SlideShare a Scribd company logo
1 of 7
Download to read offline
Introduction: What are Black Swans, and
what do they have to do with your data center?
Chapter 1: Expect the Unexpected
Chapter 2: Start with an Intelligent and
Virtual Foundation
Chapter 4: Disaster Recovery Best Practices —
Top 10
Conclusion: A Quick-Start Guide to Disaster
Recovery
Appendix: Disaster Recovery 101—The Basics
INSIDE:
www.vmware.com
How to prepare for and mitigate the
“Black Swan Events” in your data center
A Guide to Modern
IT Disaster Recovery
introduction
Your data center is your castle. That’s where
all your critical IT components — hardware, data, and
software — reside. You protect it with the latest bul-
letproof security solutions and make it reliable through
redundant multiprocessing, highly scalable platforms,
and super-fast optical networks.
And yet, it is not fully protected from forces beyond
your control such as natural disasters; man-made events
like road closures; security procedures or partner service
interruption at a specific site.
Downtime and loss of data, even if temporary, can have
long-lasting effects for business and can contribute to
the demise of the otherwise well-lubed business:
q	Loss of revenue from your customers’ inability
to do business with you
q	Diminished market credibility and customer
trust, resulting in churn
q	Penalties for violated SLAs with partners,
suppliers, distributors, and franchisees
q	Costs of recovering and repairing the lost data
q	Legal costs of meeting internal and external
compliance requirements
How do you balance the disaster recovery risk and in-
vestment equation? Is the potential risk greater than the
investment? Let’s put it in perspective:
q	43% of companies experiencing disasters never
reopen, and 29% close within two years.1
q	93% of businesses that lost their data center for 10
days went bankrupt within one year.2
q	40% of all companies that experience a major
disaster will go out of business if they cannot gain
access to their data within 24 hours.3
“CIOs and IT organizations should consider scenarios in
which normal operations could be disrupted and adopt/
adapt practices and technologies that enable them to
deal with potential disruption from hostile, external
actions as well as internal system failures.”
—Gartner’s Top Predictions for IT Organizations and Users, 2011 and Beyond
These stakes are as high as your entire business, and it is
within your power to mitigate the risk.
1
McGladrey and Pullen
2
National Archives & Records Administration
3
Gartner, December 2009
Expect the Unexpected
Our hope is you never need to activate an IT disaster recovery plan.
Our job is to provide automated protection if you do need it.
Chapter 1
You know VMware as the virtualization
company that has been the market leader for
the past 11 years. In fact, according to Gartner,
more than 80% of all virtualized applications
in the world run on VMware today. This ebook
highlights the VMware perspective on disas-
ter recovery in the data center. But let’s forget
about IT for a moment.
The Theory of Black Swan Events is a
metaphor that encapsulates the concept of
surprise events that have a major impact. It
refers to unexpected events of large magnitude
and consequence and their dominant role
in history. Such events, considered extreme
outliers, play vastly larger roles than regular
occurrences.
The Black Swan, a book by Nassim Nicholas
Taleb, explains that while Black Swan Events
are unpredictable, a person or organization
can plan for negative events, and by doing
so strengthen their ability to respond, as well
as exploit positive events. Taleb contends that
people in general — and specifically enterprises
— are very vulnerable to hazardous Black
Swan Events and are exposed to high losses
if unprepared.
There is an obvious parallel between the
Theory of Black Swan Events and the need for
disaster preparedness for your critical IT assets.
Deploying automated disaster recovery (DR)
is the way to protect IT and business from
unpredictable events — even Black Swan
Events. The following chapters explain the
basics of DR and the required infrastructure.
They also offer DR hidden realities and best
practices with real-world advice.
What are “Black Swans,” and what do
they have to do with your data center?
1 2
“DR is the IT industry’s way to prepare and fight the Black Swan Events.”
3 4
Until reliable virtualization management
solutions became available several years ago,
DR solutions fell well short of satisfying business
requirements due to the following:
q	High Cost
q	Complexity
q	Lack of Reliability
With traditional manual DR solutions, the high cost
came from the need to deploy a second failover site
with dedicated infrastructure, software licenses, and
human personnel. The complexity was high because,
to ensure the recovery of entire business services, the
recovery plans had to manipulate many individual com-
ponents and moving parts: applications, hosts, network,
and storage. The lack of reliability of these procedures
was diminished by low automation and inability to test
any recovery procedure.
Many organizations had limited confidence in meeting
their Recovery Point Objective (RPO) and Recovery
Time Objective (RTO) in the event of a disaster. IT de-
partments were hesitant to expand disaster protection,
uncertain whether the quality of the insurance was really
worth its cost.
Virtualization is fundamental and critical to the success
of DR planning. Virtualization abstracts the complexity
of hardware and software and allows standardization of
processes, thus making planning and automation of the
recovery procedures much more reliable and repeatable.
In fact, in a recent IDG survey, 70% of customers
achieved improved BC/DR with virtualization.1
An intelligent virtual infrastructure based on VMware is
the right foundation for the modern DR solution. Highly
adaptive and scalable, it is optimized for business-
critical workloads with built-in intelligence.
The VMware DR solution provides:
q	The simplest way to replicate
applications to a secondary site
q	The simplest way to set up recovery
and migration plans
q	Fully automated, most reliable site
recovery and migration
Start with an Intelligent and
Virtual Foundation
Reliable g Repeatable g Recoverable
Chapter 2
Virtual Recovery Process — 4 Hours
Restore VM Power on VM
Physical Recovery Process — 40 Hours
Configure
Hardware
Install OS Install
Backup
Start
“Single-Step
Automatic
Recovery”
Configure OS
Cost-efficient DR: With the rapid adoption of virtualiza-
tion and the evolution of replication technology, DR is
becoming more cost-efficient. Virtualization enables in-
frastructure consolidation at the failover site. Less costly
replication options are more broadly available, using
lower-end storage appliances or stand-alone software
solutions. With these advances, DR can protect large-
scale mission-critical IT assets, as well as smaller sites
and Tier 2 applications.
Automated DR: In virtual environments, end users are
shielded from the complexity of managing each step
in the recovery process. Now, a DR solution can auto-
matically execute and coordinate all the steps required
to ensure the desired level of protection. Traditional run-
books are no longer “good enough” to manage recovery
plans and are replaced with software-driven recovery
plans. Setting up a recovery plan in a virtual environ-
ment is as simple as selecting RPOs and RTOs for each
business service.
Reliable site recovery and migration: With virtualiza-
tion, organizations get a much stronger assurance
that they can meet their RPOs and RTOs. Virtualization
provides the ability to test recovery plans frequently in
a non-disruptive manner. Manual recovery processes
are now replaced with automated recovery, eliminat-
ing the risk associated with user errors and ensuring
predictable recovery.
The chart below shows how organizations with
virtualized infrastructures utilize DR capabilities
along with other benefits of virtualization.
Chapter 2 continued
How would you describe your organization’s usage of the following virtualization features/
capabilities with its production environment-based virtual machines? (Percent of respondents, N=119)
0 20 40 60 80 100
65% 22% 12%
14%
14%
11%
11%
11%
15%
21%
28% 8%
5%
3%
3%
3%
2%
4%
4%
5%
24%
24%
31%
31%
34%
37%
35%
29%
60%
57%
54%
54%
51%
45%
39%
35%
Automated restart of virtual machines in the event
of a physical server hardware failure
Backup and recovery solutions integrated
with the virtualization platform
Site recovery solutions for virtual machines
Live migration of virtual machines based on CPU, memory,
and network utilization policies
Live migration of virtual machines
Live migration of storage associated
with virtual machines
Automated deployment of virtualized servers based
on CPU, memory, and network utilization policies
Automated enforcement of lifecycle policies and
reclamation of resources from expired virtual machines
Automated deployment of virtual machines based on
power consumption policies
We currently use this feature/capability
We have no plans to use this feature/capability Don’t know/Not applicable
We plan to use this feature/capability within next 12-24 months
1
IDG Research, Benefits of Virtualizing Business Critical Applications,
March 2011 Source: ESG white paper: Enterprise Strategy Group, 2011: Virtualization Management Critical to Achieving Scale and Efficiency
MYTH 3: After all the planning, you never know if
recovery will be successful in a real disaster.
REALITY: A recovery plan is not a complete plan with-
out testing. In fact, the recovery plan can and should
