Project Life Cycle
The 5 Phases of Project Management is also called the Project
Lifecycle. The 5 Phases of Project Management consist of:
 Project Initiation Phase
 Project Planning Phase
 Execution Phase
 Monitoring and Control Phase
 Project Closeout Phase
3
Initiation Phase
 The beginning phase of every project where a project
manager is selected.
 The project manager will meet with the project sponsor and
key stakeholders to determine the business or technical
objectives of the project.
 Determine any historical information regarding the project.
Begin to identify who is needed on a project team.
Key Outputs of this phase are:
 Develop Project Charter
 Develop Preliminary Scope Statement
 Identification of all stakeholders
 Divide the project into Phases
4
Planning Phase
 One of the largest and most important phases of every project.
The project manager will determine the team, identify roles and
responsibilities and solidify a scope statement.
 At this phase the project manager will begin to develop different
project plans.
They consist of :
 Communication Plan (How will you communicate to your team, to
your stakeholders?)
 Risk Plan (How will risks be documented how will they be
escalated?)
 Testing Plan
 Project Schedule (Timeline)
 Develop a WBS – Work Break Down Structure A work break down
structure is key because it breaks down the work into
manageable work activities and/or tasks.
5
Work Break Down Structure
6
Planning Phase
The number of outputs for the planning phase is large and that is why the
planning phase should be given adequate time for planning.
*Please keep in mind that this phase will have is an iterative process.
Everything will be revised until all parties agree on the outputs and formal
approval is given.
Triple Constraint
Is the methodology that if there is a change in cost, then the change will
impact schedule or the scope and vice versa.
7
Planning Phase
Key Outputs of this phase are:
 Create WBS and WBS Dictionary
 Develop Schedule
 Develop Budget
 Determine roles and Responsibilities
 Develop Communication Plan
 Develop Risk Plan
 Create Performance measurement baselines
 Develop Preliminary Scope Statement
 Test Plan
 Determine the Critical Path
 Prepare procurement documents
 Create Process Improvement Plan
 Gain Formal Approval of all plans and key deliverables
* After that you as the project manager are good to Launch Kickoff Meeting!
8
Execution Phase
 This phase is where you do the “work” or execute the plan.
This phase typically requires the most amount of time since
the majority of the work is done in this timeframe.
 You will solidify the team; conduct teambuilding exercises.
 Hold progress and status meetings
 Follow the processes in your project plans.
 Recommend changes and corrective actions.
 Continuous Improvement
Key outputs of this phase are:
 Signoff that key milestones are
complete.
 Documented performance reports
9
Monitor and Controlling Phase
 The phase where results derived from your new process or product are
compared to the metrics you outlined in your performance plan.
 Implement your change control process
 Determine variances and identify if they warrant corrective action or
change
 Facilitate conflict Resolution
 Use Issue Logs
Key outputs of this phase are:
 Receive all signoffs that work is
completed as per requirements.
 Archive all project assets
 Create and document lessons learned
10
Project Closure Phase
This is the final phase of the project life cycle.
 Develop closure procedures.
 Document final performance reporting
 Handoff completed product, process
or code.
 Release resources
 Complete contract closures.
Key outputs of this phase are:
 Receive all signoffs that work is
completed as per requirements.
 Index and archive all project assets
 Create and document lessons learned
11
Celebrate project success!
12

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Dania Abdel-aziz
 
Project Management
Project ManagementProject Management
Project Managementajithsrc
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Zulfiquer Ahmed Amin
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPTRaj Sampat
 
Project management
Project managementProject management
Project managementSimran Kaur
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 

Was ist angesagt? (20)

project management concepts
project management conceptsproject management concepts
project management concepts
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Project management
Project managementProject management
Project management
 
Project planning
Project planning Project planning
Project planning
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 

Ähnlich wie 5 phases of project management

A presentation on project life cycle ...
A presentation on project life cycle ...A presentation on project life cycle ...
A presentation on project life cycle ...shaikNoorJahan11
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxFawadAfridi6
 
Project Management Control
Project Management ControlProject Management Control
Project Management Controlahmad bassiouny
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOswebuploader
 
Projects2016_Franks_PreparingFortheParty-Project Close
Projects2016_Franks_PreparingFortheParty-Project CloseProjects2016_Franks_PreparingFortheParty-Project Close
Projects2016_Franks_PreparingFortheParty-Project CloseBarbara Franks
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxGagan331641
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdfeyevisioncare1
 
Ch5ProjectPlanning.ppt
Ch5ProjectPlanning.pptCh5ProjectPlanning.ppt
Ch5ProjectPlanning.pptMDNoyonIslam6
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptxPranshiGoyal2
 
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptxirrosennen
 
How to manage a construction project A Step-by-Step Guide
How to manage a construction project A Step-by-Step GuideHow to manage a construction project A Step-by-Step Guide
How to manage a construction project A Step-by-Step GuideConstructionPM
 
Planning process group
Planning process groupPlanning process group
Planning process groupMudassir Iqbal
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Amr Miqdadi
 
