.
  • 59. Repair/replace/add exterior decks, patios, porches
  • 60. Basement finishing and remodeling, which does not involve structural repairs
  • 62. Window and door replacements and exterior wall re-siding
  • 63.
  • 64. 203(k) – Streamline Continued Ineligible Work Continued… Landscaping or similar site improvements Repairs requiring a work schedule longer than 6 months Repairs arising form the appraisal not on the list of eligible work items Repairs causing borrower to be displaced more than 30 days
  • 65. 203(k) – Streamline Continued Required Exhibits for Eligible Work Pre-purchase home inspection (if performed) Borrower’s planned repairs Appraisal report indicating list of proposed repairs and costs
  • 66. 203(k) – Streamline Continued Who Does the Work Specialized Contractor/Contractors Self-help
  • 67. 203(k) – Streamline Continued Underwriting Considerations Supplemental Origination Fee Customary Charges
  • 68. 203(k) – Streamline Continued 203k Worksheet (HUD92700) Mortgage Amount Maximum – statutory limit for the area or 110% of “after-improved” value Case Number ADP Code Repair Escrow Amount 203k Consultant ID Field
  • 69. 203(k) – Streamline Continued Documentation Drawings & Specifications Rehabilitation Cost Estimate Contractor’s Cost Estimate(s) Homeowner/Consultant Agreement(s) 203k Loan Agreement 203k Rider Borrower Acknowledgement
  • 70. 203(k) – Streamline Continued Process Overview Borrower’s application Consultant Order Case Number Order Appraisal Processor Responsibilities Property & Credit Package
  • 71. 203(k) – Streamline Continued Process Overview Direct endorsement underwriter’s responsibilities Conditions Loan Closes Repair Escrow Account Repairs/Inspections/Draws
  • 72. 203(k) – Streamline Continued Completion & Payments Number of payments First Payment Permit Fees Final Payment Payment Schedule Issuance of Payments Lender’s Compensation Inspections Final Release
  • 73. Information source: www.hud.gov, ml 2005-21, ML 2009-18 Roxanne Campanella, Account Liaison Federal Housing Administration Sacramento, CA

Editor's Notes

  1. Stretch ratios of 33/45 apply only if the property meets International Energy Conservation Code (IECC) - Source: ML 2005-21
  2. Bullet #2 - The median area price is the same as the maximum loan limit for the county (go to www.fha.gov for maximum loan limit by county) and Bullet #3 - the current conforming Freddie Mac limit is $417,000
  3. In this example, $19,000 is the lesser of the three calculations and may be added to the base loan amount
  4. Source: ML 2005-21 and HUD Handbook 4155.1 Chapter 2-19
  5. The purchase of a house that needs repair is often a catch-22 situation, because the bank won't lend the money to buy the house until the repairs are complete, and the repairs can't be done until the house has been purchased.HUD's 203(k) program can help overcome this obstacle by enabling the purchase or refinance a property plus the cost of making the repairs and improvements in one mortgage.