be tested with sufficient failures, and retested to ensure
validity. SRM enables frequent non-disruptive testing of
recovery plans.
How it’s done at … Adventist Health System
Adventist Health System (AHS), a healthcare organi-
zation in the U.S., supports 37 hospitals and cares for
roughly four million patients annually. AHS Information
Services (AHS-IS) serves hospitals in nine states and
employs more than 500 people.
To ensure AHS-IS can provide excellent care, “Mission
Zero” initiative aims to provide the highest levels of
service and minimum downtime for critical healthcare
systems like Cerner’s charting and electronic medical
record applications.
Adding SRM to its VMware infrastructure allowed AHS-
IS to streamline operations even further by automating
DR planning and testing. “VMware SRM makes manag-
ing and testing our recovery plans as easy as pushing
Chapter 3 continued
With SRM, setting up an automated recovery plan is
effortless and can be done in a matter of minutes, in-
stead of the weeks required to set up manual runbooks.
How it’s done at … Swedbank
Swedbank is one of the largest financial institutions
in Scandinavia and the Baltic, with 362 branches in
Sweden and 222 branches in Estonia, Latvia, and Lithu-
ania. The bank serves 9.5 million private customers and
534,000 corporate customers, with 18,000 employees.
Preventing service disruption is critical to Swedbank.
Swedbank had to meet recovery targets for its legacy
applications through traditional means of backup and
recovery, which were complex and time-consuming.
Swedbank deployed SRM to simplify and automate the
recovery process, management, and testing of recovery
plans. Since the SRM implementation, Swedbank tests
its DR capabilities at least twice a year. It shuts down
one data center completely, moving workloads to the
surviving data center. It runs everything in the backup
data center for 24 hours, and then fails over again to the
original data center.
Mart Nael, head of Core Infrastructure, Group IT at
Swedbank, states, “Our recovery time is below 30
minutes for mission-critical workloads and less than four
hours for the whole data center.”
Business results:
q	Positive ROI within one year from hardware-
cost avoidance
q	IT operational costs reduced 14% year-to-year
q	1,000 virtual machines managed by two full-
time-equivalent staffers
q	30x faster server provisioning
5 6
MYTH 1: Disaster Recovery is a luxury feature; it’s
expensive and resource consuming.
REALITY: VMware vCenter™ Site Recovery Manager
(SRM) gives you the flexibility to define failover scenar-
ios that meet your choice of coverage, speed, and cost
of recovery. For example, while a dedicated recovery
site is a robust solution (and yes, more expensive), in
many cases it is sufficient to have an active bidirec-
tional approach where two or more data centers are
complementary with enough capacity to pick up critical
applications. Therefore, no resources are wasted and
business continuity is maintained.
Overall, SRM customers consistently report significant
savings of money, resources, and time.
How it’s done at … Challenger Limited
Challenger Limited issues annuities and provides
investment products and services. The organization
runs two co-located data centers, supporting around
500 staff in Australia.
In order to meet business requirements for fast recovery
and minimal data loss, Challenger Limited implemented
a dual-cluster VMware infrastructure that was linked
to networked storage devices in its two co-located
data centers, at about one-third the cost of a physi-
cal disaster recovery environment. SRM has enabled
the organization to dispense with most of the 50 tapes
previously used to back up data, saving one person-day
per week. In addition, Challenger Limited automated
hundreds of steps in its disaster recovery processes.
Business results:
q	Improved RPO from 24 hours to 90 minutes
and recovery time from 24 hours to less than
four hours
q	Reduced the number of people needed to restore
systems to one person
q	Cut capital investment for disaster recovery to a
third of the cost of a physical environment
q	Eliminated the need to acquire 15 standby
physical servers at a cost of $200,000
MYTH 2: Architecting and properly managing a DR
solution is a complex task requiring special skills and
expensive resources.
REALITY: Not with VMware. Physical DR can be
complex because of duplicate and siloed infrastructures
and configuration synchronization issues across sites.
Virtualization encapsulates servers, OS, and applica-
tions, including all configuration data, so the complexity
is greatly reduced. Virtualization and automation ensure
that recovery plans are simple, complete, and can be
reliably executed by staff with no special skills required.
Disaster Recovery Myths and Realities
Disaster Recovery is like an insurance policy that you can
test without having an accident.
Chapter 3 “VMware Site Recovery
Manager makes managing
and testing our recovery plans
as easy as pushing a button.”
— kenneth newball
senior disaster recovery administrator
ahs-is
1. Virtualize. Virtual environments are much more agile
and easier to migrate. Virtualization hides the complex-
ity by shielding the individual components and moving
parts, thus simplifying the planning and increasing the
visibility into the DR process. It also allows you to use
hypervisor-based replication that is far more flexible and
cost-efficient than storage-based replication.
2. Automate. Don’t let human error stand in your way.
Use automated recovery plans, not a stack of notes in
a binder. With the proper automation, a recovery plan
can be done in a matter of minutes instead of weeks.
Automation shields users from having to manage many
of the recovery steps, and automatically coordinates
activities such as preconfiguring networks and virtual
machines, configuring the recovery infrastructure, and
restarting applications.
3. Verify and test. Test your DR plans often. Use non-
disruptive testing of your recovery and failback plans.
Study a detailed report of the test outcomes, including
the RTO achieved. With this information, you can gain
the confidence that your disaster protection plan meets
the business objectives. It will also provide the neces-
sary training to the staff and show any possible issues
early so they can be addressed.
4. Set achievable goals. Automated disaster
recovery can be very powerful, but it’s not magic.
For example, 100 virtual machines containing
Exchange, Oracle SQL, and SAP cannot be failed over
and started in 30 minutes. Set your RTO realistically.
To set your baseline, run a test under different condi-
tions and see what you can achieve.
5. Act early if you can. If you have warnings, use them!
Act early to execute your well-tested DR plan before an
actual disaster strikes to avoid a DR event altogether. IT
confidence is a byproduct of a good, solid DR plan that
has been tested. Examples are a forecasted storm, a
possible tsunami, or a potential network outage threat.
6. Be proactive when at risk. Most outages are not
caused by actual disasters, but by planned procedures
gone wrong. Examples: software or network upgrades,
data maintenance, facilities repairs, etc. By proactively
migrating your critical applications, you can mitigate the
risk and greatly reduce a possibility of outage or service
degradation.
Disaster Recovery Best Practices — Top 10
As shared by VMware’s 5,000+ SRM customers
Chapter 4
7
“In addition to our 10 developmental centers, we’re also
responsible for making sure providers throughout the
state get the support they need to receive funding from
the federal government,” says Brian Brothers, network
administrator manager. “If our services were to go down
and we couldn’t ensure reimbursement for Medicaid
funds, it would have a severe impact on the providers
and the developmentally disabled they serve.” Some
providers might shut their doors.
At DODD, SRM is responsible for a reliable, verifiable DR
enablement that can be tested and audited. The agency
has tested its disaster recovery solution twice. The
second test involved 50 production servers, which were
successfully failed over to the remote site in about 90
minutes. “If we do have a true disaster someday, our
DR site becomes our production site. We expect to
be up and running in less than two hours,” notes Kipp
Bertke, IT manager for infrastructure and operations,
Ohio Department of Developmental Disabilities.
DODD’s disaster recovery site doesn’t just sit idle.
Instead, the backup site actively supports the
application development team on a daily basis.
Business results:
q	A reliable disaster recovery site that can
be up and running in less than two hours
q	Fully tested, active disaster recovery
solution implemented for an agile, private
cloud infrastructure
q	Online systems providing faster, more
reliable service
8
Chapter 3 continued
a button. The fact that we can run tests as often as we
want gives us a high degree of confidence in the recov-
erability of our systems,” says Kenneth Newball, senior
disaster recovery administrator at AHS-IS.
Business results:
q	Reduced RTO by 75%, from 48 hours to less
than one hour
q	Eliminated the cost of flying a team of seven
people to test remote DR
q	Cut hardware purchases by 84.5%, maintenance
by 93.1%, and power consumption by 90%
MYTH 4: DR expense is a sunk cost, like a protection
plan that’s most likely never used.
REALITY: Even if the big disaster never happens,
the recovery plan can be used as a migration plan
with similar steps, helping you during planned down-
times such as site migrations. In addition, DR planning