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...May Wong, PMP
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfamirashraf61
 

Ähnlich wie 5 phases of project management (20)

A presentation on project life cycle ...
A presentation on project life cycle ...A presentation on project life cycle ...
A presentation on project life cycle ...
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOs
 
Projects2016_Franks_PreparingFortheParty-Project Close
Projects2016_Franks_PreparingFortheParty-Project CloseProjects2016_Franks_PreparingFortheParty-Project Close
Projects2016_Franks_PreparingFortheParty-Project Close
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf
 
Ch5ProjectPlanning.ppt
Ch5ProjectPlanning.pptCh5ProjectPlanning.ppt
Ch5ProjectPlanning.ppt
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectively
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
 
Project mgmt.
Project mgmt.Project mgmt.
Project mgmt.
 
How to manage a construction project A Step-by-Step Guide
How to manage a construction project A Step-by-Step GuideHow to manage a construction project A Step-by-Step Guide
How to manage a construction project A Step-by-Step Guide
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...
Taking smaller bites with PMP-Bite series - 5 Process Groups to master and ac...
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 

Kürzlich hochgeladen

Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
Mastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxMastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxAS Design & AST.
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
Critical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxCritical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxcalinagavris17
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...dsnow9802
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBusiness of Software Conference
 

Kürzlich hochgeladen (16)

Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
Mastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptxMastering Management Insights from First Break All the Rules.pptx
Mastering Management Insights from First Break All the Rules.pptx
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice Sharing
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
Critical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptxCritical thinking categorical syllogism pptx
Critical thinking categorical syllogism pptx
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of Flowcharts
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
 

5 phases of project management

  • 1.
  • 2. Table of Contents I. Project Life Cycle II. Project Initiation Phase III. Project Planning Phase IV. Work Breakdown Structure V. Execution Phase VI. Monitoring and Control Phase VII. Project Closeout Phase 2
  • 3. Project Life Cycle The 5 Phases of Project Management is also called the Project Lifecycle. The 5 Phases of Project Management consist of:  Project Initiation Phase  Project Planning Phase  Execution Phase  Monitoring and Control Phase  Project Closeout Phase 3
  • 4. Initiation Phase  The beginning phase of every project where a project manager is selected.  The project manager will meet with the project sponsor and key stakeholders to determine the business or technical objectives of the project.  Determine any historical information regarding the project. Begin to identify who is needed on a project team. Key Outputs of this phase are:  Develop Project Charter  Develop Preliminary Scope Statement  Identification of all stakeholders  Divide the project into Phases 4
  • 5. Planning Phase  One of the largest and most important phases of every project. The project manager will determine the team, identify roles and responsibilities and solidify a scope statement.  At this phase the project manager will begin to develop different project plans. They consist of :  Communication Plan (How will you communicate to your team, to your stakeholders?)  Risk Plan (How will risks be documented how will they be escalated?)  Testing Plan  Project Schedule (Timeline)  Develop a WBS – Work Break Down Structure A work break down structure is key because it breaks down the work into manageable work activities and/or tasks. 5
  • 6. Work Break Down Structure 6
  • 7. Planning Phase The number of outputs for the planning phase is large and that is why the planning phase should be given adequate time for planning. *Please keep in mind that this phase will have is an iterative process. Everything will be revised until all parties agree on the outputs and formal approval is given. Triple Constraint Is the methodology that if there is a change in cost, then the change will impact schedule or the scope and vice versa. 7
  • 8. Planning Phase Key Outputs of this phase are:  Create WBS and WBS Dictionary  Develop Schedule  Develop Budget  Determine roles and Responsibilities  Develop Communication Plan  Develop Risk Plan  Create Performance measurement baselines  Develop Preliminary Scope Statement  Test Plan  Determine the Critical Path  Prepare procurement documents  Create Process Improvement Plan  Gain Formal Approval of all plans and key deliverables * After that you as the project manager are good to Launch Kickoff Meeting! 8
  • 9. Execution Phase  This phase is where you do the “work” or execute the plan. This phase typically requires the most amount of time since the majority of the work is done in this timeframe.  You will solidify the team; conduct teambuilding exercises.  Hold progress and status meetings  Follow the processes in your project plans.  Recommend changes and corrective actions.  Continuous Improvement Key outputs of this phase are:  Signoff that key milestones are complete.  Documented performance reports 9
  • 10. Monitor and Controlling Phase  The phase where results derived from your new process or product are compared to the metrics you outlined in your performance plan.  Implement your change control process  Determine variances and identify if they warrant corrective action or change  Facilitate conflict Resolution  Use Issue Logs Key outputs of this phase are:  Receive all signoffs that work is completed as per requirements.  Archive all project assets  Create and document lessons learned 10
  • 11. Project Closure Phase This is the final phase of the project life cycle.  Develop closure procedures.  Document final performance reporting  Handoff completed product, process or code.  Release resources  Complete contract closures. Key outputs of this phase are:  Receive all signoffs that work is completed as per requirements.  Index and archive all project assets  Create and document lessons learned 11