helps to fulfill compliance where disaster recovery plans
are required. The outcome of recovery testing proves
disaster preparedness and the ability to meet RTOs.
How it’s done at … Ohio Department of
Developmental Disabilities
The Ohio Department of Developmental Disabilities
(DODD) runs a statewide system of support services for
some 80,000 people with developmental disabilities. A
disaster causing a systemwide failure would have very
real human impact.
While your data center is critical to your ability to conduct
business, events beyond your control (or even planned
ones) can make IT services unavailable or highly limited.
This situation, however rare, could be very damaging to the
integrity of your business, your market credibility, and your
customers’ satisfaction and loyalty.
You can mitigate this risk by implementing a DR solution to
protect your critical IT assets. A well-designed DR solution
built on an intelligent virtual infrastructure can provide the
required RTO and RPO while keeping the costs in check. Your
DR plans can be tested in a nondisruptive way and benefit
your IT department in areas beyond the typical DR needs.
Your IT infrastructure plays the most critical role for the
feasibility and the ultimate success of your DR plans.
Virtualized infrastructure proved to be the most reliable
and cost-effective platform for DR by allowing you to
abstract the moving parts and components of your data
center, simplifying the replication architecture and requir-
ing fewer resources overall.
So how do you start the journey to protect your IT assets?
Use this quick-start list as your guide:
1. Identify your most critical applications and data.
What applications directly generate revenue, maintain
safety, or are otherwise critical to business continuity?
What data is absolutely critical for your customers, your
internal accounting and finances, or compliance?
2. If you have not yet, consider virtualizing your key
applications. This will not only cut much of the operational
and maintenance costs by removing unnecessary complex-
ity and operational cost, but it will also make your environ-
ment better suited for effective DR planning.
3. Agree on the target RTO and RPO. What data can
you lose? For how long? When do you want to be back
online with your critical applications? Make sure your goals
are realistic.
4. Define the triggers for DR to bring all the planned
activities to action. This can be a business decision based
on the data you are getting, or a technical event automati-
cally triggering your DR.
5. Identify what DR replication, failover, and failback
options you want to implement. The resulting solution
will be a compromise among level of protection, speed of
recovery, and costs.
6. Select the solution vendor. Beware of vendors push-
ing specific hardware, operating system, or other limiting
choices that don’t align well with your environment. Study
the level of your team’s expertise required to maintain the
solution or the amount of resources you need to allocate.
Make sure you can test the solution without waiting for an
actual disaster.
And finally, good luck. We hope you will never experience
a Black Swan Event and never need to use your DR solu-
tion to recover from the unexpected. But if you ever do,
VMware is here to make sure you are well prepared.
For more information on VMware vCenter Site
Recovery Manager, or free 60-day evaluation, please
visit VMware SRM.
For details and hints on SRM implementation, and thoughts
on delivering data protection, high availability, business
continuity, and disaster recovery with VMware, we wel-
come you to read our blog.
A Quick-Start Guide to Disaster Recovery
It can be done. It must be done. VMware can help you do it.
conclusion
9 10
9. Prepare for failback. Create and test a failback
recovery plan, set up replication in reverse, and know
when to trigger it. Agree on what to consider the
“end” of the disaster so your business can go back
to normal.
10. Don’t just throw money at DR. Utilize cheaper,
commodity failover site assets, or use the repurposed
hardware left over after your primary data center has
gone virtual. Consider bidirectional or shared failover
sites, use more software in the cloud (SaaS), and also
look at non-IT DR means (UPS or backup generators,
fuel reserves, better fire protection, etc.).
Chapter 4 continued
7. Assign responsibilities. Assign everybody involved
in the DR plan a specific task. Don’t expect the relevant
personnel to always be at the disaster site or to be in
control immediately. Implement necessary duplication
and redundancy for people, just like you would do with
computers.
8. Keep your recovery data as current as
possible. It is a good practice to prepopulate your
failover site with the data that doesn’t change often, or
by much. This will allow you to focus only on the fast-
changing critical data at the time of failover, and ulti-
mately meet your RTO with less effort.
.
11 12
Disaster Recovery is a key part of a company’s
business continuity initiative to ensure the availability of
integral IT-dependent business processes and prevent
any long-term negative effects of both planned and u
nplanned disruptions. The goal of DR is to restore critical
IT services as quickly as possible and minimize business
disruption.
Nothing impacts your ability to recover more than the
agility of your IT and applications infrastructure. Just
like fire safety must be built into the building before the
fire occurs, and a car’s safety features are engineered to
reduce crash impact, the design of your IT infrastructure
can make or break the success of your DR program.
IT and Applications Infrastructure
Your data center’s infrastructure plays an instrumental
role in the effectiveness of your DR solution. The infra-
structure can make DR very complex, hard to imple-
ment, and sometimes even impossible; or it can help
to make your IT reliable, verifiable, and effective. The
next section explains how.
Two key processes for simple and reliable
disaster recovery:
failover
Failover is the capability to switch over to a redundant
or standby server, system, or network upon the failure
or termination of an existing asset. Failover should hap-
pen without any kind of human intervention or warning.
failback
Failback is the process of restoring a system or another
asset that is in a failover state back to its original state.
Effective failback returns the system to the state of
operation before the disruption.
Disaster Recovery 101 — The Basics
Primary Site Recovery Site
Appendix
RTO
While RTO is purely a technical metric, the decision to
trigger the failover is a business one, and RTO can often
take much longer than the actual DR itself. Whether
initiated by humans or by an automatic trigger, the
lead time to start DR should be also accounted for and
included in RTO. Replication is a key element of any DR
process in most cases, usually provided by the specific
DR solution used.
Replication
In the context of preparing for a failover, replication
provides intentionally architected redundancy of your IT
resources: hardware, data, software, networks, or all of
them together. There are several factors in determining
the depth and amount of replication needed: type of
services to be protected, criticality of different compo-
nents, technology, and cost.
Disaster Recovery Scenarios
Various DR scenarios and techniques are available to
meet your specific requirements and cost objectives. The
right architecture can make your DR procedures more
efficient, cost-effective, and predictable. Here are a few
commonly used configurations from which to choose:
q	Active-Passive: This is a more traditional DR sce-
nario, where a production site running applications is
recovered at a second site that is idle until failover is
required. In this scenario you are paying for a DR site
that is idle most of the time.
Key metrics for planning and measuring success of
the procedures.
RPO
Recovery Point Objective (RPO) is the point in time to
which you must recover data as defined by your organi-
zation, generally called an “acceptable loss” in a disaster
situation. It allows an organization to define a window
of time before a disaster when data may be lost and is
tightly dependent on the type of data replication used.
The higher granularity of data replication, the shorter
the RPO.
q	Active-Active: Use your DR site for non-critical
workloads when you are not using it for DR.
Configure it to automatically shut down or suspend
the virtual environment as part of the failover process
so that you can easily free up compute capacity for
the workloads being recovered.
q	Bidirectional: Provide bidirectional failover protec-
tion so that you can run active production workloads
at both sites and fail over in either direction. The
spare capacity at the other site will be used to run the
virtual environments that are failed over.
q	Local Failover: Some workloads need to be able to
fail over within a given “site” or campus; for example,
when a storage failure occurs or when maintenance
forces you to move workloads to a different local lab.
q	Shared Recovery Sites: In the standard one-to-one
deployment, a single data center is protected by a
single recovery site. You may also choose to protect
multiple data centers using a “shared” recovery site.
All protected sites are visible and manageable within
this single instance of the DR solution at the shared
recovery site. Companies that have several sites
that need protection will find this feature appealing.
This topology can be implemented using the shared
recovery site feature.
Appendix continued
	
  
VMware vSphere
VMware
vCenter Server
Site Recovery
Manager
VMware
vCenter Server
Site Recovery
Manager
VMware vSphere
Site A (Primary) Site B (Recovery)
Servers Servers

More Related Content

What's hot

6dec2011 - APC Solutions
6dec2011 - APC Solutions6dec2011 - APC Solutions
6dec2011 - APC Solutions
Agora Group
 
Paper id 25201464
Paper id 25201464Paper id 25201464
Paper id 25201464
IJRAT
 
SungardASRaaS_WhitePaper_Final
SungardASRaaS_WhitePaper_FinalSungardASRaaS_WhitePaper_Final
SungardASRaaS_WhitePaper_Final
Eric Brahney
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
VAST
 
Sentry Insurance Eprint
Sentry Insurance EprintSentry Insurance Eprint
Sentry Insurance Eprint
Kristin Yokota
 

What's hot (19)

CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
CA Infrastructure Management 2.0 vs. Solarwinds Orion: Speed and ease of mana...
 
Data Center Infrastructure Management Demystified
Data Center Infrastructure Management Demystified Data Center Infrastructure Management Demystified
Data Center Infrastructure Management Demystified
 
Data Center Infrastructure Management
Data Center Infrastructure ManagementData Center Infrastructure Management
Data Center Infrastructure Management
 
Disaster recovery plan sample 2
Disaster recovery plan sample 2Disaster recovery plan sample 2
Disaster recovery plan sample 2
 
6dec2011 - APC Solutions
6dec2011 - APC Solutions6dec2011 - APC Solutions
6dec2011 - APC Solutions
 
Paper id 25201464
Paper id 25201464Paper id 25201464
Paper id 25201464
 
Business Continuity for Mission Critical Applications
Business Continuity for Mission Critical ApplicationsBusiness Continuity for Mission Critical Applications
Business Continuity for Mission Critical Applications
 
SungardASRaaS_WhitePaper_Final
SungardASRaaS_WhitePaper_FinalSungardASRaaS_WhitePaper_Final
SungardASRaaS_WhitePaper_Final
 
Cloud Security: A Brief Journey through the Revolutionary Technology
Cloud Security: A Brief Journey through the Revolutionary TechnologyCloud Security: A Brief Journey through the Revolutionary Technology
Cloud Security: A Brief Journey through the Revolutionary Technology
 
Harris Bdr
Harris BdrHarris Bdr
Harris Bdr
 
What's Your Data Worth?
What's Your Data Worth?What's Your Data Worth?
What's Your Data Worth?
 
TierPoint's Craig Hurley - ZertoCon Presentation
TierPoint's Craig Hurley - ZertoCon PresentationTierPoint's Craig Hurley - ZertoCon Presentation
TierPoint's Craig Hurley - ZertoCon Presentation
 
Mastering disaster a data center checklist
Mastering disaster a data center checklistMastering disaster a data center checklist
Mastering disaster a data center checklist
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
 
DCIM
DCIMDCIM
DCIM
 
The Nuts and Bolts of Disaster Recovery
The Nuts and Bolts of Disaster RecoveryThe Nuts and Bolts of Disaster Recovery
The Nuts and Bolts of Disaster Recovery
 
Sentry Insurance Eprint
Sentry Insurance EprintSentry Insurance Eprint
Sentry Insurance Eprint
 
Cloud computings
Cloud computingsCloud computings
Cloud computings
 
Mastering disaster e book Telehouse
Mastering disaster e book TelehouseMastering disaster e book Telehouse
Mastering disaster e book Telehouse
 

Similar to A guide to modern it disaster recovery

V mware quick start guide to disaster recovery
V mware   quick start guide to disaster recoveryV mware   quick start guide to disaster recovery
V mware quick start guide to disaster recovery
VMware_EMEA
 
V mware business trend brief - crash insurance - protect your business with...
V mware   business trend brief - crash insurance - protect your business with...V mware   business trend brief - crash insurance - protect your business with...
V mware business trend brief - crash insurance - protect your business with...
VMware_EMEA
 
Disaster recovery and the cloud
Disaster recovery and the cloudDisaster recovery and the cloud
Disaster recovery and the cloud
Jason Dea
 

Similar to A guide to modern it disaster recovery (20)

Symantec Disaster Recovery Orchestrator: One Click Disaster Recovery to the C...
Symantec Disaster Recovery Orchestrator: One Click Disaster Recovery to the C...Symantec Disaster Recovery Orchestrator: One Click Disaster Recovery to the C...
Symantec Disaster Recovery Orchestrator: One Click Disaster Recovery to the C...
 
Enterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bankEnterprise grade disaster recovery without breaking the bank
Enterprise grade disaster recovery without breaking the bank
 
V mware quick start guide to disaster recovery
V mware   quick start guide to disaster recoveryV mware   quick start guide to disaster recovery
V mware quick start guide to disaster recovery
 
V mware business trend brief - crash insurance - protect your business with...
V mware   business trend brief - crash insurance - protect your business with...V mware   business trend brief - crash insurance - protect your business with...
V mware business trend brief - crash insurance - protect your business with...
 
Enterprise-Grade Disaster Recovery Without Breaking the Bank
Enterprise-Grade Disaster Recovery Without Breaking the BankEnterprise-Grade Disaster Recovery Without Breaking the Bank
Enterprise-Grade Disaster Recovery Without Breaking the Bank
 
Enterprise-Grade Disaster Recovery Without Breaking the Bank
Enterprise-Grade Disaster Recovery Without Breaking the BankEnterprise-Grade Disaster Recovery Without Breaking the Bank
Enterprise-Grade Disaster Recovery Without Breaking the Bank
 
The Cost of Doing Nothing: A Ransomware Backup Story
The Cost of Doing Nothing: A Ransomware Backup StoryThe Cost of Doing Nothing: A Ransomware Backup Story
The Cost of Doing Nothing: A Ransomware Backup Story
 
IRJET-Comparative Analysis of Disaster Recovery Solutions in Cloud Computing
IRJET-Comparative Analysis of Disaster Recovery Solutions in Cloud ComputingIRJET-Comparative Analysis of Disaster Recovery Solutions in Cloud Computing
IRJET-Comparative Analysis of Disaster Recovery Solutions in Cloud Computing
 
Will You Be Prepared When The Next Disaster Strikes - Whitepaper
Will You Be Prepared When The Next Disaster Strikes - WhitepaperWill You Be Prepared When The Next Disaster Strikes - Whitepaper
Will You Be Prepared When The Next Disaster Strikes - Whitepaper
 
Cloud Migration and Disaster Recovery
Cloud Migration and Disaster RecoveryCloud Migration and Disaster Recovery
Cloud Migration and Disaster Recovery
 
Boomerang Total Recall
Boomerang Total RecallBoomerang Total Recall
Boomerang Total Recall
 
The Great Disconnect of Data Protection: Perception, Reality and Best Practices
The Great Disconnect of Data Protection: Perception, Reality and Best PracticesThe Great Disconnect of Data Protection: Perception, Reality and Best Practices
The Great Disconnect of Data Protection: Perception, Reality and Best Practices
 
Disaster recovery and the cloud
Disaster recovery and the cloudDisaster recovery and the cloud
Disaster recovery and the cloud
 
November 2014 Webinar - Disaster Recovery Worthy of a Zombie Apocalypse
November 2014 Webinar - Disaster Recovery Worthy of a Zombie ApocalypseNovember 2014 Webinar - Disaster Recovery Worthy of a Zombie Apocalypse
November 2014 Webinar - Disaster Recovery Worthy of a Zombie Apocalypse
 
Protect Your Data and Apps from Zombies and Other Disasters
Protect Your Data and Apps from Zombies and Other DisastersProtect Your Data and Apps from Zombies and Other Disasters
Protect Your Data and Apps from Zombies and Other Disasters
 
Celera Networks on Cloud Computing
Celera Networks on Cloud Computing Celera Networks on Cloud Computing
Celera Networks on Cloud Computing
 
Cloud-Based Disaster Recovery Service Overview
Cloud-Based Disaster Recovery Service OverviewCloud-Based Disaster Recovery Service Overview
Cloud-Based Disaster Recovery Service Overview
 
Focus on business, not backups
Focus on business, not backupsFocus on business, not backups
Focus on business, not backups
 
Disaster Recovery and the Cloud
Disaster Recovery and the CloudDisaster Recovery and the Cloud
Disaster Recovery and the Cloud
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 

Recently uploaded

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 

A guide to modern it disaster recovery

  • 1. Introduction: What are Black Swans, and what do they have to do with your data center? Chapter 1: Expect the Unexpected Chapter 2: Start with an Intelligent and Virtual Foundation Chapter 4: Disaster Recovery Best Practices — Top 10 Conclusion: A Quick-Start Guide to Disaster Recovery Appendix: Disaster Recovery 101—The Basics INSIDE: www.vmware.com How to prepare for and mitigate the “Black Swan Events” in your data center A Guide to Modern IT Disaster Recovery
  • 2. introduction Your data center is your castle. That’s where all your critical IT components — hardware, data, and software — reside. You protect it with the latest bul- letproof security solutions and make it reliable through redundant multiprocessing, highly scalable platforms, and super-fast optical networks. And yet, it is not fully protected from forces beyond your control such as natural disasters; man-made events like road closures; security procedures or partner service interruption at a specific site. Downtime and loss of data, even if temporary, can have long-lasting effects for business and can contribute to the demise of the otherwise well-lubed business: q Loss of revenue from your customers’ inability to do business with you q Diminished market credibility and customer trust, resulting in churn q Penalties for violated SLAs with partners, suppliers, distributors, and franchisees q Costs of recovering and repairing the lost data q Legal costs of meeting internal and external compliance requirements How do you balance the disaster recovery risk and in- vestment equation? Is the potential risk greater than the investment? Let’s put it in perspective: q 43% of companies experiencing disasters never reopen, and 29% close within two years.1 q 93% of businesses that lost their data center for 10 days went bankrupt within one year.2 q 40% of all companies that experience a major disaster will go out of business if they cannot gain access to their data within 24 hours.3 “CIOs and IT organizations should consider scenarios in which normal operations could be disrupted and adopt/ adapt practices and technologies that enable them to deal with potential disruption from hostile, external actions as well as internal system failures.” —Gartner’s Top Predictions for IT Organizations and Users, 2011 and Beyond These stakes are as high as your entire business, and it is within your power to mitigate the risk. 1 McGladrey and Pullen 2 National Archives & Records Administration 3 Gartner, December 2009 Expect the Unexpected Our hope is you never need to activate an IT disaster recovery plan. Our job is to provide automated protection if you do need it. Chapter 1 You know VMware as the virtualization company that has been the market leader for the past 11 years. In fact, according to Gartner, more than 80% of all virtualized applications in the world run on VMware today. This ebook highlights the VMware perspective on disas- ter recovery in the data center. But let’s forget about IT for a moment. The Theory of Black Swan Events is a metaphor that encapsulates the concept of surprise events that have a major impact. It refers to unexpected events of large magnitude and consequence and their dominant role in history. Such events, considered extreme outliers, play vastly larger roles than regular occurrences. The Black Swan, a book by Nassim Nicholas Taleb, explains that while Black Swan Events are unpredictable, a person or organization can plan for negative events, and by doing so strengthen their ability to respond, as well as exploit positive events. Taleb contends that people in general — and specifically enterprises — are very vulnerable to hazardous Black Swan Events and are exposed to high losses if unprepared. There is an obvious parallel between the Theory of Black Swan Events and the need for disaster preparedness for your critical IT assets. Deploying automated disaster recovery (DR) is the way to protect IT and business from unpredictable events — even Black Swan Events. The following chapters explain the basics of DR and the required infrastructure. They also offer DR hidden realities and best practices with real-world advice. What are “Black Swans,” and what do they have to do with your data center? 1 2 “DR is the IT industry’s way to prepare and fight the Black Swan Events.”
  • 3. 3 4 Until reliable virtualization management solutions became available several years ago, DR solutions fell well short of satisfying business requirements due to the following: q High Cost q Complexity q Lack of Reliability With traditional manual DR solutions, the high cost came from the need to deploy a second failover site with dedicated infrastructure, software licenses, and human personnel. The complexity was high because, to ensure the recovery of entire business services, the recovery plans had to manipulate many individual com- ponents and moving parts: applications, hosts, network, and storage. The lack of reliability of these procedures was diminished by low automation and inability to test any recovery procedure. Many organizations had limited confidence in meeting their Recovery Point Objective (RPO) and Recovery Time Objective (RTO) in the event of a disaster. IT de- partments were hesitant to expand disaster protection, uncertain whether the quality of the insurance was really worth its cost. Virtualization is fundamental and critical to the success of DR planning. Virtualization abstracts the complexity of hardware and software and allows standardization of processes, thus making planning and automation of the recovery procedures much more reliable and repeatable. In fact, in a recent IDG survey, 70% of customers achieved improved BC/DR with virtualization.1 An intelligent virtual infrastructure based on VMware is the right foundation for the modern DR solution. Highly adaptive and scalable, it is optimized for business- critical workloads with built-in intelligence. The VMware DR solution provides: q The simplest way to replicate applications to a secondary site q The simplest way to set up recovery and migration plans q Fully automated, most reliable site recovery and migration Start with an Intelligent and Virtual Foundation Reliable g Repeatable g Recoverable Chapter 2 Virtual Recovery Process — 4 Hours Restore VM Power on VM Physical Recovery Process — 40 Hours Configure Hardware Install OS Install Backup Start “Single-Step Automatic Recovery” Configure OS Cost-efficient DR: With the rapid adoption of virtualiza- tion and the evolution of replication technology, DR is becoming more cost-efficient. Virtualization enables in- frastructure consolidation at the failover site. Less costly replication options are more broadly available, using lower-end storage appliances or stand-alone software solutions. With these advances, DR can protect large- scale mission-critical IT assets, as well as smaller sites and Tier 2 applications. Automated DR: In virtual environments, end users are shielded from the complexity of managing each step in the recovery process. Now, a DR solution can auto- matically execute and coordinate all the steps required to ensure the desired level of protection. Traditional run- books are no longer “good enough” to manage recovery plans and are replaced with software-driven recovery plans. Setting up a recovery plan in a virtual environ- ment is as simple as selecting RPOs and RTOs for each business service. Reliable site recovery and migration: With virtualiza- tion, organizations get a much stronger assurance that they can meet their RPOs and RTOs. Virtualization provides the ability to test recovery plans frequently in a non-disruptive manner. Manual recovery processes are now replaced with automated recovery, eliminat- ing the risk associated with user errors and ensuring predictable recovery. The chart below shows how organizations with virtualized infrastructures utilize DR capabilities along with other benefits of virtualization. Chapter 2 continued How would you describe your organization’s usage of the following virtualization features/ capabilities with its production environment-based virtual machines? (Percent of respondents, N=119) 0 20 40 60 80 100 65% 22% 12% 14% 14% 11% 11% 11% 15% 21% 28% 8% 5% 3% 3% 3% 2% 4% 4% 5% 24% 24% 31% 31% 34% 37% 35% 29% 60% 57% 54% 54% 51% 45% 39% 35% Automated restart of virtual machines in the event of a physical server hardware failure Backup and recovery solutions integrated with the virtualization platform Site recovery solutions for virtual machines Live migration of virtual machines based on CPU, memory, and network utilization policies Live migration of virtual machines Live migration of storage associated with virtual machines Automated deployment of virtualized servers based on CPU, memory, and network utilization policies Automated enforcement of lifecycle policies and reclamation of resources from expired virtual machines Automated deployment of virtual machines based on power consumption policies We currently use this feature/capability We have no plans to use this feature/capability Don’t know/Not applicable We plan to use this feature/capability within next 12-24 months 1 IDG Research, Benefits of Virtualizing Business Critical Applications, March 2011 Source: ESG white paper: Enterprise Strategy Group, 2011: Virtualization Management Critical to Achieving Scale and Efficiency
  • 4. MYTH 3: After all the planning, you never know if recovery will be successful in a real disaster. REALITY: A recovery plan is not a complete plan with- out testing. In fact, the recovery plan can and should be tested with sufficient failures, and retested to ensure validity. SRM enables frequent non-disruptive testing of recovery plans. How it’s done at … Adventist Health System Adventist Health System (AHS), a healthcare organi- zation in the U.S., supports 37 hospitals and cares for roughly four million patients annually. AHS Information Services (AHS-IS) serves hospitals in nine states and employs more than 500 people. To ensure AHS-IS can provide excellent care, “Mission Zero” initiative aims to provide the highest levels of service and minimum downtime for critical healthcare systems like Cerner’s charting and electronic medical record applications. Adding SRM to its VMware infrastructure allowed AHS- IS to streamline operations even further by automating DR planning and testing. “VMware SRM makes manag- ing and testing our recovery plans as easy as pushing Chapter 3 continued With SRM, setting up an automated recovery plan is effortless and can be done in a matter of minutes, in- stead of the weeks required to set up manual runbooks. How it’s done at … Swedbank Swedbank is one of the largest financial institutions in Scandinavia and the Baltic, with 362 branches in Sweden and 222 branches in Estonia, Latvia, and Lithu- ania. The bank serves 9.5 million private customers and 534,000 corporate customers, with 18,000 employees. Preventing service disruption is critical to Swedbank. Swedbank had to meet recovery targets for its legacy applications through traditional means of backup and recovery, which were complex and time-consuming. Swedbank deployed SRM to simplify and automate the recovery process, management, and testing of recovery plans. Since the SRM implementation, Swedbank tests its DR capabilities at least twice a year. It shuts down one data center completely, moving workloads to the surviving data center. It runs everything in the backup data center for 24 hours, and then fails over again to the original data center. Mart Nael, head of Core Infrastructure, Group IT at Swedbank, states, “Our recovery time is below 30 minutes for mission-critical workloads and less than four hours for the whole data center.” Business results: q Positive ROI within one year from hardware- cost avoidance q IT operational costs reduced 14% year-to-year q 1,000 virtual machines managed by two full- time-equivalent staffers q 30x faster server provisioning 5 6 MYTH 1: Disaster Recovery is a luxury feature; it’s expensive and resource consuming. REALITY: VMware vCenter™ Site Recovery Manager (SRM) gives you the flexibility to define failover scenar- ios that meet your choice of coverage, speed, and cost of recovery. For example, while a dedicated recovery site is a robust solution (and yes, more expensive), in many cases it is sufficient to have an active bidirec- tional approach where two or more data centers are complementary with enough capacity to pick up critical applications. Therefore, no resources are wasted and business continuity is maintained. Overall, SRM customers consistently report significant savings of money, resources, and time. How it’s done at … Challenger Limited Challenger Limited issues annuities and provides investment products and services. The organization runs two co-located data centers, supporting around 500 staff in Australia. In order to meet business requirements for fast recovery and minimal data loss, Challenger Limited implemented a dual-cluster VMware infrastructure that was linked to networked storage devices in its two co-located data centers, at about one-third the cost of a physi- cal disaster recovery environment. SRM has enabled the organization to dispense with most of the 50 tapes previously used to back up data, saving one person-day per week. In addition, Challenger Limited automated hundreds of steps in its disaster recovery processes. Business results: q Improved RPO from 24 hours to 90 minutes and recovery time from 24 hours to less than four hours q Reduced the number of people needed to restore systems to one person q Cut capital investment for disaster recovery to a third of the cost of a physical environment q Eliminated the need to acquire 15 standby physical servers at a cost of $200,000 MYTH 2: Architecting and properly managing a DR solution is a complex task requiring special skills and expensive resources. REALITY: Not with VMware. Physical DR can be complex because of duplicate and siloed infrastructures and configuration synchronization issues across sites. Virtualization encapsulates servers, OS, and applica- tions, including all configuration data, so the complexity is greatly reduced. Virtualization and automation ensure that recovery plans are simple, complete, and can be reliably executed by staff with no special skills required. Disaster Recovery Myths and Realities Disaster Recovery is like an insurance policy that you can test without having an accident. Chapter 3 “VMware Site Recovery Manager makes managing and testing our recovery plans as easy as pushing a button.” — kenneth newball senior disaster recovery administrator ahs-is
  • 5. 1. Virtualize. Virtual environments are much more agile and easier to migrate. Virtualization hides the complex- ity by shielding the individual components and moving parts, thus simplifying the planning and increasing the visibility into the DR process. It also allows you to use hypervisor-based replication that is far more flexible and cost-efficient than storage-based replication. 2. Automate. Don’t let human error stand in your way. Use automated recovery plans, not a stack of notes in a binder. With the proper automation, a recovery plan can be done in a matter of minutes instead of weeks. Automation shields users from having to manage many of the recovery steps, and automatically coordinates activities such as preconfiguring networks and virtual machines, configuring the recovery infrastructure, and restarting applications. 3. Verify and test. Test your DR plans often. Use non- disruptive testing of your recovery and failback plans. Study a detailed report of the test outcomes, including the RTO achieved. With this information, you can gain the confidence that your disaster protection plan meets the business objectives. It will also provide the neces- sary training to the staff and show any possible issues early so they can be addressed. 4. Set achievable goals. Automated disaster recovery can be very powerful, but it’s not magic. For example, 100 virtual machines containing Exchange, Oracle SQL, and SAP cannot be failed over and started in 30 minutes. Set your RTO realistically. To set your baseline, run a test under different condi- tions and see what you can achieve. 5. Act early if you can. If you have warnings, use them! Act early to execute your well-tested DR plan before an actual disaster strikes to avoid a DR event altogether. IT confidence is a byproduct of a good, solid DR plan that has been tested. Examples are a forecasted storm, a possible tsunami, or a potential network outage threat. 6. Be proactive when at risk. Most outages are not caused by actual disasters, but by planned procedures gone wrong. Examples: software or network upgrades, data maintenance, facilities repairs, etc. By proactively migrating your critical applications, you can mitigate the risk and greatly reduce a possibility of outage or service degradation. Disaster Recovery Best Practices — Top 10 As shared by VMware’s 5,000+ SRM customers Chapter 4 7 “In addition to our 10 developmental centers, we’re also responsible for making sure providers throughout the state get the support they need to receive funding from the federal government,” says Brian Brothers, network administrator manager. “If our services were to go down and we couldn’t ensure reimbursement for Medicaid funds, it would have a severe impact on the providers and the developmentally disabled they serve.” Some providers might shut their doors. At DODD, SRM is responsible for a reliable, verifiable DR enablement that can be tested and audited. The agency has tested its disaster recovery solution twice. The second test involved 50 production servers, which were successfully failed over to the remote site in about 90 minutes. “If we do have a true disaster someday, our DR site becomes our production site. We expect to be up and running in less than two hours,” notes Kipp Bertke, IT manager for infrastructure and operations, Ohio Department of Developmental Disabilities. DODD’s disaster recovery site doesn’t just sit idle. Instead, the backup site actively supports the application development team on a daily basis. Business results: q A reliable disaster recovery site that can be up and running in less than two hours q Fully tested, active disaster recovery solution implemented for an agile, private cloud infrastructure q Online systems providing faster, more reliable service 8 Chapter 3 continued a button. The fact that we can run tests as often as we want gives us a high degree of confidence in the recov- erability of our systems,” says Kenneth Newball, senior disaster recovery administrator at AHS-IS. Business results: q Reduced RTO by 75%, from 48 hours to less than one hour q Eliminated the cost of flying a team of seven people to test remote DR q Cut hardware purchases by 84.5%, maintenance by 93.1%, and power consumption by 90% MYTH 4: DR expense is a sunk cost, like a protection plan that’s most likely never used. REALITY: Even if the big disaster never happens, the recovery plan can be used as a migration plan with similar steps, helping you during planned down- times such as site migrations. In addition, DR planning helps to fulfill compliance where disaster recovery plans are required. The outcome of recovery testing proves disaster preparedness and the ability to meet RTOs. How it’s done at … Ohio Department of Developmental Disabilities The Ohio Department of Developmental Disabilities (DODD) runs a statewide system of support services for some 80,000 people with developmental disabilities. A disaster causing a systemwide failure would have very real human impact.
  • 6. While your data center is critical to your ability to conduct business, events beyond your control (or even planned ones) can make IT services unavailable or highly limited. This situation, however rare, could be very damaging to the integrity of your business, your market credibility, and your customers’ satisfaction and loyalty. You can mitigate this risk by implementing a DR solution to protect your critical IT assets. A well-designed DR solution built on an intelligent virtual infrastructure can provide the required RTO and RPO while keeping the costs in check. Your DR plans can be tested in a nondisruptive way and benefit your IT department in areas beyond the typical DR needs. Your IT infrastructure plays the most critical role for the feasibility and the ultimate success of your DR plans. Virtualized infrastructure proved to be the most reliable and cost-effective platform for DR by allowing you to abstract the moving parts and components of your data center, simplifying the replication architecture and requir- ing fewer resources overall. So how do you start the journey to protect your IT assets? Use this quick-start list as your guide: 1. Identify your most critical applications and data. What applications directly generate revenue, maintain safety, or are otherwise critical to business continuity? What data is absolutely critical for your customers, your internal accounting and finances, or compliance? 2. If you have not yet, consider virtualizing your key applications. This will not only cut much of the operational and maintenance costs by removing unnecessary complex- ity and operational cost, but it will also make your environ- ment better suited for effective DR planning. 3. Agree on the target RTO and RPO. What data can you lose? For how long? When do you want to be back online with your critical applications? Make sure your goals are realistic. 4. Define the triggers for DR to bring all the planned activities to action. This can be a business decision based on the data you are getting, or a technical event automati- cally triggering your DR. 5. Identify what DR replication, failover, and failback options you want to implement. The resulting solution will be a compromise among level of protection, speed of recovery, and costs. 6. Select the solution vendor. Beware of vendors push- ing specific hardware, operating system, or other limiting choices that don’t align well with your environment. Study the level of your team’s expertise required to maintain the solution or the amount of resources you need to allocate. Make sure you can test the solution without waiting for an actual disaster. And finally, good luck. We hope you will never experience a Black Swan Event and never need to use your DR solu- tion to recover from the unexpected. But if you ever do, VMware is here to make sure you are well prepared. For more information on VMware vCenter Site Recovery Manager, or free 60-day evaluation, please visit VMware SRM. For details and hints on SRM implementation, and thoughts on delivering data protection, high availability, business continuity, and disaster recovery with VMware, we wel- come you to read our blog. A Quick-Start Guide to Disaster Recovery It can be done. It must be done. VMware can help you do it. conclusion 9 10 9. Prepare for failback. Create and test a failback recovery plan, set up replication in reverse, and know when to trigger it. Agree on what to consider the “end” of the disaster so your business can go back to normal. 10. Don’t just throw money at DR. Utilize cheaper, commodity failover site assets, or use the repurposed hardware left over after your primary data center has gone virtual. Consider bidirectional or shared failover sites, use more software in the cloud (SaaS), and also look at non-IT DR means (UPS or backup generators, fuel reserves, better fire protection, etc.). Chapter 4 continued 7. Assign responsibilities. Assign everybody involved in the DR plan a specific task. Don’t expect the relevant personnel to always be at the disaster site or to be in control immediately. Implement necessary duplication and redundancy for people, just like you would do with computers. 8. Keep your recovery data as current as possible. It is a good practice to prepopulate your failover site with the data that doesn’t change often, or by much. This will allow you to focus only on the fast- changing critical data at the time of failover, and ulti- mately meet your RTO with less effort. .
  • 7. 11 12 Disaster Recovery is a key part of a company’s business continuity initiative to ensure the availability of integral IT-dependent business processes and prevent any long-term negative effects of both planned and u nplanned disruptions. The goal of DR is to restore critical IT services as quickly as possible and minimize business disruption. Nothing impacts your ability to recover more than the agility of your IT and applications infrastructure. Just like fire safety must be built into the building before the fire occurs, and a car’s safety features are engineered to reduce crash impact, the design of your IT infrastructure can make or break the success of your DR program. IT and Applications Infrastructure Your data center’s infrastructure plays an instrumental role in the effectiveness of your DR solution. The infra- structure can make DR very complex, hard to imple- ment, and sometimes even impossible; or it can help to make your IT reliable, verifiable, and effective. The next section explains how. Two key processes for simple and reliable disaster recovery: failover Failover is the capability to switch over to a redundant or standby server, system, or network upon the failure or termination of an existing asset. Failover should hap- pen without any kind of human intervention or warning. failback Failback is the process of restoring a system or another asset that is in a failover state back to its original state. Effective failback returns the system to the state of operation before the disruption. Disaster Recovery 101 — The Basics Primary Site Recovery Site Appendix RTO While RTO is purely a technical metric, the decision to trigger the failover is a business one, and RTO can often take much longer than the actual DR itself. Whether initiated by humans or by an automatic trigger, the lead time to start DR should be also accounted for and included in RTO. Replication is a key element of any DR process in most cases, usually provided by the specific DR solution used. Replication In the context of preparing for a failover, replication provides intentionally architected redundancy of your IT resources: hardware, data, software, networks, or all of them together. There are several factors in determining the depth and amount of replication needed: type of services to be protected, criticality of different compo- nents, technology, and cost. Disaster Recovery Scenarios Various DR scenarios and techniques are available to meet your specific requirements and cost objectives. The right architecture can make your DR procedures more efficient, cost-effective, and predictable. Here are a few commonly used configurations from which to choose: q Active-Passive: This is a more traditional DR sce- nario, where a production site running applications is recovered at a second site that is idle until failover is required. In this scenario you are paying for a DR site that is idle most of the time. Key metrics for planning and measuring success of the procedures. RPO Recovery Point Objective (RPO) is the point in time to which you must recover data as defined by your organi- zation, generally called an “acceptable loss” in a disaster situation. It allows an organization to define a window of time before a disaster when data may be lost and is tightly dependent on the type of data replication used. The higher granularity of data replication, the shorter the RPO. q Active-Active: Use your DR site for non-critical workloads when you are not using it for DR. Configure it to automatically shut down or suspend the virtual environment as part of the failover process so that you can easily free up compute capacity for the workloads being recovered. q Bidirectional: Provide bidirectional failover protec- tion so that you can run active production workloads at both sites and fail over in either direction. The spare capacity at the other site will be used to run the virtual environments that are failed over. q Local Failover: Some workloads need to be able to fail over within a given “site” or campus; for example, when a storage failure occurs or when maintenance forces you to move workloads to a different local lab. q Shared Recovery Sites: In the standard one-to-one deployment, a single data center is protected by a single recovery site. You may also choose to protect multiple data centers using a “shared” recovery site. All protected sites are visible and manageable within this single instance of the DR solution at the shared recovery site. Companies that have several sites that need protection will find this feature appealing. This topology can be implemented using the shared recovery site feature. Appendix continued   VMware vSphere VMware vCenter Server Site Recovery Manager VMware vCenter Server Site Recovery Manager VMware vSphere Site A (Primary) Site B (Recovery) Servers Servers